Back to Finding Aids
Washington State University Libraries
Manuscripts, Archives, and Special Collections
Pullman, WA 99164-5610 USA
(509) 335-6691
Inquiries

Archives 280-284
W.S.U. Capital Planning and Facilities Development
Building Files and Reports, 1963-1999

ORGANIZATIONAL HISTORY

A University Architect served as the construction officer at Washington State University from 1911 forward. The modern form of the office dates from 1947 when it became a full-time, staffed administrative department. In 1967 the office was renamed as Facilities Planning, and then to Facilities Development in 1993 upon absorbing the engineering portion of the Physical Plant. In 2001 it was renamed as Capital Planning. While Capital Planning is responsible for major planning and development, smaller projects are conducted by Facilities Operations. Facilities Operations descended from the Physical Plant in 1998, which in turn descended from Building and Grounds in 1967. While each line of programs has existed separately, some migration in function has occurred over the years. The primary difference between Capital Planning and Facilities Operations is the cost of the project in question - initially items costing less than $1,000,000 were assigned to Fac Ops, and those costing more to CP. By 2009, this break point is between $1,500,000 and $2,000,000.

COLLECTION ARRANGEMENT

This page compiles a number of collections received from Capital Planning and its predecessor, Facilities Development, between 1995 and 2002, in reverse chronological (newest to oldest) order. In requesting materials, please make sure you have identified the correct collection. This page compiles:

Archives 280. Capital Planning Building Files and Records, 1981-1999. UA 2002-03. Received March, 2002.
Archives 281. Facilities Development Vancouver Campus Files and Records, 1986-1998. UA 2000-12. Received April, 2000.
Archives 282. Facilities Development Building Files and Records, 1978-1996. UA 1998-16. Received July, 1998.
Archives 283. Facilities Development Building Files and Records, 1963-1998. UA 1998-14. Received July, 1998.
Archives 284. Facilities Development Building Files and Records, 1964-1995. UA 1995-18. Received October, 1995.

Each collection is maintained in the order in which it was received in the Archives from Capital Planning.

ACCESS

The majority of these are open and available for research use, though a few files are marked as confidential or classified (these are primarily identified as Attorney General files or Issues & Claims files; please contact Capital Planning if you wish access to these) and access to those may be restricted. These files are labeled in this page as RESTRICTED, each box containing restricted material is so labeled, and individual restricted folders are stickered as such. Copyright restrictions may apply.

RELATED MATERIALS

The WSU Archives hold a number of other Capital Planning collections; to locate these please view our Archives' Collections List and our Accessions List, looking for the various names under which this department has operated: University Architect, Facilities Planning, Facilities Development, Capital Planning.


Archives 280
Capital Planning
Building Files and Records, 1981-1999

ACQUISITION AND PROCESSING INFORMATION

These Capital Planning Building Files and Records were transferred to Manuscripts, Archives, and Special Collections on March 19th, 2002 (UA 2002-03) by Annie (last name unrecorded) of Capital Planning. They were processed in 2009 by University Archivist Mark O'English and Tim Mace.

EXTENT/QUANTITY INFORMATION

Number of containers: 25 boxes
Linear feet of shelf space: 25

COLLECTION DESCRIPTION & ARRANGEMENT

The collection consists of records pertaining to construction, remodeling, maintenance, and improvement of WSU buildings. The records are retained in their original order, which is primarily by building number, with a few small files for individual buildings at the end. Buildings included here include Streit-Perham Hall, Hall Rotunda Dining Hall, and Stimson Hall.

PREFERRED CITATION

The suggested citation for the collection is:

[Item Description]
Capital Planning Building Files and Records, 1981-1999 (UA 280)
Manuscripts, Archives, and Special Collections
Washington State University Libraries
Pullman, WA

Box Description
Building 0032 — Science Hall Remodeling, Phase II
1 Budget 2/26/1986 - 6/24/1993
Regents 1/8/1987 - 8/7/1990
Mahan & Smith Correspondence 5/5/1982 - 5/16/1988
S. G. Morin Correspondence C08967 6/29/1987 - 10/15/1987
Construction Reports 6/6/1988 - 1/2/1992
Concrete Tests 1/4/1989 - 12/27/1988
Arbitration Correspondence 5/5/1992 - 10/8/1993
General Correspondence #10 11/1/1990 - 6/15/1993
Decker/Fukui Architects (Decker Associates) General Correspondence #6 10/19/1990 - 12/8/1992
Decker/Fukui Architects Contract File #3 C08470 11/1/1990 - 1/14/1993
Bouten Construction General Correspondence #2 6/1/1990 - 11/17/1992
Bouten Construction Contract File #3 C09267 10/27/1989 - 2/26/1993
Statements of Compliance 8/11/1988 - 12/14/1989
Rejected Bids — Electrical — Bid Date 4/21/1988
Rejected Bids — Mechanical — Bid Date 4/21/1988
Rejected Bids — General — Bid Date 4/28/1988
General Correspondence #9 5/1/1990 - 10/31/1990
General Correspondence #8 1/1/1990 - 4/30/1990
2 General Correspondence #7 6/1/1989 - 12/31/1989
General Correspondence #6 1/1/1989 - 5/31/1989
General Correspondence #5 3/1/1988 - 12/31/1988
General Correspondence #4 7/1/1987 - 2/29/1988
General Correspondence #3 12/1/1986 - 6/30/1987
General Correspondence #2 6/1/1986 - 11/30/1986
General Correspondence #1 2/10/1983 - 5/31/1986
Building Program May, 1982
Building Program November, 1985
Building Program December, 1985
BIOS Exhibit Planning and Design Statement of Qualifications
Decker/Hobbs Fukui Davison Life Cycle Cost Analysis 12/9/1982
Decker/Fukui Davison Schematic Design Phase Brochure November, 1986
Decker/Fukui and BIOS Exhibit Program Review and Recommendations 8/6/1990
Neudorfer Engineers, Inc. Test Report 1/27/1992
3 Decker Fukui General Correspondence #5 1/1/1990 - 10/31/1990
Decker Fukui General Correspondence #4 1/1/1989 - 12/31/1989
Decker Fukui General Correspondence #3 7/1/1987 - 12/31/1988
Decker Fukui General Correspondence #2 2/1/1987 - 6/30/1987
Decker Fukui General Correspondence #1 11/20/1985 - 1/31/1987
Decker Fukui Contract File #2 C08470 1/8/1988 - 10/31/1990
Decker Fukui Contract File #1 C08470 3/1/1986 - 1/7/198 8
Bouten Construction General Correspondence #1 6/1/1988 - 5/31/1990
Bouten Construction Contract File #2 C09267 4/1/1989 - 10/31/1989
Bouten Construction Contract File #1 C09267 4/1/1988 - 3/31/1989
Building 0055A — Todd Hall Addition
4 Budget 1/11/1983 - 5/17/1991
Environmental Impact Statement 6/23/1988 - 7/21/1988
Regents 11/4/1987 - 11/12/1990
Burke/Lee, A Joint Venture Correspondence 10/3/1988 - 12/12/1990
Burke/Lee, A Joint Venture Site Selection Study February, 1994
Mahan and Smith Correspondence 3/13/1984 - 1 1/27/1990
Construction Reports 7/7/1989 - 12/14/1991
Pittsburgh Testing Laboratory Concrete Testing 7/24/1989 - 5/22/1990
Todd Hall Terrace 5/17/1990 - 11/1/1990
General Correspondence #6 11/1/1990 - 1/7/1999
Henry Klein Partnership General Correspondence #7 10/1/1990 - 1/7/1999
Henry Klein Partnership Contract File C07860 1/1/1984 - 5/31/1991
C.D. Contractors General Correspondence #3 9/1/1990 - 5/19/1993
C.D. Contractors Contract File #2 3/29/1990 - 1/25/1991
Rejected Bids — Bid Date 4/25/1989
Schematic Design Brochure November, 1987
Building Program Statement December, 1983
General Correspondence #5 3/1/1990 - 10/31/1990
General Correspondence #4 8/1/1989 - 2/28/1990
General Correspondence #3 1/1/1989 - 7/31/1989
General Correspondence #2 7/1/1984 - 12/31/1988
5 General Correspondence #1 11/1/1982 - 6/30/1984
Henry Klein Architects General Correspondence #6 4/1/1990 - 9/30/1990
Henry Klein Architects General Correspondence #5 11/1/1989 - 3/31/1990
Henry Klein Architects General Correspondence #4 7/1/1989 - 10/31/1989
Henry Klein Architects General Correspondence #3 1/1/1989 - 6/30/1989
Henry Klein Architects General Correspondence #2 1/1/1985 - 12/31/1988
Henry Klein Architects General Correspondence #1 11/1/1982 - 6/30/1984
C.D. Contractors General Correspondence #2 2/1/1990 - 8/31/1990
C.D. Contractors General Correspondence #1 5/31/1989 - 1/31/1990
C.D. Contractors Contract File #1 C09729 6/1/1989 - 3/31/1990
Building 0088 — WSU Children’s Center
6 Budget
Environ mental Impact Statement
Regents Reports
Mahan & DeSalvo Correspondence
Gifford Consultants Geotechnical Report
Building Committee
Constniction Reports
General ColTespondence #3
Tsang Partnership General ColTespondence #4
Tsang Partnership Contract File CO10799
Pacific Crest Contractors, Inc. General Correspondence #2
Pacific Crest Contractors Contract File #2 CO 11340
Child Care Facility Playground Log #105378 General Correspondence
Child Care Facility Playground Tsang Partnership General Correspondence
Child Care Facility Playground R.A. Co. General Correspondence
Child Care Facility Playground R.A. Co. Contract File CO11727
Pacific Crest Contractors Pending Change Proposals
Rejected Bids - Bid Date 3/25/1993
General Correspondence #2
General Correspondence #1
7 Tsang Partnership General Correspondence #3 7/1/1993 - 12/31/1993
Tsang Partnership General Correspondence #2 8/1/1992 - 6/30/1993
Tsang Partnership General Correspondence #1 9/1/1991 - 7/31/1992
Pacific Crest Contractors General Correspondence #1 3/1/1993 - 12/31/1994
Pacific Crest Contractors Contract File #1 CO11340 3/25/1993 - 8/25/1993
Telecommunications
Budget 8/31/1987 - 11/10/1989
Regents Reports (empty folder)
General Correspondence #3 8/1/1990 - 6/20/1991
General Correspondence #2 3/1/1988 - 9/30/1990
General Correspondence #1 12/1/1986 - 2/29/1988
Peat Marwick Main & Co. General Correspondence 5/20/1988
Peat Marwick Main & Co. Contract File C09206 2/26/1988 - 2/29/1988
Building 0680 —University Housing Apartment Project (Yakama Village)
8 Budget 1/12/1995 - 12/8/1995
Environmental linpact Statement 5/19/1994 - 6/24/1994
Regents 1/18/1994 - 3/8/1996
Attorney General Correspondence 1/31/1994 - 8/25/1994 RESTRICTED
Issues and Claims 5/26/1994 - 1 1/2/1995 RESTRICTED
S.R. 270 Issues 5/3/1995 - 10/18/1995
Burke/Lee Correspondence 5/25/1994 - 6/16/1994
Don Brigham Plus Associates Correspondence 6/12/1995 - 6/29/1995
Robert Fossatti Associates 8/18/1994 - 7/23/1996
HCI Howard Consultants Geotechnical Engineers 9/9/1994 - 6/21/1995
Contractor Field Reports 9/16/1994 - 10/23/1995
Walsh Daily Construction Reports 9/1994 - 6/1995
Wyatt - Jaykim Engineers Concrete Testing 9/26/1994 - 5/26/1995
E-mail General Correspondence 3/22/1994 - 2/28/1995
General Correspondence #3 1/1 1/1995 - 3/25/1998
The ORB Organization Submittals 8/30/1994 - 10/7/1994
The ORB Organization Construction Meeting Minutes 9/15/1994 - 6/29/1995
The ORB Organization General Correspondence #3 12/13/1994 - 1 1/3/1995
The ORB Organization Contract File #2 CO11640 10/10/1995 - 12/22/1995
Walsh Construction Company General Correspondence #2 8/1/1995 - 8/15/1997
Walsh Construction Company Contract File #2 COl 1778 8/23/1995 - 12/8/1995
Punch Lists 6/6/1995 - 7/24/1995
Pending Change Proposals 9/24/1994 - 9/27/1994
9 Kruegel - McAllister Residence Halls Infonnation
Step 2: Design Competition 6/7/1994 - 8/31/1994
Reference Letters 5/13/1994 - 5/16/1994
Ledcor Industries General Correspondence 8/1994
Rejected Bid Summaries — Bid Date 7/22/1994
General Correspondence #1 9/1/1994 - 12/31/1994
The ORB Organization, Inc. General Correspondence #2 9/1/1994 - 11/30/1994
The ORB Organization, Inc. General Correspondence #1 4/1/1994 - 8/31/1994
The ORB Organization, Inc. Contract File #1 CO11640 3/25/1994 - 6/30/1995
Walsh Construction Company General Correspondence #1 8/1/1994 - 7/31/1995
Walsh Construction Company Contract File #1 CO11778 8/1/1994 - 6/30/1995
Punch Lists #1 5/22/1995 - 6/15/1995
SR 270/WSU Entrance Project/University Housing Project Memo 12/16/1994
Washington State University Design Build Student Housing Proposal
R.G. Nelson, Architect, and Northwest Architectural Company 5/17/1994
URS Consultants, Inc - Statement of Qualifications 2/21/1994
Design West Architects Statement of Qualifications 2/18/1994
Dames and Moore Statement of Qualifications 2/21/1994
10 CMA Project Management, Inc. Statement of Qualifications 2/21/1994
Draft RFQ from ORB Organization 4/12/1994
The ORB Organization, Inc. Statement of Qualifications 4/17/1994
The ORB Organization, Inc. Draft Proposal & General Requirements 5/12/1994
Walsh Construction & Michael and Kuhns Statement of Qualifications 5/17/1994
Ledcor Industries Inc. Design/Build Information 5/17/1994
CTS Engineers, Inc. Traffic Study 5/1994
DEl Electrical Consultants Electrical Calculations and Specifications 9/1994
Burke/Lee Environmental Checklist 5/12/1994
Walsh Construction Co. Storm Water Pollution Prevention Program 8/26/1994
Budgetary Estimate of Telecommunications Installation 6/2/1994
Draft copy of General Conditions for WA State Facility Construction
Draft copy of Modifications to General Conditions
WSU 1994 Design/Build Housing Draft Program 5/6/1994
WSU 1994 Design/Build Housing Draft Part 1 of 2 5/20/1994
WSU 1994 Design/Build Housing Drat Par 2 of 2 5/20/1994
Dave Smith’s Project Notebook (Cost Estimates, Regents Info, Emergency various dates
Contacts, Sub - Contractor Info, Design/Build Firms, RFQ/RFP,
Schedule, Telecomm & Trans, Sanitary Sewer, Comments, Submittals, Miscellaneous, Contracts, SR 270)
Building #816 - Food and Human Nutrition Facility Phase II
11 Budget 9/25/1987 - 4/13/1993
Regents 1/3/1989 - 5/7/1993
AGRA Earth and Environmental CO11569 7/11/1994 - 9/19/1994
Burke/Lee, A Joint Venture 4/18/1989 - 10/17/1989
Mahan and DeSalvo 2/7/1989 - 1/12/1990
Gifford Consultants Geotechnical Report 2/11/1991
Building Committee 1/17/1989 - 6/15/1993
Construction Reports 6/12/1990 - 6/9/1992
Pittsburgh Testing Laboratory Concrete Testing Reports 5/15/1990 - 7/27/1994
Wyatt - Jaykim Engineers Concrete Testing Reports 10/29/1987 - 9/22/1988
Test Reports 10/14/1988 - 11/6/1989
Creamery Grout Files 2/24/1993 - 4/17/1997
Creamery Equipment #2 11/3/1992 - 4/7/1994
Equipment Lists 5/16/1991 - 1/14/1992
Fluid Engineering Correspondence 8/5/1987 - 8/2/1990
Grant Applications 6/4/1989 - 1/11/1995
General Correspondence #10 9/2/1993 - 8/28/1995
Northwest Architectural Company General Correspondence 8/3/1993 - 12/19/1996
Northwest Architectural Company Contract File #2 C09293 9/20/1990 - 5/14/1996
Shea Construction General Correspondence #2 5/10/1993 - 10/4/1996
Shea Construction Contract File #4 CO10174 11/14/1991 - 3/24/1993
Monroe Machinery and Supplies Contract File #2 CO10739 10/5/1992 - 6/2/1993
Pending Change Proposals 5/14/1990 - 6/19/1992
12 Statements of Compliance 5/29/1990
Rejected Bids - Bid Date 3/29/1990
Creamery Equipment #1 6/6/1991 - 11/2/1992
General Correspondence #9 7/1/1992 - 7/31/1993
General Correspondence #8 1/2/1992 - 6/30/1992
General Correspondence #7 8/1/1991 - 12/31/1991
General Correspondence #6 3/1/1991 - 7/31/1991
General Correspondence #5 10/1/1990 - 2/28/1991
General Correspondence #4 5/1/1990 - 9/30/1990
General Correspondence #3 1/1/1990 - 4/30/1990
General Correspondence #2 1/1/1989 - 12/31/1989
General Correspondence #1 7/1/1987 - 12/31/1988
13 Northwest Architectural Company General Correspondence #9 6/1/1992 - 7/3 1/1993
Northwest Architectural Company General Correspondence #8 10/1/1991 - 5/31/1992
Northwest Architectural Company General Correspondence #7 2/1/1991 - 9/30/1991
Northwest Architectural Company General Correspondence #6 8/1/1990 - 1/31/1991
Northwest Architectural Company General ColTespondence #5 5/1/1990 - 7/31/1990
Northwest Architectural Company General ColTespondence #4 2/1/1990 - 4/30/1990
Northwest Architectural Company General Correspondence #3 7/1/1989 - 1/31/1990
Northwest Architectural Company General Correspondence #2 1/1/1989 - 6/30/1989
Northwest Architectural Company General Correspondence #1 7/1/1987 - 12/31/1988
14 Northwest Architectural Company Contract File #1 C09293 7/12/1988 - 8/27/1990
Shea Construction, Inc. General Correspondence File #1 4/1/1990 - 3/31/1993
Shea Construction, Inc. Contract File #3 CO10174 6/1/1991 - 10/2/1991
Shea Construction, Inc. Contract File #2 CO10174 4/2/1991 - 6/18/1991
Shea Construction, Inc. Contract File #1 CO10174 3/22/1990 - 3/1/1991
Monroe Machinery and Supplies Creamery Installation Contract #1 CO10739 9/1/1991 - 8/31/1992
Creamery Installation Rejected Bids - Bid Date 8/24/1991
Rejected General Bids - Bid Date 9/10/1987
Rejected Electrical Bids - Bid Date 9/3/1987
Rejected Mechanical Bids - Bid Date 9/3/1987
Northwest Architectural Company Design Development Review Comments 12/7/1989
Pacific Testing Laboratories Statement of Qualifications 12/18/1989
Perspective Sketch, Site Plan, Floor Plans 8/30/1994
Photographs in blue notebook June, 1994
AGRA Earth & Environmental Evaluation of Epoxy Grout 10/19/1994
Gifford Consultants, Inc. Geotechnical Report 4/18/1989
Creamery Installation Bid Set Specifications (2) 6/28/1991
Builders’ Hardware and Supply Company Schedule of Finish Hardware 4/22/1992
Northwest Architectural Company Design Development Presentation April, 1989
Northwest Architectural Company Design Development Phase November, 1986
Northwest Architectural Company Schematic Design Phase 6/26/1986
FHN Phase II Building Program Master Copy May, 1988
APV Crepaco, Inc. Creamery Contractor Bid 3/21/1990
15 Northwest Architectural Company Addendum #1 3/8/1990
Northwest Architectural Company Addendum #2 3/16/1990
Northwest Architectural Company Addendum #3 3/20/1990
Northwest Architectural Company Addendum #4 3/23/1990
Shea Construction, Inc. Requests For Clarification 5/11/1990 - 10/10/1991
Northwest Architectural Company Clarifications
Change Proposals 4/26/1990 - 2/10/1992
Dave Smith FSHN Creamery Items from Notebook - General Correspondence,
Dairy Equipment, and Equipment Bids
Dave Smith FSHN Items from Notebook - A/E Fees, Budget, Equipment/Furnishings, Federal Grants, Fixed Equipment, General Correspondence,
Physical Plant, Project Stats, Regents, Schedules, Telecom Cable, Telecom Center, 95% Review Comments, Review Comments
Building #1500 - Dairy Forage Facility Phase II, Buckley., WA
16 Budget 9/30/1991 - 9/28/1995
Environmental Impact Statement 9/21/1992 - 12/21/1992
Regents 3/24/1989 - 11/3/1994
Bradley - Noble Geotechnical Committee 4/22/1994
Burke/Lee Correspondence 5/13/1992
Construction Materials Testing Laboratories 3/22/1994 - 10/19/1994
Building Committee 9/25/1987 - 1/20/1993
Water Line Upsize General Correspondence 2/16/1993 - 9-14-95
General Correspondence 3/3/1993 - 9/24/1997
The BJSS Group General Correspondence #2 1/24/1994 - 8/7/1995
The BJSS Group Contract File #2 CO10845 12/1/1993 - 5/31/1995
John Korsmo Construction, Inc. General Correspondence 12/14/1993 - 2/5/1996
John Korsmo Construction, Inc. COl1557 11/17/1993 - 11/1/1995
Rejected Bid Summaries Bid Date 7/1/1993
Rejected Bid Summaries ReBid Date 11/18/1993
General Correspondence #1 6/13/1990 - 12/21/1992
The BJSS Group General Correspondence #1 11/26/1991 - 12/12/1993
Building 9500 — Tri-Cities University Center Addition
17 Master Planning various dates
Budget 8/31/1987 - 4/6/1993
Regents Reports 9/2/1988 - 1/8/1992
Burke/Lee Correspondence 1/6/1988 - 12/10/1990
Mahan and DeSalvo Correspondence 4/14/1989 - 1/22/1990
Concrete Testing 7/19/1990 - 3/29/199 1
General Correspondence #9 7/8/1992 - 9/23/1993
McKinley Gordon General Correspondence #15 2/1/1992 - 11/9/1992
McKinley Gordon Contract File #3 CO9110 9/11/1992
Hazen and Clark General Correspondence #2 10/1/1991 - 3/31/1993
Hazen and Clark Contract File #7 CO10126 11/20/1991 - 2/17/1993
Pending Change Proposals 11/26/1990 - 9/11/1991
Rejected Electrical Bids — Bid Date 3/13/1990
Rejected Mechanical Bids — Bid Date 3/13/1990
Rejected General Bids — Bid Date 3/20/1990
General Correspondence #8 9/1/1991 - 12/31/1992
General Correspondence #7 4/1/1991 - 8/31/1991
General Correspondence #6 11/1/1990 - 3/31/1991
18 General Correspondence #5 6/1/1990 - 10/31/1990
General Correspondence #4 1/1/1990 - 5/31/1990
General Correspondence #3 1/1/1989 - 12/31/1989
General Correspondence #2 5/1/1988 - 12/31/1988
General Correspondence #1 1/1/1987 - 4/1/1988
McKinley Gordon General Correspondence #14 11/1/1991 - 1/31/1992
McKinley Gordon General Correspondence #13 9/1/1991 - 10/31/1991
McKinley Gordon General Correspondence #12 8/1/1991 - 8/30/1991
McKinley Gordon General Correspondence #11 6/1/1991 - 7/31/1991
McKinley Gordon General Correspondence #10 4/1/1991 - 5/31/1991
19 McKinley Gordon General Correspondence #9 3/1/1991 - 4/30/1991
McKinley Gordon General Correspondence #8 1/1/1991 - 2/28/1991
McKinley Gordon General Correspondence #7 11/1/1990 - 12/31/1990
McKinley Gordon General Correspondence #6 9/1/1990 - 10/31/1990
McKinley Gordon General Correspondence #5 8/1/1990 - 8/31/1990
McKinley Gordon General Correspondence #4 2/1/1990 - 7/30/1990
McKinley Gordon General Correspondence #3 8/1/1989 - 2/28/1990
McKinley Gordon General Correspondence #2 1/1/1989 - 7/31/1989
McKinley Gordon General Correspondence #1 7/1/1987 - 12/31/1988
McKinley Gordon Contract File #2 CO9119 10/1/1990 - 7/31/1992
21 Branch Campus Development Alternatives Appendix for Chapter 7
Chapter 7 Branch Campus Development WHECB 11/5/1989
Riley Engineering, Inc. Life Cycle Cost Analysis January, 1989
Dillman - Luvaas Architects Life Benefit & Life Cycle Cost Analysis
McKinley Gordon WSU Tn - Cities Design Development 3/7/198 9
Material Data Safety Sheets, Miscellaneous Items various dates
Draft Tri-Cities University Center Building Addition 11/24/1987
Draft Tri-Cities University Center Building Addition 12/30/1987
Draft Tri-Cities University Center Building Addition 2/8/1988
Tri-Cities University Center Building Addition 2/8/1988
Addendum to Building Program 7/1/1988
McKinley Gordon Draft Master Planning Report 5/4/1988
Draft Master Planning Report 6/1/1988
Master Planning Report 6/1/1988
McKinley Gordon Schematic Design Building Statistics 8/22/1988
McKinley Gordon Schematic Design Cost Estimate 8/22/1988
McKinley Gordon Schematic Design 9/16/1988
McKinley Gordon Field Reports 6/19/1991 - 8/14/1991
State of WA Supplemental Proposal to the Advisory Council
Campus Reports various dates
Joint Center for Graduate Study Faculty Handbook 11/20/1981
University Center Addition Travel Related Items
22 University Center Addition Travel Related Items Center Grad Study - Richland
Department of Capital Planning and Development
Commons Offices
Building #0806 - Beasley Coliseum Asbestos Removal
Budget 2/26/1992 - 12/02/1992
Environmental Impact Statement 1/13/1992 - 2/18/1992
Regents 10/16/1992
General Correspondence 4/29/1991 - 1/7/1994
Alpha Engineers General Correspondence 6/1991
Alpha Engineers Contract File no contents
Communication Infrastructure Renewal (C.I.R.)
23 Budget 9/17/1991 - 12/19/1995
Environmental Impact Statement 3/9/1992 - 5/20/1992
Regents Reports 11/18/1991 - 5/11/1995
Burke/Lee Correspondence 4/17/1992 - 9/27/1992
Robert Fossatti Associates 11/24/1993
Mahan & DeS alvo Correspondence 3/19/1992 - 7/31/1992
Installation Operational Contract - Johnson Controls Network Integration Svcs. 6/7/1994
Program Committee 6/10/1992 - 9/30/1994
Facilities Work Group #3 10/1/1992 - 5/12/1993
Construction Reports 9/15/1993 - 9/17/1993
General Correspondence #6 7/1/1994 - 10/4/1996
JWP Information Systems, Inc. General Correspondence 4/9/1992 - 11/9/1993
JWP Information Systems, Inc. Contract File C0 10714 11/20/1992 - 12/18/1992
Inland Construction, Inc. General Correspondence 9/16/1994 - 11/18/1994
Inland Construction, Inc. Contract File CO 11790 9/1/1994 - 10/6/1994
Poe Asphalt Paving, Inc. Contract File CO 11643 8/4/1994 - 7/12/1995
Shea Construction, Inc. General Correspondence 5/24/1994 - 9/28/1994
Shea Construction, Inc. Contract File CO 11642 4/12/199
Rejected Bids - Telecomm Equipment Rooms - Bid Date 9/1/1994
Rejected Bids - Satellite Master Antennae TV - Bid Date 7/26/1994
Rejected Bids - Five Main Communication Facility - Bid Date 2/25/1994
Facilities Work Group #2 6/1/1992 - 9/30/1992
Facilities Work Group #1 12/31/1991 - 5/31/1992
General Correspondence #5 2/1/1994 - 6/30/1994
General Correspondence #4 12/1/1994 - 1/31/1994
24General Correspondence # 3 7/1/1993 - 11/30/1993
General Correspondence # 2 4/1/1992 - 6/30/1993
General Correspondence # 1 9/1/1990 - 2/29/1992
Program Committee File # 1 6/24/1992 - 5/31/1992
Project Management - Quality Assurance
Planning and Construction Profile Surveys 1/1992
Evaluation Scoring 6/1990 - 7/1990
General Correspondence # 1 4/9/1990 - 2/25/1991
Heery Program Management General Correspondence 8/9/1990 - 8/10/1990
Heery Program Management Contract File (draft copy) 4/9/1990
Morrison Knudsen General Correspondence 10/31/1991 - 8/29/1996
Morrison Knudsen Contract File CO10465 10/29/1990 - 2/18/1993
Morrison Knudsen Letter Log 3/7/1991 - 5/23/1991
Morrison Knudsen General Correspondence # 1 7/1/1990 - 2/29/1992
Records, Maintenance Materials, Storage, and Recycling
Budget Spring, 1991 - 12/12/1995
Environmental Impact Statement 5/3/1992 - 7/26/1993
Regents 5/26/1992 - 1/26/1996
Attorney General Correspondence 3/6/1996 RESTRICTED
Burke/Lee Correspondence 7/9/1991 - 8/25/1992
Mahan Partnership Correspondence 11/18/1992 - 1/26/1993
Professional Services Industries, Inc. Correspondence 11/15/1994 - 1/27/1995
The Redicheck Firm Correspondence 6/6/1994 - 6/28/1994
25 Gifford Consultants Geotechnical Report 11/13/1992
Building Committee Minutes 4/23/1991 - 3/16/1993
Daily Construction Reports 11/10/1994 - 6/30/1995
Concrete Test Reports 6/9/1995
General Correspondence #2 5/1/1994 - 5/14/1996
Archos Corporation General Correspondence #6 6/5/1995 - 5/7/1996
Archos Corporation Contract File #1 CO10803 9/27/1991 - 5/10/1996
Mark Construction, Inc. General Correspondence #1 9/1/1994 - 4/2/1997
Mark Construction, Inc. Contract File #1 CO11804 9/1/1994 - 11/6/1995
Pending Change Proposals 12/20/1994 - 11/8/1995
Rejected Bids — Bid Date 9/13/1994
General Correspondence #1 2/1/1995 - 5/31/1995
Archos Corporation General Correspondence #5 7/1/1994 - 1/31/1995
Archos Corporation General Correspondence #4 7/1/1994 - 1/31/1995
Archos Corporation General Correspondence #3 6/1/1994 - 6/31/1994
Archos Corporation General Correspondence #2 10/1/1993 - 5/31/1994
Archos Corporation General Correspondence #1 6/1/1991 - 9/30/1993

Archives 281
Facilities Development
Vancouver Campus Building Files and Records, 1986-1998

ACQUISITION AND PROCESSING INFORMATION

These Facilities Development Vancouver Campus Building Files and Records were transferred to Manuscripts, Archives, and Special Collections on April 25th, 2000 (UA 2000-12) by Annie (last name unrecorded) of Facilities Development. They were reboxed for space considerations upon arrival, reducing the collection from 34 boxes to 32 without altering the order of the documents. They were processed in 2009 by University Archivist Mark O'English and Tim Mace, at which time they were further reboxed down to 29 boxes, again without altering document order.

EXTENT/QUANTITY INFORMATION

Number of containers: 29 boxes
Linear feet of shelf space: 29

COLLECTION DESCRIPTION & ARRANGEMENT

The collection consists of records from 1986-1998 covering early plans for construction of the Vancouver Campus, focused primarily on Building #6501, here listed as the General Campus Vancouver University Center. Records are maintained in their original order, in two series, each broken into two parts: general Vancouver Phase I documents, and Public Information Request Numbered Documents.

PREFERRED CITATION

The suggested citation for the collection is:

[Item Description]
Facilities Development Vancouver Campus Building Files and Records, 1986-1998 (UA 281)
Manuscripts, Archives, and Special Collections
Washington State University Libraries
Pullman, WA

6
Box Description
Public Information Request Numbered Documents
1No. 024954 - 024982 Reduced Plans & Elevations of Design Development Drawings, 12/3/1993
No. 024983 - 025012 Reduced Plans & Elevations of Design Development Drawings, 12/3/1993
No. 025013 Final Supplemental Environmental Impact Statement, 2/24/1993
No. 025014 Draft Supplemental Environmental Impact Statement, 12/2/1992
No. 025015 - 025037 Box #9 WSU - V Salmon Creek Statutory Warranty Deed, 5/14/1991
No. 025038 - 025085 ZGF Constructability Report for WSU - V, 4/20/1994
No. 025086 Estimate of Probable Construction Cost Construction Documents Phase, 5/12/1994
No. 025087 ZGF Design Development Estimate of WSU - V Campus, 12/3/1993
No. 025088 - 025 132 WSU Vancouver Value Engineering Miscellaneous Information, 1/1994 - 3/1994
No. 025133 Value Engineering Study for WSU - V Campus, 12/22/1993
No. 025134 Wetlands Report for WSU - V Clark County Campus, 1/1993
No. 025135 Storm Water Pollution Prevention Plan, 4/1994
No. 025136 Parametrix, Inc., Drainage Design WSU - V Clark County Campus, 4/1994
No. 025138 - 025337 Site Storm Drainage Information Including Baseline General Permit, Various Dates
No. 025339 - 025549 ZGF WSU - V Campus Wetland Mitigation, 1/1993
No. 025550 ZGF WSU - V Master Plan Concept Development Report Volume 1
No. 025551 ZGF WSU - V Master Plan Concept Development Report Volume 2
No. 025552 ZGF WSU - V Summary Master Plan, 7/1992
No. 025553 - 025775 WSU - V Site Proposal No. 10 and Miscellaneous Site Proposal No. 10 Information, 1989
No. 025756 - 025 820 ZGF WSU - V Consultant Selection — 1991 Phase I Campus Development
No. 025821 ZGF Phase I Campus Development Interview Statement of Qualifications, 6/1991
No. 025822 - 025 866 WSU - V Aerial Topography (Walker and Associates), Various Dates
No. 025867 - 02602 1 WSU - V Cultural Resource Survey, Various Dates
No. 026022 - 026047 Environmental Audit, Various Dates
No. 026048 ZGF Phase I Campus Development Preliminary Design Onsite and Offsite Infrastructure Work, 9/1993
No. 026049 ZGF Phase I Campus Development Classroom Bldg., Library, Student Services, and Physical Plant Building Schematic Design, 10/1993
No. 026052 Capital Project Review Submittal - Allotment Request for Construction, 5/16/1994
No. 026053 Branch Campus Interim Planning Report, 9/20/1989
No. 026054 Supplemental Site Data, 8/3/1990
2No. 026055 ZGF 100% Design Development Specifications Divisions 2 through 16, 12/3/1993
No. 026056 - 026063 ZGF 75% Construction Documents Submittal Divisions 2 through 14, 2/25/1994
No. 026064 ZGF 75% Construction Documents Submittal Divisions 15 and 16, 2/21/1994
No. 026065 ZGF Preliminary Diffuser & Grille, Plumbing, Classroom Bldg. Equip. & Load Calc., Student Services Bldg. Equip. & Load Calc., Library Equip. & Load Calc., Physical Plant Equip. & Load Calc. (Part of 75% CD Submittal), 2/21/1994
No. 026066 ZGF Preliminary Electrical Load Calc., Electrical Equip., Luminaire Selections, Telecom Equipment & Calculations (Part of 75% CD Submittal), 2/21/1994
No. 026067 Kramer Gehlen Associates Student Services Building Computations & Structural Engineering, 3/25/1994
No. 026068 Kramer Gehlen Associates Landscape Retaining Wall Computations & Structural Engineering, 4/4/1994
No. 026069 Kramer Gehlen Associates Physical Plant Building Computations & Structural Engineering, 3/25/1994
No. 026070 Kramer Gehlen Associates Library Building Computations & Structural Engineering, 3/25/1994
No. 026071 Kramer Gehlen Associates Classroom Building Computations & Structural Engineering, 3/25/1994
Phase I
Vancouver Campus Master Plan Appendix
Site Selection Information Pertaining to the Site Selection Process & Sites #2, 4, 8, 10, and 12, 3/5/1990
WSU - V Draft Environmental Impact Statement, 6/22/1990
WSU - V Draft Environmental Impact Statement Comment Letters, Various Dates
WSU Southwest Washington Public Hearing Transcript, 7/17/1990
WSU Southwest Washington Scoping Notice Comments, Various Dates
3WSU - V Site Selection Final Environmental Impact Statement, 8/30/1990
WSU Southwest Washington Environmental Impact Statement Information
WSU Southwest Washington Site Proposal Summaries, 1989
WSU Southwest Washington Petitions, Sites 4, 8, and 10, 3/23/1990
WSU Vancouver Site Selection HECB Activity, 1990
WSU Southwest Washington Campus Phase 1 Public Involvement Report Volume 1, 6/1990
WSU Southwest Washington Campus Phase 1 Public Involvement Report Volume 2, 8/1990
4WSU Vancouver Miscellaneous (Public Involvement, Site Costs, Microwave Access, Agricultural Land Issues, Technical Advisory Group, Other Sites, Site Sequence, Site Descriptions, Supplemental Site Data Report, SRC Final Report, Descriptions of 9 Sites, Descriptions of 14 Sites, and Enrollment Projections), Various Dates
WSU Southwest Washington Addendum (FEIS) Comments and Responses, Various Dates 1990
WSU Vancouver Site Selection Miscellaneous Information, Various Dates
HBHS Asbestos Circumstances, Various Dates
Site 8 Central Park, Various Dates
Port Real Estate Corporation Proposal Form SW Washington Campus Intersection of 1 - 5/1 - 205
Transmittal to Port Real Estate Corp. from Earl Muir Re: Site No. 1 Proposal, 11/21/1989
Site 12 Mill Plain
City of Vancouver Proposal for WSU SW WA Campus, Initial 8, 11/17/1989
City of Vancouver Proposal for WSU SW WA Campus, Supplemental 8, 11/17/1989
City of Vancouver Proposal for WSU SW WA Campus Presentation to the Higher Education Coordinating Board, 10/23/1990
Law Offices of Williams Kastner and Gibbs Re: Branch Campus Site Proposal, 9/22/1989
Law Offices of Williams Kastner and Gibbs Initial 12 Branch Campus Site Proposal
Law Offices of Williams Kastner and Gibbs Supplemental 12 Branch Campus Site Proposal
Law Offices of Williams Kastner and Gibbs Supplemental 13 Branch Campus Site Proposal
Checklist Form for Initial Site Proposal, Ruth Henderson, Proponent, 9/21/1989
Checklist Form for Initial Site Proposal, W, Ken Lillequist, Proponent, 9/21/1989
Richard Woods and Dennis Weber Proposal Form - Initial Submittal Site for SW WA Campus 8/16/1989
Supplemental Proposal East Clark County Tektronix Site, 11/17/1989
5A Proposal for Site Selection WSU Battleground by Citizen’s Group of Battle Ground,
Supplemental Submittal WSU Battleground by Citizen’s Group of Battle Ground
Initial Proposal Site for SW WA Campus WSU, Ridgefield Sitting Committee
Supplemental Proposal Site for SW WA Campus WSU, Ridgefield Sitting Committee
Whitfield - Bernhardt, Inc. Site Submittal for SW WA Campus
Whitfield - Bernhardt, Inc. Supplemental Site Submittal for SW WA Campus
James F. Fowler & Associates Initial Proposal Site #3 for WSU SW WA Campus
James F. Fowler & Associates Supplemental Proposal Site #3 for WSU SW WA Campus
East Clark County Site Recommendation Committee Proposal
WSU Vancouver Site Selection Process Information for HECB
WSU Vancouver Proposal Information
WSU Southwest Washington Public Meetings
WSU Vancouver Background Information, Schedules, Site Comparison, Selection Criteria, Miscellaneous
WSU Vancouver Site Selection Criteria, RFP Information
WSU Vancouver Committee Meeting Notes
WSU Vancouver RFP Materials, Proposal Evaluations, Meetings with Qualified Proponents, Site Visits, Proponent Interviews, Final SRC Report, Academic Committee Report, Regents Recommendation, and HECB Decision. 1 of 2.
WSU Vancouver RFP Materials, Proposal Evaluations, Meetings with Qualified Proponents, Site Visits, Proponent Interviews, Final SRC Report, Academic Committee Report, Regents Recommendation, and HECB Decision. 2 of 2
WSU Vancouver Burke/Lee Research (1st Segment Services)
WSU Vancouver Burke/Lee
WSU Southwest Washington Letters 1/1988 - 3/1990
WSU Southwest Washington Letters 4/1990 - 6/1990
WSU Southwest Washington Letters 7/1990 - 9/1990
WSU Southwest Washington Letters 1/1988 - 6/1990
WSU Southwest Washington Petitions Site 12 - Volume 1
WSU Southwest Washington Petitions Site 12 - Volume 2
7WSU Southwest Washington News Items
WSU College of Engineering & Architecture “An Addition for the SW WA Joint Center for Education & WSU - V At the Evergreen State College Building in Vancouver”, Fall 1986 and Spring 1987
Social & Economic Sciences Research Center “WSU - V Higher Education Needs Assessment Survey Summary Report”, 3/1988
WSU Development Plan for Campuses in Spokane, Tri - Cities, and Vancouver, 5/1988
WSU - V and Clark College Bauer Hall Second Phase Building Program Project No. 88030, 6/1988
7.0 Estimation of Branch Campus Needs, undated
Burke/Lee “WSU at Vancouver Branch Campus Interim Planning Report”, 9/1989
MGT of America, Inc., SRI International & Elaine Day and Associates “Branch Campus Development Alternatives: Appendix for Chapter 7”, 11/1989
Burke/Lee “WSU Vancouver Alternative Sites Preliminary Environmental Report”, 1/1990
Burke/Lee “Draft Environmental Impact Statement WSU Branch Campus SW WA, Phase I - Site Selection”, 6/1990
Burke/Lee “WSU Southwest Washington Branch Campus Supplemental Site Data”, 8/1990
Burke/Lee “WSU Southwest Washington Branch Campus Alternate Site Graphics”, 8/1990
Burke/Lee “Final Environmental Impact Statement”, 8/1990
Burke/Lee “WSU - V Response to Higher Education Coordinating Board Questions 10/10/1990”
Physical Planning Committee “Phase I Building Program - Classroom Building, Library Building, Student Services & Classroom Building”, 2/1992
ZGF “WSU - V Campus Master Plan Concept Development Report” Volume I, 5/1992
ZGF “Washington State University Vancouver Campus Summary Master Plan”, 6/1992
ZGF “Washington State University Vancouver Campus Summary Master Plan”, 7/1992
JD White Co. “Draft Supplemental Environmental Impact Statement for WSU at Vancouver, WA”, 12/1992
JD White Co. “Conditional Use Request Washington State University at Vancouver”, undated
Hazcon, Inc. Asbestos Investigative Survey, 1/1993
JD White Co. “Final Supplemental Environmental Impact Statement for Washington State University at Vancouver, WA”, 2/1993
WSU Vancouver Predesign Study Draft Review, 4/1993
ZGF Phase I Campus Development Classroom Bldg., Library Bldg., Student Services and Classroom Bldg. Predesign Study, 5/1993
Clark Public Utilities Industrial Customer Information, 5/1993
ZGF Phase I Campus Development Preliminary On Campus & Off - Site Infrastructure Design, 6/1993
ZGF Phase I Campus Development Preliminary Design Onsite & Offsite Infrastructure Work 6/1993
Pemco Underground Storage Tank Site Characterization Report prepared for WA Dept of Ecology 6/1993
Parametrix, Inc. NE 134th St. & NE Salmon Creek Ave. Reconstruction Design Report 9/1993
JD White Co. Notice of Public Hearing - Variance to Height Limitation Standards of the Single Family Residential Zoning Dist. 9/1993
ZGF WSU Vancouver Campus Phase I Schematic Design Estimate 10/1993
8Parametrix, Inc., Water Resource Evaluation of Salmon Creek Property 10/1993
Parametrix, Inc., NE 134th St & Salmon Creek Ave. Reconstruction Design Report 10/1993
Consulting Value Specialists Inc., Value Engineering Study for WSU Vancouver Campus 12/1993
ZGF Design Development Estimate or WSU Vancouver Campus Phase I - CSI Format 12/1993
Vancouver Master Plan Appendix, undated
PAE Consulting Engineers, Inc., WSU - V Campus Energy Conservation Report 1/1994
ZGF Drainage Report for WSU - V Phase I, 1/1994
Pinnell Busch, Inc., Combined Sewer Overflow Program Management Subconsultant Team 2/1994
PAE Consulting Engineers, Inc., WSU - V Campus Energy Conservation Report 3/1994
LaSalle Manufacturing Corp., Air Handling Units
Vulcan Hydraulic Heating Equipment
JD White Co., Wetlands Mitigation for WSU - V Campus Clark County, WA Phase I Final Mitigation Plan 4/1994
Geotechnical Resources Inc., Supplemental Geotechnical Investigation, WSU Vancouver Campus 5/1994
ZGF Estimate of Probable Construction Cost Construction Documents Phase WSU - V Campus CSI Format 5/1994
Heery International WSU - V Campus Construction Phase Procedures Manual 8/1994
Parametrix, Inc., Drainage Design Report 10/1994
JD White Co., Wetland Delineation for NE 134th St & NE Salmon Creek Ave Road Improvements 10/1994
JD White Co., Wetlands Mitigation for NE 134th St & NE Salmon Creek Ave Road Imp., Phase I Preliminary Mitigation Plan 11/1994
Parametrix, Inc., Storm water Pollution Prevention Plan NE 134th St & NE Salmon Creek Ave Road Improvements 12/1994
Parametrix, Inc., Drainage Design Report NE l34 St & NE Salmon Creek Ave Road Improvements 12/1994
Heery International, Inc., WSU - V Branch Campus Dispute Review Board Informal Hearing on Constructive Acceleration 1994 - 10/1995
Prezant IAQ Flush Report 10/1996
Prezant Vancouver Campus Mold Sampling January 22, 1997
WSU Vancouver Phase I Campus Development Project Program, undated
Parametrix, Inc., Fifteen Year Water Resource Plan 5/1997
Public Information Request Numbered Documents
WSU Vancouver Environmental Impact Statement #1 4/1/1990 - 7/6/1990
9WSU Vancouver Environmental Impact Statement #2 7/17/1990 - 7/23/1990
WSU Vancouver Environmental Impact Statement #3 7/24/1990 - 8/31/1990
WSU Vancouver Environmental Impact Statement #4 9/1/1990
WSU Vancouver Burke/Lee, A Joint Venture #1 7/1989 - 9/1989
WSU Vancouver Burke/Lee, A Joint Venture #2 10/1989 - 4/30/1990
WSU Vancouver Burke/Lee, A Joint Venture #3 6/1/1990 - 8/31/1990
WSU Vancouver Burke/Lee, A Joint Venture #4 9/1/1990 - 10/1992
WSU Vancouver Site Proponents & Proponent General Information #1 8/1989 - 12/31/1989
WSU Vancouver Site Proponents & Proponent General Information #2 1/1990 - 5/16/1990
WSU Vancouver Phase I Notes from Meetings - Earl Muir 5/1988 - 7/1990
WSU Vancouver Phase I Site Plan Review 11/5/1993 - 2/1994
WSU Vancouver Phase I HECB Off - Campus Property Acquisition 1/22/1992
WSU Vancouver Phase I Bauer Hall 4/1988 - 8/2/1990
10WSU Vancouver Phase I S.E.I.S. #1 2/1992 - 2/1993
WSU Vancouver Phase I S.E.I.S. #2 3/1993 - 6/1993
WSU Vancouver Phase I General Sitting Information #4 11/1990 - 12/1990
WSU Vancouver Phase I General Sitting Information #3 12/1/1989 - 10/31/1990
WSU Vancouver Phase I General Sitting Information #2 1/18/1989 - 11/21/1989
WSU Vancouver Phase I General Sitting Information #1 9/12/1988 - 12/13/1988
WSU Vancouver Phase I Budget
WSU Vancouver Phase I Regents’ Reports 10/1989 - 8/1990
WSU Vancouver Phase I Parametrix, Inc. CO11148 7/1/1992 - 5/20/1997
WSU Vancouver Phase I Site Demolition & Cleanup Parametrix, Inc. 4/1992 - 5/1994
WSU Vancouver Phase I Demolition 8/1/1992 - 7/19/1993
WSU Vancouver Phase I Predesign 3/1993 - 6/1993
WSU Vancouver Phase I Master Plan # 2 6/1/1992 - 6/23/1993
WSU Vancouver Phase I Master Plan #1 3/1992 - 5/31/1992
WSU Vancouver Phase I Master Plan Project Program 1/1992 - 5/1992
WSU Vancouver Phase I Archeological Investigation 1992
11WSU Vancouver Phase I Bookstore 12/11/1993 - 8/31/1996
WSU Vancouver Phase I Soils Report - Geotechnical Resources, Inc., various dates (1993)
WSU Vancouver Phase I Background Information (project description, principles, planning concepts, prototype analysis, administrative & planning information, capacity, design criteria, budget requests, funding, space requirements, interim planning report space, HECB report excerpts, site issues, road improvements, transit, infrastructure, geotechnical, storm drainage, wetlands, energy considerations, urban growth area, BPA)
WSU Vancouver Phase I Planning/Building Committee #2 10/5/1992 - 5/1997
WSU Vancouver Phase I Planning/Building Committee #1 8/1991 - 9/1992
WSU Vancouver Phase I Site Work and Building Construction Rejected Bid Forms - Bid Date 6/22/1994
WSU Vancouver Phase I Heery Program Management CO11678 2/1992 - 7/1994
WSU Vancouver Phase I Heery International, Inc. General Correspondence #1 2/1992 - 7/31/1994
WSU Vancouver Phase I Off - Site Road 10/1993 - 11/30/1994
WSU Vancouver Phase I General Correspondence #22 7/1994 - 9/1994
WSU Vancouver Phase I General Correspondence #21 5/1/1994 - 6/30/1994
WSU Vancouver Phase I General Correspondence #20 3/1/1994 - 4/30/1994
12WSU Vancouver Phase I General Correspondence #19 2/15/1994 - 3/1/1994
WSU Vancouver Phase I General Correspondence #18 1/1/1994 - 2/14/1994
WSU Vancouver Phase I General Correspondence #17 11/1/1993 - 12/31/1993
WSU Vancouver Phase I General Correspondence #16 10/1/1993 - 10/31/1993
WSU Vancouver Phase I General Correspondence #15 8/1/1993 - 9/30/1993
WSU Vancouver Phase I General Correspondence #14 3/1/1993 - 7/31/1993
WSU Vancouver Phase I General Correspondence #13 12/1/1992 - 2/29/1993
WSU Vancouver Phase I General Correspondence #12 8/1/1992 - 11/1992
WSU Vancouver Phase I General Correspondence #11 5/1992 - 7/31/1992
WSU Vancouver Phase I General Correspondence #10 3/16/1992 - 4/30/1992
13WSU Vancouver Phase I General Correspondence #9 2/1992 - 3/15/1992
WSU Vancouver Phase I General Correspondence #8 1/1/1992 - 1/31/1992
WSU Vancouver Phase I General Correspondence #7 10/1/1991 - 11/30/1991
Vancouver Phase I General Correspondence #6 3/1/1991 - 9/30/1991
WSU Vancouver Phase I General Correspondence #5 9/1/1990 - 2/28/1991
WSU Vancouver Phase I General Correspondence #4 4/1990 - 8/31/1990
WSU Vancouver Phase I General Correspondence #3 11/1989 - 3/31/1990
WSU Vancouver Phase I General Correspondence #2 1/1989 - 10/1989
WSU Vancouver Phase I General Correspondence #1 7/1986 - 12/198 8
WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership General Correspondence #18 7/1994 - 8/1994
WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership General Correspondence #17 6/1994
14WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership General Correspondence #16 5/16/1994 - 5/31/1994
WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership General Correspondence #15 4/16/1994 - 5/15/1994
WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership General Correspondence #14 4/1/1994 - 4/15/1994
WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership General Correspondence #13 3/11/1994 - 3/31/1994
WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership General Correspondence #12 2/17/1994 - 3/10/1994
WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership General Correspondence #11 2/1/1994 - 2/16/1994
WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership General Correspondence #10 1/1/1994 - 1/31/1994
WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership General Correspondence #9 12/1/1993 - 12/31/1993
15WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership General Correspondence #8 11 / 1/1993 - 11/30/1993
WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership General Correspondence #7 9/15/1993 - 10/31/1993
WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership General Correspondence #6 8/2/1993 - 9/14/1993
WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership General Correspondence #5 4/1/1993 - 7/30/1993
WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership General Correspondence #4 2/1/1993 - 3/31/1993
WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership General Correspondence #3 7/1/1992 - 1/31/1993
WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership General Correspondence #2 3/1991 - 6/30/1992
WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership General Correspondence #110/1991 - 2/29/1992
16WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership CO10797 #6 6/1994 - 1/1995
WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership CO10797 #5 4/1994 - 5/1994
WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership CO10797 #4 1/1/1994 - 3/31/1994
WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership CO10797 #3 7/1/1993 - 12/31/1993
WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership CO10797 #2 8/31/1992 - 6/30/1993
WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership CO10797 #1 9/1991 - 10/1992
WSU Vancouver Phase I Attorney General Correspondence 5/1990 - 6/1994 RESTRICTED
WSU Vancouver Phase I Consultant Selection (Project Management, Construction Administration) 2/1994 - 5/1994
WSU Vancouver Phase I Consultant Selection (Request for Qualification) 3/1/1994 - 3/11/1994
WSU Vancouver Phase I Consultant Selection (Request for Proposals) 4/24/1994 - 4/29/1994
WSU Vancouver Phase I Consultant Selection (Interviews) 1994
WSU Vancouver Phase I Consultant Selection (PM/CA Services Applicant Log) 2/1994
WSU Vancouver Phase I Consultant Selection (Miscellaneous Correspondence) 2/11/1994 - 4/29/1994
WSU Vancouver Phase I Consultant Selection (Project Management Questions & Responses) 3/1994
WSU Vancouver Phase I Consultant Selection (Acceptance/Rejection Letters) 3/17/1994 - 4/1/1994
17Phase I
WSU Vancouver Phase I Campus Development Budget 8/1/1995 - 1/5/1998
WSU Vancouver Phase I Campus Development E.T.S. Off - Site Roadwork 9/1994 - 12/1994
WSU Vancouver Phase I Campus Development Final Supplemental Environmental Impact Statement 2/24/1993
WSU Vancouver Phase I Campus Development Draft Supplemental Environmental Impact Statement
WSU Vancouver Phase I Campus Development Regents Reports 6/1992 - 9/1998
WSU Vancouver Phase I Campus Development Attorney General Correspondence 8/1994 - 10/1994 RESTRICTED
WSU Vancouver Phase I Campus Development Issues and Claims #3 6/1997 - 7/1998 RESTRICTED
WSU Vancouver Phase I Campus Development Minor Capital Improvement Request E-mail 4/5/1996 - 6/26/1996
WSU Vancouver Phase I Campus Development Capital Improvement Program E-mail 4/17/1996 - 1/23/1997
WSU Vancouver Phase I Campus Development Minor Capital Improvement Request 4/5/1996 - 4/16/1996
WSU Vancouver Phase I Campus Development Capital Improvement Program 3/14/1996
WSU Vancouver Phase I Campus Development Clark County Public Works Dept. Offsite Inspection Consultant
WSU Vancouver Phase I Campus Development Disputes Review Board #2 8/1/1996 - 5/15/1997
WSU Vancouver Phase I Campus Development Norman C. Anderson, Quadrant II, Inc. CO1 1932 #1 3/23/1995 - 12/23/1997
WSU Vancouver Phase I Campus Development James B. Donaldson CO11931 2/17/1995 - 3/3/1998
WSU Vancouver Phase I Campus Development J.D. White Company, Inc., General Correspondence #1 7/1997 - 10/1998
WSU Vancouver Phase I Campus Development J.D. White Company, Inc., CO13085 10/13/1998
WSU Vancouver Phase I Campus Development J.D. White Company, Inc., CO12623 5/28/1997
WSU Vancouver Phase I Campus Development Heery International E-mail Correspondence #2 6/1/1996 - 6/20/1997
WSU Vancouver Phase I Campus Development Heery International CO11702 4/1/1997 - 4/13/1998
WSU Vancouver Phase I Campus Development Heery International General Correspondence 5/1997 - 12/1997
WSU Vancouver Phase I Campus Development Philip Wickstrand Dufford CO12700 10/1996 - 6/1997
WSU Vancouver Phase I Campus Development Paul E. Pederson CO121 16 10/15/1995 - 7/198/1997
WSU Vancouver Phase I Campus Development Robert E. Bayley Construction, Inc. CO12676 5/6/1997 - 6/27/1997
WSU Vancouver Phase I Campus Development Stanton Phillip Beck CO12699 3/10/1997 - 9/4/1997
WSU Vancouver Phase I Campus Development Zimmer Gunsul Frasca Partnership CO12273 4/27/1996
WSU Vancouver Phase I Campus Development Partnering Executive Committee 4/1995 - 5/1995
WSU Vancouver Phase I Campus Development Walsh Claim General Correspondence 4/1997 - 2/1998
WSU Vancouver Phase I Campus Development Conditional Use Permit 6/1993 - 12/1996
WSU Vancouver Phase I Campus Development Bookstore E-mail 7/30/1995 - 6/18/1997
WSU Vancouver Phase I Campus Development Bookstore #2 General Correspondence 9/1/1996 - 9/199/1997
WSU Vancouver Phase I Campus Development Parametrix General Correspondence #112/14/1994 - 7/17/1997
18WSU Vancouver Phase I Campus Development Carlson Testing, Inc. #2 3/1/1995 - 6/19/1995
WSU Vancouver Phase I Campus Development Off - Site Road Improvements General Correspondence E-mail 1/21/1996 - 4/199/1997
WSU Vancouver Phase I Campus Development Off - Site Road Improvements General Correspondence #6 1/1/1997 - 5/15/1997
WSU Vancouver Phase I Campus Development Nutter Underground Utilities Co., Inc. General Correspondence 4/1995 - 5/1998
WSU Vancouver Phase I Campus Development Nutter Underground Utilities Co., Inc. CO11970 4/1995 - 5/1996
WSU Vancouver Phase I Campus Development U - District Ordinance 4/14/1994 - 9/13/1994
WSU Vancouver Phase I Campus Development Water Resource Evaluation 8/1993 - 6/1996
WSU Vancouver Phase I Campus Development General Correspondence E-mail #3 3/3/1997 - 6/26/1997
WSU Vancouver Phase I Campus Development General Correspondence #34 6/1/1997 - 11/199/1998
WSU Vancouver Phase I Campus Development Zimmer Gunsul Frasca General Correspondence E-mail 1/1/1996 - 6/3/1997
WSU Vancouver Phase I Campus Development Zimmer Gunsul Frasca General Correspondence #34 6/1997 - 12/1997
WSU Vancouver Phase I Campus Development Indoor Air Quality Mold Sampling 1/22/1997
WSU Vancouver Phase I Campus Development Zimmer Gunsul Frasca Final Air Flow Study 5/22/1994
WSU Vancouver Phase I Campus Development Zimmer Gunsul Frasca CO10797 5/1/1997 - 1/13/1998
WSU Vancouver Phase I Campus Development Pease and Sons, Inc. General Correspondence E-mail 11/4/1995 - 12/3/1996
WSU Vancouver Phase I Campus Development Pease and Sons, Inc. General Correspondence #5 11/1/1996 - 8/1998
WSU Vancouver Phase I Campus Development Pease and Sons, Inc. Unnumbered Contract Change Proposals 1/29/1997
WSU Vancouver Phase I Campus Development Contract Change Proposal #195
WSU Vancouver Phase I Campus Development Contract Change Proposal #194
WSU Vancouver Phase I Campus Development Contract Change Proposal #193
WSU Vancouver Phase I Campus Development Contract Change Proposal #192
WSU Vancouver Phase I Campus Development Contract Change Proposal #190
WSU Vancouver Phase I Campus Development Contract Change Proposal #189
WSU Vancouver Phase I Campus Development Contract Change Proposal #188
WSU Vancouver Phase I Campus Development Contract Change Proposal #187
WSU Vancouver Phase I Campus Development Contract Change Proposal #186
WSU Vancouver Phase I Campus Development Contract Change Proposal #185
WSU Vancouver Phase I Campus Development Contract Change Proposal #183
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #184
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #181
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #180
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #179
19Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #178
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #177
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #176
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #175
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #174
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #173
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #172
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #171
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #170
WSU Vancouver Phase I Campus Development Site Work & Buildings Construction General Information Notebook 3/17/1997
WSU Vancouver Phase I Campus Development Site Work & Buildings Construction ZGF Consultant Agreement Notebook 3/17/1997
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #164
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #148
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #130
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #129
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #128
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #122
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #121
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #119
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #118
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #117
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #116
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #115
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #114
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #113
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #112
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #111
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #110
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #109
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #108
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #107
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #106
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #105
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #104
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #103
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #101
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #099
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #098
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #097
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #096
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #095
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #094
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #093
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #092
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #089
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #088
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #086
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #085
Pease and Sons, Inc.., WSU Vancouver Phase I Campus Development Contract Change Proposal #084
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #084
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #082
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #079
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #078
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #077
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #076
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #075
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #074
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #073
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #072
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #070
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #068
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #067
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #169
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #167
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #166
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #165
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #163
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #162
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #160
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #159
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #158
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #157
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #156
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #155
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #154
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #153
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #152
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #151
20Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #150
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #149
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #148
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #147
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #146
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #145
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #144
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #143
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #142
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #140
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #139
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #138
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #137
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #136
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #135
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #134
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #133
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #132
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #131
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #127
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #126
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #125
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #124
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #123
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #066
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #062
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #061
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #060
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #059
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #056
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #053
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #052
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #048
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #036
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #032
Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #023
WSU Vancouver Phase I Campus Development NE Salmon Creek Avenue Reconstruction Rejected Bids - Bid Opening 3/31/1995
WSU Vancouver Phase I Campus Development Issues/Claims #2 4/11/1997 - 5/1997 RESTRICTED
Vancouver Phase I Campus Development Issues/Claims #1 8/22/1996 - 4/10/1997 RESTRICTED
WSU Vancouver Phase I Campus Development Disputes Review Board #112/1994 - 7/31/1996
WSU Vancouver Phase I Campus Development Heery International #3 CO11702 6/1/1996 - 3/31/1997
WSU Vancouver Phase I Campus Development Heery International #2 CO11702 1/1/1996 - 5/31/1996
WSU Vancouver Phase I Campus Development Heery International #1 CO11702 6/27/1994 - 12/31/1995
21WSU Vancouver Phase I Campus Development Carlson Testing, Inc. #1 8/1994 - 2/1995
WSU Vancouver Phase I Campus Development General Correspondence #2 E-mail 6/1/1996 - 2/24/1997
WSU Vancouver Phase I Campus Development General Correspondence #1 E-mail 8/5/1994 - 5/31/1996
WSU Vancouver Phase I Campus Development General Correspondence #33 1/1/1997 - 5/31/1997
WSU Vancouver Phase I Campus Development General Correspondence #32 9/1/1996 - 12/31/1996
WSU Vancouver Phase I Campus Development General Correspondence #31 6/1/1996 - 8/31/1996
WSU Vancouver Phase I Campus Development General Correspondence #30 2/1/1996 - 5/31/1996
WSU Vancouver Phase I Campus Development General Correspondence #29 11/16/1995 - 1/31/1996
WSU Vancouver Phase I Campus Development General Correspondence #28 9/1/1995 - 11/15/1995
22WSU Vancouver Phase I Campus Development General Correspondence #27 8/1/1995 - 8/31/1995
WSU Vancouver Phase I Campus Development General Correspondence #26 6/1/1995 - 7/31/1995
WSU Vancouver Phase I Campus Development General Correspondence #25 4/1/1995 - 5/31/1995
WSU Vancouver Phase I Campus Development General Correspondence #24 12/1/1994 - 3/31/1995
WSU Vancouver Phase I Campus Development General Correspondence #23 10/1994 - 11/30/1994
WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #40 2/1/1997 - 5/1997
WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #39 1/1/1997 - 1/31/1997
WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #38 12/1/1996 - 12/31/1996
WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #37 11/16/1996 - 11/30/1996
23WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #36 10/24/1996 - 11/15/1996
Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #35 10/1/1996 - 10/23/1996
WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #34 8/17/1996 - 9/30/1996
WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #33 8/1/1996 - 8/16/1996
WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #32 7/16/1996 - 7/31/1996
WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #31 6/16/1996 - 7/15/1996
WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #30 5/16/1996 - 6/15/1996
WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #29 4/16/1996 - 5/15/1996
WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #28 4/1/1996 - 4/15/1996
WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #27 3/16/1996 - 3/31/1996
24WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #26 3/1/1996 - 3/15/1996
WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #25 3/12/1996
WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #24 2/14/1996 - 2/29/1996
Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #23 2/21/1996 - 2/23/1996
Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #22 2/1/1996 - 2/20/1996
Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #21 1/11/1996 - 1/31/1996
Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #20 12/16/1995 - 1/10/1996
Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #19 12/1/1995 - 12//15/1995
Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #18 11/1/1995 - 11/30/1995
Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #17 10/16/1995 - 10/31/1995
25Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #16 10/1/1995 - 10/15/1995
Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #15 9/1/1995 - 9/30/1995
Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #14 9/1/1995 - 9/15/1995
WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #13 8/23/1995 - 8/31/1995
WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #12 8/1/1995 - 8/22/1995
WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #11 7/1/1995 - 7/31/1995
WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #10 6/1/1995 - 6/30/1995
WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #9 4/1/1995 - 5/1/1995
WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #8 2/16/1995 - 3/31/1995
26WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #7 1/16/1995 - 2/15/1995
WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #6 12/16/1994 - 1/15/1995
WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #5 12/1/1994 - 12/15/1994
WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #4 11/16/1994 - 11/30/1994
WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #3 10/1/1994 - 11/15/1994
WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #2 8/1/1994 - 9/30/1994
WSU Vancouver Phase I Campus Development General Correspondence Zimmer Gunsul Frasca #33 2/1/1997 - 5/1997
WSU Vancouver Phase I Campus Development General Correspondence Zimmer Gunsul Frasca #32 11/1/1996 - 1/31/1997
WSU Vancouver Phase I Campus Development General Correspondence Zimmer Gunsul Frasca #31 10/16/1996 - 10/31/1996
27WSU Vancouver Phase I Campus Development General Correspondence Zimmer Gunsul Frasca #30 6/1/1996 - 10/15/1996
WSU Vancouver Phase I Campus Development General Correspondence Zimmer Gunsul Frasca #29 4/1/1996 - 5/31/1996
WSU Vancouver Phase I Campus Development General Correspondence Zimmer Gunsul Frasca #27 12/1/1995 - 1/31/1996
WSU Vancouver Phase I Campus Development General Correspondence Zimmer Gunsul Frasca #26 10/16/1995 - 11/30/1995
WSU Vancouver Phase I Campus Development General Correspondence Zimmer Gunsul Frasca #25 8/16/1995 - 10/15/1995
WSU Vancouver Phase I Campus Development General Correspondence Zimmer Gunsul Frasca #24 6/1/1995 - 8/15/1995
WSU Vancouver Phase I Campus Development General Correspondence Zimmer Gunsul Frasca #23 4/1/1995 - 5/31/1995
WSU Vancouver Phase I Campus Development General Correspondence Zimmer Gunsul Frasca #22 2/1/1995 - 3/31/1995
WSU Vancouver Phase I Campus Development General Correspondence Zimmer Gunsul Frasca #21 12/16/1994 - 1/31/1995
28WSU Vancouver Phase I Campus Development General Correspondence Zimmer Gunsul Frasca #20 11/1/1994 - 12/15/1994
WSU Vancouver Phase I Campus Development General Correspondence Zimmer Gunsul Frasca #19 9/1994 - 10/31/1994
WSU Vancouver Phase I Campus Development Pease and Sons CO11751 #38/1/1995 - 1/31/1996
WSU Vancouver Phase I Campus Development Heery International E-mail 8/26/1995 - 5/31/1996
WSU Vancouver Phase I Campus Development Zimmer Gunsul Frasca CO10797 #13 8/1/1996 - 4/30/1997
WSU Vancouver Phase I Campus Development Zimmer Gunsul Frasca CO10797 #12 4/1/1996 - 7/1/1996
WSU Vancouver Phase I Campus Development Zimmer Gunsul Frasca CO10797 #111/1/1996 - 3/31/1996
WSU Vancouver Phase I Campus Development Zimmer Gunsul Frasca CO10797 #10 10/1995 - 12/31/1995
WSU Vancouver Phase I Campus Development Zimmer Gunsul Frasca CO10797 #9 8/1995 - 9/1995
WSU Vancouver Phase I Campus Development Zimmer Gunsul Frasca CO10797 #8 5/1995 - 7/1995
WSU Vancouver Phase I Campus Development Zimmer Gunsul Frasca CO10797 #7 2/1995 - 4/1995
29Vancouver Phase I Campus Development General Correspondence Zimmer Gunsul Frasca #28 2/1/1996 - 3/31/1996
WSU Vancouver Phase I Campus Development Off - Site Road Improvements #5 9/1/1996 - 12/31/1996
WSU Vancouver Phase I Campus Development Off - Site Road Improvements #4 1/1/1996 - 8/31/1996
WSU Vancouver Phase I Campus Development Off - Site Road Improvements #3 4/1/1995 - 12/31/1995
WSU Vancouver Phase I Campus Development Off - Site Road Improvements #2 9/1994 - 3/31/1995
WSU Vancouver Phase I Campus Development Pease and Sons, Inc., General Correspondence #4 5/1/1996 - 10/31/1996
WSU Vancouver Phase I Campus Development Pease and Sons, Inc., General Correspondence #3 11/1/1995 - 4/30/1996
WSU Vancouver Phase I Campus Development Pease and Sons, Inc., General Correspondence #2 8/1/1995 - 10/31/1995
WSU Vancouver Phase I Campus Development Pease and Sons, Inc., General Correspondence #1 6/1/1994 - 7/31/1995
WSU Vancouver Phase I Campus Development Public Information Requests 7/1995 - 9/1997

Archives 282
Facilities Development
Building Files and Records, 1978-1996

ACQUISITION AND PROCESSING INFORMATION

These Facilities Development Building Files and Records were transferred to Manuscripts, Archives, and Special Collections on July 31st, 1998 (UA 1998-16) by Anne Clark of Facilities Development. They were processed in 2009 by University Archivist Mark O'English and Tim Mace.

EXTENT/QUANTITY INFORMATION

Number of containers: 15 boxes
Linear feet of shelf space: 15

COLLECTION DESCRIPTION & ARRANGEMENT

The collection consists of records pertaining to construction, remodeling, maintenance, and improvement of WSU buildings. The records are retained in their original order, which is primarily by building number, with a few campus-wide items located at the end. Buildings included here include Fulmer Hall and Carpenter Hall.

PREFERRED CITATION

The suggested citation for the collection is:

[Item Description]
Facilities Development Building Files and Records, 1978-1996 (UA 282)
Manuscripts, Archives, and Special Collections
Washington State University Libraries
Pullman, WA

Box Description
Building #0003 - Fulmer Hall (Phase I and II)
1Budget 12/1981 - 10/1985
Affirmative Action Reports 4/1984 - 5/1985
Mahan & Smith Correspondence 5/1983 - 8/1983
Towne, Richards & Chaudiere, Inc. 5/1968 - 2/1983
Diary Reports (Construction Reports) 3/1984 - 3/1985
Concrete Testing 3/1984 - 6/1984
General Correspondence #3 6/1984 - 3/1986
General Correspondence #2 12/1983 - 5/1984
General Correspondence #1 4/1983 - 4/1983
Waldron Pomeroy Smith Foote & Akira General Correspond. #3 12/1984 - 6/1985
Waldron Pomeroy Smith Foote & Akira General Correspond. #2 6/1984 - 11/1984
Waldron Pomeroy Smith Foote & Akira General Correspond. #1 5/1983 - 5/1984
Waldron Pomeroy Smith Foote & Akira Contract, Payments 12/1982 - 6/1985
Airway’s Sheet Metal General Correspondence #2 11/1984 - 8/1985
Airway’s Sheet Metal General Correspondence #1 2/1984 - 10/1984
Airway’s Sheet Metal Payments, C.O. s #2 12/1984 - 3/1985
Airway’s Sheet Metal Contract, Payments, C.O. s #1 2/1984 - 1/1985
Pending Change Proposals 7/24/1984
Rejected Bids (First Bid) 9/23/1983
Rejected Bids (Second Bid) 1/24/1984
Building Program Statement 8/1979
Building #0003 - Fulmer Hall (Phase II)
2Budget File 7/1979 - 10/1985
Affirmative Action Reports 6/1982 - 4/1983
DHEW Correspondence 2/1982 - 3/1982
Smith & Swenson Engineers Correspondence 5/1981 - 3/1984
Diary Reports (Construction Reports) 5/1982 - 5/1983
Minutes of the Meetings 10/8/1982
Hardware Schedule 6/1982 - 7/1982
ABC Laboratories, Inc., Testing 5/28/1982
General Correspondence #4 2/1983 - 5/1990
General Correspondence #3 4/1982 - 1/1983
General Correspondence #2 10/198 1 - 3/1982
General Correspondence #1 5/1978 - 9/1981
Waldron Pomeroy Smith Foote & Akira General Corres. #3 12/1982 - 6/1989
Waldron Pomeroy Polk & Smith General Correspondence #2 10/1981 - 11/1982
Waldron Pomeroy Polk & Smith General Correspondence #1 6/1978 - 9/198 1
Waldron Pomeroy Polk & Smith Contract, Payments 8/1978 - 4/1984
Levernier - Shea General Correspondence 3/1982 - 1/1984
Levernier - Shea Contract, Payments, C.O.s 2/1982 - 10/1983
Rejected Bids - General 3/9/1982
Rejected Bids - Electrical 3/4/1982
Rejected Bids - Mechanical 3/4/1982
Building Program Statement 2/20/1979
Design Development 5/1980
Building #0003 - Fulmer Hall Annex
Budget [empty file]
Mahan & Smith Correspondence 3/1984 - 5/1984
Air Flow Study 4/2/1984
General Correspondence 5/1983 - 12/1984
Building #0020 - Carpenter Hall
3Budget 4/1987 - 10/1993
E.I.S. 9/1987 - 10/1987
Regents Reports 10/1986 - 5/1992
Burke/Lee A Joint Venture 11/1988 - 1/1993
Mahan & DeSalvo General Correspondence #2 5/1990 - 10/1990
Mahan & DeSalvo General Correspondence #1 3/1987 - 3/1990
Earl Nelson Corporation General Correspondence 2/1990 - 12/1990
Heery General Correspondence #2 3/1991 - 12/1992
Heery General Correspondence #1 12/1989 - 2/1991
Heery Program Management Contract, Payments #2 12/1992 - 6/1993
Heery Program Management Contract, Payments #1 2/1990 - 11/1992
Coopers & Lybrand General Correspondence 2/1993 - 6/1993
Coopers & Lybrand Contract, Payments 2/1993 - 3/1993
MW Consulting Engineers Contract, Payments 1/1992 - 2/1992
Peterson Consulting, Ltd., Contract, Payments 2/1993 - 3/1993
Budinger & Associates Geotechnical Investigation & Review 7/28/1989
Building Program 1/1988
Physical Plant Inspection Reports 12/1989 - 2/1992
Construction Diary Reports #3 9/1991 - 2/1992
Construction Diary Reports #2 5/1991 - 8/1991
Construction Diary Reports #1 12/1989 - 3/1991
4Diary and Progress Reports 8/1990 - 2/1991
Diary and Progress Reports 6/1989 - 2/1990
Temperature Controls undated
Project Manager Weekly Reports 3/1991 - 8/1991
Non-Completed Submittals 7/30/1991
Pittsburgh Testing Laboratory 8/1990 - 10/1990
Pittsburgh Testing Laboratory 10/1989 - 7/1990
Wyatt-Jaykim Concrete Testing 10/1990 - 8/1991
General Correspondence #10 6/1993 - 7/1995
General Correspondence #9 1/1992 - 5/1993
General Correspondence #8 9/1991 - 12/1991
General Correspondence #7 5/1991 - 8/1991
General Correspondence #6 11/1990 - 4/1991
General Correspondence #5 6/1990 - 10/1990
5General Correspondence #4 2/1990 - 5/1990
General Correspondence #3 8/1989 - 1/1990
General Correspondence #2 1/1989 - 7/1989
General Correspondence #1 8/1986 - 12/1988
NBBJ Architects Hardware Schedule 7/1989 - 11/1989
NBBJ Architects General Correspondence #22 1/1991 - 6/1995
NBBJ Architects General Correspondence #21 10/1991 - 12/1991
NBBJ Architects General Correspondence #20 6/1991 - 9/1991
NBBJ Architects General Correspondence #19 2/1991 - 5/1991
NBBJ Architects General Correspondence #18 12/1990 - 1/199 1
6NBBJ General Correspondence #17 11/1990 - 11/1990
NBBJ General Correspondence #16 10/1990 - 10/1990
NBBJ General Correspondence #15 9/1990 - 9/1990
NBBJ General Correspondence #14 7/1990 - 8/1990
NBBJ General Correspondence #13 5/1990 - 6/1990
NBBJ General Correspondence #12 4/1990 - 4/1990
NBBJ General Correspondence #11 3/1990 - 3/1990
NBBJ General Correspondence #10 1/1990 - 2/1990
NBBJ General Correspondence #9A 12/7/1989 - 12/28/1989
NBBJ General Correspondence #9 11/1989 - 12/4/1989
7NBBJ Architects General Correspondence #8 9/1989 - 10/1989
NBBJ Architects General Correspondence #7 8/1989 - 8/1989
NBBJ Architects General Correspondence #6 6/1989 - 7/1989
NBBJ Architects General Correspondence #5 5/1989 - 5/1989
NBBJ Architects General Correspondence #4 4/1989 - 4/1989
NBBJ Architects General Correspondence #3 1/1989 - 3/1989
NBBJ Architects General Correspondence #2 11/1987 - 12/1988
NBBJ Architects General Correspondence #1 8/1986 - 10/1987
NBBJ Architects Contract, Payments 4/1987 - 3/1995
Landscaping General Architect Correspondence 11/1987 - 8/1990
Carpenter Hall Furnishings 10/1994 - 4/1995
8Bouten Construction General Correspondence #8 10/1991 - 7/1993
Bouten Construction General Correspondence #7 5/1991 - 9/1991
Bouten Construction General Correspondence #6 3/1991 - 4/1991
Bouten Construction General Correspondence #5A 2/1991 - 2/1991
Bouten Construction General Correspondence #5 1/1991 - 1/1991
Bouten Construction General Correspondence #4 12/1990 - 12/1990
Bouten Construction General Correspondence #3 10/1990 - 10/1990
Bouten Construction General Correspondence #2 4/1990 - 9/1990
Bouten Construction General Correspondence #1 5/1989 - 3/1990
Bouten Construction Company RFI #900-941 8/21/1991 - 2/6/1992
Bouten Construction Company RFI #850-899 5/9/1991 - 7/10/1991
Bouten Construction Company RFI #800-850 4/2/1991 - 5/9/1991
9Bouten Construction Company RFI #751-799 2/28/1991 - 3/29/1991
Bouten Construction Company RFI #651-750 1/7/1991 - 2/28/1991
Bouten Construction Company RFI #600-650 1/19/1990 - 1/28/1991
Bouten Construction Company RFI #501-522 (no folder) 9/19/1990 - 9/27/1990
Bouten Construction Company RFI #560-599 10/17/1990 - 11/19/1990
Bouten Construction Company RFI #500-559 9/19/1990 - 10/18/1990
Bouten Construction Company RFI #451-499 8/20/1990 - 9/20/1990
Bouten Construction Company RFI #400-450 7/20/1990 - 8/21/1990
Bouten Construction Company RFI #351-399 6/11/1990 - 7/20/1990
Bouten Construction Company RFI #300-350 5/8/1990 - 8/13/1990
Bouten Construction Company RFI #250-299 3/20/1990 - 5/8/1990
Bouten Construction Company RFI #201-249 1/18/1990 - 6/14/1990
10Bouten Construction Company RFI #126-200 10/20/1989 - 1/26/1990
Bouten Construction Company RFI #71-125 8/22/1989 - 10/20/1989
Bouten Construction Company RFI #1-70 6/23/1989 - 8/22/1989
Bouten Construction Company Contract, Payments, C.O.s #18 5/1992 - 7/1992
Bouten Construction Company C.P.s, C.O.s #17 C.O. #19
Bouten Construction Company C.P.s, C.O.s #17A C.O. #19
Bouten Construction Company C.P.s, C.O.s #17B C.O. #19
Bouten Construction Company C.P.s, C.O.s #16 C.O. #18
Bouten Construction Company C.P.s, C.O.s #15 C.O. #18
11Bouten Construction Company C.P.s, C.O.s #14 CO. #17
Bouten Construction Company C.P.s, C.O.s #13 C.O. #16
Bouten Construction Company C.P.s, C.O.s #12 C.O. #16
Bouten Construction Company C.P.s, C.O.s #11 C.O. #15
Bouten Construction Company C.P.s, C.O.s #10 C.O. #15
Bouten Construction Company C.P.s, C.O.s #9 CO. #14
Bouten Construction Company C.P.s, C.O.s #8 C.O. #14
Bouten Construction Company C.P.s, C.O.s #7 C.O. #13
12Bouten Construction Company Payments, C.O.s, C.P.s #6 CD. #11
Bouten Construction Company Payments, C.O.s, C.P.s #5 C.O. #12
Bouten Construction Company Payments, C.O.s, C.P.s #4 C.O.s #8,9,10
Bouten Construction Company Payments, C.O.s, C.P.s #3 C.O.s. #6,7
Bouten Construction Company Payments, C.O.s, C.P.s #2 12/1989 - 3/1990
Bouten Construction Company Payments, Contract, C.O.s, C.P.s #1 6/1989 - 11/1989
Bouten Construction file (Blue Label) misc. dates
Bouten Settlement and Release Agreement 4/1993 - 4/1996
Change Order Proposal Log 12/1991 - 5/1992
Statements of Compliance 1989 - 1991
Pending Change Proposals Aa - Am
Pending Change Proposals Ao - Az
Pending Change Proposals Ba - Br
Pending Change Proposals Bs - Bz
Pending Change Proposals Ca - Cz
Pending Change Proposals Da - Di
Pending Change Proposals Dj - Du
Pending Change Proposals Du - Dz
Pending Change Proposals Ea - Ez
Pending Change Proposals Fa - Fz
13Pending Change Proposals Ga - Go
Pending Change Proposals Gr - Gz
Pending Change Proposals Ha - Hz
Pending Change Proposals F & L
Pending Change Proposals N - AL
Rejected Bids 5/9/1989 - 10/25/1994
Schematic Design 4/24/1987
Building Program 1/1987
Design Development 10/16/1987
The NBBJ Group Project & Cost Management 5/2/1989
Wausau Metals Corp Retrofit Information 6/15/1988
Carpenter Hall Remodel Time Line 9/25/1991
Life Cycle Cost Analysis 12/1/1987
Mechanical Calculations 3/10/1989
14Pending Change Proposals GA - GQ
Pending Change Proposals GR - GZ
Bouten Construction RFI's H
Pending Change Proposals F - L
Pending Change Proposals N - AL
Rejected Bids
Schematic Design 4/24/1987
Building Program 1/1988
Design Development 10/16/1987
Project Cost Management
WAUSAU Metals Corporation Correspondence 6/15/1988
Remodel Timeline 9/16/1991
Life Cycle Cost Analysis 12/1/1987
Mechanical Calculations 3/10/1989
Central Campus Storm Sewer and Circulation Improvements
15Central Campus Storm Sewer and Circulation Improvements 8/1981 - 9/1985
Diary Reports 9/1986 - 11/1986
Central Campus Storm Sewer and Circulation Improvements Study 4/1984
Comprehensive Campus Plan
Parking and Grounds Study 12/1986 - 3/1989
Parking and Grounds Study 4/1984 - 11/1986
Parking and Grounds Study 10/1981 - 3/1984
General Correspondence 11/1979 - 1/1983
Burke/Lee Associates General Correspondence #2 5/1983 - 10/1988
Burke/Lee Associates General Correspondence #1 10/1980 - 4/1983
Comprehensive Physical Planning Process 6/1987 - 1/1989
Comprehensive Plan Update #4 2/1986 - 5/1987
Comprehensive Plan Update #3 6/1985 - 1/1986
Comprehensive Plan Update #2 10/1984 - 5/1985
Comprehensive Plan Update #1 6/1983 - 9/1984

Archives 283
Facilities Development
Building Files and Records, 1963-1998

ACQUISITION AND PROCESSING INFORMATION

These Facilities Development Building Files and Records were transferred to Manuscripts, Archives, and Special Collections on July 9th, 1998 (UA 1998-14) by Anne Clark of Facilities Development. They were processed in 2009 by University Archivist Mark O'English and Tim Mace.

EXTENT/QUANTITY INFORMATION

Number of containers: 36 boxes
Linear feet of shelf space: 36

COLLECTION DESCRIPTION & ARRANGEMENT

The collection consists of records pertaining to construction, remodeling, maintenance, and improvement of WSU buildings. The records are retained in their original order, which is primarily by building number, with a few campus-wide items located at the end. Buildings included here include Fulmer Hall and Carpenter Hall.

PREFERRED CITATION

The suggested citation for the collection is:

[Item Description]
Facilities Development Building Files and Records, 1963-1998 (UA 283)
Manuscripts, Archives, and Special Collections
Washington State University Libraries
Pullman, WA

Box Description
Building #0003 - Chemistry Building
1Budget 1/1983 - 4/1991
Regents Reports 9/1986 - 11/1989
E.I.S. 1/1985 - 2/1987
Burke/Lee-Correspondence 1/1983 - 9/1988
Mahan & Smith - Correspondence 3/1984 - 8/1989
Wyatt-Jaykim Engineers Reports 10/1987 - 4/1992
Shannon & Wilson, Inc. Correspondence 1/1985 - 2/1988
Construction Reports 6/1989 - 8/1989
Construction Reports 11/1988 - 5/1989
Construction Reports 7/1988 - 10/1988
Construction Reports (Diary Reports) 6/1988
Concrete Testing 7/1987 - 11/1987
General Correspondence #21 1/1991 - 8/1997
General Correspondence #20 4/1990 - 12/1990
General Correspondence #19 12/1989 - 3/1990
2General Correspondence #18 9/1989 - 11/1989
General Correspondence #17 6/1989 - 8/1998
General Correspondence #16 4/1989 - 5/1989
General Correspondence #15 9/1988 - 3/1989
General Correspondence #14 12/1987 - 8/1988
General Correspondence #13 8/1987 - 11/1987
General Correspondence #12 6/1987 - 4/1987
General Correspondence #11 4/1987 - 5/1987
General Correspondence #10 2/1987 - 3/1987
3General Correspondence #9 8/1986 - 1/1987
General Correspondence #8 2/1986 - 7/1986
General Correspondence #7 10/1985 - 1/1986
General Correspondence #6 6/1985 - 9/1985
General Correspondence #5 3/1985 - 5/1985
General Correspondence #4 1/1985 - 2/1985
General Correspondence #3 10/1984 - 12/1984
General Correspondence #2 5/1984 - 9/1984
General Correspondence #1 1/1983 - 4/1984
Brooks Hensley Creager Architects Daily Reports 10/1987 - 1/1988
Brooks Hensley Creager Architects General Correspondence #28 9/1990 - 12/1991
Brooks Hensley Creager Architects General Correspondence #27 1/1990 - 8/1990
Brooks Hensley Creager Architects General Correspondence #26 10/1989 - 12/1989
4Brooks Hensley Creager Architects General Correspondence #25 8/1989 - 9/1989
Brooks Hensley Creager Architects General Correspondence #24 6/1989 - 7/1989
Brooks Hensley Creager Architects General Correspondence #23 3/1989 - 5/1989
Brooks Hensley Creager Architects General Correspondence #22 10/1988 - 2/1989
Brooks Hensley Creager Architects General Correspondence #21 5/1988 - 9/1988
Brooks Hensley Creager Architects General Correspondence #20 3/1988 - 4/1988
Brooks Hensley Creager Architects General Correspondence #19 12/1987 - 2/1988
Brooks Hensley Creager Architects General Correspondence #18 8/1987 -11/1987
Brooks Hensley Creager Architects General Correspondence #17 6/1987 - 7/1987
5Brooks Hensley Creager Architects General Correspondence #16 5/1987 - 5/1987
Brooks Hensley Creager Architects General Correspondence #15 4/1987 - 4/1987
Brooks Hensley Creager Architects General Correspondence #14 3/1987 - 3/1987
Brooks Hensley Creager Architects General Correspondence #13 2/1987 - 2/1987
Brooks Hensley Creager Architects General Correspondence #12 1/1987 - 1/1987
Brooks Hensley Creager Architects General Correspondence #11 10/1986 - 12/1986
Brooks Hensley Creager Architects General Correspondence #10 2/1986 - 9/1986
Brooks Hensley Creager Architects General Correspondence #9 11/1985 - 1/1986
Brooks Hensley Creager Architects General Correspondence #8 9/1985 - 10/1985
Brooks Hensley Creager Architects General Correspondence #7 8/1985 - 8/1985
Brooks Hensley Creager Architects General Correspondence #6 5/1985 - 7/1985
Brooks Hensley Creager Architects General Correspondence #5 3/1985 - 4/1985
Brooks Hensley Creager Architects General Correspondence #4 1/1985 - 2/1985
6Brooks Hensley Creager Architects General Correspondence #3 9/1984 - 12/1984
Brooks Hensley Creager Architects General Correspondence #2 6/1984 - 8/1984
Brooks Hensley Creager Architects General Correspondence #1 5/1984 - 5/1984
Brooks Hensley Creager Payments, Addendums #3 5/1989 - 7/1990
Brooks Hensley Creager Payments, Addendums #2 4/1987 - 3/1988
Brooks Hensley Creager Contract, Payments, Change Proposals #1 6/1983 - 4/1987
Shea/Emerick Construction General Correspondence #4 1/1990 - 4/1992
Shea/Emerick Construction General Correspondence #3 1/1989 - 12/1989
Shea/Emerick Construction General Correspondence #2 1/1988 - 12/1988
Shea/Emerick Construction General Correspondence #1 8/1987 - 6/1988
Shea/Emerick Construction Contract, Payments, C.O. s #4 9/1989 - 11/1989
Shea/Emerick Construction Contract, Payments, C.O. s #3 3/1989 - 9/1989
Shea/Emerick Construction Contract, Payments, C.O. s #2 10/1988 - 2/1989
7Shea/Emerick Construction Contract, Payments, C.O.s # 1 8/1987 - 9/1988
Pending Contract Change Proposals 10/1987 - 8/1989
Rejected Bids - General Construction 8/6/1987 - 8/13/1987
Rejected Bids - Electrical Work 31995
Rejected Bids - Lab Controlled Temperature 31995
Rejected Bids - Mechanical Work 31995
Rejected Bids - Laboratory Furnishings 31995
Rejected Bids - Laboratory Equipment 31995
Certificate of Substantial Completion 32597
Certificate of Substantial Completion 32797
Exhaust Gas Re-Entry in the WSU Chemistry Synthesis and Fulmer Annex Buildings 33227
Chemistry Building Color Selections 32818
Waterproofing 6/1984 - 10/1987
Chemistry Building Geotechnical Investigation 9/1984 - 6/1987
Brooks Hensley Creager Contract and Background Information Regarding Cost Overrun and Fee Circumstances 9/1985 - 8/1986
Wind Tunnel Study of Air Flow About Fulmer Hall and the New Chemistry Synthesis Building 32554
Design Development Chemistry Building Project Description Chemistry Building Program Statement 3/1984
Schematic Design Phase Binder 11/2/1984
Schematic Design Phase Binder 9/24/1986
Schematic Design Phase Binder - Architectural Work undated
A WSU Chemistry Building Waterproofing Research Report 10/1985 - 5/1987
Geotechnical Report Research Chemistry Building WSU 12/6/1984
Rock Quality and Mechanical Room Extension Supplemental 3/11/1986
Vibration Testing 6/1/1989
Chemistry Building Design Development Cost Estimate 2/11/1987
Statement of Qualifications for Engineering & Architectural Services 6/1987
Chemistry Building Revised Design Development 3/1987
Chemistry Building Site Selection Study 3/1984
Building #0009 - Olympic Weight Room Addition
8Budget 11/1987 - 7/1990
Regents Reports 4/1987 - 8/1990
Mahan & DeSalvo 5/1985 - 1/1989
Meeting Minutes 2/1987 - 7/1987
Construction Reports 5/1989 - 8/1989
Concrete Testing 5/1989 - 8/1989
General Correspondence 4/1987 - 9/1992
ALSC Architects General Correspondence # 2 5/1989 - 7/1992
ALSC Architects General Correspondence # 1 10/1987 - 4/1989
ALSC Architects Contract, Payments 10/1987 - 3/1990
Levernier Construction General Correspondence 4/1989 - 8/1990
Levernier Construction Company Contract, Payments, C.O.s 5/1989 - 9/1990
Rejected Bids 1/24/1989
Olympic Weight Room Addition Design Development 4/1988
Olympic Weight Room Facility Design Development 3/1985
Olympic Weight Room Addition Building Program 8/1987
Olympic Weight Room Building Addition Building Program 12/1984
Building #0032 - Science Hall Phase I
9Budget 2/1980 - 9/1986
Richal Smith General Correspondence 1/1978 - 8/1983
Concrete Testing 9/1983 - 8/1984
Affirmative Action Reports 1/1984 - 8/1985
Landscaping 12/1984 - 5/1985
General Correspondence # 9 4/1985 - 10/1991
General Correspondence # 8 12/1984 - 3/1985
General Correspondence # 7 6/1984 - 11/1984
General Correspondence # 6 1/1984 - 5/1984
General Correspondence # 5 8/1983 - 12/1983
General Correspondence # 4 2/1983 - 7/1983
General Correspondence # 3 8/1982 - 1/1983
General Correspondence # 2 10/1981 - 7/1982
General Correspondence # 1 1/1997 - 9/1981
Decker Hobbs Fukui Davison Arch. General Correspondence # 10 4/1985 - 9/1986
Decker Hobbs Fukui Davison Arch. General Correspondence # 9 10/1984 - 3/1985
Decker Hobbs Fukui Davison Arch. General Correspondence # 8 4/1984 - 9/1984
10Decker Hobbs Fukui Davison Arch. General Correspondence # 7 12/1983 - 3/1984
Decker Hobbs Fukui Davison Arch. General Correspondence # 6 9/1983 - 11/1983
Decker Hobbs Fukui Davison Arch. General Correspondence # 5 4/1983 - 8/1983
Decker Hobbs Fukui Davison Arch. General Correspondence # 4 1/1983 - 3/1983
Decker Hobbs Fukui Davison Arch. General Correspondence # 3 10/1982 - 12/1982
Decker Hobbs Fukui Davison Arch. General Correspondence # 2 10/1981 - 9/1982
Decker Hobbs Fukui Davison Arch. General Correspondence # 1 6/1977 - 9/1981
Decker Hobbs Fukui Davison Arch. Fee Information 4/1985 - 7/1985
Decker Hobbs Fukui Davison Arch. C.O.s, Payments # 3 9/1984 - 5/1986
Decker Hobbs Fukui Davison Arch. Contract, C.O.s, Payments # 2 6/1983 - 7/1984
Decker Hobbs Fukui Davison Arch. Contract, C.O.s, Payments # 1 6/1977 - 5/1983
Levernier - Shea Construction General Correspondence # 2 1/1985 - 6/1988
Levernier - Shea Construction General Correspondence # 1 8/1983 - 12/1984
Levernier - Shea Construction Payments, C.O.s # 3 9/1983 - 6/1985
Levernier - Shea Construction Contract, C.O.s, Payments # 2 9/1983 - 12/1984
Levernier - Shea Construction Contract, C.O.s, Payments # 1 7/1983 - 7/1984
11Contract Change Proposals 8/1983 - 1/1985
Rejected Bids - Electrical 7/21/1983
Rejected Bids - Mechanical 7/21/1983
Rejected Bids - General 7/28/1983
Phase I Science Hall Remodeling Building Program 5/1982
Building Program for Science Hall Remodeling 10/1977
Electrical Engineers - Sparling & Associates, Inc. Firm Profile Life Cycle Cost Analysis Science Hall Remodeling 12/7/1982
John R. Cook, P.E., Electrical Calculations 6/20/1983
Report Geotechnical Consultation Proposed Science Hall Bldg. 1/19/1983
Mechanical Calculations Science Hall Remodeling 6/30/1983
Structural Calculations for Science Hall Remodeling Phase I 5/16/1983
Schematic Construction Cost Estimate 6/11/1982
Site & Volume Planning Study Science Area Complex
Building #0044 - McCoy Hall
12Budget 4/1998 - 1/1988
Regents Reports 9/1986 - 9/1987
Construction Reports 3/1988 - 1/1989
General Correspondence # 5 9/1989 - 10/1991
General Correspondence # 4 1/1989 - 8/1989
General Correspondence # 3 3/1988 - 12/1988
General Correspondence # 2 10/1986 - 2/1988
General Correspondence # 1 11/1979 - 9/1986
DeNeff Deeble Barton Associates Architects - General Correspondence # 3 7/1989 - 10/1990
DeNeff Deeble Barton Associates Architects - General Correspondence # 2 10/1987 - 6/1989
DeNeff Deeble Barton Associates Architects - General Correspondence # 1 11/1986 - 9/1987
DeNeff Deeble Barton Associates Architects - Contract, Payments 11/1986 - 10/1990
Culler Gale Martell Ericson, PS, Architecture Planning, General Correspondence 3/1979 - 5/1986
Culler Gale Martell Ericson, PS, Architecture Planning, Contract, Payments 12/1985 - 3/1986
Levernier Construction - General Correspondence 2/1988 - 12/1989
Levernier Construction - Contract, Payments, C.O.'s 1/1989 - 5/1990
Levernier Construction - Contract, Payments, C.O.'s 1/1988 - 12/1988
Rejected Bids 1/21/1988
Affirmative Action Reports 8/1988 - 12/1988
2 Schematic Phase Binders 3/1987
Balance Report Review for Supply & Exhaust Fans of HVAC Binder 5/1988 - 6/1989
Remodeling/Renewal Program Binder 4/1986
David L. Smith Working File
Building #0070 - Neill Hall
13Duarte Bryant Architects General Correspondence # 2 4/1989 - 7/1989
Duarte Bryant Architects General Correspondence # 1 1/1989 - 3/1989
Duarte Bryant Architects Payments, Contract 3/1987 - 5/1991
Lydig Construction General Correspondence 5/1989 - 1/1992
Lydig Construction Payments, Change Orders # 2 2/1990 - 4/1991
Lydig Construction Contract, Payments, C.O.s # 1 6/1989 - 1/1990
Pending Change Proposals 5/1989 - 5/1990
Rejected Bids 5/2/1989 - 5/9/1989
Landscaping 9/1990 - 10/1990
Neill Hall Renewal Schematic Phase Binder
Building Program 5/1987
14Budget 6/1987 - 4/1991
E.I.S. 10/1984 - 9/1987
Regents Report 5/1989 - 1/1991
Mahan & DeSalvo, Consulting Engineers 4/1987 - 3/1989
Contraction Reports 1/1990 - 5/1990
Concrete Testing Reports 7/1989 - 8/1989
General Correspondence # 6 10/1990 - 12/1995
General Correspondence # 5 5/1990 - 9/1990
General Correspondence # 4 8/1989 - 4/1990
General Correspondence # 3 4/1989 - 7/1989
General Correspondence # 2 10/1987 - 3/1989
General Correspondence # 1 3/1984 - 9/1987
Duarte Bryant Architects General Correspondence # 6 11/1990 - 10/1991
Duarte Bryant Architects General Correspondence # 5 5/1990 - 10/1990
Duarte Bryant Architects General Correspondence # 4 12/1989 - 4/1990
Duarte Bryant Architects General Correspondence # 3 8/1989 - 11/1989
Building #0078A - Electrical/Mechanical Engineering Building
15Budget 2/1982 - 10/1989
E.I.S. 6/1983 - 7/1983
Affirmative Action Reports 7/1984 - 9/1986
"Alucobond" Study 1/1986 - 11/1986
Concrete Testing 6/1984 - 5/1988
Life Cycle Cost Analysis and Air Flow Study 7/1983
Mahan & Smith General Correspondence 4/1983 - 7/1986
Comprehensive Campus Plan (Burke/Lee General Correspondence) 12/1981 - 9/1983
Construction Reports (Dairy Reports) 6/1984 - 10/1986
General Correspondence # 9 12/1986 - 8/1992
General Correspondence # 8 7/1986 - 11/1986
General Correspondence # 7 4/1986 - 6/1986
General Correspondence # 6 10/1985 - 3/1986
General Correspondence # 5 12/1984 - 9/1985
General Correspondence # 4 7/1984 - 11/1984
General Correspondence # 3 3/1984 - 6/1984
16General Correspondence # 2 6/1983 - 2/1984
General Correspondence # 1 1/1982 - 5/1983
CSA/LMN Joint Venture General Correspondence # 7 10/1986 - 3/1990
CSA/LMN Joint Venture General Correspondence # 6 4/1986 - 9/1986
CSA/LMN Joint Venture General Correspondence # 5 7/1985 - 3/1986
CSA/LMN Joint Venture General Correspondence # 4 1/1985 - 6/1985
CSA/LMN Joint Venture General Correspondence # 3 6/1984 - 12/1984
CSA/LMN Joint Venture General Correspondence # 2 12/1983 - 5/1984
CSA/LMN Joint Venture General Correspondence # 1 4/1983 - 11/1983
CSA/LMN Joint Venture Contract, Payments, C.O.s # 2 11/1984 - 9/1987
CSA/LMN Joint Venture Contract, Payments, C.O.s # 1 6/1982 - 8/1984
Ace Elliott Landscaping General Correspondence # 2 6/1986 - 12/1987
Ace Elliott Landscaping General Correspondence # 1 1/1986 - 11/1988
Ace Elliott Landscaping Contract, Payments, C.O.s 8/1986 - 10/1986
17M.A. Mortenson Co. Contractor General Correspondence 6/1984 - 12/1989
M.A. Mortenson Co. Contractor C.O.s # 4 4/1986 - 3/1987
M.A. Mortenson Co. Contractor Payments, C.O.s # 3 8/1985 - 4/1986
M.A. Mortenson Co. Contractor Contract, Payments, C.O.s # 2 4/1985 - 11/1985
M.A. Mortenson Co. Contractor Contract, Payments, C.O.s # 1 5/1984 - 7/1985
Pending Change Proposals 9/1985 - 7/1986
Rejected Bids - General 5/24/1984
Rejected Bids - Mechanical 5/17/1984
Rejected Bids - Electrical 5/17/1984
Rejected Bids - Landscaping 6/26/1986
Contractor Qualification Statement - M.A. Mortenson Company 6/7/1984
WSU Engineering Photographs 9/1984 - 10/1984
Report on the Life Cycle Cost Analysis of the WSU Electrical/Mechanical Engineering Building 7/1983
WSU Electrical/Mechanical Engineering Building undated
Landscaping Specifications 6/6/1986
Schematic Design Submittal CSA - LMM undated
Outline Specification CSA - LMM undated
Design Development CSA - LMM 7/5/1983
Building Program 12/1983
Building #0089 - Food Service Building
18Budget 3/1985 - 3/1989
E.I.S. 10/1985 - 11/1985
Regents Reports 11/1985 - 5/1988
Affirmative Action Reports 1/1987 - 5/1988
Mahon & Smith, Inc. 4/1985 - 3/1987
Shannon & Wilson Geotechnical 10/4/1985
Asbestos Reports 12/16/1985
Daily Construction Reports (Dairy Reports) 1/1987 - 10/1988
Concrete Testing Reports 1/1987 - 7/1987
Keying Schedule 3/1987 - 4/1987
General Correspondence # 5 7/1990 - 6/1992
General Correspondence # 4 4/1987 - 6/1990
General Correspondence # 3 1/1987 - 7/1987
General Correspondence # 2 4/1986 - 12/1986
General Correspondence # 1 2/1983 - 3/1986
Miller/Hull General Correspondence # 5 12/1990 - 3/1992
Miller/Hull General Correspondence # 4 3/1988 - 11/1990
19Miller/Hull General Correspondence # 3 4/1987 - 2/1988
Miller/Hull General Correspondence # 2 4/1986 - 2/1987
Miller/Hull General Correspondence # 1 6/1983 - 4/1986
Miller/Hull Contract, Payments 3/1985 - 10/1990
Redding Construction General Correspondence 10/1986 - 1/1989
Redding Construction Contract, Payments, C.O.s # 2 1/1987 - 6/1992
Redding Construction Contract, Payments, C.O.s # 1 12/1986 - 1/1988
Emory & Emory, Inc. General Correspondence 6/1988 - 12/1990
Landscaping General Correspondence 2/1987 - 3/1990
Emory & Emory, Inc., Contract, Payments, C.O.s 7/1987 - 7/1989
Addendums to Specs 10/1986 - 12/1986
Pending Change Proposals 2/1987 - 4/1988
Rejected Bids - Electrical 10/14/1986
Rejected Bids - Mechanical 10/1986 - 11/1986
Rejected Bids - General (Second Bid) 12/9/1986
Rejected Bids - General (First Bid) 10/21/1986
Rejected Bids - Landscaping 5/4/1988
Building Program 4/1985
Shannon & Wilson, Inc., Geotechnical Report 10/4/1988
D.W. Thompson Life Cycle Cost Analysis 2/27/1986
Design Development 11/12/1985
Design Development 9/12/1985
Schematics 6/5/1985
Building #0097 - Fine Arts Center
20Budget 12/1987 - 4/1990
Regents Reports 8/1987 - 7/1989
Center for Occupational Hazards, Inc., Correspondence 3/1988 - 5/1988
Wyatt Jaykim Report 9/1988 - 11/1988
Mahan & DeSalvo 3/1988 - 5/1988
Concrete Tests 9/1988 - 12/1988
General Correspondence # 4 5/1990 - 10/1991
General Correspondence # 3 1/1989 - 4/1990
General Correspondence # 2 11/1987 - 12/1988
General Correspondence # 1 5/1987 - 10/1987
Halvorson, Beach & Bower General Correspondence # 3 5/1990 - 1/1991
Halvorson, Beach & Bower General Correspondence # 2 10/1988 - 4/1990
Halvorson, Beach & Bower General Correspondence # 1 9/1987 - 9/1988
Halvorson, Beach & Bower Contract, Payments 10/1987 - 2/1991
21Lydig Construction General Correspondence 6/1988 - 3/1990
Lydig Construction Contract, Payments, C.O.s # 2 4/1989 - 7/1989
Lydig Construction Contract, Payments, C.O.s # 1 7/1988 - 3/1989
Pending Change Proposals 11/1988 - 7/1989
Rejected Bids - Mechanical 6/8/1988 - 6/10/1988
Mechanical Systems Renovation Life Safety Requirements 10/9/1987
Mechanical Systems Renovation Life Safety Requirements 10/9/1987
Air Balance Report Halvorson, Beach & Bower, Inc. 2/15/1991
Schematic Design Phase Submittal 11/301987
Parking Study Final Report 11/22/1988
Building #0138 - Alumni Center
22E.I.S. 10/1984 - 12/1984
Burke/Lee, A Joint Venture 11/1988 - 5/1989
Building Committee Minutes # 2 1/1989 - 9/1989
Building Committee Minutes # 1 12/1983 - 12/1988
Construction Observations and Meetings 9/1987 - 8/1989
Daily Construction Reports (Dairy Reports) 7/1987 - 2/1990
Concrete Testing 9/1987 - 7/1989
General Correspondence # 7 8/1989 - 9/1994
General Correspondence # 6 3/1988 - 7/1989
General Correspondence # 5 11/1987 - 2/1988
General Correspondence # 4 6/1987 - 10/1987
General Correspondence # 3 3/1986 - 5/1987
General Correspondence # 2 8/1984 - 2/1986
General Correspondence # 1 10/1983 / -7/1984
23N.W. Architects General Correspondence # 6 8/1989 - 1/1994
N.W. Architects General Correspondence # 5 8/1988 - 7/1989
N.W. Architects General Correspondence # 4 3/1988 - 7/1988
N.W. Architects General Correspondence # 3 8/1987 - 2/1988
N.W. Architects General Correspondence # 2 3/1987 - 7/1987
N.W. Architects General Correspondence # 1 5/1984 - 2/1987
Alumni Center Landscaping 1/1987 - 2/1991
Turnkey Incorporated - Contractor Correspondence 10/1986 - 9/1989
Our Legacy - The Alumni Center 1/27/1986
Preliminary Structural Engineering Report 8/1/1988
Soil Investigation for WSU Foundation 9/11/1986
WSU Alumni Center 4/1984
Project Acceptance Letter 9/15/1989
2 Alumni Center Binders - N.W. Architectural Company 3/21/1986
Building #0362 - Feed Preparation, Mixing and Storage Facility
24Budget 8/1985 - 1/1989
E.I.S. 5/1986 - 12/1986
Regents Reports 5/1986 - 11/1987
Affirmative Action 10/1987 - 7/1988
Consultants 1/1986 - 4/1986
Mahan & Smith Correspondence 9/1985 - 11/1987
Daily Construction Reports (Diary Reports) 10/1987 - 4/1988
Concrete Testing 3/1987 - 5/1988
Purchase Orders A - L mixed dates
Purchase Orders M - Z mixed dates
General Correspondence # 5 7/1989 - 8/1991
General Correspondence # 4 9/1987 - 6/1989
General Correspondence # 3 5/1987 - 8/1987
General Correspondence # 2 8/1985 - 4/1987
General Correspondence # 1 1/1985 - 7/1985
ARC Architects Correspondence # 4 12/1987 - 9/1997
25ARC Architects Correspondence # 3 8/1987 - 11/1987
ARC Architects Correspondence # 2 8/1986 - 7/1987
ARC Architects Correspondence # 1 6/1985 - 7/1985
ARC Architects Contract, Payments 7/1985 - 3/1989
The Haskins Company Correspondence 10/1987 - 9/1989
The Haskins Company Contracts, Payments, C.O.s 9/1987 - 12/1988
Feed Systems, In., Correspondence 3/1987 - 2/1988
Statements of Compliance 10/1987 - 8/1988
Pending Change Proposals 11/1987 - 12/1987
Rejected Bids
Shannon & Wilson, Inc. Explorations & Geotechnical Studies 6/19/1986
Shannon & Wilson, Inc. Explorations & Geotechnical Studies 10/14/1985
Building Program 7/1985
Martens/Chan, Inc., Structural Calculations 9/16/1987
ARC Architects Schematic Design undated
Burke/Lee A Joint Venture Site Study 12/5/1985
Design Development 11/17/1986
Specifications for Freed Plan 6/8/1970
ARC Architects Equipment Specifications 1/27/1987
Building #0816 - Food/Human Nutrition Building
26Budget 1/1988 - 12/1989
E.I.S. 9/1983 - 9/1986
Regents Reports 6/1987 - 11/1989
Affirmative Action Reports 1/1988 - 12/1988
Mahan & Smith Correspondence 7/1985 - 7/1989
Burke/Lee Associates General Correspondence 10/1983 - 2/1987
Fluid Engineering Correspondence 7/1986 - 6/1990
Keying Schedule 2/23/1988
Building Program 3/16/1983
Building Committee Meeting Minutes 3/1983 - 7/987
Construction Meeting Minutes 10/1987 - 3/1988
Daily Construction Reports (Diary Reports) 10/1987 - 2/1991
General Correspondence # 9 9/1989 - 10/1991
General Correspondence # 8 3/1989 - 8/1989
General Correspondence # 7 7/1988 - 2/1989
General Correspondence # 6 10/1987 - 6/1988
General Correspondence # 5 2/1987 - 9/1987
General Correspondence # 4 6/1986 - 1/1987
27General Correspondence # 3 10/1985 - 5/1986
General Correspondence # 2 10/1984 - 9/1985
General Correspondence # 1 1/1983 - 9/1984
N.W. Architects General Correspondence # 9 1/1990 - 6/1990
N.W. Architects General Correspondence # 5 6/1989 - 12/1989
N.W. Architects General Correspondence # 4 1/1989 - 5/1989
N.W. Architects General Correspondence # 6 8/1988 - 12/1988
N.W. Architects General Correspondence # 5 3/1988 - 7/1988
N.W. Architects General Correspondence # 4 8/1987 - 3/1988
N.W. Architects General Correspondence # 3 1/1987 - 7/1987
N.W. Architects General Correspondence # 2 10/1985 - 12/1986
N.W. Architects General Correspondence # 1 6/1983 - 9/1985
28N.W. Architects Contract, Payments, C.O.s 4/1985 - 2/1991
Bouten Construction General Correspondence # 2 1/1989 - 11/1992
Bouten Construction General Correspondence # 1 9/1987 - 1/1990
Bouten Construction Insurance 2/1987 - 2/1988
Bouten Construction Contract, Payments, C.O.s # 3 3/1989 - 2/1990
Bouten Construction Contract, Payments, C.O.s # 2 9/1988 - 2/1989
Bouten Construction Contract, Payments, C.O.s # 1 9/1987 - 8/1988
Matia Contractors, Inc. General Correspondence 7/1989 - 1/1990
Matia Contractors, Inc. Landscaping Correspondence # 2 8/1990 - 9/1991
Matia Contractors, Inc. Landscaping Correspondence # 1 7/1989 - 1/1990
Matia Contractors, Inc. Contract, Payments, C.O.s 7/1989 - 11/1989
29Statements of Compliance # 2 6/1988 - 6/1989
Statements of Compliance # 1 10/1987 - 5/1988
Pending Change Proposals Bouten Construction Co. 9/9/1987
Pending Change Proposals Matia Contractors, Inc. empty file
Landscaping Rejected Bids 7/11/1989
Site Selection Study 9/1983
Design Development Phase 11/1986
Schematic Design Phase 6/26/1986
Structural Review Comments 7/27/1987
Foundation Investigation 5/15/1986
Building Program 9/1984
Building #0820 - Research and Technology Park - Building One
30Budget 6/1982 - 7/1984
E.I.S. 12/1982 - 4/1985
Taber Chaitin Associates and Carley Capital Group 2/7/1985 - 2/1988
General Correspondence # 3 4/1985 - 10/1991
General Correspondence # 2 5/1983 - 3/1985
General Correspondence # 1 11/1980 - 4/1981
Research Park Wood Technology Building # 2 4/1987 - 10/1987
Research Park Wood Technology Building # 1 2/1984 - 3/1987
Wood Technology General & Architect Correspondence 11/1987 - 9/1989
Burke/Lee Associates Correspondence 2/1982 - 4/1985
Bouten Construction Company Correspondence 6/1987 - 8/1987
Taber Chaitin Associates Addendum # 6 2/12/1986
Draft Environmental Impact Statement 4/13/1983
Wood Engineering at Research Technology Park 11/1984
Building #1530 - Dairy Forage Facility at Buckley
31Budget 2/1988 - 6/1991
E.I.S. 7/1989 - 4/1993
Regents Reports 3/1989 - 5/1991
Burke/Lee, A Joint Venture 12/19/1988
Mahan & DeSalvo Correspondence 2/1989 - 12/1989
Shop Drawings 9/1990 - 12/1990
Concrete and Soils Testing 7/1990 - 2/1991
General Correspondence # 3 4/1990 - 5/1993
General Correspondence # 2 8/1989 - 3/1990
General Correspondence # 1 5/1986 - 7/1989
BJSS Architects General Correspondence # 4 10/1990 - 5/1993
BJSS Architects General Correspondence # 3 5/1990 - 9/1990
BJSS Architects General Correspondence # 2 8/1989 - 4/1990
32BJSS Architects General Correspondence # 1 8/1987 - 9/1989
BJSS Architects Contract, Payments 11/1987 - 5/1993
Leo Finnegan Construction Company General Correspondence 6/1990 - 5/1991
Leo Finnegan Co. Contracts, Payments, C.O.s 5/1990 - 6/1991
Statements of Compliance 11/1990 - 12/1990
Pending Change Proposals 6/1990 - 11/1990
Rejected Bids 12/1989 - 7/1990
95% Review Comments and Responses 12/7/1989
Facility Building Document 3/1988
Dairy/Forage Research Program 7/21/1986
Addendum to Geotechnical Engineering Report 7/21/1989
Shoreline Management Use Regulations for Pierce County 4/1981
Blunt Hamm and Urquhart Engineers Resume & Qualifications 10/11/1988
Structural Calculations 8/17/1989
Cost Estimate 5/8/1989
The BJSS Group Architects and Planners 2/21/1989
Addendum # 1 Project Documents 4/27/1990
100% Review 11/21/1989
Project Estimate (Construction Document Phase) 2/1990 - 3/1990
Cost Estimate and Area Comparison 9/8/1989
Proposed Phase I Additions 1/1989
Master Plan 12/7/1988
Schematic Design Submittal 1/30/1989
Rebid Project Manual, Volume 2 - Architectural Details undated
Rebid Project Manual, Volume 1 - Specifications 4/1990
Schematic Design Submittal 4/21/1992
Veterinary Research Diagnostic Center (WWREC) at Puyallup
33Budget 8/1987 - 4/1989
Regents Reports 7/1987 - 11/1987
Building Committee Meetings 7/1987 - 1/1990
General Correspondence 7/1987 - 3/1991
Gross, Thurman & deMeers, Inc. Architect General Correspondence 7/1987 - 1/1990
Gross, Thurman & deMeers, Inc. Contract, Payments 6/1988 - 4/1990
Interview Material Gross, Thurman & DeMeers, Inc. 9/30/1987
Schematic Design Material 12/1988 - 12/1989
David L. Smith Working Papers 12/1986 - 10/1988
Specifications for a Horse Disease Laboratory Binder 2/15/1967
Rabbit Laboratory Addition to the Swine Barn Binder 10/22/1963
Program for Animal Holding and Quarantine Facilities 2/13/1978
WSU Spokane - Spokane Intercollegiate Research and Technology Institute (SIRTI)
34Budget 6/1988 - 1/1990
Regents Reports 8/1990 - 5/1991
E.I.S. 8/1985 - 3/1991
Burke/Lee, A Joint Venture 1/1988 - 7/1993
Value Engineering 8/1990
General Correspondence # 5 4/1991 - 5/1994
General Correspondence # 4 5/1990 - 3/1991
General Correspondence # 3 12/1989 - 4/1990
General Correspondence # 2 7/1988 - 11/1989
General Correspondence # 1 2/1987 - 6/1988
35Integrus Architecture (WMFL) General Correspondence # 5 7/1991 - 5/1992
Integrus Architecture (WMFL) General Correspondence # 4 3/1991 - 6/1991
Integrus Architecture (WMFL) General Correspondence # 3 4/1990 - 2/1991
Integrus Architecture (WMFL) General Correspondence # 2 1/1989 - 8/1989
Integrus Architecture (WMFL) General Correspondence # 1 1/1988 - 12/1988
Integrus Architecture (WMFL) Contract, Payments # 2 5/1990 - 8/1991
Integrus Architecture (WMFL) Contract, Addendums, Payments # 1 7/1988 - 5/1990
Gifford Consultants, Inc., Geotechnical Engineering Report 11/6/1990
Wind Tunnel Study of the Proposed S.I.R.T.I. 9/15/1990
WMFL Transmittal Re: Shoreline Permit, Summary of Spaces 5/4/1990
Addendum # 1 to Final Environmental Impact Statement 5/1987
Final Environmental Impact Statement 6/1986
Draft Environmental Impact Statement 6/1986
University of Washington Value Engineering Study 6/1988
WSU Spokane Building Plan 7/1988
36State of WA Dept. of Ecology State Environmental Policy Act Handbook 12/1988
Spokane Riverfront Development Program 5/1974
Design Development SIRTI 7/1990
Department of Ecology Model Toxics Control Act Folder 7/1991
Preplanning and Schematic Design - Spokane University District Development 9/12/1988
Gifford Consultants, Inc., Additional Geotechnical Information 6/17/1991
WSU Spokane Building Plan 4/22/1988
WSU Spokane Miscellaneous Information Folder 1991
Riverpoint Boundary Line Adjustment # CITY 87 Map 8/1987
Fabrication Prototype Development Shop Plan 12/1990
Higher Education Park Site Plan 3/1990
Design Development Outline Specifications SIRTI 7/19/1990
A Plan for Excellence in Advance Studies - Developing the WSU - Spokane Campus 4/1988
MW Consulting Engineers Energy Conservation Report 10/1990
Program and Design Concept Spokane Facility Eastern Washington University 10/15/1990
WMFL Division 9 - Division 14 General Requirements for Work undated
Construction Document Phase SIRTI Integrus Architecture 3/1991
R.F.P. for Requirements Analysis for SIRTI 8/1990

Archives 284
Facilities Development
Building Files and Records, 1964-1995

ACQUISITION AND PROCESSING INFORMATION

These Facilities Development Building Files and Records were transferred to Manuscripts, Archives, and Special Collections on October 25th, 1995 (UA 1995-18) by Janna (last name unrecorded) of Facilities Development. They were processed in 2009 by University Archivist Mark O'English and Tim Mace.

EXTENT/QUANTITY INFORMATION

Number of containers: 4 boxes
Linear feet of shelf space: 4

COLLECTION DESCRIPTION & ARRANGEMENT

The collection consists of records pertaining to construction, remodeling, maintenance, and improvement of WSU buildings. The records are retained in their original order, which is primarily by building number, with a few campus-wide items located at the end. Buildings included here include Fulmer Hall and Carpenter Hall.

PREFERRED CITATION

The suggested citation for the collection is:

[Item Description]
Facilities Development Building Files and Records, 1964-1995 (UA 284)
Manuscripts, Archives, and Special Collections
Washington State University Libraries
Pullman, WA

Box Description
Building No. 0081C - Streit-Perham Hall Remodel
1Budget 3/1985 - 7/1987
EIS 10/1984 - 6/1986
Diary Reports 11/1985 - 9/1986
Affirmative Action Reports 11/1985 - 9/1986
Landscaping Correspondence 10/1985 - 1/1986
Pittsburgh Testing 12/1985 - 6/1986
Mahan/Smith Inc. Consultants 4/1985 - 1/1986
Asbestos Reports 4/1985 - 1/1986
Long Painting Co, General Correspondence 9/1985 - 1/1987
Long Painting Co, Contract, Payments, Change Orders 8/1985 - 1/1986
Housing's Move 1/1985
General Correspondence File # 3 6/1986 - 8/1989
Clayton Joyce Architects General Correspondence File # 3 7/1986 - 1/1987
Clayton Joyce Architects Contracts, Payments, Change Orders 4/1985 - 2/1987
Lydig Construction General Correspondence 3/1986 - 8/1987
Lydig Construction Contract, Payments, Change Orders 1/1986 - 9/1987
Pending Change Proposals 1/1986 - 9/1986
Rejected Bids - Electrical 1/1986
Rejected Bids - Mechanical 1/1986
Rejected Bids - General 1/1986
Rejected Bids - Asbestos Abatement & Selective Demolition 8/1985
General Correspondence File # 2 10/1985 - 5/1986
General Correspondence File # 1 2/1985 - 9/1985
Clayton Joyce Architects File # 2 10/1985 - 6/1986
Clayton Joyce Architects File # 1 3/1985 - 9/1985
Asbestos Fin Tube (Perimeter Radiation) 6/1985 - 9/1986
Ackroyd & Associates Contract Documents Estimate prepared for Clayton Joyce Architects 11/1985
Ackroyd & Associates Design Development Estimate prepared for Clayton Joyce Architects 6/1985
Clayton Joyce Architects Asbestos Abatement & Demolition Specifications 7/1985
WSU Design Development 4/1995
Building No. 0080 - Hall Rotunda Dining Hall Renovation
2Budget 3/1985 - 11/1988
Mahan & Smith Consultant 5/1985 - 7/1985
Building Program 8/1984
Concrete Testing 11/1985 - 4/1986
Diary Reports 11/1985
Asbestos Air Sampling Reports 5/1985
Central Painting, Inc. General Correspondence 6/1985 - 9/1985
Central Painting, Inc. Contract, Payments, Change Orders 6/1985 - 9/1985
General Correspondence File # 4 2/1986 - 4/1988
Walker McGough Foltz Lyerla Architects File # 4 4/1986 - 2/1988
Walker McGough Foltz Lyerla Architects 4/1985 - 2/1988
Affirmative Action Reports, Lydig Construction 11/1985 - 9/1986
Lydig Construction General Correspondence 10/1985 - 3/1987
Lydig Construction Contract, Payments, Change Orders File # 2 10/1985 - 2/1987
Pending Change Proposals 10/1985
Electrical Rejected Bids 9/1985
Mechanical Rejected Bids 9/1985
Rejected Bids Selective Demolition & Asbestos Abatement 6/1985
General Rejected Bids 10/1985
Stanton J. Hall Rotunda Dining Hall Renovation - Building Program 1/1985
General Correspondence File # 3 9/1985 - 1/1986
General Correspondence File # 2 4/1985 - 8/1985
General Correspondence File # 1 3/1985 - 6/1985
Walker McGough Foltz Lyerla Architects File # 3 12/1985 - 3/1986
Walker McGough Foltz Lyerla Architects File # 2 7/1985 - 11/1985
Walker McGough Foltz Lyerla Architects File # 1 2/1985 - 6/1985
Lydig Construction Contract, Payments, Change Orders File # 1 9/1985 - 2/1986
Building No. 0035 - Stimson Hall
3Budget 3/1982 - 4/1989
Diary Reports 12/1985 - 4/1987
Affirmative Action Reports 12/1985 - 4/1987
Regents Reports 2/1984 - 6/1987
Concrete Testing 11/1985 - 5/1986
Mahan & Smith Consultants 6/1978 - 8/1978
Nelson Landscape, Inc. General Correspondence 3/1987 - 6/1987
Nelson Landscape, Inc. Contract, Payments, Change Orders 3/1987 - 6/1987
Landscaping General Correspondence 8/1986 - 7/1988
General Correspondence File # 5 12/1986 - 4/1990
Warren C. Heylman, Architect General Correspondence 7/1989 - 11/1989
Warren C. Heylman, Architect Contract, Payments, Change Orders 12/1983 - 6/1987
Lydig Construction, Inc. General Correspondence File # 5 11/1985 - 9/1989
Lydig Construction, Inc. Contract, Payments, Change Orders # 2 9/1986 - 5/1987
General Correspondence File # 4 6/1986 - 11/1986
General Correspondence File # 3 10/1985 - 5/1986
General Correspondence File # 2 5/1983 - 10/1985
General Correspondence File # 1 11/1964 - 4/1983
Warren C. Heylman, Architects General Correspondence File # 4 8/1986 - 7/1989
Warren C. Heylman, Architects General Correspondence File # 3 10/1985 - 7/1986
Warren C. Heylman, Architects General Correspondence File # 2 7/1984 - 9/1985
Warren C. Heylman, Architects General Correspondence File # 1 3/1982 - 6/1984
4Lydig Construction, Inc. Contract, Payments, Change Orders # 1 10/1985 - 9/1986
Pending Change Proposals 11/1985
Rejected Bids 3/1987
Rejected Bids - Mechanical 10/1985
Rejected Bids - Electrical 10/1985
Rejected Bids General 10/1985
Building Program 8/1982
Design Development Phase Cost Estimate Doyle Engineering, Inc. 5/1985
Warren C. Heylman & Partners Design Development Phase 3/1984 - 4/1984
Warren C. Heylman & Partners Proposal 4/1984
Warren C. Heylman & Partners Construction Cost Estimate Schematic Design # 3 5/1983
Warren C. Heylman & Partners 95% Completion of Contract Documents 8/1985
Warren C. Heylman & Partners Seismic Analysis 4/1986
Stimson Hall Montezuma Club - Hall Residents' Proposal 3/1983
Warren C. Heylman & Partners Schematic Design Submittal 12/1982
Warren C. Heylman & Partners Comparison Floor Plan Changes Design Development Phase 3/1984
Miscellaneous Building Files
Lab Animal Resource Center - Building No. 811; General Correspondence 9/1970 - 1/1975
Troy Hall Remodel - Building No. 36; General Correspondence 9/1970 - 7/1971
Troy Hall Remodel - Building No. 36; Cost Estimate 6/1971 - 8/1972
Edgar K. Murrow Building (Arts Hall) - Building No. 33W; General Correspondence Phase II 11/1971 - 5/1973
Heald Hall Phase II - Building # 82; Decker, Kolb & Stansfield Architects Presentation for Schematic Outline Specification and Space Analysis 10/1970
Science Hall Remodeling for Electron Microscope - Building No. 32: General Correspondence 4/1970 - 7/1970
McCoy Hall Addition North - Building No. 44; General Correspondence 5/1970 - 3/1971
Fulmer Hall Addition - Building No. 3; Miscellaneous Correspondence 5/1970 - 3/1971
Wood Technology - Building No. 95; Miscellaneous Correspondence 6/1970 - 7/1971
Miscellaneous File
Dog Runs - Budget Code and Architectural Fee Expense 7/1969