Washington State University Libraries Manuscripts, Archives, and Special Collections
Guide to the Capital Planning Building Files
1972-2003
Archives 272
Table of Contents
- Summary Information
- Biography/History
- Scope and Content
- Arrangement
- Administrative Information
- Related Materials
- Names and Subjects
- Detailed Description of Collection
- Consolidated Information Center (C.I.C.). Building No. 9512
- Chemical Storage Building. Eastlick 82A, Wegner 45, Engineering (Sloan) 78
- Chemical Waste Collection Sites. Eastlick 82A, Wegner 45, Engineering (Sloan) 78
- Classroom Auditoria Building (Closed project. No building # assigned)
- Compost Facility. Building No. 359
- Plant Growth Wheat Research Center. Building No. 1040
- Todd Hall Renewal. Building No. 55A
- Glenn Terrell Mall. Building No. 790
- Fulmer Hall Annex Building No. 003
- Veterinary Teaching Hospital. Building No. 818
- Greenhouse Replacements WWREC Puyallup. Building No. 1034
- Student Services Addition. Building No. 6504
- Greenhouse Replacement WWREC Puyallup. Building No. 1034 (Continued From Box #36)
- Miscellaneous
- ICNE - Yakima Permanent Facility. Building No. 9401
- Family Student Housing Replacement
- Foley Institute for Public Policy and Public Service at Thompson Hall. Building No. 001
- Animal Science Laboratory Building. Building No. 100
Summary Information
- Repository
- Washington State University Libraries, Manuscripts, Archives and Special Collections
- Creator
- Washington State University. Capital Planning
- Title
- Capital Planning Building Files
- ID
- Archives 272
- Date [inclusive]
- 1972-2003
- Extent
- 45 Linear feet of shelf space, 46 boxes
- Language
- Collection materials are in English.
- Abstract
- The collection consists of correspondence and contracts relating to several WSU construction projects from the early 1990s.
Preferred Citation
[Item Description] Capital Planning Building Files, 1972-2003 (UA 272)
Manuscripts, Archives, and Special Collections, Washington State University Libraries, Pullman, WA.
Biography/History
A University Architect served as the construction officer at Washington State University from 1911 forward. The modern form of the office dates from 1947 when it became a full-time, staffed administrative department. In 1967 the University Architect office was renamed as Facilities Planning, and then to Facilities Development in 1993. In 2001 it was renamed as Capital Planning. While Capital Planning is responsible for major planning and development, smaller projects are conducted by Facilities Operations. Facilities Operations descended from the Physical Plant in 1998, which in turn descended from Building and Grounds in 1967. While each line of programs has existed separately, some migration in function has occurred over the years. The primary difference between Capital Planning and Facilities Operations is the cost of the project in question - initially items costing less than $1,000,000 were assigned to Fac Ops, and those costing more to CP. By 2009, this break point is between $1,500,000 and $2,000,000.
Scope and Content
The collection consists of correspondence and contracts relating to several WSU construction projects from the early 1990s.
Arrangement
The collection is maintained in the order in which it was received in the Archives from Capital Planning.
Administrative Information
Publication Information
Washington State University Libraries Manuscripts, Archives, and Special Collections © 2016
http://www.libraries.wsu.edu/masc/
Terrell Library
P.O. Box 645610
Pullman, WA, 99164-5610 USA
509-335-6691
mascref@wsu.edu
Restrictions on Access
The majority of this collection is open and available for research use. A few files are marked as confidential or classified (these are primarily identified as Attorney General files or Issues and Claims files; please contact Capital Planning if you wish access to these) and access to those may be restricted. These files are labeled in this page as RESTRICTED, each box containing restricted material is so labeled, and individual restricted folders are stickered as such.
Restrictions on Use
Copyright restrictions may apply.
Acquisition Information
These records were transfered to Manuscripts, Archives, and Special Collections from Capital Planning on May 25, 2005 (UA 2005-07).
Processing Information
This collection was processed by Tim Mace and University Archivist Mark O'English in early 2009.
Related Materials
Related Material
The WSU Archives hold a number of other Capital Plannng collections; to locate these please view our Archives' Collections List and our Accessions List, looking for the various names under which this department has operated: University Architect, Facilities Planning, Facilities Development, Capital Planning.
Names and Subjects
Corporate Name(s)
Subject(s) :
- Washington State University. Capital Planning -- Records and correspondence.
- Washington State University. Capital Planning and Development -- Records and correspondence.
- Washington State University. Department of Facilities Development -- Records and correspondence.
- Washington State University. Department of Facilities Planning -- Records and correspondence.
- Washington State University. University Architect -- Records and correspondence.
- Washington State University -- Buildings -- History -- Archives.
Creator(s) :
- >Washington State University. Capital Planning.
- Washington State University. Capital Planning and Development.
- Washington State University. Department of Facilities Development.
- Washington State University. Department of Facilities Planning.
- Washington State University. University Architect.
Subject(s)
- College buildings -- Washington (State)
- Architecture
- Colleges and Universities
- Washington (State)
Detailed Description of Collection
Consolidated Information Center (C.I.C.). Building No. 9512 |
||||
box | ||||
Budget 8/1993 - 10/1997 |
1 | |||
E.I.S. 4/1989 - 4/1999 |
1 | |||
Regents Reports 9/1993 - 9/1998 |
1 | |||
Public Records Request 4/1996 - 9/1996 |
1 | |||
Attorney General Correspondence 3/1996 - 1/1999 RESTRICTED |
1 | |||
Disputes Review Board - General Corresp 1/1996 - 2/1997 |
1 | |||
Disputes Review Board - Three Party Agreement #12204 |
1 | |||
Landscaping Claim 7/1997 |
1 | |||
James P. Donaldson - Construction Consulting 5/1996 - 2/1997 |
1 | |||
Robert Fossatti Associates 8/1994 - 9/1995 |
1 | |||
Steven M. Gold blatt CO # 12204 3/1996 - 2/1997 |
1 | |||
Ruth I. Johnson 12/1995 - 6/1998 |
1 | |||
The Red icheck Firm CO # 11621 7/1995 - 8/1995 |
1 | |||
Howard Consultants, Inc.! Strata CO # 12210 12/1995 - 8/1996 |
1 | |||
Time and Cost Management CO # 12156 11/1995 - 8/15 |
1 | |||
Time and Cost Management General Corresp. #5 6/1997 |
1 | |||
Time and Cost Management - Non Conformance Reports 5/1996 - 7/1997 |
1 | |||
HCI Howard Consultants, Inc./Strata Inspection and Test Reports 2/1996 - 4/1997 |
1 | |||
Value Engineering Study 8/1994 - 12/1994 |
1 | |||
Geotechnical Report 12/1994 |
1 | |||
Project Planning Report 1/1992 - 11/1994 |
1 | |||
Building Plan 5/1994 |
1 | |||
Daily Construction Reports (Time and Cost Management) #3 1/1997 - 8/1991 |
1 | |||
General E-Mail Correspondence #1 8/1995 - 8/1999 |
1 | |||
General Correspondence #7 1/1997 - 6/1999 |
1 | |||
Integrus Architecture E-Mail #1 5/1996 - 3/1999 |
2 | |||
Integrus Architecture - Requests for Information 12/1995 - 8/1997 |
2 | |||
Integrus Architecture - Construction Meeting Minutes 12/1995 - 6/1997 |
2 | |||
Integurs Architecture - General Correspondence 1/1998 - 4/2000 |
2 | |||
Contractors Northwest, Inc. - E-Mail Correspondence 12/1997 - 10/1998 |
2 | |||
Contractors Northwest, Inc. #6 6/1997 - 8/2003 |
2 | |||
Contractors Northwest, Inc. - Certified Payroll #1 6/1996 - 7/1996 |
2 | |||
Non - Numbered Change Proposals 4/1996 - 9/1997 |
2 | |||
Change Proposals # 167 - 121 |
2 | |||
Contractors Northwest Change Proposals # 1 - 120 |
3 | |||
Rejected Bids (Bid Opening 10/17/1995) |
3 | |||
Time and Cost Management - General Correspondence #4 11/1996 - 6/1997 |
4 | |||
Time and Cost Management - General Correspondence #3 5/1996 - 11/1996 |
4 | |||
Time and Cost Management - General Correspondence #2 3/1996 - 4/1996 |
4 | |||
Time and Cost Management - General Correspondence #1 10/1995 - 2/1996 |
4 | |||
Time and Cost Management - Daily Construction Reports #2 6/1996 - 12/1996 |
4 | |||
Time and Cost Management - Daily Construction Reports #1 12/1995 - 5/1996 |
4 | |||
General Correspondence #6 4/1996 - 12/1996 |
4 | |||
General Correspondence #5 11/1995 - 3/1996 |
4 | |||
General Correspondence #4 8/1995 - 10/1995 |
4 | |||
General Correspondence # 3 3/1995 - 7/1995 |
4 | |||
General Correspondence #2 3/1994 - 2/1995 |
5 | |||
General Correspondence #1 2/1993 - 3/1994 |
5 | |||
Integrus Architecture General Correspondence # 9 8/1997 - 12/1997 |
5 | |||
Integrus Architecture General Correspondence # 8 2/1997 - 8/1997 |
5 | |||
lntegrus Architecture General Correspondence # 7 8/1996 - 2/1997 |
5 | |||
Integrus Architecture General Correspondence # 6 3/1996 - 7/1996 |
5 | |||
Integrus Architecture General Correspondence # 5 11/1995 - 2/1996 |
5 | |||
Integrus Architecture General Correspondence # 4 9/1995 - 10/1995 |
5 | |||
Integrus Architecture General Correspondence # 3 1/1995 - 8/1995 |
5 | |||
Integrus Architecture General Correspondence # 2 10/1994 - 10/1994 |
6 | |||
Integrus Architecture General Correspondence # 1 1/1993 - 9/1994 |
6 | |||
Integrus Architecture Contract Payment #3 6/1996 - 6/1998 |
6 | |||
Integrus Architecture Contract Payment #2 3/1995 - 5/1996 |
6 | |||
Integrus Architecture Contract Payment #1 1/1994 - 2/1995 |
6 | |||
Contractors Northwest General Corresp. #5 4/1997 - 5/1997 |
6 | |||
Contractors Northwest General Corresp. (All Star Corresp.) #5 4/1/1997 - 4/30/1997 |
6 | |||
Contractors Northwest General Corresp. #4 11/1996 - 3/1997 |
6 | |||
Contractors Northwest General Corresp. #3 8/1996 - 10/1996 |
6 | |||
Contractors Northwest General Corresp. #2 2/1996 - 7/1996 |
7 | |||
Contractors Northwest General Corresp. #1 10/1995 - 1/1996 |
7 | |||
Contractors Northwest Contract #1 10/1995 - 4/1997 |
7 | |||
|
||||
Chemical Storage Building. Eastlick 82A, Wegner 45, Engineering (Sloan) 78 |
||||
box | ||||
Budget 7/1993 - 9/1995 |
8 | |||
Building Planning Committee 10/1993 - 12/1993 |
8 | |||
General Correspondence #2 6/1994 - 3/1995 |
8 | |||
Bovey Northwest, Inc. - Contract CO 10798 10/1991 - 6/1994 |
8 | |||
Bovay Northwest General Corresp. #2 5/1994 - 1/1995 |
8 | |||
Bovay Northwest General Corresp. # 1 10/1993 - 4/1994 |
8 | |||
General Correspondence # 1 7/1993 - 5/1994 |
8 | |||
|
||||
Chemical Waste Collection Sites. Eastlick 82A, Wegner 45, Engineering (Sloan) 78 |
||||
box | ||||
Budget 10/1993 - 9/1998 |
8 | |||
E.l.S. 8/1994 - 9/1998 |
8 | |||
Regents Report 5/1994 - 9/1998 |
8 | |||
Professional Services Industries CO # 12206 11/1994 - 1/1997 |
8 | |||
Fossatti Associates 12/1994 - 9/1995 |
8 | |||
Professional Services Industries - Concrete Test Reports 5/1996 - 2/1997 |
8 | |||
Program Planning Committee 10/1993 |
8 | |||
Construction Meeting Minutes (Vet.Med.) 12/1997 - 6/1998 |
8 | |||
General E-Mail #1 12/1995 - 4/1998 |
8 | |||
General Correspondence # 3 1/1997 - 10/1998 |
8 | |||
Bovay Northwest Inc. E-Mail #1 6/1996 |
8 | |||
Bovay Northwest Inc. - General Correspondence #7 1/1998 - 2/1999 |
8 | |||
Bovay Northwest #2 - CO # 10798 9/1996 - 4/1999 |
8 | |||
Bouten General Correspondence #1 11/1995 - 10/1997 |
8 | |||
Bouten Construction #1, CO 12150 10/1995 - 2/1997 |
8 | |||
Mike Coman General Correspondence #1 10/1997 - 12/1998 |
8 | |||
Mike Coman Construction (College of Veterinary Med.) CO 12798 10/1997 - 9/1998 |
8 | |||
Mike Coman Contract Change Proposals 1,4 - 5 - 1 1 |
8 | |||
Bouten Construction Co. - Contract Change Proposal 29r - 24 |
8 | |||
Bouten Construction Change Proposals 23 - 1 |
9 | |||
Rejected Bids - Bid Opening (College of Veterinary Medicine) 10/1997 |
9 | |||
Rejected Bids - Bid Opening 10/1995 |
9 | |||
General Correspondence #2 10/1995 - 12/1996 |
9 | |||
General Correspondence # 1 7/1993 - 9/1995 |
9 | |||
Bovay Northwest General Corresp. #6 5/1996 - 12/1997 |
9 | |||
Bovay Northwest General Corresp. #5 2/1996 - 4/1996 |
9 | |||
Bovay Northwest General Corresp. #4 6/1995 - 1/1996 |
9 | |||
Bovay Northwest General Corresp. #3 12/1994 - 5/1995 |
9 | |||
Bovay Northwest General Corresp. #2 7/1994 - 11/1994 |
10 | |||
Bovay Northwest General Corresp. # 1 10/1993 - 6/1994 |
10 | |||
Schematic Design Brochure - Vet Complex 9/1996 |
10 | |||
Schematic Design Brochure - Eastlick Hall, Wegner Hall, Engineering Complex, and Silver Recovery Units Preliminary Design Brochure - Fulmer Hall Chemical Waste 11/1994 |
10 | |||
Preliminary Design Brochure - Fulmer Hall Chemical Waste 6/1994 |
10 | |||
|
||||
Classroom Auditoria Building (Closed project. No building # assigned) |
||||
box | ||||
Budget 10/1992 - 5/1993 |
10 | |||
Regents 1/1992 - 5/1994 |
10 | |||
Building Meeting Minutes 1/1992 - 5/1992 |
10 | |||
Burke/Lee Correspondence 4/1991 - 11/1992 |
10 | |||
Classroom Auditoria/Univ. Center Subcommittee Mtg. minutes #1 1/1972 - 4/1992 |
10 | |||
General Correspondence #2 1/1992 - 11/1994 |
10 | |||
The Callison Partnership General Correspondence #2 6/1992 - 6/1993 |
10 | |||
The Callison Partnership Agreement, Pavement - CO 10973 2/1992 - 12/1992 |
10 | |||
The Callison Partnership Agreement, #1 1/1992 - 5/1992 |
10 | |||
General Correspondence #1 12/1991 |
10 | |||
|
||||
Compost Facility. Building No. 359 |
||||
box | ||||
Budget (empty folder) |
10 | |||
E.I.S. 4/1993 - 9/1998 |
10 | |||
Building Committee 9/1992 - 1/1997 |
10 | |||
General Correspondence #1 10/1992 - 10/1997 |
10 | |||
Burke/Lee Correspondence 11/1992 |
10 | |||
|
||||
Plant Growth Wheat Research Center. Building No. 1040 |
||||
box | ||||
Budget 1/1997 - 5/1998 |
11 | |||
Regents 4/1994 - 9/1998 |
11 | |||
Attorney General Correspondence 11/1995 - 2/1997 RESTRICTED |
11 | |||
Disputes Review Board - General Correspondence 9/1996 - 7/1997 |
11 | |||
Federal Grant Correspondence #2 1/1996 - 4/2001 |
11 | |||
DRB Contract CO# 12540 5/1997 |
11 | |||
DRB 5/1997 - 6/1997 |
11 | |||
Fossatti CO# 6060 1/1995 |
11 | |||
Frank Noble CO# DRB 11/1996 - 5/1997 |
11 | |||
Conviron Inc. 3/1997 - 3/1998 |
11 | |||
Strata Geotechnical Engineering and Materials Testing C0#12380 6/1996 - 6/1997 |
11 | |||
Strata Plant Growth Wheat Research Facility File: WASUNI - M9602A CO 12380 |
11 | |||
Giflord Consultants, Inc. - Geotechnical Report 9/1995 |
11 | |||
Project Planning Committee #1 2/1994 - 10/1996 |
11 | |||
Daily Construction Reports #1 11/1996 |
11 | |||
General Correspondence #3 10/1996 - 12/1999 |
11 | |||
General Correspondence E-Mail 9/1997 |
11 | |||
Tan Heyamoto Architects - General Correspondence #5 12/1996 - 2/1999 |
11 | |||
Calculations 7/1996 - 12/1996 |
11 | |||
Tan Heyamoto Architects - Design Clarifications 8/1996 - 7/1997 |
11 | |||
Tan Heyamoto Architects - Daily Inspection Reports 3/1997 |
11 | |||
Tan Heyamoto - Requests for Information #2 5/1997 - 10/1997 |
12 | |||
Tan Heyamoto - Submittals #1 8/1996 - 7/1997 |
12 | |||
Tan Heyamoto - Contract Payments #1 7/1994 - 1/1999 |
12 | |||
Schedules #1 - 8/1996 |
12 | |||
Construction Meeting Minutes #1 8/1996 - 8/1997 |
12 | |||
Lydig Construction General Correspondence #2 1/1998 - 12/1999 |
12 | |||
Lydig Construction Contract #1 7/1996 - 4/1998 |
12 | |||
Lydig Construction, Inc. CO Change Proposals Numbers 90 - 56 |
12 | |||
Lydig Construction, Inc. CO Change Proposals Numbers 55 - 001 |
13 | |||
Rejected Bids - Bid Opening Jun 25 1996 6/1996 |
13 | |||
Close Out 1/1998 - 6/1999 |
13 | |||
Strata Geotech Engr. and Mat. Testing Reports Concrete Test reports # 1 9/1996 - 3/1997 |
13 | |||
Calculations #1 2/1996 - 6/1996 |
13 | |||
Close out File #1 3/1997 - 12/1997 |
14 | |||
Federal Grant Correspondence # 1 12/1994 - 12/1995 |
14 | |||
Tan Heyamoto Architects Requests for Information #1 9/1996 - 5/1997 |
14 | |||
General Correspondence #2 10/1995 - 9/1996 |
14 | |||
General Correspondence #1 4/1992 - 9/1995 |
14 | |||
Tan Heyamoto Architects General Corresp. #4 5/1996 - 11/1996 |
14 | |||
Tan Heyamoto Architects General Corresp. #3 3/1996 - 4/1996 |
14 | |||
Tan Heyamoto Architects General Corresp. #2 10/1995 - 2/1996 |
14 | |||
Tan Heyamoto Architects General Corresp. #1 5/1994 - 9/1995 |
14 | |||
Lydig Construction, Inc. General Corresp. #1 6/1996 - 12/1997 |
14 | |||
|
||||
Todd Hall Renewal. Building No. 55A |
||||
box | ||||
Budget 4/1992 - 3/1997 |
15 | |||
Regents Reports 6/1991 - 4/1996 |
15 | |||
Halvorson, Beach and Bower 3/1995 |
15 | |||
Agra Earth and Environmental CO #11569 2/1994 - 9/1994 |
15 | |||
Burke/Lee Associates Correspondence 12/1990 - 8/1992 |
15 | |||
Robert Fossatti Associates 11/1993 - 9/1996 |
15 | |||
Mahan and DeSalvo Correspondence 11/1991 - 9/1993 |
15 | |||
Building Committee 10/1989 - 3/1995 |
15 | |||
Construction field Reports 6/1994 - 4/1995 |
15 | |||
Professional Service Industries - Concrete Testing 4/1994 - 6/1995 |
15 | |||
Wind Tunnel Report 10/1993 - 2/1996 |
15 | |||
Henry Klein Partnership - Design Clarification/Verification Reg. 5/1995 - 8/1995 |
15 | |||
E-Mail Correspondence 9/1995 - 7/1998 |
15 | |||
General Correspondence 8/1996 - 7/1999 |
15 | |||
Henry Klein Partnership - Architect Correspondence 5/1991 - 3/1997 |
15 | |||
Lydig Construction, Inc. - Contract CO's Pay Ests. 8/1995 - 4/1996 |
15 | |||
Lydig Construction, Inc. - Contract Change Proposals Numbers 230 - 009 |
15 | |||
Lydig Construction, Inc. Change Proposals Numbers 113 - 009 |
16 | |||
General Correspondence 12/1990 - 6/1992 |
16 | |||
General Correspondence 7/1992 - 7/1993 |
16 | |||
General Correspondence 8/1993 - 2/1994 |
16 | |||
General Correspondence # 4 3/1994 - 2/1995 |
16 | |||
General Correspondence #5 3/1995 - 6/1995 |
16 | |||
General Correspondence #6 7/1/1995 - 7/31/1995 |
16 | |||
General Correspondence #7 8/1/1995 - 7/31/1996 |
16 | |||
Todd Hall Renewal Building Program 5/1990 |
16 | |||
Henry Klein Partnership Design Clarification/Verification Reg. #3 |
16 | |||
Henry Klein Partnership Design ClarificationNerification Reg. #2 9/1994 - 12/1994 |
17 | |||
Henry Klein Partnership Design Clarification/Verification Reg. #1 3/1994 - 8/1994 |
17 | |||
Henry Klein Partnership General Correspondence #8 9/1995 - 3/1997 |
17 | |||
Henry Klein Partnership General Correspondence #7 3/1995 - 8/1995 |
17 | |||
Henry Klein Partnership General Correspondence #6 6/1994 - 3/1995 |
17 | |||
Henry Klein Partnership General Correspondence # 5 2/1994 - 5/1995 |
17 | |||
Henry Klein Partnership General Correspondence #1 12/1990 - 10/1992 |
18 | |||
Henry Klein Contract #10804 10/1991 - 12/1996 |
18 | |||
Henry Klein Partnership Agreement # 10193 5/1990 - 9/1991 |
18 | |||
Lydig Construction General Correspondence 2/1995 - 10/1996 |
18 | |||
Lydig Construction General Correspondence 1/1994 - 1/1995 |
18 | |||
Lydig Construction Pay Estimates, Change Orders. #6 1/1994 - 6/1995 |
18 | |||
Lydig Construction Pay Estimates, Change Orders. #5 1/1994 - 5/1995 |
18 | |||
Lydig Construction Pay Estimates, Change Orders. #4 1/1994 - 4/1995 |
18 | |||
Lydig Construction Pay Estimates, Change Orders. #3 1/1994 - 2/1995 |
18 | |||
Lydig Construction Pay Estimates, Change Orders #2 12/1994 - 2/1995 |
18 | |||
Lydig Construction Pay Estimates, Change Orders. #1 1/1994 - 11/1994 |
18 | |||
Rejected Bids 1/1994 |
18 | |||
Todd Hall Renewal Schematic Design 4/1992 |
18 | |||
Todd Hall Renewal Schematic Design 7/1992 |
18 | |||
Todd Hall Renewal Renovation Feasibility Study 5/1992 |
18 | |||
|
||||
Glenn Terrell Mall. Building No. 790 |
||||
box | ||||
Regents 8/1993 |
19 | |||
Budget 1995 |
19 | |||
Burke/Lee Correspondence (Comprehensive Physical Planning Process) 03/1991 - 03/1992 |
19 | |||
E.l.S. 03/1993 |
19 | |||
Request for Information |
19 | |||
Rejected Bids |
19 | |||
Pending Change Proposals 9/2003 |
19 | |||
Atkinson Construction Company., Correspondence 7/1993 - 1/1995 |
19 | |||
Atkinson Construction Co., Contract, Pay applications #1 7/1993 - 1/1995 |
19 | |||
ALSC Construction Meeting Minutes 08/1993 - 11/2002 |
19 | |||
General Correspondence 12/1993 - 03/1997 |
19 | |||
AISC - Architect Correspondence 12/1992 - 2/1994 |
19 | |||
File Un - named #1 (General Correspondence) 9/1986 - 12/1992 |
19 | |||
ALSC Architects - General Correspondence 3/1994 - 5/1995 |
19 | |||
General Correspondence #2 1/1993 - 11/1993 |
19 | |||
|
||||
Fulmer Hall Annex Building No. 003 |
||||
box | ||||
Budget 5/1992 - 7/1997 |
20 | |||
Regents 1/1993 - 7/1997 |
20 | |||
Public Information Requests 5/1/1999 |
20 | |||
Steven M. Goldblatt CO # 12117 9/1995 - 7/1996 |
20 | |||
James P. Donaldson CO# 1211 7 8/1995 - 10/1996 |
20 | |||
Patrick Sullivan 10/1995 |
20 | |||
Bovay Northwest, Inc. General Correspondence 6/1995 - 8/1997 |
20 | |||
Agra Earth and Environmental 10/1995 - 11/1996 |
20 | |||
Mahan and Desalvo 4/1992 - 5/1993 |
20 | |||
Robert Fossatti 7/1993 - 8/1 |
20 | |||
The Redicheck Firm CO # 11621 7/1994 - 9/1994 |
20 | |||
Value Engineering 8/1993 |
20 | |||
Meng Associates - Value Engineering Study |
20 | |||
Fulmer Hall/Annex Renewal - Schematic Design Submittal |
20 | |||
Fulmer Hall/ Fulmer Annex - Program Statement |
20 | |||
Fulmer Hall Remodeling - Building Program Statement Phase II |
20 | |||
NSF Grant Application 3/1993 |
20 | |||
Determination of Non - significance (E.l .S.) 9/1994 |
20 | |||
Building Committee Meetings 7/1991 - 9/1995 |
20 | |||
General Correspondence E-Mail #1 1/1994 - 2/1997 |
20 | |||
General Correspondence #7 8/1996 - 11/1997 |
20 | |||
Mahlum and Nordfors McKinley Gordon - Design Information Request #1 1/1994 - 12/1995 |
20 | |||
Mahlum and Nordfors McKinley Gordon - Construction Meeting Minutes 7/1995 - 10/1996 |
20 | |||
Mahlum and Nordfors McKinley Gordon - General Correspondence #9 12/1996 - 4/1998 |
20 | |||
Inland Construction Co. General Correspondence #2 3/1997 - 7/1998 |
20 | |||
Mahlum and Nordfors McKinley Gordon - Co 10921 3/1997 - 8/1998 |
20 | |||
Inland Construction CO # 12000 5/1995 - 6/1997 |
21 | |||
Inland Construction Contract Change Proposals #109 - 001 |
21 | |||
Palouse Empire Inc. Request for Equitable Adjustment for Fulmer Annex Renewal |
22 | |||
Rejected Bids 6/1995 |
22 | |||
RZAAGRA, Inc. CO# 11569 6/1992 - 5/1994 |
22 | |||
RZAAGRA, Inc. CO #11569 6/1994 - 9/1995 |
22 | |||
General Correspondence #6 6/1995 - 7/1996 |
22 | |||
General Correspondence #5 7/1994 - 5/1995 |
22 | |||
General Correspondence #4 12/1993 - 6/1994 |
22 | |||
General Correspondence #3 1/1993 - 11/1993 |
22 | |||
Mahlum and Nordfors Mckinley Gordon General Correspondence #8 11/1995 - 11/1996 |
22 | |||
Mahlum and Nordfors Mckinley Gordon General Correspondence #7 4/1995 - 10/1995 |
22 | |||
Mahlum and Nordfors Mckinley Gordon General Correspondence #6 7/1994 - 3/1995 |
23 | |||
Mahlum and Nordfors Mckinley Gordon General Correspondence #5 1/1994 - 6/1994 |
23 | |||
Mahlum and Nordfors Mckinley Gordon General Correspondence #4 9/1993 - 12/1993 |
23 | |||
Mahlum and Nordfors Mckinley Gordon General Correspondence #3 6/1993 - 8/1993 |
23 | |||
Mahlum and Nordfors Mckinley Gordon General Correspondence #2 11/1992 - 5/1993 |
23 | |||
Mahlum and Nordfors Mckinley Gordon General Correspondence #1 6/1991 - 10/1992 |
23 | |||
Mahlum and Nordfors Mckinley Gordon Contract No. 10921 #3 9/1995 - 2/1997 |
23 | |||
Mahlum and Nordfors Mckinley Gordon Contract No. 10921 #2 11/1994 - 8/1995 |
23 | |||
McKinley and Nordfors McKinley Gordon Contract No. 10921 #1 1/1992 - 9/1994 |
24 | |||
Inland Construction Requests for Information #2 11/1995 - 12/1996 |
24 | |||
Inland Construction Requests for Information #1 7/1995 - 10/1995 |
24 | |||
Inland Construction General Correspondence #1 5/1995 - 2/1997 |
24 | |||
Inland Construction General Correspondence #2 1/1992 - 2/1993 |
24 | |||
General Correspondence #1 8/1991 - 12/1991 |
24 | |||
|
||||
Veterinary Teaching Hospital. Building No. 818 |
||||
box | ||||
Professional Services Industry #2 6/1994 - 8/1994 |
25 | |||
Professional Services Industry #1 1/1994 - 5/1994 |
25 | |||
Construction Diary Reports #1 8/1991 - 1/1996 |
25 | |||
General Correspondence #15 4/1996 - 10/1996 |
25 | |||
General Corresp. #14 9/1995 - 3/1996 |
25 | |||
General Corresp. #13 1/1995 - 8/1995 |
25 | |||
General Corresp. #12 7/1994 - 12/1994 |
25 | |||
General Correspondence #10 9/1993 - 2/1994 |
26 | |||
General Corresp. #9 3/1993 - 8/1993 |
26 | |||
General Corresp. #8 6/1992 - 2/1993 |
26 | |||
General Corresp. #7 4/1992 - 5/1992 |
26 | |||
General Corresp. #6 8/1991 - 3/1992 |
26 | |||
General Corresp. #5 5/1991 - 7/1991 |
26 | |||
General Corresp. #4 3/1991 - 4/1991 |
26 | |||
General Corresp. #3 4/1990 - 2/1991 |
26 | |||
General Corresp. #2 1/1989 - 3/1990 |
27 | |||
General Corresp. #1 7/1987 - 12/1988 |
27 | |||
DeNeff Deeble Barton Associates General Corresp. #20 12/1996 - 1/1997 |
27 | |||
DeNeff Deeble Barton Associates General Corresp. #19 10/1996 - 1/1997 |
27 | |||
DeNeff Deeble Barton Associates General Corresp.#18 6/1996 - 9/1996 |
27 | |||
DeNeff Deeble Barton Associates General Corresp.#17 3/1996 - 5/1996 |
27 | |||
DeNeff Deeble Barton Associates General Corresp.#16 12/1995 - 2/1996 |
27 | |||
DeNeff Deeble Barton Associates General Corresp.#15 9/1995 - 11/1995 |
27 | |||
DeNeff Deeble Barton Associates General Corresp.#14 6/1995 - 8/1995 |
27 | |||
DeNeff Deeble Barton Associates General Corresp.#13 3/1995 - 5/1995 |
27 | |||
DeNeff Deeble Barton Associates General Corresp. #12 11/1994 - 2/1995 |
28 | |||
DeNeff Deeble Barton Associates General Corresp. #11 9/1994 - 10/199???????? |
28 | |||
DeNeff Deeble Barton Associates General Corresp.#10 6/1994 - 8/1994 |
28 | |||
DeNeff Deeble Barton Associates General Corresp. #9 4/1994 - 5/1994 |
28 | |||
DeNeff Deeble Barton Associates General Corresp. #8 1/1994 - 3/1994 |
28 | |||
DeNeff Deeble Barton Associates General Corresp. #7 7/1993 - 12/1993 |
28 | |||
DeNeff Deeble Barton Associates General Corresp. #6 3/1993 - 6/1993 |
28 | |||
Pending Change Proposals 10/2008 - 7/1994 |
28 | |||
DeNeff Deeble Barton Associates General Corresp. #5 8/1992 - 2/1993 |
29 | |||
DeNeff Deeble Barton Associates General Corresp. #4 11/1991 - 7/1992 |
29 | |||
DeNeff Deeble Barton Associates General Corresp. #3 4/1991 - 10/1991 |
29 | |||
DeNeff Deeble Barton Associates General Corresp. #2 3/1990 - 3/1991 |
29 | |||
DeNeff Deeble Barton Associates General Corresp #1 8/1987 - 2/1990 |
29 | |||
DeNeff Deeble Barton Assoc. Contract, Pay Est. #5 5/1996 - 1/1997 |
29 | |||
DeNeff Deeble Barton Assoc. Contract, Pay Est. #4 4/1995 - 5/1996 |
29 | |||
DeNeff Deeble Barton Assoc. Contract, Pay Est. #3 5/1992 - 3/1995 |
29 | |||
DeNeff Deeble Barton Assoc. Contract, Pay Est. #2 2/1990 - 4/1992 |
29 | |||
DeNeff Deeble Barton Associates Contract NO.9152 #1 1/1988 - 12/1988 |
30 | |||
DeNeff Deeble Barton Associates Construction Meeting Minutes #1 10/1993 - 12/1995 |
30 | |||
Morgan and Oswood Construction Co. Requests for Clarification 11/1993 - 12/1994 |
30 | |||
Morgan and Oswood Construction Co. General Corresp. #3 3/1996 - 1/1997 |
30 | |||
Morgan and Oswood Construction Co. General Corresp. #2 1/1995 2/1996 |
30 | |||
Morgan and Oswood Construction Co. General Corresp. #1 6/1993 - 12/1994 |
30 | |||
Morgen and Oswood Construction Co. Contract #9 3/1995 - 12/1996 |
30 | |||
Morgen and Oswood Construction Co. Contract #8 10/1995 - 2/1996 |
31 | |||
Morgen and Oswood Construction Co. Contract #7 5/1995 - 11/1995 |
31 | |||
Morgen and Oswood Construction Co. Contract #6 9/1994 - 7/1995 |
31 | |||
Morgen and Oswood Construction Co. Contract #5 3/1995 - 6/1995 |
31 | |||
Morgen and Oswood Construction Co. Contract #4 11/1994 - 11/1995 |
31 | |||
Morgen and Oswood Construction Co. Contract #3 8/1994 - 10/1994 |
31 | |||
Morgen and Oswood Construction Co. Contract #2 3/1994 - 6/1994 |
31 | |||
Morgen and Oswood Construction Co. Contract #1 8/1993 - 2/1994 |
31 | |||
Site Grading - Motley and Motley Corresp. #1 8/1991 - 1/1992 |
32 | |||
Motley and Motley Contractors Contract Payments, C.O.#1 7/1991 - 1/1992 |
32 | |||
Note Book Contract Info. Inserts Tabs: Inland Coatings Inc. Aztec Electric, Inc. McClintock and Turk, Inc. |
32 | |||
Rejected Bids - General/Rebid Opening 8/12/1993 |
32 | |||
Rejected Bids - Electrical (Opening) 5/4/1993 |
32 | |||
Rejected Bids - Mechanical (Opening) 5/4/1993 |
32 | |||
Issues and Claims 3/1996 - 4/1996 RESTRICTED |
32 | |||
Issues and Claims 11/1996 - 12/1996 and 5/1996 RESTRICTED |
32 | |||
Issues and Claims 11/1996 - 12/1996 RESTRICTED |
32 | |||
Phase I: Site Grading Rejected Bids 7/1991 |
32 | |||
Rejected Bids Phase II - General Opening #2 5/1993 |
32 | |||
Rejected Bids Phase II - General Opening #1 5/1993 |
32 | |||
Construction Diary Reports 2/1996 - 6/1996 |
33 | |||
DeNeff Deeble Barton Associates Construction Mtg. Minutes #2 1/1996 - 5/1996 |
33 | |||
Deneff Deeble Barton Associates General Corresp. #21 3/1997 - 3/1998 |
33 | |||
Deneff Deeble Barton Associates Consultant's Site Visitation Reports #1 4/1994 - 4/1997 |
33 | |||
Allotment Request for Construction 4/1993 |
33 | |||
Equipment/Furnishings 1/1994 |
33 | |||
Morgen and Oswood Construction Contract, Payment, Co's #10 3/1996 - 10/1996 |
33 | |||
Morgen and Oswood Construction #1 General Corresp # 1 12/1996 - 7/1998 |
33 | |||
Morgen and Oswood Construction Certified Payroll Reports #1 - 44 6/1994 - 10/1994 |
33 | |||
Morgen and Oswood Construction Request for Clarification 1/1995 - 4/1996 |
33 | |||
Morgen and Oswood Construction Contract Change Proposals (missing many) #171 - 15 |
33 | |||
Pending Change Proposals 10/1994 - 4/1995 |
33 | |||
Building Committee Meetings 9/1987 - 11/1993 |
34 | |||
Design Development |
34 | |||
Problems and Pitfalls in Water Treatment Specifications Cooling Tower Institute 2/1990 |
34 | |||
Pitting Corrosion of Cooling Water Systems |
34 | |||
The Impact of Environmental Considerations on Corrosion Control Economics and Technology |
34 | |||
Fingerprints of Errors - Failures in Cooling Water Systems |
34 | |||
Water in Boilers - A Retrospective and A Perspective |
34 | |||
Practical Consideration in High Cycle Cooling Water Operations 2/1992 |
34 | |||
Microbiologically Influenced Corrosion: A State of the Art Technology |
34 | |||
Some Guidelines for Optimizing the Operation of Raw Water Cooling Systems |
34 | |||
Fail Safe Cooling Water Operations 2/1991 |
34 | |||
Drinking Water System Components - Health Effects |
34 | |||
MW Consulting Engineers - General Corresp. #1 10/1993 - 10/1994 |
34 | |||
Tomasi - Dubois and Associates General Corresp. 7/1997 - 11/1998 |
34 | |||
Professional Services Industries Inc. #3 11/1994 - 12/1997 |
34 | |||
Wyatt jaykim Engineers 11/1990 - 8/1992 |
34 | |||
Privileged Information 2/1996 - 5/1997 |
34 | |||
Bidding Information 5/1993 - 8/1993 |
34 | |||
E-Mail Correspondence #1 2/1996 - 9/1998 |
34 | |||
General Correspondence # 16 11/1996 - 8/1998 |
34 | |||
Budget 3/1989 - 9/1998 |
35 | |||
E.I.S. 3/1991 - 6/1997 |
35 | |||
Regents Reports |
35 | |||
Public Records Request 2/1996 - 6/1997 |
35 | |||
Attorney General Corresp. 1/1997 - 9/1997 RESTRICTED |
35 | |||
Issues and Claims RESTRICTED |
35 | |||
Notebook: Phase II, WSU Veterinary Teaching Hospital Revised Claim for additional Compensation 11/1996 |
35 | |||
Disputes Resolution Board 7/1994 - 10/1995 |
35 | |||
Burke/Lee A joint Venture 12/1987 - 9/1991 |
35 | |||
Long and Associates 5/1997 - 11/1997 |
35 | |||
Paul E. Pederson Agreement No. 12115 1/1997 - 5/1997 |
35 | |||
Robert Fossatti Associates 7/1993 - 9/1993 |
35 | |||
URS Consultants, Inc. 2/1996 - 1/1997 |
35 | |||
Heery Correspondence 8/1990 - 5/1994 |
35 | |||
Mahan and DeSalvo 3/1990 - 9/1993 |
35 | |||
Cooling Coils Issues 12/1996 - 8/1997 |
35 | |||
MW Consulting Engineers - Protection Study 6/5/1992 |
35 | |||
Value Engineering and Constructability Review 5/1992 |
35 | |||
Geotechnical Report 2/1991 |
35 | |||
|
||||
Greenhouse Replacements WWREC Puyallup. Building No. 1034 |
||||
box | ||||
Budget 5/1999 |
36 | |||
E.l.S 5/1995 |
36 | |||
Regents 10/1997 |
36 | |||
Construction Testing Laboratories, Inc. CO No. 12241 7/1996 |
36 | |||
Robert Fossatti and Associates General Corresp. 3/1995 |
36 | |||
SCM Consultants 8/1995 - 9/1995 |
36 | |||
SCM Consultants, Inc. - Toxic Leaching Characteristic Procedure 10/1995 |
36 | |||
SCM Consultants, Inc. - Lead Based Paint Survey 4/1995 |
36 | |||
Construction Testing Laboratories In. Testing Reports 7/1996 - 3/1997 |
36 | |||
Program Planning Committee 7/1994 - 7/1994 |
36 | |||
Moza Construction, Inc. - Contract 3 General Correspondence #1 5/1995 - 6/1995 |
36 | |||
Christopher Stafford Architects, Inc. #3 General Correspondence #3 10/1996 - 8/1998 |
36 | |||
The Stafford Architects, Inc. Co. 3/1994 - 4/1997 |
36 | |||
MOZA Construction, Inc. Co. Pay Estimates #1 10/1995 - 2/1996 |
36 | |||
John Korsmo Construction, Inc. CO 1 Headhouse and Site Improve. #1 5/1996 - 10/1997 |
36 | |||
General Correspondence Co. #2 Co. #2 1/1996 - 11/1997 |
36 | |||
John Korsmo Construction inc. - Co. #1 5/1996 - 7/1997 |
36 | |||
John Korsmo Contract Change Proposals No. 20 - 01 |
36 | |||
Rejected Bids - Co. 1 Headhouse and Site Improvement - Bid Opening 4/18/1996 |
36 | |||
Hartford Contracting, Inc. Co #2 Greenhouse 5/1996 - 2/1999 |
36 | |||
General Correspondence #2 5/1996 - 2/1999 |
36 | |||
Stafford Harris, Inc. General Correspondence #2 1/1996 - 9/1996 |
36 | |||
The Stafford Architects, Inc. General Correspondence. #1 3/1994 - 11/1995 |
36 | |||
|
||||
Student Services Addition. Building No. 6504 |
||||
box | ||||
Budget 4/1992 - 5/1999 |
37 | |||
Regents 6/1991 - 9/1996 |
37 | |||
E.I.S. |
37 | |||
Attorney General Correspondence #1 4/1996 RESTRICTED |
37 | |||
Burke/Lee Correspondence 5/1991 - 6/1991 |
37 | |||
Robert Fossatti Associates 9/1993 - 1/1997 |
37 | |||
The Mahan Partnership 10/1992 - 2/1993 |
37 | |||
The Redicheck Firm - Amends and Ext. Serv. Contr. 11621 3/1994 - 4/1994 |
37 | |||
Value Engineering Study 10/1993 |
37 | |||
Construction Reports #1 9/1994 |
37 | |||
Geotechnical Report 10/1992 |
37 | |||
Building Committee Minutes 4/1991 - 8/1994 |
37 | |||
General E-Mail Correspondence #1 8/1996 - 2/1997 |
37 | |||
General Correspondence #7 9/1996 - 6/1997 |
37 | |||
Mahlum and Nordfors McKinley Gordon General Correspondence #10 4/1996 - 9/1996 |
37 | |||
Preliminary Estimate for Student Services Addition Prepared 6/1991 |
37 | |||
Construction Meeting Minutes 9/1994 - 2/1996 |
37 | |||
Lydig Construction General Correspondence #2 8/1996 - 3/1997 |
37 | |||
Lydig Construction Contract 9/1995 - 4/1997 |
37 | |||
Mahlum and Nordfors Mckinley Gordon Contract 8/1996 - 3/1997 |
37 | |||
Lydig Construction Change Proposals #'s 51 - 001 |
37 | |||
Rejected Bid Summaries (Bid Opening July 12, 1994) |
38 | |||
SSA Sound |
38 | |||
SSA Directories and Signs 9/1996 - 1/1997 |
38 | |||
General Correspondence #6 6/1995 - 7/1996 |
38 | |||
General Correspondence #5 6/1994 - 5/1995 |
38 | |||
General Correspondence #4 2/1994 - 4/1994 |
38 | |||
General Correspondence #3 10/1993 - 2/1994 |
38 | |||
General Correspondence #2 3/1992 - 9/1993 |
38 | |||
General Correspondence #1 2/1990 - 2/1992 |
38 | |||
Mahlum and Nordfors McKinley Gordon General Correspondence #9 7/1995 - 3/1996 |
38 | |||
Mahlum and Nordfors McKinley Gordon General Correspondence #8 7/1994 - 6/1995 |
38 | |||
Mahlum and Nordfors McKinley Gordon General Correspondence #7 4/1994 - 6/1994 |
38 | |||
Mahium and Nordfors Mckinley Gordon General Correspondence #6 2/1994 - 3/1994 |
39 | |||
Mahium and Nordfors McKinley Gordon General Correspondence #5 12/1994 - 1/1994 |
39 | |||
Mahium and Nordfors Mckinley Gordon General Correspondence #4 10/1993 - 11/1990 |
39 | |||
Mahium and Nordfors McKinley Gordon General Correspondence #3 8/1993 - 9/1993 |
39 | |||
Mahium and Nordfors McKinley Gordon General Correspondence #2 10/1992 - 7/1993 |
39 | |||
Mahium and Nordfors McKinley Gordon General Correspondence #1 6/1991 - 8/1993 |
39 | |||
Mahium and Nordfors McKinley Gordon Contract #1 9/1991 - 12/1994 |
39 | |||
Mahlum and Nordfors McKinley Gordon Contract #2 1/1995 - 7/1996 |
39 | |||
Lydig Construction Contract #2 6/1995 - 8/1995 |
39 | |||
Lydig Construction Contract #1 3/1994 - 4/1995 |
39 | |||
Lydig Construction General Correspondence # 1 6/1994 - 7/1996 |
39 | |||
|
||||
Greenhouse Replacement WWREC Puyallup. Building No. 1034 (Continued From Box #36) |
||||
box | ||||
Hartford Contracting Contract #2 2/1997 - 8/1996 |
40 | |||
Hartford Contracting Contract #1 5/1996 - 5/1997 |
40 | |||
Hartford Contracting Change Proposals #s012 - 001 |
40 | |||
Rejected Bids - Contract #2 (Bid Opening 4/18/1996) |
40 | |||
General Correspondence #1 Contract #3 New Campus Elec. Upgrade 6/1995 - 7/1996 |
40 | |||
New Campus Elec. Upgrade - Rejected Bids (Bid Opening 6/23/1995) |
40 | |||
General Correspondence #1 5/1993 - 4/1996 |
40 | |||
|
||||
Miscellaneous |
||||
box | ||||
University Housing Apartment Project (Yakima Village - Building #680) Regents 1/1994 - 1/1996 |
40 | |||
Dairy Forage Facility Phase II (Building #1516) - Regents 1/1994 - 9/1995 |
40 | |||
Food Science Human Nutrition Phase II (Building #81 6) - Regents 1/1994 |
40 | |||
Records Maintenance Materials and Recycling (Building #357) Regents 6/1991 - 10/1994 |
40 | |||
|
||||
ICNE - Yakima Permanent Facility. Building No. 9401 |
||||
box | ||||
Budget 4/1995 - 3/1995 |
41 | |||
E.I.S. 1/1995 |
41 | |||
Regents Reports 10/1992 - 9/1996 |
41 | |||
Attorney General Correspondence #1 12/1995 - 1/1996 RESTRICTED |
41 | |||
Burke/Lee Architects 3/1993 - 9/2003 |
41 | |||
AGRA Earth and Environmental 3/1995 |
41 | |||
Bovay Northwest 11/1994 - 3/1995 |
41 | |||
Robert Fossatti Associates 12/1994 - 4/1995 |
41 | |||
Loofburrow Architects Contract # 11 955 3/1995 - 6/1996 |
41 | |||
GN Consulting Engineers Contract #11 987 5/1995 - 11/1995 |
41 | |||
Project Planning Committee 7/1993 |
41 | |||
GN Northen Consultants Concrete/Steel Reinforcing Test Reports 5/1995 - 11/1995 |
41 | |||
General E-Mail Correspondence 1/1996 |
41 | |||
General Correspondence 8/1995 - 5/1997 |
41 | |||
Integrus Architecture - General Correspondence #2 11/1995 - 12/1996 |
41 | |||
Moen - Garza - Lehman, Joint Venture Agreement 2/1995 |
41 | |||
ALSC Architects - Hollingbery Fieldhouse Concept Study 8/1997 |
41 | |||
Integrus Architecture - Construction Meeting Minutes 5/1994 - 5/1996 |
41 | |||
Integrus Architecture - Contract #1 10/1993 - 7/1996 |
41 | |||
Kranz Construction, Inc. - General Correspondence #1 2/1995 - 9/1996 |
41 | |||
Kranz Construction, Inc. - Contract #1 2/1995 - 9/1996 |
41 | |||
Kranz Construction Contract Change Proposals #s 065 - 16 |
41 | |||
Kranz Construction Contract Change Proposals #'s 15 - 01 |
42/43 | |||
Rejected Bids 2/1995 - 4/1995 |
42/43 | |||
YAKIMA ICNE Balance Report Copy 3 |
42/43 | |||
ICNE - Yakima site studies (Draft) |
42/43 | |||
General Correspondence #1 9/1992 - 7/1995 |
42/43 | |||
Integrus Architecture - General Correspondence 10/1993 - 10/1995 |
42/43 | |||
SITING 8/1992 - 11/1993 |
42/43 | |||
Site Information Overheads/Transparencies |
42/43 | |||
Facilities Conditions Survey - Ad Annex, Commons, Van Doren Elec. General Correspondence |
42/43 | |||
|
||||
Family Student Housing Replacement |
||||
box | ||||
Married Student Housing project - Budget 2/1982 - 12/1984 |
42/43 | |||
Burke/Lee Correspondence |
42/43 | |||
E.l.S. 4/1983 |
42/43 | |||
General Correspondence 7/1980 - 2/1992 |
42/43 | |||
|
||||
Foley Institute for Public Policy and Public Service at Thompson Hall. Building No. 001 |
||||
box | ||||
General Correspondence #1 1/1995 - 10/1999 |
42/43 | |||
|
||||
Animal Science Laboratory Building. Building No. 100 |
||||
box | ||||
Budget 10/1992 - 4/1999 |
44 | |||
E.I.S. 4/1994 - 6/1994 |
44 | |||
Regents Reports 10/1991 - 8/1994 |
44 | |||
HCI Howard Consultants, Inc./ Strata 7/1996 - 8/1996 |
44 | |||
HCI Howard Consultants, Inc. /Strata Concrete Test Reports 3/1996 - 4/1996 |
44 | |||
Professional Services Industries 11/1994 - 9/1996 |
44 | |||
Redicheck Firm Agreement Contract # 621 3/1995 - 5/1995 |
44 | |||
Robert Fossatti Associates Inc. 1/1994 - 6/1998 |
44 | |||
Geotechnical Report 6/1994 - 7/1994 |
44 | |||
HVAC Duct Problem General Correspondence 3/1997 - 6/1997 |
44 | |||
Wind Tunnel Study 8/1987 |
44 | |||
Sandblasting Correspondence 10/1996 - 9/1996 |
44 | |||
General Correspondence E-Mail 4/1996 - 8/1996 |
44 | |||
General Correspondence #3 1/1997 - 7/1998 |
44 | |||
General Correspondence #2 9/1995 - 12/1996 |
44 | |||
MBT Architecture General Correspondence #5 12/1996 - 4/1999 |
44 | |||
MBT Architecture General Correspondence #2 10/1994 - 6/1995 |
44 | |||
MBT Architecture Contract # 10907 Payments #2 3/1996 - 11/1997 |
44 | |||
MBT Architecture Contract # 10907 Payments #1 2/1992 - 4/1995 |
44 | |||
Lydig Construction, Inc. General Correspondence 9/1997 - 4/1998 |
44 | |||
Lydig Construction, Inc. Contract # 121 37/Pay Estimates 10/1995 - 9/1997 |
44 | |||
Lydig Construction, Inc. Contract Change Proposal # 93 - 69 6/1997 - 12/1996 |
45 | |||
Lydig Construction, Inc. Contract Change Proposal # 67 - 65 7/1997 - 12/1996 |
45 | |||
Lydig Construction, Inc. Contract Change Proposal # 63 1/1997 |
45 | |||
Lydig Construction, Inc. Contract Change Proposal # 62 - 32 11/1996 - 7/1996 |
45 | |||
Lydig Construction, Inc. Contract Change Proposal # 30 - 1 6/1996 - 11/1995 |
45 | |||
Rejected Bids 10/1995 - 12/1995 |
45 | |||
ASC - Sound 2/1997 - 5/1997 |
45 | |||
Drawings |
45 | |||
Energy Conservation Report/Life Sciences Cost Analysis 2/1995 |
45 | |||
MBT Associates General Correspondence #1 1/1992 - 9/1994 |
46 | |||
MBT Associates General Correspondence #4 10/1995 - 12/1996 |
46 | |||
MBT Associates General Correspondence #3 7/1995 - 9/1995 |
46 | |||
Construction Documents Estimate by ACKROYD 8/1995 |
46 | |||
MBT Associates Architect Contract Payment 4/1995 - 7/1996 |
46 | |||
Lydig Construction, Inc. General Correspondence #1 9/1995 - 8/1997 |
46 | |||
MBT Architects - Schematic Design Submittal |
46 | |||
|
||||