Guide to the Washington State University Capital Planning Building Files 1957-1998
Archives 273

Summary Information

Repository
Washington State University Libraries, Manuscripts, Archives and Special Collections
Creator
Washington State University. Capital Planning
Title
Washington State University Capital Planning Building Files
ID
Archives 273
Date [inclusive]
1957-1998
Extent
31.5 Linear feet of shelf space, 32 Boxes
Language
Collection materials are in English.
Abstract
The collection consists of reports, plans, designs, and schematics relating to a large number of WSU Buildings; though a few earlier materials are included, the majority of the materials dates from the late 1980s to early 1990s.

Preferred Citation

[Item Description]

Washington State University Capital Planning Building Files, 1957-1998 (UA 273)

Manuscripts, Archives, and Special Collections, Washington State University Libraries, Pullman, WA.

Return to Top »


Biography/History

A University Architect served as the construction officer at Washington State University from 1911 forward. The modern form of the office dates from 1947 when it became a full-time, staffed administrative department. In 1967 the University Architect office was renamed as Facilities Planning, and then to Facilities Development in 1993. In 2001 it was renamed as Capital Planning. While Capital Planning is responsible for major planning and development, smaller projects are conducted by Facilities Operations. Facilities Operations descended from the Physical Plant in 1998, which in turn descended from Building and Grounds in 1967. While each line of programs has existed separately, some migration in function has occurred over the years. The primary difference between Capital Planning and Facilities Operations is the cost of the project in question - initially items costing less than $1,000,000 were assigned to Fac Ops, and those costing more to CP. By 2009, this break point is between $1,500,000 and $2,000,000.

Many terms historically used to describe individuals and communities with disabilities are offensive and were used to dismiss, discount and dehumanize these individuals and communities. Terms often focused on a perceived impairment and not the person. MASC recognizes the harm caused by these terms. We retain the language in this finding aid to document history and preserve context.

Return to Top »


Scope and Content

The collection consists of reports, plans, designs, and schematics relating to a large number of WSU Buildings; though a few earlier materials are included, the majority of the materials dates from the late 1980s to early 1990s.

Return to Top »


Arrangement

The collection is maintained in the order in which it was received in the Archives from Capital Planning, and loosely consists of two series in a close-to-alphabetical order.

Return to Top »


Administrative Information

Publication Information

Washington State University Libraries Manuscripts, Archives, and Special Collections  © 2016

https://libraries.wsu.edu/masc/

Terrell Library

P.O. Box 645610

Pullman, WA, 99164-5610 USA

509-335-6691

mascref@wsu.edu

Restrictions on Access

The majority of this collection is open and available for research use. A few files are marked as confidential or classified (these are primarily identified as Attorney General files or Issues and Claims files; please contact Capital Planning if you wish access to these) and access to those may be restricted. These files are labeled in this page as RESTRICTED, each box containing restricted material is so labeled, and individual restricted folders are stickered as such.

Restrictions on Use

Copyright restrictions may apply.

Acquisition Information

These records were transfered to Manuscripts, Archives, and Special Collections from Capital Planning on February 10, 2004 (UA 2004-01).

Processing Information

This collection was processed by Tim Mace and University Archivist Mark O'English in early 2009.

In 2022, in response to evolving standards regarding the language used to describe individuals and communities with disabilities, Gayle O’Hara added a Historical Note to this finding aid.

Return to Top »


Related Materials

Related Material

The WSU Archives hold a number of other Capital Plannng collections; to locate these please view our Archives' Collections List and our Accessions List, looking for the various names under which this department has operated: University Architect, Facilities Planning, Facilities Development, Capital Planning.

Return to Top »


Names and Subjects

Corporate Name(s)

Subject(s) :
  • Washington State University. Capital Planning -- Records and correspondence
  • Washington State University. Capital Planning and Development -- Records and correspondence
  • Washington State University. Department of Facilities Development -- Records and correspondence
  • Washington State University. Department of Facilities Planning -- Records and correspondence
  • Washington State University -- Buildings -- History -- Archives
Creator(s) :
  • >Washington State University. Capital Planning
  • Washington State University. Capital Planning and Development
  • Washington State University. Department of Facilities Development
  • Washington State University. Department of Facilities Planning

Subject(s)

  • College buildings -- Washington (State)
  • Architecture
  • Colleges and Universities
  • Washington (State)

Return to Top »


Detailed Description of Collection

box

College of Agriculture. Controlled Environment Laboratories and Growth Chambers. 1/1976. 

1

Agriculture Sciences Building - Program Statement. Clark and Hulbert Halls. 11/1965. 

1

Agriculture Sciences Building - Clark Hall Preliminary Design. 7/1968. / Lloyd J. Lovegren and Associates Architects 

1

Agriculture Sciences Building - Preliminary Design. 11/1969. / Lloyd J. Lovegren and Associates Architects 

1

Animal Disease Biotechnology Facility Value Engineering Design Development.12/1992. / KIM and Associates, Ltd. 

1

Animal Disease Biotechnology (ADBF) Facility Site Selection Study. 6/1991. / Burke Lee Architects, Planners and Landscape Architects 

1

ADBF - Design Development. 12/1992. / Northwest Architectural Company 

1

ADBF - Schematic Design Brochure. 6/1992. / Northwest Architectural Company 

1

ADBF - Program Statement. 1/1992. 

1

ADBF Partial Specifications (Third Submittal). 12/1992. / Northwest Architectural Company 

1

ADBF - Construction Document Phase/Structural Calculation. Vol. I Final Submittal. 2/1994. / Structural Design Northwest, Inc. ; Garrick A. Dung - Professional Engineer 

1

ADBF - Construction Document Phase/Structural Calculation. Vol. II - Final Submittal. 2/1994. / Structural Design Northwest, Inc. ; Garrick A. Dung - Professional Engineer 

1

ADBF - Construction Document Phase/Structural Calculation. Vol. III - Final Submittal. 2/1994. / Structural Design Northwest. Inc. ; Garrick A. Dung - Professional Engineer 

1

ADBF - Architectural Specifications - Volume I of 2. 2/1992. / Northwest Architectural Company 

1

ADBF - Mechanical and Electrical Specification - Volume II of II. 3/1994. / Northwest Architectural Company 

1

Alumni Center - Schematic Design Brochure. / Northwest Architectural Company 

2

Alumni Center - Interior Design. 4/1988. / Northwest Architectural Company 

2

Alumni Center - Furnishings Presentations. 7/1988. / Northwest Architectural Company 

2

Alumni Center - Specifications. 12/1987. / Northwest Architectural Company 

2

Athletic Facilities Study - ALSC Architects. 6/1996. / ALSC Architects, P.S. 

2

Animal Sciences Laboratory Building (ASLB) - Schematic Design Submittal. / MBT Associates 

2

ASLB Building - Schematic Design Submittal. / MBT Associates 

2

ASLB - Project Manual, Vol. I. Sec 0 - 14. 9/1995. / MBT Architecture 

2

ASLB - Project Manual, Vol. II. Sec 15 - 16. 9/1995. / MBT Architecture 

2

ASLB - Design Development Value Engineering. 11/1994. / Ehninger Fetzer Tholen 

2

ASLB - ***Revised*** Construction Documents Estimate. 8/1995. / Ackroyd Cost Control Consultants 

2

ASLB - Energy Conservation Report/Life Cycle Cost Analysis. 2/1995. / Affiliated Engineers NW, Inc. 

2

ASLB - Schematic Design Estimate (Final). 4/1994. / Ackroyd Cost Control Consultants 

2

ASLB - Addendum NO. 1. 9/1995. / MBT Architecture 

2

ASLB - Addendum NO. 2. 9/1995. / MBT Architecture 

2

ASLB - Addendum NO. 4. 10/1995. / MBT Architecture 

2

ASLB - Addendum NO. 5. 10/1995. / MBT Architecture 

2

Completion Of Laboratory - Central Animal Laboratory Facility. 5/1975. / Barnard and Holloway, Architects 

2

Veterinary Animal Holding and Quarantine Facilities Isolation Building Specification. 11/1979. / Architects: Barnard and Holloway ; Mechanical: Rice and LunhElectrical: Stingle - Atwood 

2

Completion of Large Animal Isolation Facility - Specifications. 3/1982. / Barnard and Holloway 

2

The Architecture Interior Design Landscape Architecture Facility @ WSU Design Report. 5/1981. / Architects: Adkison Leigh Sims Cuppage 

2

Design Associates: Simmer Gunsul Frasca Partnership. / Landscape Architects: Jongejan Gerard McNeal 

2

A Study of Alternative Sites - Architecture, Interior Design, Landscape Architecture Facility. 3/1980. / Architects: Adkison Leigh Sims Cuppage ; Design Associates: Simmer Gunsul Frasca PartnershipLandscape Architects: Jongejan Gerard McNeal 

2

Avery Hall - English Building Phase 1. 11/1970. / Architects: Fred Bassetti and Company ; Mechanical Engineers: Valentine, Fisher and TomlinsonElectrical Engineers: Beverly A. Travis and Associates ; Landscape Architects: Richard Haag Associates 

2

Multi Purpose Coliseum (Beasley) Program and Site Analysis. 12/1968. / John Graham and Company - Architects/Planners/Engineers 

3

Multi Purpose Coliseum Schematic Design. 4/1969. / John Graham and Company - Architects/Planners/Engineers 

3

Multi Purpose Coliseum - Preliminary Design. 10/1969. / John Graham and Company - Architects/Planners/Engineers 

3

Beasley Performing Arts Coliseum. Roof Structure Evaluation - Volume 1 Report. 5/1988. / Peden Petersen Lee, R. S. Consulting Engineers 

3

Beasley Performing Arts Coliseum. Roof Structure Evaluation - Volume 2 Calculations. 5/1988. / Peden Petersen Lee, R.S. Consulting Engineers 

3

Biosciences Building Phase II - Program. 11/1973. 

3

Biosciences Building Phase II - Preliminary Design (Kolb and Stansfield). 7/1974. 

3

Biosciences Building Phase II - Specifications (Kolb and Stansfield). 3/1975. 

3

Biological Sciences Building (Eastlick) - Preliminary Presentation. 11/1959. / Decker and Christenson AIA Architects 

3

Bohler Gymnasium Addition - Predesign Study. 10/1992. / Sasaki Associates, Inc. ; Stewart Associates 

3

Bohler Gym Addition - Schematic Design. 11/1994. / Architect: Sasaki Associates ; Associated Architect: Stewart AssociatesStructural and Civil Engineers: Summit Technology ; Mechanical Engineers: Notkin Engineering ; Electrical Engineers: Elcon Associates ; 

3

Bohler Gym Addition - 100% Design Development Submittal 1 of 2. 5/1995. / Architect: Sasaki Associates. Inc. ; Mechanical Engineer: Notkin Engineering. Inc. 

3

Bohler Gym Addition - 100% Design Development Submittal 2 of 2. 5/1995. / Architect: Sasaki Associates, Inc. 

3

Bohler Gym Addn. - Structural Calculations 1 of 2. 2/1996. / Prepared by Summit Technology 

3

Bohler Gym Add. - Structural Calculations 2 of 2. 2/1996. / Prepared by Summit Technology 

3

Bohler Gym Add. - Construction Bid Documents 1 of 2. 2/1996. / Sasaki Architects, Inc. 

3

Bohler Gym Add. - 100% Design Mechanical Calculations. 5/1996. / Architect: Sasaki Associates, Inc. ; Mechanical Engineer: Notkin Engineering In. 

3

Bohler Gym Renovation - Schematic Design Value Engineering. 6/1996. / EFT Architects/Planners/Project Managers 

3

Bohler Gym Renovation - Schematic Design. 6/1996. / Sasaki Architects 

3

Bohler Gym Add. - Load Calculations. 5/1996. / Elcon Associates. inc. 

3

Boiler No. 8 - Proposal for Engineering Services. 11/1975. / Bovay Engineers, Inc. 

3

Bryan Hall Remodel - Schematic Design Brochure. 7/1972. / James and Hicks, Architects ; Rice and Luhn, Mechanical EngineersJoseph Dyole and Assoc. Electrical Engineers ; Atwood - Hinzman, Structural Engineers 

3

Child and Family Studies Center - Building Program. 10/1967. 

4

Child Care Center - Bldg Assessments Report (Rogers Orton Dining Hall). 12/1991. / The Tsang Partnership, Inc. 

4

Child Care Center Building Program. 6/1991. / The Tsang Partnership, Inc. 

4

Child Care Facility - Design Development Phase. 7/1992. / The Tsang Partnership. Inc. 

4

Child Care Center - Schematic Design Phase Report. 1/1992. / The Tsang Partnership, Inc. 

4

Child Care Facility - Schematic Design. 4/1992. / The Tsang Partnership. Inc. 

4

Child Care Facility - Design Development Phase. 7/1992. 

4

Child Care Facility Project Manual. 2/1993. / Architect: The Tsang Partnership, Inc. ; Structural Engineer: Chulker, Putnam Collins and Scott, Inc.Mechanical Engineer: Thomas J. Gerard and Assoc. ; Electrical Engineers. Doyle Engineering, Inc. 

4

Child Care Center Playground. Report of Subsurface Exploration and Geotechnical Studies. 4/1994. / Gifford Consultants. inc. 

4

Chemistry Building - Project Manual General Volume I of III. 6/1987. / Architect: Brooks Hensley Creager Architects P.S. ; Landscape Architect: Hellstorm AssociatesElectrical Engineers: Doyle Engineering Inc. ; Vibration Consultants: Applied Dynamics Inc. 

4

Chemistry Building - Project Manual. Mechanical Specifications Volume II of III. 6/1987. / Architect: Brooks Hensley Creager Architects P.S. 

4

Chemistry Building - Project Manual. Electrical Specification Volume III of III. 6/1987. / Architect: Brooks Hensley Creager Architects P.S. 

4

Chemistry Building - Index/ Sec. 16000 - 16851. 

4

Chemistry Building - Section 15010 - General Provisions. 

4

Chemistry Building - Engineering Calculations. / Brooks Hensley Creager Architects, P.S. 

4

Chemistry Building - Schematic Design Documents. 11/1984. / Brooks Hensley Creager Architects, P.S. 

4

Chemistry Building - Schematic Design Documents. 9/1986. / Brooks Hensley Creager Architects, P.S. 

4

Chemistry Building - Pedestrian Corridor Design Development of College Avenue From Library Road to Stadium Way. / Brooks Hensley Creager Architects P.S. 

4

Chemistry Building - Site Study Selection. 3/1984. / Burke/Lee A joint venture 

4

Specifications for a Crew Shellhouse. 2/8/1984. 

5

Fulmer Hall: Chemical Waste Collection Site Facility. 6/24/1994. 

5

Schematic Design Brochure: Chemical Waste Collection Sites - Vet Complex. 9/3/1996. 

5

Schematic Design Brochure: Chemical Waste Collection Sites - Eastlick Hall, Wegner Hall, Engineering Complex and Silver Recovery Units. 11/18/1994. 

5

Creamery Annex: Schematic Design Brochure. 11/10/1998. 

5

Chemical Sciences Bld: Site Selection Study. 11/1980. 

5

Chemistry Building: Program Statement. 3/1984. 

5

Chemistry Building #3 Section 15010 - General Provisions. 

5

Site Study: Cancer Research and Training Center. 11/1976. 

5

Building Program, Preliminary Draft: Cancer Research and Training Center. 11/1976. 

5

Proposal: Carpenter Hall Renewal. 5/1984. 

5

Carpenter Hall Schematic Design. 4/24/1987. 

5

Carpenter Hall Design Development. 10/16/1987. 

5

Carpenter Hall Renewal Addendums. . 

5

Centeral Chilled Water System. 1973 - 1974. 

5

Centeral Water Chilling and Dist. A Feasibility Study. 1973 - 1974. 

5

Centeral Campus Storm Sewer and Circulation Improvements Study. 4/1984. 

5

Cleveland Hall. 10/1961. 

5

Cleveland Hall, Addition to. 

5

Department of Anthropology. 

5

College Hall Renovation: Design Development. 1/1982. 

5

College Hall. 

5

Project Manual: College Hall Renovation. 8/12/1982. 

5

Comp. Sci. Bld. Martin Academic/Stadium. 7/1971. 

5

Computer Sciences - Mathmatics Building, Phase 1, Martin Stadium/Academic Center Phase II. 10/22/1976. 

5

Schematic Design: Martin Stadium Academic Center Phase II Computer Science Building. 3/15/1975. 

5

Computer Sciences - Mathmatics Building, Phase 1, Martin Stadium/Academic Center Phase II. 5/1976. 

5

Open Plan Feasibility Study: Computer Sciences/Mathmatics Building. 4/1980. 

5

Cancer Research: Preliminary Concepts (along side of box). 12/1976. 

5

Campus Downtown Pedestrian Corridor. 

6

West Entrance Pedestrian Way - Specifications. 7/1986. / Burke/Lee A Joint Venture Architects/Landscape Architects 

6

Compton Union (Wilson) - Expansion Program Statement. 

6

Compton Union Building - Technical Report. Graphical Results from a Telephone Survey of WSU Student. Faculty, and Staff on the Compton Union Building (CUB) and Campus Recreation Facilities. 9/1996. 

6

SESRC (Social and Economic Sciences Research Center) Report # 96 - 22 (CUB6 # 1265). 

6

Comparative Behavior Laboratory - Schematic Design Brochure “Addition to”. 1/1966. / Victor Louis Wulff Architect. AIA and Associates 

6

Colorado Street preliminary Design - Technical Memorandum. 10/1994. / CH2M Hill Engineers Planners Economists Scientists 

6

Commons Remodeling Program for Ground Floor. Listings of Projected Uses and Requirements. 5/1971. 

6

Dairy Forage Facility - Master Plan. 11/1988. / The BJSS Group Architecture and Planners AIA 

6

Dairy Forage Facility - Schematic Design Submittal. 1/1989. / The BJSS Group Architecture and Planners AIA 

6

Dairy Forage Facilities - Proposed Phase 1 Additions. Subsurface Exploration and Geotechnical Engineering Report. 1/1989. / RittenHouse-Zeman and Associates/Geotechnical and Hydrogeological Experts 

6

Dairy Forage Facility - Buckley Cost Estimate. 2/1989. / The BJSS Group Architecture and Planners AIA 

6

Dairy Forage Facility - Volume 1 - Specifications. 11/1989. / The BJSS Group Architecture and Planners AIA 

6

Dairy Forage Facility - Volume 2 - Architectural Details. 11/1989. / The BJSS Group Architecture and Planners AIA 

6

Dairy Forage Facility - Project Manual Volume 1 Specifications. 4/1990. / The BJSS Group Architecture and Planners AIA 

6

Dairy Forage Facility - Cost Estimate and Area Comparison Charts. Schematic Design Phase. 4/1992. / The BJSS Group Architecture and Planners AIA 

6

Dairy Forage Facility - Phase II Schematic Design Submittal The BJSS Group Architecture and Planners AIA. 4/1992. 

6

Dairy Forage Facility - Design Development Submittal (Buckley WA): Design Description, Cost Estimate, Area Comparison, Proposed Time Schedule. 9/1992. / The BJSS Group Architecture and Planners AIA 

6

Dairy Forage Facility - Outline Specifications (Buckley WA). 9/1992. / The BJSS Group Architecture and Planners AIA 

6

Dairy Forage Facility - Phase II Project Manual Volume 1 Specifications. 4/1993. / The BJSS Group Architecture and Planners AIA 

6

Dairy Forage Facility - Phase II Project Manual Volume 2 Details and Schedule. 4/1993. / The BJSS Group Architects and Planners, AIA 

6

Dairy Forage Facility - Phase II Project Manual Volume 1 Specifications. 10/1993. / The BJSS Group Architects and Planners, AIA 

6

Dairy Forage Facility - Phase II Project Manual Volume 2 Details and Schedule. 10/1993. / The BJSS Group Architects and Planners, AIA 

6

Dairy Forage Facility - Phase II - Structural Calculations. 1/1993. / AKB Consulting Engineers/BJSS 

6

Dairy Forage Facility - Western Washington Research and Extension Center (Puyallup) Veterinary Research - Diagnostic Center. 8/1987. / Gross, Thurman and DeMers, Joe, P.S. 

6

Electrical/Mechanical Engineering Building. 11/1982 - Revised 12/1983. / The Callison Partnership, Ltd. 

7

Electrical/Mechanical Engineering Bldg. Site Selection Study. 8/1982. / Burke/Lee A Joint Venture 

7

Electrical/Mechanical Engineering Bldg. Design Development. 7/1983. 

7

Electrical/Mechanical Engineering Bldg. - Building Program (Original). 12/1983. 

7

Electrical/Mechanical Engineering Bldg. - (Revised). 12/1983. 

7

Electrical/Mechanical Engineering Bldg. - Specifications Cummings Schiatter Associates. 4/1984. / Loschky Marquardt and Nesholm 

7

Engineering Teaching Research Laboratory Building (ETRL). Project Manual Volume 1. 3/1996. / Callison Architecture. Inc. 

7

ETRL Building - Project Manual Volume 2. 3/1996. / Callison Architecture, Inc. 

7

ETRL - Project Manual Volume I - (Placed On Top in Box). 5/1995. / Callison Architecture, Inc. 

7

ETRL Building - Electrical Panel Schedule. 5/1995. / Callison Architecture, Inc. 

7

ETRL Building Schematic Design Submittal - Scheme T. / Callison Architecture, Inc. 

7

ETRL Building - Design Development outline Specifications. 7/1994. / Callison Architecture 

7

ETRL Building - Addendum #1 and Addendum #2. 3/1996. / Callison Architecture 

7

ETRL Building - Project Manual - Volume I Bid Set. 3/1996. / Callison Architecture, Inc. 

7

Electrical/Mechanical Engineering Bldg. - Addendums No. 2 and 3. 1984. / The Callison Partnership, Ltd. - Predesign Consultant 

7

Engineering Teaching Research Laboratory Building. Energy Conservation Report - Life Cycle Cost Analysis. 7/1994. / Riley Engineering, Inc. ; The Callison Partnership Ltd. 

8

English Building - Phase 1 - Avery Hall. / Architects: Fred Bassetti and Company ; Mechanical Engineers: Valentine, Fisher and TomlinsonElectrical Engineers: Beverly A. Travis and Associates ; Landscape Architects: Richard Haag Associates 

8

Experimental Animal Laboratory - Program. 6/1975. 

8

Experimental Animal Laboratory - Waste Treatment Facilities - Engineering Report. / Parametrix, Inc. 

8

Experimental Animal Laboratory - Design Development. 10/1975. / Architects: Kirk, Wallace, McKinley, AIA and Associates;Structural Engineers: Skilling, Helle, Christiansen, RobertsonMechanical and Electrical: Valentine, Fisher and Tomlinson ; Electrical: Sparli 

8

Experimental Animal Laboratory - Draft Impact Statement. 12/1976. / Parametrix, Inc. 

8

Facility Condition Survey - McAllister/ Kruegel Resident Halls CO 11063. / SCM Consultants , Inc. 

8

Facility Condition Survey - Administration Annex CO 10153. 7/1990. / SCM Consultants, Inc. 

8

Facility Condition Survey - Van Doren Hall CO 10153. 7/1990. / SCM Consultants. Inc. 

8

Facility Condition Survey - Chemical Engineering Building CO 10153. 7/1990. / SCM Consultants, Inc. 

8

Facility Condition Survey - Commons Building CO 10153. 7/1990. / SCM Consultants, Inc. 

8

Family Student Housing Environmental Checklist. 5/1994. / Burke/Lee Architects/Landscape Architects/Planners 

8

Fulmer Hall Remodeling - Phase II. 5/1980. 

8

Fulmer Hall/Annex Renewal - Value Engineering Study. 8/1993. / Meng Associates 

8

Fulmer Hall and Annex - Fume Hood Survey - Draft. 11/1993. / Mclellen and Copenhagan ; Mahium and Nordfors, McKinley, Gordon 

8

Fulmer Hall/Annex Renewal - Schematic Design Submittal. / McKinley Gordon PSC, Architect - McKinley Gordon PSC ; Ratti Swenson Perbix, Inc. - Structural Engineer.H.K. Kim Engineers, Inc. - MBE Structural Engineer. ; Riley Engineering - Mechanical and Electr 

8

Fulmer Hall Remodeling - Building Program Statement - Phase II. 

8

Fulmer Hall - Fulmer Hall Annex Renewal - Construction Documents. Project Manual Volume 1. Specification 0 - 4. 4/1995. / Mahlum and Nordfors McKinley Gordon 

8

Fulmer Hall Remodeling - Building Program Statement. Phases II and III. 8/1979. 

8

Fulmer Hall Phases I and II Completion - Specifications. 12/1983. / Waldron Pomeroy Smith Foote and Akira Architects 

8

Fulmer Hall Remodeling - Program Statement. 11/1992. 

8

Fulmer Hall/Fulmer Annex - Program Statement. 5/1993. 

8

Fine Arts Building Program - Building Program - Design Disciplines Building Phase II (worn brown unbound notebook). / Prepared as a collaborative effort by the Departments of Architecture, Fine Arts, Interior Design and Landscape Architecture 

8

Fine Arts Center Mechanical Systems Renovations - Specifications. / Halvorson, Beach and Bower Inc. ; Waldron Pomeroy Smith Foote and Akira ArchitectsRobert Fossatti Associates 

8

Fine Arts Center - Mechanical Systems Renovations. 95% Construction Document Submittal. 3/1988. / Halvorson, Beach and Bower, Inc. ; Waldron Pomeroy Smith Foote and Akira ArchitectsRobert Fossatti Associates Sparling and Associates, Inc. 

8

Fine Arts Plaza - Project Manual. 5/1995. / Architect: ALSC Architects ; Structural Consultant: Structural Design NWLandscape Consultant: T.C. Sherry and Associates, P.S. ; Electrical Engineer: DEI Electrical Consultants, Inc. 

8

Fine Arts - Building Program. Life Safety Requirements - Mechanical Systems Renovation. 10/1987. 

8

Fine Arts - Design Disciplines Building. 6/1967. / Naramore, Bain, Brady and Johanson 

8

Fine Arts Building - Mechanical Systems Renovations. Schematic Design Phase Submittal. 11/1987. / Halvorson, Beach and Bower, Inc. ; Waldron, Pomeroy, Smith, Foote and Akira, ArchitectsRobert Fossatti Associates ; Sparling and Associates, Inc. 

8

Fine Arts Building Plaza - Schematic Design Analysis. 1/1995. / ALSC Architects 

8

Food and Nutrition Facility - Site Selection Study. 9/1983. / Burke/Lee A Joint Venture 

9

Food Proc. and Pilot Plant - Proposed Building Plan. 6/1983. 

9

Food - Human Nutrition Facility - Building Program. 9/1984. 

9

Food and Human Nutrition Facility - Schematic Design Phase. 5/1986. / Northwest Architectural Company 

9

Food - Human Nutrition Facility - Phase II Schematic Design Presentation. Area Comparison Table and Cost Estimate. 10/1988. / Northwest Architectural Company 

9

Food - Human Nutrition Facility. Phase II - 95% Construction Document Submittal/Program updates. 11/1989. / Northwest Architectural Company 

9

Food - Human Nutrition Facility Phase II - Design Development Presentation. 4/1989. / Northwest Architectural Company ; Structural Design Northwest. Inc. and Peden, Petersen and Lee. P.S.Thomas J. Gerard and Associates, Inc. ; Wanless-Cook Associates ; Milten 

9

Food - Human Nutrition Facility Phase II - Plan Holders List, Addendum #3 and Bid Tabulation Form. 3/1990. / Northwest Architectural Company 

9

Food - Human Nutrition Facility Phase II - Project manual. Volume I of II Architectural/Structural. 2/1990. / Northwest Architectural Company 

9

Food - Human Nutrition Facility Phase II - Project Manual. Volume II of II Mechanical/Electrical. 2/1990. / Northwest Architectural Company 

9

Food - Human Nutrition Facility - Specifications. 6/1989. / Northwest Architectural Company 

9

Food and Nutrition Facility (New Science Facility) - Proposal for Architectural Services - Support Document. / Hummel Jones Miller Hunsucker, P.A. Arthru Erickson Architects 

9

Food - Service Building Addition - Building Program. 4/1985. 

9

Food - Service (Housing and Food Service Facility) - Design Development. 11/1985. / Miller/Hull Partnership 

9

Food - Service Equipment Specifications. 8/1985. / Walker McGough Foltz Lyeria, P.S. 

9

Food - Service Building Addition - Specifications. 9/1986. / Miller/Hull 

9

Food Services Building Addition - Specifications Landscape Work. 4/1988. / Miller/Hull 

9

Food Services Building Addition - Specifications Landscape Bid. 1989. / Miller/Hull 

9

Food Service (Housing) Facility - Schematics. 6/1985. / Miller/Hull 

9

Feed Preparation Mixing and Storage Facility - Site Study. 12/1985. / Burke/Lee A Joint Venture. Architects, Landscape Architects, Planners 

10

Feed Preparation, Mixing and Storage Facility - Building Program. 7/1985. 

10

Feed Preparation Mixing and Storage Facility - Design Development. 7/1986. / ARC Architects 

10

Feed Preparation Mixing and Storage Facility - Schematic Design. / ARC Architects 

10

Feed Preparation Mixing and Storage Facility - Project Manual. 5/1987. / ARC Architects 

10

Fieldhouse - Concept Study. 7/1997. / ALSC Architects, P.S. ; Riley Engineering - Mechanical and Electrical EngineersStructural Design Northwest - Structural Engineers 

10

New Administration Building - Program Statement. 12/1964. 

10

New Administration Building - Schematic Design Brochure. 12/1964. / Worthington. Skilling, Helle and Jackson - Structural Engineers ; James B. Notkin. and Associates - Mechanical Engineers ; Thomas E. Sparling and Associates - Electrical Engineers ; Richard Haag and Associates - Landscape Architects ; Robin M. Towne and Associates - Acoustical Consultants 

10

Greenhouse Replacements Contract 1 - Headhouse and Site Improvements, Puyallup Research and Extension Center. 3/1996. / Stafford Harris, Inc. ; Bouillon Christofferson and Schairer. Inc. 

10

Greenhouse Replacements Contract 2 - Greenhouses, Puyallup Research and Extension Center. 3/1996. / Stafford Harris , Inc. ; Bouillon Christofferson and Schairer, inc. 

10

Greenhouse Replacements Contract 3 - New Campus Electrical Upgrade, Puyallup Research and Extension Center - Specifications. 4/1995. / Stafford Harris. Inc. ; Bouillon Christofferson and Schairer, Inc. 

10

Greenhouse - Headhouse Facilities Building Program, Puyallup Research and Extension Center. 9/1994. 

10

Greenhouse Replacements Puyallup - Schematic Design CO 11611. 12/1994. / Stafford Harris, Inc. ; Sub-Consultants: Bouillon Christofferson and Schairer. Inc.; AKB Consulting Engineers 

10

Greenhouse Replacements - Design Development/Puyallup WWREC. 2/1995. / Stafford Harris, Inc. 

10

Greenhouse Replacements - Schematic Design Submittal WWREC. / Stafford Harris, Inc. 

10

Golf Storage Building - Specifications. 2/1984. / Cambell Engineers, Inc. 

10

Goldsworthy Hall Renovation - Building Program. 8/1985. 

10

Gannon/Golds - Men’s Residence Halls - Design and Cost Submittal. 6/1959. / Lea, Pearson and Richards Architects 

10

Glenn Terrell Friendship Mall - Project Manual. 5/1993. / Architect: ALSC Architects, P.S. ; Landscape Consultant: Thorson PartnershipElectrical Engineer: Doyle Engineering 

10

General Services Complex - Schematic Design Brochure. 1967. / Architect: Victor Louis Wulff, Architect. AIA and Associates ; Consultants: T. R. Hance - Structural EngineersRice and Luhn - Mechanical Engineers ; Wanless - Cook - Electrical Engineers 

10

General Services Complex Phase II - Program Statement. 10/1975. / Victor Louis Wulff Architect, A.LA. Associates ; Atwood - Hinzman, Structural 

10

Graduate Student Residence Hall - Specifications. Drawings and Cost Estimate. 7/1969. / Walker/McGough/Foltz, Architects ; Lyerla/Peden, Engineers 

10

Hazardous Waste Facilities - Schematic Design Brochure. 6/1996. / Bovay Northwest 

10

Hazardous Materials Survey - Mechanical Engineering Laboratory. 8/1994. / AGRA Earth and Environmental 

10

Hazardous Waste Facilities - Predesign Study. 6/1994. / Bovay Northwest 

10

Hazardous Material Survey - Fulmer Hall/Fulmer Annex Renovation. 7/1994. / RZA AGRA, Inc. Engineering Environmental Services 

10

Handicapped Accessibility Improvements - Report Summary Volume I The Pence Associates, Inc. / Campanella Murakami Brummitt Inc. 

11

Handicapped Accessibility Guide - Memorandum, Mobility Related Improvements. 8/1988. 

11

Handicapped Persons Transition Plan for Facilities Access, Draft Number Four - University of Washington Main Campus, Pack Forest, Friday Harbor Laboratories, Richland Graduate Center. 9/1978. 

11

Handicapped Accessibility Improvements - Part A. Schematic Design and Design Improvement. 11/1980. / The Pence Associates, Inc. ; Campanella Murakami Brummitt, Inc. 

11

Handicapped Accessibility Improvements - Schematic Design. Part B The Pence Associates, Inc. 11/1980. / Campanella Murakami Brummitt. Inc. 

11

Handicapped Accessibility Improvements - Schematic Design and Development. Supplement - Part A. 11/1980. / The Pence Associates, Inc. ; Campanella Murakami Brummitt Inc. 

11

Handicapped Accessibility - Building/Site Survey (Stapled). 8/1/1998. / Campanella Murakami Brummitt Inc. ; The Pence Associates, Inc. 

11

Handicapped Accessibility Improvements - Outline Specifications, Phase 1/Part B - 2 (Physical Plant). 6/1981. 

11

Survey of Physical Barriers Which Affect the Handicapped. 12/1977. 

11

Handicapped Accessibility Improvements - Construction Specifications. Phase 1. Part C - Building Retrofit / The Pence Associates, Inc. ; Chisom Murakami Brummitt Inc. 

11

Handicapped Accessibility Improvements - Construction Documents. Phase 1, Part - Elevator Controls. 3/1981. / The Pence Associates, Inc. ; Chisom Murakami Brummitt Inc. 

11

Handicapped Accessibility Improvements - Specs. Phase 1, Part C-1 - Building Retrofit - Nez Perce Village Unit F-Apt. 17. 9/1982. / The Pence Associates, Inc. ; Chisom Murakami Brummitt Inc. 

11

Handicapped Accessibility Improvements - Phase I, Parts B and C Design Development. 3/1981. / The Pence Associates, Inc. ; Chisom Murakami Brummitt Inc. 

11

Handicapped Accessibility Improvements - Construction Specifications. Phase I, part B - I Site Improvements. 10/1981. / The Pence Associates. Inc. ; Chisom Murakami Brummitt Inc. 

11

Handicapped Accessibility Improvements - Structural Calculations. / Atwood Hinzman Consulting Engineers 

11

Handicapped Accessibility Improvements - Report Summary Volume 1. / The Pence Associates, Inc. ; Chisom Murakami Brummitt Inc. 

11

Remodeling for the Handicapped - Specifications. 11/1974. / Douglas C. Durkoop 

11

Remodeling for the Handicapped - Kamiak Apartments. 10/1979. 

11

Handicapped Accessibility Improvements - Schematic Design Part C. / The Pence Associates, Inc. ; Campanella Murakami Brummitt Inc. 

11

WSU Map - Campus and Vicinity Wheelchair Routes and Building Access. 1978. / The Pence Associates. Inc. ; Campanella Murakami Brummitt Inc. 

11

Heald Hall Fifth Floor Addition - Schematic Design Brochure. 1966. / Decker, Kolb and Stansfield Architects 

11

Heald Hall Renewal - Predesign Study. 9/1992. / The Miller Hull Partnership 

11

Hollingbery Annex - Handball/Racquet Phases I and II. Building Program. 3/1979. 

11

Hollingbery Field House Annex - Handball/Racquet - Design Development. 6/1979. / Architects: Adkison, Leigh. Sims, Cuppage ; Structural Engineers: Atwood/HinzmanMechanical and Electrical: Riley Engineering 

11

Holland Library Renewal - Project Scope Development. 1/1994. / ALSC Architects 

11

Holland Library Addition - Shelving and Compact Storage Systems. Project Manual. 6/1993. / ALSC Architects. P.S. 

11

Holland Library - Specifications for Fire Pump Installation - Bid Set Drawings and Specifications/ Fire Protection and Suppression Design Alternatives. 12/1993. / Creighton Brook Engineers 

11

Holland Library Addition - Project Manual - General Construction. Volume 1 of 2. 8/1991. / ALSC Architects 

11

Holland Library Addition - Project Manual - Mechanical and Electrical. Volume 2 of 2. 8/1991. / ALSC Architects 

11

Holland Library Addition Specifications. 5/1990. / ALSC Architects, P.S. 

11

Holland Library Addition - Design Development Appendix ALSC Architects. 2/1990. / Zimmer Gunsul Frasca Partnership 

11

Holland Library Addition - Design Development. 1/1990. / Architects. ALSC Architects, Zimmer Gunsul Frasca ; Structural Engineer. Structural Design NorthwestMechanical Engineer: Riley Engineering ; Electrical Engineer: Doyle Engineering ; Civil Engineer: 

12

Holland Library Addition - Design Development Specification. 1/1990. / ALSC Architects, P.S. ; Zimmer Gunsul Grasca Partnership 

12

Holland Library Addition - Preliminary Design. 11/1989. / Architects: ALSC Architects. Zimmer Gunsul Frasca ; Structural Engineer: Structural Design NorthwestMechanical Engineer: Riley Engineering ; Electrical Engineer: Doyle Engineering ; Civil Engineer: 

12

Holland Library Addition and Renewal. Site Design and Building Massing Studies. 5/1989. / ALSC Architects, Zimmer Gunsul Frasca Partnership ; Structural: Suden Golden and GuestMechanical: Riley Engineering ; Electrical: Wanless Cook ; Civil: Wyatt Jaykim ; Libr 

12

Holland Library Addition - Preliminary Site Studies and Cost Estimates. 3/1989. / Architects: ALSC Architects ; Design Architects: Zimmer Gunsul Frasca Partnership 

12

Holland Library Addition - Schematic Design Architects: ALSC Architects. 7/1989. / Design Architects: Zimmer Gunsul Frasca Partnership 

12

Holland Library Addition and Renewal - Architect Selection Interview. 9/1988. / Architects: ALSC Architects ; Design Architects: Zimmer Gunsul Frasca Partnership 

12

Holland Library Renovation - Partial Schematic Design for Full Renovation and Design Development for Phase One. 9/1980. / Joyce/Nordfors and Associates, P.S. 

12

Holland Renovation - Program. 3/1980. 

12

Holland Library for State College of Washington. 1947. / Schematic Design Brochure 

12

HVAC Design Analysis (Incinerator). 10/1997. / Prepared By Bovay Northwest, Inc. 

12

Incinerator Building - Specifications - Volume 1. 8/1998. 

12

Incinerator Building - Specifications - Volume 2. 8/1998. 

12

Incinerator Project - Civil Design Analysis. 10/1997. / Prepared By Bovay Northwest, Inc. 

12

Incinerator Study - Incinerator Report. 8/1991. / Wieland, Lindgren and Associates, Inc. 

12

Incinerator Study - Reasonable Available Control Technology. 11/1994. / Bovay Northwest ; EnviromechDames and Moore 

12

Incinerator - Site Selection Study for Pathological Waste incinerator. 2/1995. / Bovay Northwest 

12

Incinerator Opinion of Probable Costs for Pathological and Solid Waste Incinerators. 3/1995. / Bovay Northwest 

12

Incinerator - Environmental Impact Statement for Replacement Medical Waste. Incinerator, Volume 1 of II. (Needs to Be Pulled and Tossed. A Complete Set Volume I and II are in Box # 29.). 10/1996. / WSU 

12

Incinerator - Geotechnical Report on Storage Building Gifford Consultants, Inc. 11/1992. 

12

Incinerator - Environmental Health and Safety Plan Review Record. Notice of Construction. 1/1998. / Envirotech Drawings 

12

Incinerator - Notice of Construction Application Declaring Intent to Construct, Install, or Establish A New Air Contaminant Source or Replacement or Substantial Alteration of Emission Control Technology on an Existing Stationary Source. Attachment: Proces 

12

Incinerator. / Envirotech Drawings 

12

Incinerator - New incinerator Building - Utility Study. 2/1997. / Bovay Northwest A Dames and Moore Subsidiary 

12

Incinerator - Schematic Design Brochure. 3/1997. / Bovay Northwest, Inc. ; EnviroMech 

12

Incinerator - Design Development Submittal. 7/1997. / Bovay Northwest 

12

Incinerator - Conceptual Design Analysis for Medical Waste Incinerator. 1/1997. / Bovay Northwest ; EnviroMech 

12

Incinerator Project - Design Development: Outline Specifications Submittal. 7/1997. / Bovay Northwest A Dames and Moore Subsidiary 

12

Incinerator - Bidder’s Equipment List, Technical Data and Guarantees. 1/1998. / Bovay Northwest 

12

Incinerator Upgrades - Trade Specifications. 9/1995. / Bovay Northwest 

13

Intercollegiate Center For Nursing Education - Project Manual (Yakima). 1/1995. / Architect: Integrus Architecture, P.S. ; Structural Engineer: Structural Design Northwest. Inc.Mechanical and Electrical Engineers: MW Consulting Engineers 

13

Intercollegiate Center for Nursing Education - Project Manual (Yakima). 11/1994. / Architect: Integrus Architecture. P.S. ; Structural Engineer: Structural Design Northwest, Inc.Mechanical and Electrical Engineers: MW Consulting Engineers 

13

Intercollegiate Center for Nursing Education (Spokane) - Design Development / Walker McGough Foltz Lyerla. 10/1976. 

13

Intercollegiate Center for Nursing Education - Joint EWSC - WSU Building Program. 3/1976. 

13

Intercollegiate Center for Nursing Education (Yakima) - Design Development. 8/1994. / Architect: Integrus Architecture, P.S. ; Structural Engineer: Structural Design Northwest, Inc.Mechanical and Electrical Engineers: MW Consulting Engineers 

13

Johnson Hall Specifications for Remodel Rooms 101, 122, 184, 190, 387, 396 and 39. By the Board of Regents Of WSU. 6/1994. 

13

Johnson Hall Addition - Schematic Design Brochure. 10/1978. / Architect: Gayne L Jones and Associates ; Structural: Charles E. KitchinMechanical: Valentine. Fisher, and Tomlinson ; Electrical: Beverly A. Travis 

13

Kimbrough Hall - Specifications for General Contract - Books 1,2, and 3. 2/1964. / Ralph E. Decker, AIA Architects ; Administrative Architect: Gary L. Shavey. AIAUniversity Architect: Philip E. Keene, AIA 

13

Kimbrough Hall Addition - Predesign Study - Books 1,2, and 3. 6/1992. / Predesign Consultants: Thompson Vaivoda and Associates, Architects AIA ; In Association With Heylman Martin and Associates, Architects, AIA 

13

Kimbrough Hall - Asbestos Abatement Submittals by Tektoniks Corp. 6/1997. / Tektonics Corporation 

14

Kimbrough Music Building - Pictures and Design Plans. 3/1966. / Ralph E. Decker AIA Architects 

14

Kimbrough Hall - Preliminary Presentation. 1/1963. / Ralph E. Decker AIA Architects 

14

Kimbrough Music Building - A Program for an Addition to. 5/1970. 

14

Kimbrough Hall Addition and Renewal - Bid Set Volume One. 3/1998. / Architect: Thompson Vaivoda and Assoc. Arch‘s ; Structural: kpff Consulting EngineersCivil: Rosewater Engineering ; Mechanical and Electrical Glumac ; Landscape: Murase and Associates ; Acoustica 

14

Kimbrough Hall Addition and Renewal - Bid Set Volume Two. 3/1998. / Architect: Thompson Vaivoda and Assoc. Arch's ; Structural: kpff Consulting EngineersCivil: Rosewater Engineering ; Mechanical and Electrical: Glumac ; Landscape: Murase and Associates ; Acoustic 

14

Kimbrough Hall Addition and Renewal - Addendum Two . 4/1998. / Prepared by Thompson Vaivoda and Associates, Architects AIA. 

14

Kimbrough Hall Addition and Renewal - Design Development Set Project Manual. 5/1996. / Thompson Vaivoda and Associates Architects, Inc. 

14

Kimbrough Hall Renovation - Hazardous Materials Abatement Project. 

14

Abatement Specifications and Contract Documents. 5/1997. / Prepared By: Edward S. DeLorme While Employed By: SCM Consultants, Inc. 

14

Kimbrough Hall - Asbestos Abatement Project - Final Report. 12/1997. / Prepared by Richard A. Johnson, CIH SCM Consultants, Inc. 

14

Kimbrough Hall - Addition and Renewal - Schematic Design. 1/1996. / Architect: Thompson Vaivoda and Associates Architects AIA ; Associated Architect: Heylman Martin and AssociatesStructural: kpff Consulting Engineers ; Mechanical and Electrical: Glumac Internatio 

14

Launch Boathouse and Dock - Building Program 84 - 85. / McKinley Nance Director of Facilities Planning 

14

Laboratory Animal Resources Facility - Building Program. 8/1970. / Mr. Owen Bradvold - Office of Facilities Planning Liaison and Advisory Architect 

14

McCoy Hall Additions - Second Floor. 10/1969. / Architects: Culler Gale Martell Ericson ; Engineer: Kenneth P. Norrie 

14

McCoy Hall - South Addition. 4/1970. / Architects: Culler Gale Martell Ericson ; Engineer: Kenneth P. Norrie 

14

McCoy Hall - Completion of South and Anatomy Refrigeration Room. 11/1971. / Architects: Culler Gale Martell Ericson ; Engineer: Kenneth P. Norrie 

14

McCoy Hall Remodeling - Building Program 1 of 2. 4/1978. 

14

McCoy Hall Remodeling - Building Program 2 of 2. 4/1978. 

14

McCoy Hall Remodeling - Schematic Design Brochure. 10/1978. / Culler Gale Martell and Ericson. Architects 

14

McCoy Hall Remodeling - General Specifications. 9/1979. / Culler Gale Martell Ericson P.S. 

14

McCoy Hall Phase 11 - Building Program. 6/1982. 

14

McCoy Hall Remodeling Phase 11 - Schematic Design Brochure. 2/1983. / Culler Gale Marteil and Ericson, Architects 

14

McCoy Hall Remodeling/Renovation Program. 11/1985. 

14

McCoy Hall Remodeling/Renewal Program Phase II. 4/1986. 

14

McCoy Hall Renewal - Schematic Phase. 3/1987. / De Neff Deeble Barton Associates ; Peter A. SudenTres West Engineers, Inc. 

14

McCoy Hall Renewal - Project Manual. 12/1987. / De Neff Deeble Barton Associates 

14

Martin Stadium and Academic Center North Stands Replacement - Schematic Design Brochure/Some Pictures. / Naramore Bain Brady and Johanson Architects Engineers Planners 

14

Martin Stadium - Fire Lane Route Study. 7/1997. / PPL Coffman Project# 95027-03 

14

Martin Stadium - Schematic Design Brochure, Academic Athletic Complex (Lengthwise along box). 3/1972. / Naramore Bain Brady and Johanson Architects Engineers Planners 

14

Murrow Hall Renovation/Addition - Predesign Study. 6/1998. / Northwest Architectural Company 

15

Morrill Hall Remodeling - Design Development. 9/1979. / Ralph D. Anderson and Partners ; Booth and Koch Architects 

15

Morrill Hall Remodeling - Construction Details, As Built. 12/1981. / Ralph D. Anderson and Partners/Booth and Koch Architects and Environmental Planners 

15

Murrow Remodeling - Schematic Design Brochure. 1971. / Architects and Planners: De Neff Deeble Barton Associates ; Mechanical: Rice and LuhnElectrical: Wanless - Cook 

15

Murrow - Schematic Design Brochure. 7/1969. / Architects and Planners: De Neff Deeble Barton Associates ; Mechanical: Rice and LuhnElectrical: Wanless - Cook ; Structural: Peter Suden 

15

Murrow - Department of Communications Student Publications Radio - Television Services - Building Program Statement. 

15

Memorial Hospital Study - Schematic Design Brochure. 1/1976. / Architects and Planners: De Neff Deeble Barton Associates ; Mechanical: Rice and LuhnElectrical: Wanless - Cook ; Structural: Peter Suden 

15

Meats Laboratory - Schematic Design Brochure. 9/1964. / Barnard and Holloway Architects 

15

Meats Laboratory - Schematic Design Brochure Phase II. / Barnard and Holloway Architects 

15

Married Student Apartments - Kamiak 100 Unit. 1964. / McClure and Adkison Architects AIA 

15

Neill Hall Renewal - Specifications. 2/1988. / Anderson Koch and Duane 

15

Neill Hall Renewal - Final Cost Estimate. 3/1989. / Duarte Bryant Architecture 

15

Neill Hall Renewal - Schematic Phase. 1988. / Anderson Koch and Duarte ; United Pacific EngineersLee Engineering ; Travis Fitzmaurice and Associates, Inc. 

15

Neill Hall Renewal - Building Program. 5/1987. 

15

North-South Ski Lodge - Design Development Phase I. 2/1976. / Architects: Adkison Leigh Sims Cuppage ; Structural: L.C. CampbellMechanical and Electrical: Riley Engineering 

15

Nuclear Reactor Building. Addition to. 3/1967. / Miller and Fiedler - Architects AIA 

15

Orton Hall - Schematic Design Brochure. 6/1962. / Philip E. Keene - University Architect ; Lea, Pearson and Richards - Architects 

15

Rogers Hall - Men’s Residence Tower. 5/1961. / Philip E. Keene - University Architect ; Lea, Pearson, and Richards - Architects 

15

Rogers/Orton Site Plan for Residence Halls. 6/1962. / Resume of Richard Haag Associates ; Landscape Architects - Planning Consultants 

15

Owen Science Library - Foundation Investigation. 6/1974. / For Harris, Reed and Litzenberger Architects, AIA ; By: Shannon and Wilson, Inc. - Geotechnical Consultants 

15

Owen Science Library Design Development. 1979. / Harris, Reed and Litzenberger, AIA, Architects ; Abam Engineers, Inc., Structural EngineersValentine, Fisher and Tomlinson, Mechanical and Electrical Engineers 

15

Olympic Weight Room Expansion - Revised. Description of Project; Building Committee; Statement of Problem; Statement of Goals; Planning Criteria; General Considerations; Space Requirements; Specific Requirements. 12/1995. 

15

Olympic Weight Room Addition - Design Development. 4/1988. / ALSC Architects, P.S. ; Campbell Engineers - StructuralRiley Engineering - Mechanical and Electrical Engineers 

15

Olympic Weight Room Addition - Specifications (construction set). 12/1988. / ALSC Architects, P.S. ; Campbell Engineers - StructuralRiley Engineering - Mechanical and Electrical Engineers 

15

Olympic Weight Room Addition Building Program. 8/1987. 

15

Olympic Weight Room Facility - Specifications. 6/1985. / ALSC Architects, P.S. ; Campbell Engineers - StructuralRiley Engineering - Mechanical and Electrical Engineers 

15

Olympic Weight Room Facility - Design Development. 3/1985. / Adkison Leigh Sims Cuppage - Architects ; Campbell Engineers - StructuralRiley Engineering - Mechanical and Electrical Engineers 

15

Olympic Weight Room Building Addition - Building Program, Hollingbery Field House. 12/1984. 

15

P.E Building - Program for the Proposed Gymnasium. 11/1965. 

15

P.E. Building - Schematic Design Brochure. 11/1966. / Paddock and Hollingbery AIA Architects 

15

Parking Facility - Design Criteria and Outline Specification. 1500 Car Parking Facility Preliminary Design. 8/1970. / John Graham and Company Architects - Planners - Engineers 

15

President’s Residence. Additions and Remodeling to. 1967. / Trogdon-Smith, AIA Architects ; Philip E Deene, AIA, Director of Facilities PlanningMechanical and Electrical: Rice. Strecker, and Cook ; Structural: Lyerla and Peden ; Landscape Architect: L Keith Hells 

15

Physical Science Building - Schematic Design Brochure. 2/1970. / Naramore Bain Brady and Johanson ; Skilling, Helle, Christiansen, Robertson - StructuralBouillon, Christofferson and Schairer - Mechanical ; Naramore, Bain, Brady and Johanson - Electrical ; Paul 

15

Physical Science Building Phase II - Schematic Design Brochure. 7/1970. / Naramore Bain Brady and Johanson ; Skilling, Helle, Christiansen, Robertson - StructuralBouillon, Christofferson and Schairer - Mechanical ; Naramore, Bain, Brady and Johanson - Electrica 

15

Physical Science Building Elevator Data. 5/1970. / Prepared By Charles W Larch and Associates 

15

Physical Science Building - Preliminary Design. 11/1968. / Naramore Bain Brady and Johanson Architects ; Skilling, Helle, Christiansen, Robertson - StructuralBouillon, Christofferson and Schairer - Mechanical ; Naramore, Bain, Brady and Johanson - Electrical ; 

15

Publications Building - Schematic Design Brochure. 1967. / Architects: Evanoff and Kabush, AIA ; Structural Engineers: Lyerla and PedenMechanical and Electrical: James S. Latenser 

15

Puyallup - Controlled Environment - Lab and Greenhouse. 1970. / Research and Extension Center ; Carlson and James ArchitectAndrew T. Bingham - Structural ; Stingle-Atwood and Associates - Mechanical and Electrical 

15

Puyallup - Office and Lab Facilities. Research and Extension Center. 5/1966. / Naramore Bain Brady and Johanson - Architects ; Bouillon, Christofferson and Schairer - Mechanical and ElectricalWorthington Skilling Helle and Jackson - Structural 

15

Prosser - Rogers Hamilton Laboratory Building. Institute of Agriculture Sciences Irrigation Experiment Station. 9/1961. / Philip E. Deene, AIA ; Cowan and Paddock, AIA 

15

Regents Dining Hall Remodeling - Schematic Design Brochure. 2/1979. / Tan Brookie Kundig Architects ; Structural: L. C. CampbellMechanical: Gerard and Associates ; Electrical: Wanless - Cook Associates ; Good Service Consultants: George E. Bundy and Associate 

15

Research and Technology Park - Project Manual - Building One. Phase 3 Tenant Improvements. 11/1985. / Taber Chaitin Associates - Architecture, Landscape Architecture, Planning, Interior Design ; Charlie Capital Group - Developer 

15

Research and Technology Park - Project Manual Phase 2 - Site and Weatherskin. 7/1985. / Taber Chaitin Associates - Architecture. Landscape Architecture, Planning, Interior Design ; Charlie Capital Group - Developer 

15

Research and Technology Park - Building One Phase 2. Replaces Addendum No. 1 ENTIRELY. / Taber Chaitin Associates 

15

Research and Technology Park - Building One Phase 3 - Addendum #6. 2/1986. / Taber Chaitin Associates 

15

Rogers/Orton Din. Hall - Schematic Design Brochure. / Kenneth W. Brooks, AIA Architects 

15

Rotunda Dining Hall (RDH) - Renovation Proposal; Packet of Pictures. / John Graham and Company 

16

Rotunda Dining Hall - Selective Demolition and Asbestos removal. 5/1985. / Walker McGough Goltz Lyerla P.S. - Architect and Engineers ; Centrac Associates, Inc. - Asbestos Removal Consultants 

16

Rotunda D.H. Design Development - Outline Specifications. Construction Cost Estimate. 5/1985. / Walker McGough, Foltz Lyerla, P.S. - Architects and Engineers 

16

Rotunda D.H - Design Development. 6/1985. / Walker McGough Foltz Lyerla, P.S. - Architects and Structural Engineers ; Mechanical and Electrical: Riley EngineeringAsbestos Removal and Lighting Consultants: Centrac Associates ; Design Collaborative - Interior Des 

16

Rotunda D.H - Remodel Engineers’ Calculations. 9/1985. / Architects and Engineers: Walker McGough Foltz Lyerla P.S. ; Mechanical and Electrical: Riley Engineering, Inc.Lighting Engineer. Centrac Associates, Inc. 

16

Rotunda D.H - Renovation - Building Program. 1/1985. 

16

Rotunda D.H - Life Cycle Cost Analysis. 4/1985. / Prepared by Riley Engineering, Inc. and Walker McGough Foltz Lyerla 

16

Rotunda D.H - Project Manual. 9/1985. / Walker, McGough Foltz Lyerla, P.S. 

16

Rotunda D.H - Project Manual. Selective Demolition and Asbestos Abatement. 5/1985. / Walker McGough Foltz Lyerla, P.S. - Architects and Engineers. ; Centrac Associates - Asbestos Abatement ConsultantRiley Engineering - Mechanical/Electrical 

16

Rotunda D.H. Remodel - Schematic Design Brochure. 4/1985. / Walker McGough Goltz Lyerla. P.S. - Architects and Engineers 

16

Stimson Hall - Renovation - Project Manual. 10/1985. / Warren Cummings Heylmnan and Partners - Architects 

16

Stimson Hall Renovation - Life Cycle Cost Analysis. 5/1984. / Warren Cummings Heylman and Partners/Architects Stingle - Atwood and Associates/Engineers 

16

Stimson Hall Renovation- Design Development. 4/1984. / Warren Cummings Heylman and Partners/Architects 

16

Stimson Hall Renovation- Hall Residents Proposal. 8/1983. / Warren Cummings Heylman and Partners/Architects 3/ 

16

Stimson Hall Remodel Building Program. 8/1982. 

16

Stimson Hall Renovation Design Development. 3/1984. / Warren Cummings Heylman and Partners/Architects 

16

Stimson Hall Renovation - Schematic Design Submittal. Design Analysis Tabulations; Construction Cost Estimate; Outline Specifications. 12/1982. / Warren Cummings Heylman and Partners/Architects 

16

Stimson Hall Renovation - Project Manual Draft Copy. 9/1985. / Warren Cummings Heylman and Partners/Architects 

16

Stimson Hall Landscaping - Project Manual. 2/1987. / Warren Cummings Heylman and Partners/Architects 

16

Science Hall Remodel Phase 2. Volume 2 Sec 15/16. 1/1988. / Architect and Planners: Decker/Fukui Davison ; Structural Engineers: Engineers Northwest, Inc.Mechanical Engineers: Halvorson, Beach and Bower. Inc. ; Electrical Engineers. Sparling and Associates, Inc 

16

Science Hall Remodel Phase 1 - Project Manual, Volume 1. 6/1983. / Architect and Planners: Decker/Fukui Davison ; Structural Engineers: Engineers Northwest, Inc. 

16

Science Hall Remodeling Phase 1 - Project Manual, Volume 2. / Architect and Planners: Decker/Fukui Davison 

16

Science Hall Remodeling - Building Program. 10/1977. 

16

Science Hall Remodeling - Building Program Phase 1. 5/1982. / Architect and Planners: Decker/Fukui Davison 

16

Science Hall Remodeling - Phase 1 Schematic Design Brochure. 11/1982. 

16

Science Hall Remodeling - Building Program Phase 2. 5/1982. 

16

Science Hall Remodeling - Building Program Phase 2. 12/1985. 

16

Science Hall Remodeling - Schematic Design Phase 2. 

16

Safety Building - Schematic Design Submittal (Placed alongside of box due to length). / Doudna Williams Phipps Architects 

17

Student Services Addition - Energy Conservation Report, Life Cycle Cost Analysis. 11/1993. / Riley Engineering, Inc. ; Mahlum and Nordfors. McKinley, Gordon 

17

Student Services Addition - Value Engineering Study Mahlum and Nordfors, McKinley, Gordon. 10/1993. 

17

Student Services Addition - Scheme E McKinley Gordon. 10/1992. 

17

Student Services Addition - Schematic Design Submittal McKinley Gordon Architect. 11/1992. 

17

Student Health Service Remodeling and Addition Schematic Design Brochure. / De Neff Deeble Barton Associates - Architects and Planners ; Rice and Luhn - Mechanical EngineersWanless-Cook Associates - Electrical Engineers ; Peter A. Suden - Structural Engineers ; 

17

Students’ Bookstore - Schematic Design Submittal. / Architect: Trogdon - Smith AIA ; Bookstore Planning: Henry Berry Associates, Inc.Structural Engineers Lyerla and Peden ; Mechanical Engineers: Rice and Strecker ; Electrical Engineers: Joseph M. Doyle and Asso 

17

Student Bookstore - Addition to. 9/1978. / TSG Architects ; Structural: Peter A. SudenMechanical: Rice and Luhn ; Electrical: Wanless-Cook 

17

Student Residential Community (Steptoe). Schematic Design Brochure 200 Apartments. 4/1969. / Architect. Durham Anderson Freed AIA ; Landscape Architect: Richard Carothers AssociatesStructural: Harold K. Roe, CE, SE ; Mechanical: Benjamin S. Notkin and Assoc 

17

Student Recreation Center - Project Update. 4/1998. / Architect: Yost Grube Hall Architects 

17

Student Recreation Center - Schematic Design. 4/1998. / Architect: Yost Grube Hall Architects 

17

Student Health - Student Health Service Clinic Building Preliminary Brochure (Placed alongside of box due to length). 1963. / Prepared by McClure and Adkison Architect AIA 

17

Streit - Perham Remodel - Project Manual. 12/1985. / Clayton R. Joyce Architects ; Interior Design: Design CollaborativeStructural: H.K. Kim Engineers, Inc. ; Mechanical: D. W Thompson Consultant, Ltd. ; Electrical Engineers: Louis C. Warner and Co. 

17

Streit - Perham Remodel - Design Development. 4/1985. / Clayton R. Joyce Architects ; Interior Design: Design CollaborativeStructural: H.K. Kim Engineers, Inc. ; Mechanical: D. W. Thompson Consultant, Ltd. ; Electrical Engineers: Louis C. Warner and Co. 

17

Streit - Perham Remodel - Specifications - Asbestos Abatement and Demolition. 7/1985. / Clayton and Joyce Architects ; Centrac Associates - Asbestos Abatement Consultant 

17

South Fairway Intramural Field - Schematic Design Report. 2/1992. / Richard Carothers Associates - Landscape Architects. Planners, Civil Engineers, and Surveyors ; Subconsultants: Tam, Boyle Heyamoto - ArchitectsRiley Engineers - Mechanical/Electrical 

17

South Fairway Intramural Field - Construction Document Submittal. 5/1993. / Richard Carothers Associates - Landscape Architects, Planners, Civil Engineers, and Surveyors ; Subconsultants: Tan, Boyle Heyamoto - ArchitectsRiley Engineers - Mechanical/Electric 

17

Swine Center - Design Development Phase II. Livestock Teaching and Research Facilities. 1975. / Architects: ORB Architects Planners Engineers ; EISI Engineered Industrial Systems. Inc. 

17

Swine Center - Design Development Phase II. Livestock Teaching and Research Facilities (Booklet is titled the same as above, contains different supplemental material). 1975. / Architects: ORB Architects Planners Engineers ; EISI Engineered Industrial System 

17

Sloan - Technology Building - Engineering Addition Preliminary Design. 5/1959. / Culler Gale Martell Norrie Architects and Engineers 

17

Stephenson Residence Center - Preliminary Design Submittal - Third Tower. 1967. / Architects: Walker and McGough, AIA ; Mechanical Engineers Lyle Marque and AssociatesElectrical Engineers: Joseph M. Doyle ; Landscape Architect Keith L. Hellstrom 

17

Smith Agricultural Engineering Building - Alterations and Additions. 1966. / Architects: Evanoff and Kabush, AIA ; Structural: Lyerla and PedenMechanical and Electrical: James S Latenser 

17

Spokane Intercollegiate Research and Technology Institute (SIRTI) Design Development. 7/1990. / WMFL, P.S. Architect and Engineers in Association with Arthur Erickson Architects ; Structural: WMFL, P.S. Architects, and EngineersElectrical: Riley Engineering ; L 

17

SIRTI Geotechnical Information - Stone Column/Vibro - Replacement Foundation Improvement Work, SIRTI Site, Spokane WA. / Gifford Consultants, Inc. - Geotechnical Consultants 

17

SIRTI - Project Manual. 4/1991. / WMFL Architects and Engineers ; MW Consulting Engineers: MechanicalRiley Engineering: Electrical ; SKU: Civil Engineering/ Landscape Architecture 

17

SIRTI - Building Program. 4/1988. 

17

Spokane Riverpoint - Health Sciences Building - Schematic Design. / Architect: Integrus Architecture ; Structural: Integrus ArchitectureMechanical/Electrical: MW Consulting Engineers ; Cost Estimating: Roen Associates 

17

Spokane Riverpoint - Health Sciences Building - Predesign Study at the Riverpoint Higher Education Park For The Joint Center for Higher Education Integrus Architecture, P.S. 7/1996. 

17

Spokane Riverpoint - State Archives Facility Eastern Washington Region and Cooperative Academic Library Services (CALS) - Riverpoint Higher Education Park Management. 10/1998. / Prepared for: the Office of the Secretary of State Archives and Records Division, 

17

Spokane - Joint Center for Higher Education. 6/1993. / Trent and Riverside Avenue Properties ; Architectural and Structural: Integrus ArchitectureMechanical and Electrical: MW Consulting Engineers ; Property Management: R.W. Robideaux and Company 

17

Spokane University District Development - Preplanning and Schematic Design. 9/1988. / W.M.F.L., P.S. Associate Architects: Arthur Erickson Architects 

17

Todd Hall Addition - Building Program DCVRs To be Kept With as Built Drawings. 1963. / C. D. Contractors, Inc. 

18

Todd Hall Addition - Specifications Volume I of II. 4/1989. / The Henry Klein Partnership ; Mechanical: Notkin Engineer, Inc.Electrical: Sparling and Associates ; Structural: ABKJ ; Landscape Consultant: Jongejan/Gerrard/McNeal Kitchen Consultant: Forma ; C 

18

Todd Hall Addition - Specification Volume II of II, Mechanical and Electrical With Addendums Attached. 4/1989. / The Henry Klein Partnership ; Mechanical: Notkin Engineer, Inc.Electrical: Sparling and Associates ; Structural: ABKJ ; Landscape Consultant. Jong 

18

Todd Hall Renewal - Specifications (three binders). 12/1993. / The Henry Klein Partnership, Architects 

18

Thompson Hall Renewal - Building Program. 6/1992. / Architect: Cardwell/Thomas and Associates/Architects 

18

Thompson Hall - Feasibility Study, Foley Institute for Public Policy and Public Service. 1/1995. / Architect. Cardwell/Thomas and Associates/Architects 

18

Thompson Hall Renewal - Schematic Design. 6/1994. / Architect: Cardwell/Thomas and Associates/Architects ; Structural: Ratti, Swenson, PerbixMechanical: Path Engineers, Inc. ; Electrical: Elcon Associates, Inc. ; Cost Control: Ackroyd. Inc. 

18

Thompson Hall Renewal - Design Development Supplemental Information. Estimate of Construction Cost; Program Area Comparison; Architectural Details; Structural Notes; Mechanical Narrative; Light Fixture Schedule. 11/1994. / Ackroyd, Inc. Cardwell/Thomas and Associates 

18

Thompson Hall Remodel Project. Results of Subsurface Explorations and Floor Slab Moisture Survey. 6/1995. / Gifford Consultants, Inc. - Geotechnical Engineers 

18

Thompson Hall Remodeling - Former Administration Building Remodeling De Neff Deeble and Barton Architects. 1975. / Rice, Strecker and Cook Professional Engineers 

18

Supplemental Appendix to the Energy Conservation Report and Life Cycle Cost Analysis. 12/1992. / Mechanical: Path Engineers. Inc. ; Electrical Engineer: Elcon Associates, Inc.Architect: Cardwell/ Thomas and Associates 

18

Todd Hall Addition - Schematic Design Brochure. 1963. / Architect: John W. Maloney, AIA ; University Architect: Philip E. Keene, AIA 

19

Todd Hall Addition - Building Program Statement. 12/1983. 

19

Todd Hall Addition - Site Selection Study. 2/1984. / Burke/Lee A Joint Venture 

19

Todd Hall Addition to - Schematic Design. 11/1987. / Burke/Lee A Joint Venture 

19

Todd Hall Renovation - Remodeling Program. 5/1990. / The Henry Klein Partnership ; Structural: KPFFMechanical: Nolkin Engineering ; Electrical: Sparling and Associates 

19

Todd Hall Renewal - Preplanning Documents - Outline Specifications, Cost Estimate and Drawings. 7/1990. / The Henry Klein Partnership, Architects 

19

Todd Hall Renewal - Schematic Design. 4/1992. / Architects: The Henry Klein Partnership, ; Structural: Andersen Bjornstad, Kane, JacobsHalvorson, Beach and Bower Sparling and Associates, Inc. ; Acoustical: Michael R. Yantis Associates 

19

Todd Hall Renewal - Design Development Submittal. 7/1992. / Henry Klein Partnership, Architects 

19

Todd Hall Renewal - Schematic Design Submittal. 7/1992. / Andersen Bjornstad Kane Jacobs, Inc. 

19

Todd Hall Renewal - Renovation Feasibility Study. 5/1992. / Morrison Knudsen Corporation 

19

Todd Hall Renovation - Health and Safety Plan, Demolition of Lead Paint Containing Material. 3/1994. / RZA AGRA, Inc. - Earth and Environmental Group 

19

Troy Hall Remodeling - Schematic Design Brochure. 1971. / Duglas C. Durkoop, Architect ; Rice and Luhn, Mechanical EngineersJoseph M. Doyle and Associates, Electrical Engineers 

19

Tri-Cities University Center - Building Addition. 2/1988. 

19

Tri-Cities University Center - Master Planning Report. 6/1988. / Architect: The McKinley Architects, PSC ; Associate Architect: Dillman - Luvaas Architects, P.S.Civil and Structural Engineers: KPFF: Consulting ; Civil Engineering Consultant to KPFF: Lin and A 

19

Tri-Cities University Center - Schematic Design. / Architect: The McKinley Architects, PSC ; Associate Architect: Dillman - Luvaas Architects, P.S.Civil and Structural Engineers: KPFF Consulting Engineers ; Civil Engineering Consultant to KPFF: Lin and Associ 

19

Tri-Cities University Center Addition Addendum No. 1. 2/1990. / The McKinley Architects PSC 

19

Tri-Cities Campus - Consolidated Information Center (C.I.C.). 12/1993. / Integrus Architecture, P.S. 

19

Tri-Cities C.I.C. - Schematic Design. 10/1994. / Integrus Architecture, P.S. 

19

Tri-Cities Campus - Science and Education Center - Predesign Report. 6/1998. / SRG Partnership, PC 

19

Tri-Cities C.I.C - Predesign Study. 5/1994. / Prime Architect and Structural Engineers Integrus Architecture P.S. ; Mechanical and Communications Electronics Consultants: MW Consulting EngineersElectrical Consultants: Elcon Associates, Inc. ; Cost Estimating 

19

Thompson Hall Renewal - Project Manual - 99% Construction Documents Submittal, Division 1 - 14. 6/1995. / Cardwell/Thomas and Associates ; Structural: Senson Say FagetMechanical: Path Engineers ; Electrical: Elcon Associates ; Estimate: Ackroyd and Associates 

20

Thompson Hall Renewal - Project Manual - 99% Construction Documents Submittal, Division 15 - 16. 6/1995. / Cardwell/Thomas and Associates ; Structural: Senson Say FagetMechanical: Path Engineers ; Electrical: Elcon Associates ; Estimate: Ackroyd and Associate 

20

Thompson Hall Renewal - Bid Package No. 2. Specification for Appendix A - Hazardous Materials Abatement Project. 3/1998. / Prepared by Ed Delorme, OHST AHERA Project Designer # 940511-05 while employed by: SCM Consultants. Inc. 

20

Thompson Hall Renovation - Abatement Specifications and Contract Documents. 6/1995. / Prepared by: Edward S. DeLorme, OHST AHERA Project Designer #940511-05 while employed by: SCM Consultants, Inc. 

20

Thompson Hall Renewal - Division 15 Mechanical. 4/1998. 

20

Thompson Hall Renewal - Bid Package II - Project Manual. Volume I Divisions 0-8 Project No. 94-1-024. 

20

Thompson Hall Renewal - Bid Package I: Demolition - Project Manual. 6/1997. / Cardwell/Thomas and Associates/Architects 

20

Thompson Hall Renewal - Bid Package II Project Manual. Volume I Divisions 1-7 Project No. 94-1-024. 3/1998. / Cardwell/Thomas and Associates 

20

Thompson Hall Renewal - Bid Package II Project Manual. Volume II Divisions 8-16. 3/1998. / Cardwell Thomas and Associates 

20

Valley Road Multi - Use Recreation Fields - Phase 2 Developments. 3/1998. / RCA/Huitt - Zollars, Inc., Prime Consultants ; Tan-Heyamoto, ArchitectRiley Engineering, Mechanical-Electrical Engineers ; Gifford Consultants, Geotechnical 

21

Van Doren Hall - Facility Condition Survey. 7/1990. / SCM Consultants, Inc. Architects and Engineers 

21

Visitor Center Site Study - Comprehensive Physical Planning Process. 11/1988. / Burke/Lee A Joint Venture 

21

New Veterinary Teaching Hospital - Design Development. 3/1990. / De Neff Deeble Barton Associates - Architects and Planners 

21

New Veterinary Teaching Hospital - Schematic Design. 3/1990. / De Neff Deeble Barton Associates - Architects and Planners 

21

Veterinary Research - Diagnostic Center - Schematic Design Material, Western WA Research and Extension Center. 12/1988. / Gtde Weisenbach ; Foil Wyatt Mckewen 

21

Veterinary Teaching Hospital Interim Report. 2/1988. / De Neff Deeble Barton Associates - Architects and Planners 

21

Veterinary Teaching Hospital - A Report on Site Planning. 11/1988. / Burke/Lee A Joint Venture, Campus Planners 

21

Veterinary Science Building - Design Development, Multipurpose Animal Holding Facility. 9/1981. / Naramore Bain Brady and Johanson 

21

Veterinary Science Building - Site Evaluation and Recommendation, Multipurpose Animal Holding Facility. 9/1980. / The NBBJ Group 

21

Veterinary Animal Holding Facilities - Schematic Design Brochure. 6/1978. / Barnard and Holloway, Architects 

21

Veterinary Science Building (Bustad) - Design Development. 1/1975. / Architects: Maloney, Herrington. Freesz and Lund ; Structural: Skilling, Helle, Christiansen and RobertsonMechanical and Electrical: Valentine, Fisher and Tomlinson 

21

Vancouver - Engineering/Life Science Building - Schematic Design. 6/1998. / Architect: Zimmer Gunsul Grasca Partnership ; Electrical: PAE Consulting Engineers, IncLandscape Architect: Zimmer Gunsul Frasca Partnership ; Civil Engineer: Kato and Warren, Inc. 

21

Vancouver Campus Circulation - Preliminary Design. 6/1998. / Architect: Zimmer Gunsul Frasca Partnership Electrical : PAE Consulting ,Inc. ; Landscape: Zimmer Gunsul FrascaCivil: Kato and Warren, Inc. ; Soils Engineer. Geotechnical Resources ; Planning and En 

21

Vancouver Physical Plant Maintenance Shops - Schematic Design. 6/1998. / Architect: Zimmer Gunsul Frasca ; Structural Engineer: Kramer GehlenMechanical: PAE Consulting Engineers, Inc. ; Electrical: PAE Consulting Engineers, Inc. ; Landscape Architect: Zim 

21

Vancouver - Multimedia Classroom Building - Schematic Design. 6/1998. / Architect: Zimmer Gunsul Frasca Partnership, ; Electrical: PAE Consulting Engineers, Inc.Landscape Architect: Zimmer Gunsul Frasca Partnership ; Civil Engineer: Kato and Warren, Inc. ; 

21

Vancouver - Phase 1 Campus Development - Schematic Design. Classroom Building Library Building; Student Services and Classroom Building 6504 or 6526; Physical Plant Building 1. 10/1993. / Architect: Zimmer Gunsul Frasca ; Structural: Kramer GehlenMechanical 

21

Vancouver - Phase II Campus Development Schematic Design. Early Childhood/Education Facility. 12/1995. / Architect: Zimmer Gunsul Frasca, Partnership ; Structural Engineer: Keramer Gehlen and AssociatesMechanical: PAE Consulting Engineers ; Electrical Engin 

21

Vancouver - Phase II Campus Development - Preliminary Design. Campus Infrastructure Work. 3/1996. / Architect: Zimmer Gunsul Frasca Partnership ; Structural: Kramer Gehlen and AssociatesCivil: Kato and Warren Inc., ; Mechanical: PAE Consulting Engineers ; Ele 

21

Vancouver - Cascades Volcano Observatory - United States Geological Survey. Conceptual Panning Submittal. 6/1996. / By: General Services Administration, United States Geological Survey United States Department of the Interior ; Washington State University 

21

Vancouver - Phase II Academic Buildings - Predesign Study. Engineering Life Sciences Building; Multimedia/Electronic Communications Building. 5/1996. / Prepared By Zimmer Gunsul Frasca Partnership 

21

Vancouver Campus Master Plan. 9/1992. / Prepared by: Zimmer Gunsul Frasca ; Moyer/ReedParametrix, inc. ; The JD White Company ; The Basmaciyan Group ; PAE Engineering ; Geotechnical Resources Incorporated 

21

Vancouver Campus Master Plan Appendix: Wetlands, Wildfire and Fisheries Report; Geotechnical Investigation; Master Plan Utility Report; Master Plan Electrical Report; Master Plan Mechanical Report; Transportation; Technical Report. / Zimmer Gunsul Frasca 

21

Vancouver - A special Report to the Presidents and Regents from the ADVISORY COUNCIL VANCOUVER - Vancouver Long Range Planning Report. 3/1988. 

21

Vancouver and Clark College Bauer Hall - Second Phase Building Program - State Project # 88-030. 6/1988. 

21

Vancouver - Clark College Bauer Hall Phase II - State Project # 88-030. Project Manual for Construction Documents. 3/1989. / Gary Rogowski - Architect AIA ; Structural: Kramer/Gehlen Associates Inc.Mechanical: Paraclete, PS ; Electrical: Dean J. Alhay and A 

21

Vancouver - Draft Supplemental Environmental Impact Statement. 12/1992. / The JD White Company, Inc. 

22

Vancouver - Summary Master Plan. 7/1992. / Zimmer Gunsul Frasca Partnership 

22

Vancouver - An Addition for The Southwest Washington Joint Center for Education and WSU At the Evergreen State College Building in Vancouver 1986 - 1987. / Andy Bremmeyer with Advisors ; Don Heil, Robert Patton, and Dave ScottDr. George Condon, Director of WS 

22

Vancouver - Campus Infrastructure Preliminary Design Specifications. 2/1996. / Zimmer Gunsul Frasca Partnership 

22

Vancouver - Campus Infrastructure Work - Phase II Development Construction Documents, WSU Review, Not for Construction. 5/1996. / Zimmer Gunsul Frasca Partnership 

22

Vancouver - Mechanical and Electrical Calculation for the Phase II Campus Infrastructure Project and The Early Childhood/Education Facility Project. 8/1996. / PAE Consulting Engineers. Inc. 

22

Vancouver - Phase II Development Campus Infrastructure Work Construction Document Set. 1/1997. / Zimmmer Gunsul Frasca Partnership 

22

Vancouver - Early Childhood Education Facility. 7/1996. / Zimmer Gunsul Frasca Partnership ; Kramer Gehlen Associates Consulting Engineers/Structural/Civil 

22

Water System Plan Update. 12/1994. / Thomas, Dean and Hoskins, Inc. 

22

Water Research Center - Schematic Design Brochure. / Carlson and James Architects ; Stingle and Atwood and AssociatesLyerla and Peden 

22

Waste Management Program Evaluation. Technical and Economic Feasibility Report - Appendix Section. 5/1990. / Doucet and Mainka, P.C. 

22

Wegner Hall - Specification (TRA Architecture Engineering Planning Interiors). General Work Project Manual Volume 1 of 3. 9/1979. / TRA Architecture Engineering Planning Interiors 

22

Wegner Hall - Specifications. Mechanical and Electrical Project Manual Volume 2 of 3. 9/1979. / TRA Architecture Engineering Planning Interiors 

22

Wegner Hall - Schedules - Project Manual Volume 3 of 3. 9/1979. / TRA Architecture Engineering Planning Interiors 

22

Wegner Hall - Library Addition - Schematic Design Brochure. / J. Kimball Barnard, AIA ; Bovay Engineers, Inc., Structural Mechanical and Electrical 

22

Wegner Hall - Design Development Remodeling/Addition. 9/1978. 

22

Wegner Hall - Design Development Renovation/Addition. 10/1978. / TRA Architecture Engineering Planning Interiors 

22

Wegner Hall - Remodeling and Addition Building Program. 9/1977. 

22

Wenatchee - Tree Fruit Research Center - Office and Laboratory Building. 1966. / Fraley and Leighton Architects 

22

Wenatchee - Tree Fruit Research Center - USDA Addition. 1977. / Fraley and Leighton Architects 

22

Wilson Hall Remodeling - Schematic Design Brochure. 1971. / Architects: De Neff Deeble Barton Associates ; Mechanical: Rice and LuhnElectrical: Wanless-Cook 

22

Wilson Compton Union Building Addition. 1966. / Architects: Maloney, Herrington, Greesz and Lund ; Structural: Worthington, Skilling, Helle and JacksonMechanical and Electrical: Valentine, Fisher, and Tomlinson ; Food Service Consultants: John R. Carlson Associat 

22

Wilmer Davis Hall - Food Services Facility - Design Development Documents. Proposed Alterations and Additions. 6/1970. / Architects: James and Hicks ; Mechanical: Rice and LuhnElectrical: Wanless and Cook ; Structural: Paul Panagakis ; Food Service Consultants: J 

22

Women’s Residence Hall - Schematic Design Brochure (Streit Perham). 1959. / Walker McGough and Trogdon Architects AIA 

22

Daggy Phase I Humanities Building. 4/1970. / Architects: Fred Bassetti and Company ; Mechanical: Valentine, Fisher and TomlinsonElectrical: Beverly A. Travis and Associates ; Theatrical Consultants: George C. Izenour and Associates ; Acoustical Consultants. Robin 

23

Daggy Phase I Humanities/Speech Building - Building Program. 

23

Dana Hall Remodeling. 6/1973. / Architect: De Neff Deeble Barton Associates ; Mechanical: Rice and LuhnElectrical: Wanless-Cook 

23

Athletic Facilities Study - Analysis of Existing Facilities! Improvements and Additions: 812S Martin Stadium; 0009 Hollingbery Field House; 372 Bailey Field; 171 Mooberry Track; 319C Stadium Way Tennis Courts; 013 Lower Soccer Fields; 365E WSU Golf Course ; 

23

AMID/Landscape Architecture Building Predesign Study. 5/1998. / Northwest Architectural Company 

23

Consolidated Information Center (C.I.C.) - Project Manual Volume 1. 9/1995. / Integrus Architecture. P.S. 

23

Consolidated Information Center (C.I.C.) - Project Manual Volume 2. 9/1995. / Integrus Architecture, P.S. 

23

Campus infrastructure and Road improvements - Phase I. Schematic Design Brochure. 1/1998. / KPFF Consulting Engineers, Prime Civil Engineer ; Wood/Harbinger, Mechanical/ElectricalC3 Management Group, Cost Estimator ; White Shield, Surveyor/Geologist 

23

Carpenter Hall Renewal Building Program. 7/1987, 1/1988. 

23

Chemical Storage Building Environmental Health Services Facility. 5/1994. / Bovay Northwest, Inc. 

23

Cleveland Hall Renovation - Value Engineering Study. 6/1927. / Roen Associates 

23

Elevator Planning - Independent Counsel for Elevators in New Construction or Modernization "old". / Charles W. Lerch and Associates - Elevator Consulting and Engineers 

23

Hazardous Waste Facility - Dangerous Waste Permit WADO 0414853301. Chemical Storage Facility, Incinerator Basement, Hazardous Waste Treatment and Waste Water Discharge Facility. 9/1989. / Bovay Northwest Inc. 

24

Hazardous, Pathological, and Radiological Waste Handling Facilities. Building Program - Physical Plant Draft,. 11/1991. / Parametrix, Inc. 

24

Hydrogeologic Investigation of the Proposed Coal Ash Disposal Facility. Physical Plant, Parametrix, Final Report. 12/1991. / Parametrix, Inc. 

24

Intercollegiate Center for Nursing Education - Joint Eastern Washington State College. Capital Budget Requests. 1977-1979. / Walker McGough Foltz Lyerla 

24

Records, Maintenance Materials Storage and Recycling - Project Manual. Phase I, Re - Bid Specifications, Archos Corporation. 10/1994. / Archos Corporation 

24

Records Maintenance, Material, Storage - Schematic Design, Inactive Records, Maintenance Materials Storage and Recycle Building: Phase I. 12/1992. / Archos Corporation 

24

Records, Maintenance Materials Storage, and Recycling Building - Phase I Building Program. 8/1991. 

24

Storm and Sanitary Sewer System Study - Physical Plant (Where is it located?). 8/1990. / CH2M Hill Engineers Planners Economists Scientists 

24

Student Services Addition - Project Manual Volume I Divisions 0 - 7 (Lighty Student Services). 9/1993. / Mahlum and Nordfors McKinley Gordon 

24

Student Services Addition - Project Manual Volume II Divisions 8 - 16 (Lighty Student Services). 9/1993. / Mahlum and Nordfors McKinley Gordon 

24

Stadium Way Programming Analysis - Draft Report. / KPFF Consulting Engineers 

24

Bohler Gymnasium Addition - Predesign Study. 10/1992. / Sasaki Associates, Inc. ; Stewart Associates 

25

Bohler Gymnasium Renovation - Predesign Study. 6/1994. / Sasaki Associates, Inc. ; Stewart Associates - Predesign Consultant 

25

Bohler Gymnasium Renovation - Capital Project Review Submittal. Allotment Request for Construction. 6/1994. / Prepared BY: WSU Department of Facilities Development 

25

Animal Science Building - Predesign Study. 7/1992. / MBT Associates - Predesign Consultants 

25

Engineering/Life Sciences Building. Multimedia/Electronic Communications Building. Phase II Academic Buildings - Predesign Study - Vancouver. 5/1996. / Zimmer Gunsul Frasca 

25

Chemical Storage Building. Environmental Health Services Facility - Predesign Study. 5/1994. / Bovay Northwest - Predesign Consultant 

25

Phase II Science Hall Remodeling - Building Program (Murrow East). 12/1985. 

25

Veterinary Teaching Hospital - Building Program (Bldg. Communication, Value Engineering Report, Physical Plant, Schedule and Equipment) +Slides and Pictures. 1991. / De Neff Deeble Barton Associates Architects and Planners 

26

WSU Tri-Cities Early Building Specifications. 1964 -1981. 

26

TriCities University Center Addition - Project Manual. 2/1990. / McKinley Architects - Volume 1 Divisions 0 - 7 

26

TriCities University Center Addition - Project Manual. / McKinley Architects - Volume 2 Divisions 8 - 16 

26

TriCities University Center Addition - Addendum No. 3. 3/1990. / McKinley Architects 

26

TriCities University Center Addition - Project Manual “As Built”. / McKinley Architects - Volume 1 Divisions 0 - 14 

26

Animal Disease Biotechnology Facility - Project Data Base - Second Submittal. 11/1993. / Northwest Architectural Company ; Wyatt - Jaykim Engineers - SurveyorsGifford Consulting Northwest - Geotechnical Consultants to Wyatt - Jaykim ; C3 Management Group, 

27

ADBF - Responses to Review Comments - (These annotated comments accompany the Bid Set, responding to review comments from earlier submittals.). 7/1994. / Northwest Architectural Company 

27

ADBF - Area Comparison/Cost estimate/Mechanical Calculations/Fire Protection Calculations/Electrical Calculations - Final Review Submittal. 2/1994. / Northwest Architectural Company 

27

ADBF - Schematic Design Slides - BD. Of Regents Presentation. 

27

ADBF - Energy Conservation Report and Life Cycle Cost Analysis. 3/1993. / Northwest Architectural Company - Architects/Engineers 

27

ADBF - Fixed Equipment - Third Submittal. 12/1993. / Northwest Architectural Company 

27

ADBF - A landmark facility dedicated to serving the state of Washington. the Western Region. and the Nation. College of Veterinary; Medicine Facility Program Goals/Financial Summary of ADBF; Grants, Licenses and Selected Refereed Publications in 93 and 94. 2/ 

27

ADBF Slide - College of Veterinary Medicine. 

27

ADBF NAC Aerial Drawing of CVM (photo and slide). 7/1994. 

27

ADBF - College of Veterinary Medicine - Design Development Manual Volume II. Structural/Mechanical/Electrical Calculations. 11/1992. / Northwest Architectural Company 

27

ADBF College of Veterinary Medicine - Design Development Manual - Volume I. Project Description/Cost Estimate/Equipment Schedule/Code Analysis. 11/1992. / Northwest Architectural Company ; Structural Design NorthwestGerard and Associates - Mechanical ; Crei 

27

ADBF - Cost Estimate - Third Submittal - Cost Estimate. 12/1993. / Northwest Architectural Company 

27

ADBF - Krieger Steel Products - Brochure Material. 12/1990. 

27

ADBF - Water Saver Faucet Co. - Brochure Material: Laboratory and Hospital Faucet Fixtures; Emergency Eye Wash and Shower Equipment. 7/1990. 

27

Animal Sciences Laboratory - Construction Documents Estimate Prepared For MBT. 5/1995. / Ackroyd - Cost Control Consultants 

27

Animal Sciences Laboratory - Won - Door Corporation (fire guard) Brochure Material. 8/1991. 

27

Animal Sciences Laboratory Building - Value Engineering Services. 8/1994. / EFT - Architects/Planners/Project Managers 

27

Animal Sciences Laboratory Building - Value Engineering Study Proposal. 8/1994. / Meng Associates, Analysis Group - Architecture Planning/Value Engineering/Construction Research 

27

Asbestos Removal Plans - Alpha Engineering Group, Inc. 

27

Beasley Performing Arts Coliseum - Asbestos Removal and Abatement Specifications. 4/1992. / By the Board of Regents - Physical Plant Department 

27

Beasley Performing Arts Coliseum - Asbestos Survey Report for the Department of Physical Plant. / Alpha Engineering Group, Inc. 

27

Bohler Addition - Summary of Field and Laboratory Test Results File: WASUMI - M9601 A/ Contract 12254. 8/1997. / Strata Geotechnical Engineering and Materials Testing 

27

Bohler Gym Addition/Renewal - Statement of Qualifications. 10/1991. / Sasaki Associates, Inc. 

27

Bohler Gym Addition - Revised OFM Predesign Submittal. / Prepared for Sasaki Associates, Inc. By C3 Management Group 

27

Bohler Gymnasium Addition - 50% Design Development Value Engineering! Workbook and Preliminary Idea Listing Test and Screen Alternatives - Optimize Total Costs and Total Performance. / Ehninger Fetzer Tholen - Architects/Planners/Project Managers 

27

Bohler Gymnasium Remodel - OFM Predesign Submittal. 5/1994. / C3 Management Group, Inc. 

27

Bohler Gymnasium Addition - Life Cycle Cost Analysis (Report Some Plans Included). 2/1995. / Notkin Engineering, inc. 

27

Chemistry Building Cost Estimate Analysis. 3/1986. / Brooks Hensley Creager Architects, 

27

Chemistry Building - Program Statement. 3/1984. 

27

Chemistry Building - Design Development. Pedestrian Corridor Development of College Avenue From Library Road to Stadium Way. / Brooks Hensley Creager Architects 

27

Child Care Playground - Project Manual. 4/1994. / Architect: The Tsang Partnership. inc. ; Landscape Architect: Douglas H. Tuma, ASLA 

27

Child Care Center - Building Program. 6/1991. 

27

Child Care Facility Playground - Specifications. 4/1994. / Architect: The Tsang Partnership, Inc. ; Landscape Architect: Douglas H. Tuma, ASIA 

27

Request for Proposal, Strategic Partner in Communications - WSU Systems and Computing. 4/1991. 

28

University Center/Classroom Auditoria Building - Predesign Study. 5/1992. / Predesign Consultant: The Callison Partnership. Ltd. 

28

University Center - Site Considerations. 5/1992. / Burke/Lee A Joint Venture, Architects, Planners and Landscape Architects 

28

Communication Infrastructure Renewal Project - Submitted July 1, 1993 to the CIR Review Team for Approval of the Format, Approval Requested Zone 2 - Sloan MCF - Communications Closet Drawings. 7/1993. / JWP information Systems Network Integration Services 

28

Composting Facility - Preliminary Design Report Draft - Project #0901-001.01. 3/1994. / Prepared for WSU by EMCON Northwest 

28

Dairy Forage Facility - Phase II Cost Estimate and Area Comparison Charts - Schematic Design Phase. 4/1992. / The BJSS Group - Architects and Planners AIA 

28

Dairy Forage Facility - Phase II Construction Documents - Cost Estimate. 2/1993. / The BJSS Group - Architects and Planners, AIA 

28

Dairy Forage Facility - Phase II Addendum No. 2. 6/1993. / The BJSS Group 

28

Dairy Forage Facility - Phase II Addendum No. 3. / The BJSS Group 

28

Kruegel Hall McAllister Hall Neill Hall - Photo Album. 4/1957. 

28

Mechanical Engineering Laboratory - Hazardous Materials Survey AGRA E and E’s Job No. 12-1195-00. 8/1994. / AGRA Earth and Environmental 

28

ETRL - Preliminary Environmental Assessment. 5/1994. / Prepared by Hart Crowser for The Callison Partnership 

28

ETRL - Pre-Design Building Program Draft - College of Engineering and Architecture. 7/1992. 

28

ETRL - Value Engineering Study. 5/1994. / Meng Analysis Group - Value Engineering/Construction Research 

28

ETRL - Value Engineering Study - (different from above). 5/1994. / Meng Associates - Analysis Group/Architecture/Planning/Value Engineering/Construction Research 

28

McAllister/Kruegel Residence Halls Consultant Agreement No. 11063. 2/1993. / SCM Consultants, Inc. Architects and Engineers 

28

McAllister/Kruegel Residence Halls Consultant Agreement No. 11063 - Part C Structural Analysis. 2/1993. / SCM Consultants Inc. Architects and Engineers 

28

Fulmer Hall/Fulmer Annex Renewal - Budget Estimate. 6/1993. / Mahlum and Nordfor McKinley Gordon 

28

Fulmer Hall - Mckinley Gordon Architects Statement of Qualifications. 3/1993. 

28

Fulmer Hall/Fulmer Annex - Operations and Maintenance Plan for Asbestos. 3/1994. / RZA AGRA, Inc. 

28

Fulmer Hall/Fulmer Annex Renovation Project - Consultant Roster Registration Environmental Consulting Services and Proposal for the Renovation Project. 11/1993. / Hart Crowser - Earth and Environmental Technologies 

28

Fulmer Hall/Fulmer Annex Renewal - Lab Layout Drawings for user Group Meetings. 11/1993. / Mahlum and Nordfors McKinley Gordon 

28

Fulmer Annex Renewal - Energy Conservation Report. 4/1994. / Prepared by Riley Engineering, Inc. Mahlum and Nordfors Mckinley Gordon 

28

Glenn Terrell Friendship Mall and Extended Areas - Technical Report. 5/1987. / By Landscape Architecture Students in Landscape Architecture 361 ; Department of Horticulture and Landscape Architecture 

28

Glenn Terrell Friendship Mall - Schematic Design Brochure. / Design Team Catherin Howett/George Trakas ; A Partnership Project of WSU and the WSU Arts Commission 

28

Greenhouse Replacements - Design Development/Puyallup WWREC with Slides Included. 2/1995. / Stafford Harris, Inc. 

28

Hazardous Waste Sites Phase II - Preliminary Construction Budget Estimate. 1/1994. / Bovay Northwest Inc. 

28

Chemical Waste Collection Sites - Schematic Design Brochure. 

28

Eastlick Hall/Wegner Hall/Engineering Complex/Silver Recovery Units. 11/1994. / Bovay Northwest Inc. 

28

Chemical Storage Building/Environmental Health Services Facility - Predesign Study (DRAFT). 4/1994. / Bovey Northwest, Inc. 

28

Hill Residence Halls - Condition Survey/Review - Stevens and McCroskey Halls. Duarte Bryant Architecture - Statement of Qualifications. 3/1995. 

29

Stevens Hall Dormitory - Exterior Renovation - Design Submittal. Lateral Study/Outline Specifications/Cost Estimate. 12/1992. / Duarte Bryant Architecture 

29

Stevens Hall Dormitory - Exterior Restoration - Building Survey. 8/1992. / Duarte Bryant Architecture 

29

Heald Hall - Rebar Study (Reinforcing Investigation). 7/1993. / Miller Hull Partnership 

29

Heald Hall - Expanded Options Study. 8/1995. / The Miller/Hull Partnership 

29

Heald Hall Renewal - Predesign Phase Proposal. 3/1992. / The Miller/Hull Partnership 

29

Heald Hall Renewal - Options Phase Document. 6/1992. / The Miller/Hull Partnership 

29

Holland Library Addition - Design Development. / ALSC Architects/ Zimmer Gunsul Frasca Partnership - Design Architect ; Structural: Structural Design NorthwestMechanical: Riley Engineering ; Electrical: Doyle Engineering ; Civil: Wyatt - Jaykim 

29

Libraries - A Guide to Spacesaver High - Density Compact Storage Systems for the Library Environment The Space Saver Group. 

29

Holland Library Renewal - Project Scope Development. 1/1994. / ALSC Architects, P.S. 

29

Holland Library Addition - Design Development Cost Estimate. 2/1990. / ALSC Architects/Zimmer Gunsul Frasca Partnership - Design Architect 

29

Holland Library Addition - Holland Library Addition - Package No. 2. 8/1993. / Mortenson - The Construction Organization 

29

Holland Library Addition - Design Development/Cost Estimate. 1/1989. / C3Management Group, Inc. 

29

Library - An Assessment of Current and Projected Library Space Needs @ WSU. 3/1988. / P. Genie Trapp - Office of Institutional Research 

29

ICNE - Yakima Permanent Facility - Proposed Site Study. Location: Between Glenn, Palmer and Prior Halls and the Brown Dental Clinic. 2/1994. / Integrus Architecture, P.S. 

29

ICNE Yakima Site Studies Log Project No. 93091. 1993. / SCM Consultant, Inc. 

29

Wheat Research Center - New Plant Growth. / Tan Boyle Heyamota Architects ; Architects Design Group, Design ConsultantsPeden Petersen Lee, Structural Consultants ; MW Consulting Engineers, Mechanical and Electrical Consultants ; Ricard Carothers Associates, 

29

Plant Growth Wheat Research Center - Schematic Design (Layouts). 

29

New Plant Growth - Wheat Research Center - Schematic Design Submittal. 11/1994. / Tan Boyle Heyamota/Architects Design Group 

29

New plant Growth Facility - Submittal of Qualifications. 5/1994. / Tan Boyle Heyamoto Architects/Architect Design Group 

29

Inactive Records, Maintenance Materials Storage, and Recycle Building: Phase 1 - Schematic Design. 12/1992. / Archos Corporation 

29

Records, Maintenance Materials Storage, and Recycling Building - Construction Document Submittal. 9/1993. / Archos Corporation 

29

Records, Maintenance Material Storage, and Recycling building - Phase I - First Design Submittal. 4/1992. / Archos Corporation 

29

Records, Maintenance Material Storage, and Recycling Building - Phase I - Revised Schematic Design Submittal. 10/1992. 

29

Records Storage and Recycle Building - Schematic Design Cost Estimate. 11/1992. / Archos Corporation/C3 Management Group, Inc. 

29

Records, Maintenance Materials Storage, and Recycling Building Phase I - Supplementary Building Program. 3/1992. / Archos Corporation 

29

University Facilities Planning and Student Housing Research - Qualifications Submittal Document. 1/1995. / MGT of America, Inc. 

29

The University of Connecticut Residential Life Facilities Study - Summary Report. 1/1991. / Division of Student Affairs and Services ; Dober, Lidsky, Craig and Associates, Inc. 

29

Proposed Undergraduate Housing Facility Program - Babson College. Babson College 1991 New Housing Study Committee. 3/1991. / Dober, Lidsky, Craig and Associates, Inc., Consultants 

29

Student Housing Proposal/Statement of Qualifications. 1/1995. / IBI Group - Architects and Engineers 

29

Graduate Student Housing - Massachusetts Institute of Technology/ 143 Albany Street. 5/1988. / Facility Program Dober and Associates, Incorporated Planning Consultants 

29

Plant Growth Wheat Research Facility - Summary of Field and laboratory Test Results. 8/1997. / File: WASUNI - M9602A Contract: 12380 ; Strata Geotechnical Engineering and Materials Testing 

29

Incinerator - Replacement Medical Waste Incinerator - Environmental Impact Statement Volume I of II WSU. 10/1996. 

29

Incinerator - Replacement Medical Waste Incinerator - Environmental Impact Statement Volume II of II WSU. 10/1996. 

29

Incinerator - Design Development Submittal for Incinerator Project. Civil Design Analysis/Preliminary Structural Calculations/Mechanical/Electrical. 7/1997. / Bovay Northwest 

29

Incinerator - Design Development Submittal for Incinerator Project. 7/1997. / Bovay Northwest 

30

Incinerator - New Incineration Facility/Wastewater Pre-Treatment Study. 2/1997. / Bovay Northwest 

30

Incinerator - Engineering Report Chapter 6 Site Selection. 7/1993. / Bovay Northwest 

30

Waste Management Evaluations - Proposal for Consulting Services. 2/1990. / Doucet and Mainka, P.C. 

30

Incinerator - Multicare Medical Center Incineration Project. Final Environmental Impact Statement. Pursuant to the State Environmental Policy Act of 1984 Chapter 43.2 (RCW 2/1990). 

30

Waste Management Program Evaluation - Technical and Economic Feasibility Report. 2/1990. / Doucet and Mainka, P.C. 

30

Final Waste Management Program Evaluation - Report (DM347). 5/1990. / Doucet and Mainka, P.C. 

30

Yakama Village - One - Year Warranty Inspection Final Report Checklist. 1/1997. / Design West 

30

Student Services Addition - Mechanical Fixture Information Booklet. 9/1993. / Mahlum and Nordfors Mckinley Gordon 

30

Student Services Addition - Design Development Phase - Schematic Design Review Comments. 3/1993. / McKinley Gordon - A Professional Service Corporation 

30

French Administration Building Addition - Proposal to provide Value Engineering Services. 6/1993. / Presented to: Mahlum and Nordfors Mckinley Gordon ; Submitted by: KJM and Associates, LTD 

30

Student Services Addition Design Development Estimate - Draft. 10/1993. / Turner Construction Company 

30

Student Services Addition - Electrical Fixture Information Booklet. 9/1993. / Mahlum and Nordfors Mckinley Gordon 

30

Thompson Hall Renewal - Design Development Supplemental Information: Estimate of Construction Cost; Program Area Comparison; Architectural Details; Structural Notes; Mechanical Narrative; Light Fixture Schedule. 11/1994. / Cardwell/Thomas and Associates/Arc 

30

Thompson Hall Renewal - Schematic Design. 6/1994. / Cardwell/Thomas and Associates/Architects 

30

Thompson Hall Renewal - Selected Product Information. Division 8 Doors and Windows/Division 9 Finishes/Division 10 Specialties. 3/1995. / Cardwell/Thomas and Associates/Architects 

30

Thompson Hall Renewal - Addenda 1 - 6 Bid Package II. 5/1998. / Cardwell/Thomas and Associates 

30

Thompson Hall - Hazardous Material Survey - Addendum No. 1. 10/1997. / SCM Consultants Inc. 

30

Thompson Hall Renewal - Value Engineering Study. 10/1994. / Olympic Associates Company 

30

Thompson Hall Hazardous Materials Survey Project 3710.010. 2/1995. / SCM Consultants, Inc. - Architects and Engineers 

30

Thompson Hall Renewal Project - Value Engineering Services. 7/1994. / Cardwell/Thomas and Associates 

30

Todd Hall - Health and Safety Observations. 9/1994. / AGRA Earth and Environment, Inc. 

30

Todd Hall Renewal - Copy Finish Hardware Schedule for your review and comment. 3/1994. / The Henry Klein Partnership 

30

Todd Hall Renewal - Value Engineering Study. 10/1992. / The Henry Klein Partnership 

30

Todd Hall Renovation - Schematic Drawings. 7/1990. / The Henry Klein Partnership ; Structural: ABJKMechanical: Halvorson, Beach and Bower ; Electrical: Sparling and Assoc., Inc. 

30

Todd Hall Renovation - Room Capacity Chart along with drawings. 10/1991. / The Henry Klein Partnership 

30

Todd Hall Renovation - Health and Safety Plan - Demolition of Lead Paint Containing Material R14. 3/1994. / AGRA - Engineering and Environmental Services 

30

Todd Hall Renewal - Allotment Request for Construction - Renovation - renovation will bring fire, safety, and handicapped compliance up to date. 12/1993. 

30

Todd Hall Addition - Construction Cost Estimate. 1/1989. / Olympic Associates Company 

30

Todd Hall Addition - Foundation Investigation. 7/1984. / c/o Henry Klein Partnership ; Shannon and Wilson, Inc. 

30

Todd Hall Addition - Fire Alarm and Clock Control System. 12/1989. / Simplex 

30

Todd Hall Addition - C.D. Contractors, Inc. Certified Payroll Reports beginning with period ending 6/23/1989 to date. 11/1989. / C and D General Contractors. 

30

Todd Hall Addition - Equipment Brochures Job # 3147. 12/1988. / FORMA - Interior Design Planning and Purchasing 

31

Consolidated Information Center (C.I.C.) - Design Development Outline Specifications. 12/1994. / Integrus Architecture 

31

Consolidated Information Center - Drainage Report (Tri-Cities). 12/1994. / Rose Water Engineering, Inc. 

31

Consolidated Information Center - Energy Conservation Report (Tri-Cities). 1/1995. / MW Consulting Engineers 

31

Consolidated Information Center - Value Engineering Study - Tri-Cities Branch. 11/1994. / Roen Associates 

31

Hazardous Communication - Hazardous Chemical Program Manual. 7/1989. / Contractors Northwest; Inc. 

31

Consolidated Information Center - Design Development Cost Estimate (Tri-Cities). 1/1995. 

31

Consolidated Information Center Preliminary Program Information. 12/1993. / Integrus Architecture, P.S. 

31

Tri-Cities WSU - Campus Expansion Traffic Impact Study - Level of Service Reports - Existing Condition Year Traffix System Version 6.7. 1994. / Licensed To INCA Engineers, Inc. 

31

Tri-Cities Campus Expansion - Traffic Impact Study. 8/1994. / Prepared by INCA Engineers, Inc. 

31

Consolidated Information Center - Phase I Geotechnical Studies. 12/1994. / Shannon and Wilson, Inc. - Geotechnical and Environmental Consultants 

31

Center for Northwest Anthropology - A Cultural Resources Survey of the WSU Tri-Cities Branch Campus Properties Contributions in Cultural Resource Management No. 49. 2/1995. 

31

Veterinary Teaching Hospital - Phase 11 Building Construction - Quality Control Program. / Morgen and Oswood Construction Co., Inc. 

31

Veterinary Teaching Hospital - Site Preparation Phase I - Information for Preparation of Bids on Excavation and Fill. 

31

Veterinary Teaching Hospital - Phase II: Building Construction Contract No. 11470. Environmental and Pollution Prevention Plan. / Morgen and Oswood Construction Co., Inc, 

31

Veterinary Teaching Hospital - Project Information and Procedures. Owner’s Project # 11470. / Morgen and Oswood Project Number 9304 

31

Veterinary Teaching Hospital - Value Engineering and Constructability Study. 5/1992. / Morrison Knudsen Corporation 

31

Veterinary Teaching Hospital - Project Manual for Phase I: Site Grading/ Job Number 5-88-328A. 6/1991. / De Neff Deeble Barton Associates Architects and Planners 

31

Veterinary Teaching Hospital - Clinic Building - Environmental Analysis. Volume Five of Six Oregon State University Environmental Quality Study (Item 10.10). Submitted to Grants and Contracts Management Branch - Public Health Service. / Submitted by Mr. Mil 

31

Environmental Quality Study for (Exhibit D). Veterinary Research Laboratory Addition, Moscow Idaho. Caldwell Veterinary Medical Center, Caldwell, Idaho. Caldwell Veterinary Medical Center Isolation Building. Caldwell, Idaho. Volume Six of Six - University 

31

College of Veterinary Medicine Capital Budget Request - Construction of New Veterinary Teaching Hospital. 1989 -1999. 

31

McCoy /Bustad Complex - Veterinary Teaching Hospital - Site Study. 4/1988. / De Neff Deeble Barton Associates - Architects and Planners 

31

New Veterinary Teaching Hospital - College of Veterinary Medicine - Schematic Design. / De Neff Deeble Barton Associates - Architects and Planners ; Thomas J. Gerard and Associates, Inc. - MechanicalSuden, Golden and Guest, Inc. - Structural ; Foil - Wyatt - Mc 

31

Veterinary Teaching Hospital - A Report on Site Planning. 11/1988. / Burke/Lee A Joint Venture - Campus Planners 

31

Veterinary Teaching Hospital - Interview. 10/1987. / Project Design Team: De Neff Deeble Barton Associates Architects and Planners ; Foil - Wyatt - McKewen - Veterinary Planning ConsultantSuden, Golden and Guest, Inc. - Structural Engineers ; Thorson Partners 

31

Veterinary Hospital - Benefit and Life Cycle Cost Analysis Summary. 

31

Veterinary Teaching Hospital Complex - Review Copy of Program. 7/1988. / De Neff Deeble Barton Associates - Architects and Planners ; Program Consultant: Foil - Wyatt - Mckewen 

32

New Veterinary Teaching Hospital - College of Veterinary Medicine. 12/1990. / De Neff Deeble Barton Associates Program consultant - Foil - Wyatt - Mckewen 

32

New Veterinary Teaching Hospital Complex Program (Needs Not Meet In New Construction). 12/1990. / De Neff Deeble Barton Associates Foil - Wyatt - Mckewen 

32

Health Professions Educational Facilities Construction Grant - Volume One of Six. 7/1977. / Submitted by: Washington State University, Oregon State University, University of Idaho, 

32