W.S.U. Capital Planning
Building Files and Reports, 1957-2007 (bulk 1985-2002)

ORGANIZATIONAL HISTORY

A University Architect served as the construction officer at Washington State University from 1911 forward. The modern form of the office dates from 1947 when it became a full-time, staffed administrative department. In 1967 the University Architect office was renamed as Facilities Planning, and then to Facilities Development in 1993. In 2001 it was renamed as Capital Planning. While Capital Planning is responsible for major planning and development, smaller projects are conducted by Facilities Operations. Facilities Operations descended from the Physical Plant in 1998, which in turn descended from Building and Grounds in 1967. While each line of programs has existed separately, some migration in function has occurred over the years. The primary difference between Capital Planning and Facilities Operations is the cost of the project in question - initially items costing less than $1,000,000 were assigned to Fac Ops, and those costing more to CP. By 2009, this break point is between $1,500,000 and $2,000,000.

COLLECTION ARRANGEMENT

This page compiles a number of collections received from Capital Planning between 2004 and 2009, in reverse chronological (newest to oldest) order. In requesting materials, please make sure you have identified the correct collection. This page compiles:

Archives 269. Student Rec Center Reports, 1997-2009. UA 2009-01. Received Feb. 4, 2009.
Archives 270. Building Files and Records, 1962-2007 (bulk 1990-1999). UA 2007-01. Received March-May, 2007.
Archives 271. Building Files and Records, 1980-2001. UA 2005-11. Received July 11, 2005.
Archives 272. Building Files and Records, 1962-2003. UA 2005-07. Received May 25, 2005.
Archives 273. Building Files and Records, 1957-1998. UA 2004-01. Received February 10, 2004.

Each collection is maintained in the order in which it was received in the Archives from Capital Planning.

ACCESS

The majority of these are open and available for research use, though a few files are marked as confidential or classified (these are primarily identified as Attorney General files or Issues & Claims files; please contact Capital Planning if you wish access to these) and access to those may be restricted. These files are labeled in this page as RESTRICTED, each box containing restricted material is so labeled, and individual restricted folders are stickered as such. Copyright restrictions may apply.

RELATED MATERIALS

The WSU Archives hold a number of other Capital Plannng collections; to locate these please view our Archives' Collections List and our Accessions List, looking for the various names under which this department has operated: University Architect, Facilities Planning, Facilities Development, Capital Planning.


Archives 269
Capital Planning
Student Recreation Center Reports, 1997-2009

ACQUISITION AND PROCESSING INFORMATION

Capital Planning's Student Recreation Center records were transfered to Manuscripts, Archives, and Special Collections on February 4, 2009 (UA 2009-01) by Anne Pinard. One additional document was received in June, 2009 and added to the General Correspondence file in Box 2. The records were processed by Tim Mace and University Archivist Mark O'English in early 2009.

EXTENT/QUANTITY INFORMATION

Number of containers: 19 boxes
Linear feet of shelf space: 19

COLLECTION DESCRIPTION

The collection consists of contractual, construction, and maintenance papers related to the Student Recreation Center, which opened in early 2001. Please note that operational or personal records pertaining to the Student Rec Center are not included here.

PREFERRED CITATION

The suggested citation for the collection is:

[Item Description]
Capital Planning Student Rec Center Reports, 1997-2009 (UA 269)
Manuscripts, Archives, and Special Collections
Washington State University Libraries
Pullman, WA

Box Description
1Budget 1997
E.I.S. 4/1998
Finance, Audit, and Capital (FAC) Comm 1/1999
FAC Committee 2001
Public Information Requests 4/1999
Regents Items 5/1997
Attorney General Correspondence 6/1997 RESTRICTED
Gilbane Building Company Contract 13039 5/1998
Gilbane Settlement 12/1999 RESTRICTED
Disputes Review Board- Stephen Goldblatt General Correspondence 12/1998 RESTRICTED
Avista Utilities 7/1999
Contract 12684 Brailsford and Dunlavey 3/1997
Disputes Review Board Stephen Goldblatt 12/1998 RESTRICTED
Gilbane Building Company- Preconstruction Contract 12980 1/1999
Hainline and Associates 4/1999
KJM and Associates, Ltd. Contract 13232 Pay Estimates 5/1999
Musgrove Engineering CO 15649 Boiler Failure Evaluation 5/2004
EMCON Contract 12965 5/1998
KJM E-mail 4/1999
KJM and Associates General Correspondence 1/2000
O’Brien Kreitzberg Consultant E-mail 4/1998
O’Brien Kreitzberg Contract 12879 5/1998
Reil Middleton General Correspondence E-mail 2/2000
2Reid Middletion, Inc. Contract 12968
Roen Associates E-mail Correspondence
Roen Associates Contract 12961
Team Tech
Walker Inspectorate Contract 13047
Value Engineering Study
Feasibility Study- Final Report Brailsford and Dunlavey
Walker Inspectorate Test Reports
Project Planning Committee
Chlorine Gas System Alternates
Gymnasium Wall Mock-Ups
Draft- Program of Architecture Requirements Brailsford and Dunlavey
Brailsford and Dunlavey General Correspondence
Geotechnical Report
WSU Field Authorizations
WSU Field Reports
General Correspondence- E-mail
General Correspondence
Yost Grube Hall Architecture E-mail
A/E Consulting Services Selection
Yost Grube Hall Architecture C012810
Yost Grube Hall Architecture General Correspondence
Susan D. Musselman CO. 12765
3Yost Grube Hall Architect’s Supplemental Instructions (ASI) 11/1998
Yost Grube Hall Site Observation Reports 5/1999
Gilbane Building Company E-mail 6/1999
Gilbane Building Company Contract 13160 3/2001
Gilbane Building Company Submittals 8/1998
GC/CM Selection Part 2 3/1998
GC/CM Selection Part 1 3/1998
Gilbane Building Company General Correspondence 2/2000
Yost Grube Hall- Energy Life Cycle Cost Analysis 12/1998
Gilbane Quality Control Activity 3/2000
Gilbane Building Company Daily Construction Reports 7/2000
Gilbane Building Company Construction Meeting Minutes 4/2000
Gilbane Building Company Monthly Reports 7/2000
Gilbane- Scope Review Meeting Minutes 1/1999
Project Progress Photographs 3/2000
4Gilbane- Weekly Safety Meetings 3/1999
Project Schedule 2/2000
Gilbane Building Company (RFI) Request for Information 300-360 1999
Gilbane Building Company (RFI) Request for Information 240-299 1999
Gilbane Building Company (RFI) Request for Information 180-204 1999
Gilbane Building Company (RFI) Request for Information 120-178 1999
Gilbane Building Company (RFI) Request for Information 66-119 1999
Gilbane Building Company (RFI) Request for Information 1-65 1998
RFI Review Reports/ Closed RFI Lists 12/1998
Gilbane Building Company (RFI) Request for Information 1281-1320 2000
Gilbane Building Company (RFI) Request for Information 1321-1360 2000
Gilbane Building Company (RFI) Request for Information 1241-1280 2000
Gilbane Building Company (RFI) Requests for Information 1201-1240 2000
Gilbane Building Company Requests for Information 1161-1200 2000
5Gilbane Building Company (RFI) Request for Information 1121-1160 2000
Gilbane Building Company (RFI) Request for Information 1041-1080 2000
Gilbane Building Company (RFI) Request for Information 1081-1120 2000
Gilbane Building Company (RFI) Request for Information 1001-1040 2000
Gilbane Building Company (RFI) Request for Information 961-1000 2000
Gilbane Building Company (RFI) Request for Information 921-960 2000
Gilbane Building Company (RFI) Request for Information 881-920 2000
Gilbane Building Company (RFI) Request for Information 841-880 2000
Gilbane Building Company (RFI) Request for Information 801-840 1999
Gilbane Building Company (RFI) Request for Information 761-800 1999
Gilbane Building Company (RFI) Request for Information 721-760 1999
Gilbane Building Company (RFI) Request for Information 681-720 1999
Gilbane Building Company (RFI) Request for Information 641-680 1999
6Gilbane Building Company (RFI) Request for Information 601-640 1999
Gilbane Building Company (RFI) Request for Information 561-600 1999
Gilbane Building Company (RFI) Request for Information 521-560 1999
Gilbane Building Company (RFI) Request for Information 481-520 1999
Gilbane Building Company (RFI) Request for Information 420-480 1999
Gilbane Building Company (RFI) Request for Information 360-419 1999
Gilbane Monthly Reports 1998-1999
PM/CA Procedures 4/1999
RFP For PM/CA Consulting Services 2/1998
7Schematic Estimates
Post Sale Summary Book
Statement Of Qualifications
Certified Payroll Reports
Gilbane Building Company Contract Change Proposal 10-22
8Gilbane Building Company Contract Change Proposal 1-8 And 51-90
9Gilbane Building Company Contract Change Proposal 23-50 And 97-115
10Gilbane Building Company Contract Change Proposal 91-96
Close-Out File 4/2000
Rejected Bids GC/CM Proposal Opening 5/1998
Brailsford And Dunlavey General Correspondence 4/1997
KJM General Correspondence 12/1999
General Correspondence E-Mail2 6/1999
General Correspondence E-Mail 1 11/1998
General Correspondence 5 8/2000
General Correspondence 4 3/1999
11General Correspondence 3 7/1998
General Correspondence 2 2/1998
General Correspondence 1 8/1997
Yost Grube Hall Architecture General Correspondence 9 10/1999
Yost Grube Hall Architecture General Correspondence 8 5/1999
Yost Grube Hall Architecture General Correspondence 7 4/1999
Yost Grube Hall Architecture General Correspondence 7A 2/1999
Yost Grube Hall Architecture General Correspondence 6 11/1998
12Yost Grube Hall Architecture 5 8/1998
Yost Grube Hall Architecture 4 7/1998
Yost Grube Hall Architecture 3 6/1998
Yost Grube Hall Architecture General Correspondence 2 4/1998
Yost Grube Hall Architecture General Correspondence 1 2/1998
Yost Grube Hall Architecture C012810 9 3/2000
Yost Grube Hall Architecture C012810 7 2/2000
13Yost Grube Hall Architecture C012810 6 8/1999
Yost Grube Hall Architecture C012810 5 7/1999
Yost Grube Hall Architecture C012810 4 2/1999
Yost Grube Hall Architecture C012810 3 11/1998
Yost Grube Hall Architecture C012810 2 9/1998
Yost Grube Hall Architecture C012810 1 1/1999
Project Schedule 3 1/2000
Project Schedule 2 12/1999
14Project Schedule 1 9/1999
Gilbane Building Company Construction Meeting Minutes 2 3/2000
Gilbane Building Company Construction Meeting Minutes 1 7/1999
Gilbane Weekly Quality Control Activity 2 2/2000
Gilbane Weekly Quality Control Activity Report 8/1999
Gilbane Building Company Monthly Reports 6/2000
Gilbane Building Company Daily Construction Reports 6 6/2000
Gilbane Building Company Daily Construction Report 5 3/2000
15Gilbane Building Company Daily Construction Reports 4 1/2000
Gilbane Building Company Daily Construction Reports 3 11/1999
Gilbane Building Company Daily Construction Reports 2 10/1999
Gilbane Building Company Daily Construction Reports 1 9/1999
General Correspondence E-Mail 2 1/2000
Gilbane Building Company E-Mail 5/1999
Gilbane Building Company General Correspondence 16 1/2000
Gilbane Building Company General Correspondence 15 11/1999
Gilbane Building Company General Correspondence 14 10/1999
Gilbane Building Company General Correspondence 13 9/1999
Gilbane Building Company General Correspondence 12 7/1999
Gilbane Building Company General Correspondence 11 6/1999
16Gilbane Building Company General Correspondence 10 6/1999
Gilbane Building Company General Correspondence 9 6/1999
Gilbane Building Company General Correspondence 8 6/1999
Gilbane Building Company General Correspondence 7 5/1999
Gilbane Building Company General Correspondence 6 5/1999
Gilbane Building Company General Correspondence 5 4/1999
Gilbane Building Company General Correspondence 3 1/1999
Gilbane Building Company General Correspondence 2 8/1998
Gilbane Building Company General Correspondence 1 7/1998
17Gilbane Building Company Contract 13160 8 2/2001
Gilbane Building Company Contract 13160 7 11/2000
Gilbane Building Company Contract 13160 6 6/2000
Gilbane Building Company Contract 13160 5 5/2000
Gilbane Building Company Contract 13160 4 2/2000
Gilbane Building Company Contract 13160 3 11/1999
Gilbane Building Company Contract 13160 2 8/1999
18Statement of Qualifications for Gilbane 4/1998
Maximum Allowable Construction Cost Proposal 12/1998
Program Of Architectural Requirements 10/1997
19CCP11R Review Log Books 1 and 2
Energy Life Cycle Cost Analysis 12/1998

Archives 270
Capital Planning
Building Files & Records, 1962-2007 (bulk 1990-1999).

ACQUISITION AND PROCESSING INFORMATION

These records were transfered to Manuscripts, Archives, and Special Collections from Capital Planning between March and May, 2007 (UA 2007-01). The records were processed by Tim Mace and University Archivist Mark O'English in early 2009.

EXTENT/QUANTITY INFORMATION

Number of containers: 16 boxes
Linear feet of shelf space: 16

COLLECTION DESCRIPTION & ARRANGEMENT

The collection consists of five series: WSU Buildings Files (generally organized alphabetically by building name), Capital Improvements and Correspondence, and then reports from three specific projects: Incinerator Upgrade, Waste handling facilities for the Pathological/Biomed Incinerator, and the Creamery Annex.

PREFERRED CITATION

The suggested citation for the collection is:

[Item Description]
Capital Planning Building Files & Records, 1962-2007 (UA 270)
Manuscripts, Archives, and Special Collections
Washington State University Libraries
Pullman, WA

Box Description
 
SERIES 1: BUILDING FILES
 
1Adams/Gladish School 8/1980 - 9/1983
Administration Annex 7/1996 - 1/1999
Albrook Lab 10/1981 - 2/1985
Alumni Centre 9/1997 - 9/1998
Animal Sciences Feed Plant 4/1994 - 10/1998
Anthropology Laboratory Building 9/1983 - 10/1994
Athletic Merger 3/1982 - 9/1982
Avery Hall 5/1978 - 9/1995
Bear Facility and Research 1/1990 - 12/1993
Beef Cattle Center Manure Separator Building 2/1993 - 3/1993
Beef Cattle Reproduction Barn 2/1984 - 11/1984
Black Footed Ferret Facility 11/1984
Bohler Gym With Phase I Remodeling for Athletic Merger Notebook. 12/1977 - 4/1998
Boiler Plant 12/1994
Bryan Hall 2/1974 - 5/1997
Bustad Hall 1/1991 - 10/1998
Campus Trails 5/1998
Carpenter Hall 4/1979 - 6/1997
Central Stores 12/1993
Child Care Facility 1/1990 - 4/1995
Clark Hall 4/1982 - 4/1998
Classroom Improvements. Part of 1988 15 Bldg. Classroom Improvement Plan 5/1986 - 9/1991
Co-Generation Facility: Production of Energy as a by Product of Steam Generation 1/1990 - 2/199 1
College Hall 7/1985 - 8/1996
Compost Facility 8/1997
Compton Union Building 11/1984 - 4/1997
Computer Sciences 6/1990 - 1/1991
Cooper Publications 8/1979 - 11/1995
Counseling Career Services Building 8/1978 - 9/1989
Daggy Hall 5/1979 - 6/1995
Day Care Center 10/1987 - 11/1987
Dean Robbins College of Agriculture 12/1978 - 7/1997
Department of Facilities Planning - Move to Commons Hall 2/1991 - 9/1992
Eastlick Hall 8/1983 - 4/1998
Energy Institute 1/1981 - 5/1981
Ensminger Beef Center 12/1997
Equine Center 3/1986 - 8/1991
Equine Exercise Track 12/1975 - 7/1978
Fine Arts Building 10/1982 - 7/1998
Fine Arts Plaza 8/1999
Food Service and Human Nutrition 5/1994 - 4/1998
Food Service Building 1/1998
2Freeway Plaza 12/1985 - 11/1985
Fulmer Hall 8/1983 - 9/1995
Gannon - Goldsworthy 9/1985 - 2/1998
General Storage 12/1992
Glen Terrell Mall 8/1996
Graham Farm Coal Ash Disposal Site 7/1987 - 6/1996
Greenhouses 5/1987 - 8/1993
Grimes Way Playfield 6/1996 - 11/1996
Hazardous Waste 10/1987 - 7/1987
Heald Hall 1/1980 - 1/1997
Heritage House 11/1980 - 6/1996
Hermosa Day Care 8/1985 - 9/1985
Hitchhock Research Track 8/1980 - 9/1991
Hollingberry Field House 1/1998 10/1998
Hulbert Hall 11/1979 - 3/1998
Ice Rink 10/1999
ICNE Spokane 2/1986 1/1999
Johnson Tower 9/1979 - 3/1996
Johnson Fire Services Training Facility 6/1985 - 10/1988
Kimbrough Music Building 2/1970 - 8/1995
Knott Dairy Farm 3/1995 - 12/1995
Libraries 12/1983 8/1999
Lighty Student Services Building 8/1997 - 5/1994
Lower Soccer Field 2/1994 - 8/1994
Meats Laboratory 1/1990 - 3/1990
McCluskey Building 6/1979 1/1999
McCoy Hall 5/1984 - 2/1998
McCroskey 1/1983 - 6/1994
McEachern Residence 8/1989 4/1996
Meyer’s Point 3/1993 - 7/1994
Morrill Hall 1/1995
Shoreline Master Program for Thurston Region (Notebook) 1990
Henderson Inlet Watershed Action Plan - Final - Thurston County Planning Department Notebook 10/1989
Thurston County - Critical Areas - Thurston County Advance Planning & Historic Preservation Board Proposed Revisions (Notebook) 10/1993
Murrow Hall 7/1979 - 7/1995
Parking Lots: AGRA Earth & Environmental - Phase I Site Assessment 6/1995
Parking Projects 1995 2/1995 - 8/1995
Parking Structures Daggy/Fine Arts 12/1994
Perham Hall Fire Damage Repairs 9/1980
Physical Sciences Building: Marine Mineral RSRC. Museum 3/1987 - 5/1987
3Pine Manor Building 8/1996 - 5/1999
Planetarium Classroom Building 6/1985
Plant Science Teaching Greenhouse 9/1991
Poultry Center Building 2/1990
Presidents Residence 4/1998
Primate Research Center 2/1983 - 10/1988
Buildings to be Razed 9/1981 - 3/1988
WSU Research & Technology Park: BLDG #2 6/1993 - 4/1996
Research & Technology Park Design Advisory Board 8/1995 - 4/1998
Ring Road 5/1998 - 6/1998
Rock Point Housing Complex 12/1985 - 2/1986
Roundtop Memorial Park 4/1992 - 1/1993
Safety Building 12/1975 - 11/1997
Science Hall 7/1993 - 7/1994
Seed Storage Facility USDA: Ken Abby's Old Files Transferred to FAC.DLN 2/1976 - 12/1976
Seed Storage Facility WSCIA: Ken Abby’ s Old Files Transferred to FAC.DL. 1/1962 - 4/1977
Shepard’s Residence 3/1994
Smith Gym 4/1980 - 2/1999
L.J. Smith Hall 5/1978 - 3/1998
Steffen Center 2/1981 - 9/1994
Stephenson - North 12/1989
Stevens Hall 10/1979 - 5/1996
Stimson Hall 6/1992 - 2/1993
Tennis Courts 6/64 - 4/1995
Terrace Apartments 2/1996
Thompson Hall 3/1974 - 5/1997
Troy Hall 8/1975 - 12/1979
Tukey Horticulture Orchard - Field Buildings 7/1989 - 3/1998
University Storage Buildings 12/198 1 - 7/1983
Various New Veterinary Science Pole Framed Buildings 9/1983 11/1983
WSU Veteran’s Memorial 1/1993 - 12/1998
Waller Hall 9/1995 - 2/1997
Wegner Hall 2/1985 - 4/1998
White Hall 5/1978 - 5/1996
Wilmer Davis Residence Hall 5/1997
Wilson Hall 6/1980 - 7/1993
WSU Vancouver 2/1995
WSU /CWU /YVCC “Shared Building - Yakima Center 9/1997 - 9/1997
Yakima Village 3/1998
USDA/General 6/1997
USDA/ARS Green - House/Headhouse Complexes 4/1988 - 6/1996
USDA Pesticide Chemical Storage Building 1/1981 - 4/1981
Washington Archeological Research Center 1978 - 1988
Research & Extension Units 10/1982 - 3/1998
Wenatchee Tree Fruit Research Center 10/1994 - 6/1998
Western Sudan Agricultural Research Project 12/1977 - 2/1980
 
SERIES 2: CAPITAL IMPROVEMENTS & CORRESPONDENCE
 
College of Agriculture & Home Economics - McClellan & Copenhagen Strategic Master Plan 4/1999
4College of Agriculture and Home Economics Major Capital Budget Request 1997 - 2007
College of Agriculture & Home Economics - McClellen & Copenhagen. Inc, CO 13222 4/1999
College of Business & Economics Dean Gale SullenBerger 4/1984 - 2/1995
College of Engineering & Architecture 10/1983 - 1/1997
Extended University Affairs - Vice President Thomas Purce 1/1996
Extended University Services Muriel Oake 7/1987
Graduate School Dean R.V. Smith 8/1981 - 12/1994
School of Music & Theatre Arts Director Erich Lear 5/1992 - 5/1996
College of Pharmacy M.M Abdel Monem 2/1984 - 3/1993
College of Sciences & Arts (Division of Sciences) Dean L.J. Radziemski 1/1983 - 6/1996
Administrative Review Reports 11/1990 - 12/1990
AEA Committee & A/E Fee Task Force 1/1994 - 5/1996
AEA Committee & A/E Fee Task Force 3/1992 - 4/1993
AEA Committee & A/E Fee Task Force 7/1991 - 3/1992
AEA Committee & A/F Fee Task Force 9/1987 - 6/1991
AEA Committee & A/F Fee Task Force 2/1985 - 1/1986
AEA Committee & A/E Fee Task Force 5/1981 - 1/1985
AGC SFC Committee Information Minutes 9/1995 - 3/1999
AGC - SFC Committee Information Minutes 1/1992 - 8/1995
5AGC - SFC Committee Information Minutes. (Associated General Contractors Stale Facilities Construction,) 6/1989 - 12/2001
AGC - SFC Committee Information Minutes. (Associated General Contractors State Facilities Construction,) 8/1987 - 3/1989
AGC - SFC Committee Information Minutes. (Associated General Contractors State Facilities Construction,) 7/1985 - 7/1987
American Arbitration Association 1989 - 1996
Artwork Correspondence Details 1980 1/1980 - 7/1998
Attorney General Correspondence 1978 - 12/1995 RESTRICTED
AUA Correspondence (Associated University Architects) 8/1994 - 8/1996
AUA Correspondence (Associated University Architects) 11/1979 - 4/1994
Major Capital Budget 12/1997 - 5/2000
Major Capital Budget 4/1996 - 11/1997
Operating & Capital Budget Guidelines Biennium 1997 - 1999
Status of Capital Appropriations 1991 - 1993
Capital Project Summary (Current Status) 1997 - 1999
Minor Capital Improvements Accounting/Project Summaries 1/1996 - 9/1997
6MCI/MCR Capital Improvements Allocations 12/1995 - 7/1997
Business Services/Real Estate 9/1987 - 1/1993
Regents MCI Projects 6/1995
Arts Electric, Inc./DBA Palouse Country Electric - Various Projects 12/1993
Atkinson Construction Co . - Various Projects 12/1993
Blue Sage Corporation - Various Projects 7/1994
Bovay Northwest 9/1995
Capital Communications Industries, Inc. 1/1994
Cosco Fire Protection. Inc. 12/1993 - 3/1994
Creighton - Brook Engineers Various Projects 8/1993 - 3/1994
Design West Architects 7/1993 - 1/1995
Don Brigham Plus Associates Various Projects 6/1994 - 8/1994
Elliot Electrical Engineers - Various Projects 7/1993 2/1994
Ellis - Feeney, Architects & Planners 7/1993 - 11/1994
Emcon Northwest. Inc. Various Projects 3/1994
Far West Services, Inc . - Various Projects 6/1993
G.Craig Lee. P.E.. S.E. - Various Projects 10/1993
Hamre Construction. Inc. - Various Projects 3/1994
Hodge & Associates Various Projects 1/1994
Inland Coatings, Inc - Various Projects 5/1994
Intermountain Electric. - Various Projects 3/1994
John Graham Associates/ DLR Group 5/1995
Lindgren & Associates, Inc. - Various Projects 12/1993
MCGowan Construction 2/1994
Morrison Knudsen Corporation 3/1992 - 8/1995
Munir Daud & Associates - Various Projects 1/1994 - 12/1994
MW Consulting Engineers - Various Projects 5/1993 - 6/1994
Palouse Country Electric - Various Projects 2/1994
Peden, Petersen, Lee. P.S. - Various Projects 4/1994
Riley Engineering Inc. 5/1993 - 5/1995
RZA AGRA - Various Projects 2/1994
S.G. Morin & Son, Inc - Various Projects 9/1993
Tektoniks Corporation - Various Projects 7/1993
3-H Mechanical - Various Projects 6/1993
T.J. Gerard & Associates Inc. - Various Projects 1/1994
TKTM(Tectum) Corporation - Various Projects 4/1994
W.B. Lehner & Associates - Various Projects 3/1994
Weiland Lindgren & Associates - Various Projects 12/1993
MCI/MCR Contract Summary Reports 7/1996 - 9/1996
MCI/MCR Allocations 1995 - 1997
MCI (Minor Capital Improvements)/MCR (Minor Capital Renewal) 9/1995 - 6/1995
MCI/MCR - 12/1992 - 8/1995
Major & Minor Capital Improvements 1991 - 1993
Capital Budget Request 1995 - 2005
Major Capital Budget Requests 6/1987 - 3/1996
Capital Improvements Six Year Plan 1993 - 1999
Capital Improvement Program 1987 - 1997
Capital Improvements 1993 - 1995
Major Capital Improvement 1991 - 1999
7Major Capital Improvements 1989 - 1995
Minor Capital Improvements 1989 - 1991
Benefit Services & Risk Management 5/67 - 9/1999
Budget Office 1976 - 6/1994
CP/CC Small Projects Subcommittee 6/1997 - 9/1997
OFM/CPCC Subcommittee on Maintenance 12/1995 - 4/1997
CP/CC Risk Assessment Subcommittee 9/1998 - 1/1999
CP/CC Project Management Survey Responses 6/1996 - 9/1996
CP/CC Project Management Survey 7/1996 - 8/1996
OFM/CPCC Project Management Subcommittee 1/1995 - 8/1999
Capital Policy/Communications Committee - General Corresp. 8/1995 - 5/1998
CP/CC Subcommittee on Maintenance Standards 10/1994 - 11/1995
CPCC - Maintenance Standards - Closed 12/1996
Carpet Policy 9/1982 - 4/1993
Central Stores 3/1990 - 8/1998
Chairs’ Workshop 1/1992
Commute Reduction 7/1993 - 9/1993
Conference and Institutes 12/1994 - 7/1998
8WSU Construction/Design Standards 4/1989 - 3/1996
Declaration of Emergency - Emergency Funds for unplanned repairs/maintenance etc. 6/1995 - 8/1996
Dining Services 9/1993 - 8/1997
Environmental Health Correspondence 8/1994 - 4/1999
Craig Benjamin. Assistant Director - General Correspondence 4/1992 - 5/1997
Laura Hubbard. Director Budget & Accounting Services 10/1998 - 3/1999
Extended University Services 2/1990 - 5/1997
Flammable/Combustible - Liquid Storage 12/1984 - 11/1988
General Administration - Dept of Public Works 5/1992 - 4/2000
Exterior Graphics 1/1988 - 4/1995
Graphics (Interior) 1/1986 - 9/1998
Hazardous Waste Program 8/1983 - 12/1989
Hazardous Waste Abatement 3/1995 - 11/2000
Heliport Correspondence 2/1982 - 5/1987
Honors Program 8/1994
Washington State Master Plan Higher Education 1988
Human Resource Services 8/1992 - 12/1999
Center for Human Rights 5/1980 - 2/1999
WSU Local Union #1066: WA FED. Of State Employees - AFL - CIO. Council #28 Bargaining Unit #IX 1999
Information Technology E-Mail, Intercom Phone System 11/1994 - 9/1995
Interinstitutional Committee 3/1995 - 11/2000
Internal Auditor 5/1990 - 5/1996
Journal of Business 8/2000
Key Card Security 12/1995 - 9/1996
9Leadership Conference 1/1989 - 9/1995
Legal/Legislative House Bill 1 509 5/1993 - 8/1996
The Libraries 5/1992 - 5/1995
Material Maintenance. Discontinuance of Office Machine & Furniture, Recycling System Changes, Recyclable Material Assignments etc. 9/1989 - 7/1997
Minority Women’s Business Enterprise 2/1987 - 11/1998
NAFH National Affordable Family Housing: 2/1995
National Trust for Historic Preservation 9/1992 - 5/1993
News Bureau & University Relations 12/1975 - 8/1998
Payroll 1/1990 - 3/2000
Peer Institutions 5/1992
Public Safety Correspondence 5/1994 - 11/1998
Safety Division Correspondence 1/1991 - 5/1994
Regional/Urban Design Assistance Team (RIUDAT) 5/1996 - 6/1996
Residence Life & Housing 5/1989 - 10/1994
Staff Senate 9/1991 - 3/1998
Larry Ganders - Director Statewide Affairs 6/1994 - 3/1999
Whitman County Wildlife Habitat Advisory Committee 10/1995 - 3/1996
Whitman County Dillon Property/Gravel Pit 6/1995 - 8/1999
Port of Whitman Project 1/1998 - 3/1999
Whitman County Zoning 10/1993 - 10/1998
Whitman Regional Transportation Planning 9/1991 - 10/1995
Washington State Furniture Contracts 5/1995 - 2/1996
Jay Becker - WWP/WSU Electrical Distribution System 8/1997 - 7/1999
Burke Lee Consulting Firm Contract No. 11635 - Various Projects 3/24/1994
Stadium Way Entrance Restoration Log#105946 10/1994 - 6/1998
Botany Greenhouse Steffen Center 8/1994 - 11/1994
Wegner Hall - Installation of Fume hoods 10/1993
Wilson Hall Remodel - Log#8593 1 4/1993 - 9/1994
WSU Water System Plan Log#5 1402 11/1993 - 5/1995
MCI Bid Summaries May - June 1995
Johnson Tower Connect to Central Chilled Water Log#89881 5/1994 - 1/1995
Johnson Hall - Room 122 Log#91017 10/1993 - 3/1995
Martin Stadium - Repairs to Tunnel Log# 66282 12/1993 - 4/1995
Martin Stadium Sound Reinforcement System 10/1993 - 3/1994
New Library Fire Sprinklers Log# 120279 4/1995 - 5/1995
10Pea & Lentil Greenhouse 4/1994 - 11/1994
Potato Storage Facility - Prosser 12/1996
Power Plant, Ash Receiver/Dustless Unloader Replacement Log#90533 11/1993
Eastlick Plaza Repair Log#42568 1/1994 - 9/1994
Fire Sprinklers for Physical Sci. Bldg. Log#89324 7/1993 - 2/1995
George Severance Memorial Plaza Log# 100881 11/1993 - 1/1994
Holland Library Addition Security System 7/1994 10/1994
IBC Greenhouse Project Log#61 170 2/1988 - 8/1994
Colorado Street Log# 90550. 89410 5/1994 - 7/1995
Animal Resources Unit (ARU) Farm Shop Log#46679 8/1993 - 2/1994
Clark Hall Room 212 log#89344 10/1993 - 1/1994
Colorado Street Renovation Log# 90550 & 89410 8/1995 - 4/1996
Architectural/Engineering Services for Existing Facilities Survey and Transition Plan in compliance with Americans with Disabilities Act (ADA) for W.S.U. By CLARK Architects PS. July 13, 1992
Americans With Disabilities Act Advice and Miscellaneous Information 1993
Americans With Disabilities ACT (ADA) General Correspondence#1 10/1991 - 12/1992
Americans With Disabilities ACT (ADA) General Correspondence #2 1/1993 - 8/1993
Americans With Disabilities ACT (ADA) General Correspondence #3 5/1993 - 12/1994
Americans With Disabilities ACT (ADA) General E-Mail Corresp. 11/1993 6/1997
Americans With Disabilities ACT (ADA) Clark Architects General Corresp. 5/1992 - 1/1993
Americans With Disabilities ACT (ADA) General Corresp. #4 12/1995 - 10/1999
Americans With Disabilities ACT (ADA) Advisory Committee 11/1992 - 4/1998
Americans With Disability Compliance Burke/Lee 9/1992 - 2/1992
Americans With Disabilities ACT (ADA) Consultant Selection 2/1992 - 5/1992
Americans With Disabilities ACT (ADA) Robert Fossatti Associates 8/1994 - 10/1994
Americans With Disabilities ACT (ADA) Budget 4/1993 - 10/1997
 
SERIES 3: INCINERATOR UPGRADE
 
11Regents 4/1996
E.I.S. 7/1996 - 2/2000
General C - Mail Correspondence #1 1/1995
Bovay Northwest - Request for Information 1/1996
Bovay General Correspondence #1 8/1995 - 8/1997
Advanced Combustion Systems Inc. - General Correspondence 9/1995
Advanced Combustion Systems Inc. - Contract Change Proposal #1 8/1995 - 8/1997
Advanced Combustion Systems Inc. Contract 9/1995 - 3/1996
General Correspondence 8/1995 - 3/1999
 
SERIES 4: PATHOLOGICAL/BIOMED INCINERATOR - WASTE HANDLING FACILITIES
 
Budget 11/1992 - 2/1999
Regents 6/1991 - 11/2000
Environmental Impact Statement for Replacement of Medical Waste Incinerator Vol. 1. of II
Environmental Impact Statement for Replacement of Medical Waste Incinerator Vol. II of II
Finance, Audit, Capital Committee 1/2000
B.A.I.T. 1/2000
Issues & Claims (Empty)
Operations & Maintenance Manual Correspondence 10/1999 - 5/2000
Public Records Request 1/1997 - 3/1999
Autoclave Correspondence 7/1999 - 1/2000
Air Emission Compliance - Test Correspondence 7/1999 - 5/2000
Wastewater Discharge Correspondence 5/1999 - 3/2000
Low Level Radiation Waste (LLRW) 8/1999 - 6/2000
Forklift Correspondence 36373
Critzer Box Truckload Correspondence 7/1999 - 8/1999
Attorney General Correspondence 34182 RESTRICTED
Burke/Lee Correspondence 33664
Doucet & Mainka, P.C. General Correspondence (empty) 4/1990 -
Envitech 4/1998 - 10/2000
Robert Fossatti Associates CO 6060 35643
Roen & Associates CO 12619 35551
Stoel & Rives LLP Attorneys CO 12559 5/1997 - 5/1998
Strata Geotechnical Engineers CO 13094 3/1998 - 7/1999
Strata Test Reports 35643
Building Committee 34851
Construction Meeting Minutes 9/1998 10/2000
File - Unnamed
General Correspondence E-Mail 1/1995 - 2/1999
General Correspondence 1/2000 - 10/2000
Bovay Northwest Estimates 4/1997 - 8/1998
Bovay General Correspondence E-Mail 9/1998 - 10/1999
12Bovay Contract 12407 5/1999 - 10/2000
Bovay Contract 10798 #3 7/1996 - 7/1997
General Correspondence #12 4/1999
Lydig Construction General Correspondence 9/1998 - 11/1998
L dig Construction Contract 13064 9/1998 - 8/2000
Contract Change Proposals 016 - 001
Rejected Bids - Bid Opening 9/1998
Rejected Bids - Bid Opening 12/1997
Close Out Items 5/2000
CBP Engineering Corp - Notebook
Analysis & Recommendation Related to the Consultant Report of May 1, 1990
E.I.S. #2 9/1996 - 7/1998
E.I.S. #1 8/1993 - 8/1996
13Program for the Incineration Facility 10/1996
Schematic Design Brochure 3/1997
Conceptual Design Analysis for Medical Waste Incinerator Prepared by Bovay 1/1997
Project Final Binder 6/1999
Project Plan for WSIJ Medical Waste Incinerator
Tuttnauer Co. Ltd. - Operation & Maintenance Manual - Steam Heated Medical Waste Sterilizer
URS Review of Operations & Maintenance Manual
General Correspondence #9 11/1999 - 12/1999
General Correspondence #8 8/1998 - 12/1998
General Correspondence #7 2/1998 - 7/1998
General Correspondence #6 1/1997 - 6/1997
General Correspondence #5 6/1993 - 12/1994
14General Correspondence #4 5/1992 - 6/1993
General Correspondence #3 6/1991 - 4/30
General Correspondence #2 1990
General Correspondence #1 11/1986 - 2/1988
Bovay Northwest - General Correspondence #11 11/1998 - 3/1999
Bovay Northwest - General Correspondence #10 1/1998 - 10/1998
Bovay Northwest - General Correspondence #9 10/1997 - 4/1998
Bovay Northwest General Correspondence #8 9/1997 - 10/1997
Bovay Northwest - General Correspondence #7 8/1997
Bovay Northwest - General Correspondence #6A 2/1997 - 7/1997
15Bovay Northwest - General Correspondence #5 7/1995 - 10/1996
Bovay Northwest General Correspondence #4 10/1993 - 6/1995
Bovay Northwest - General Correspondence #3 5/1993 - 9/1993
Bovay Northwest - General Correspondence #2 3/1993 - 4/1993
Bovay Northwest General Correspondence #1 1 10/1991 - 2/1993
Bovay Northwest - Contract #12407 #3 1 10/1998 - 4/1999
Bovay Northwest - Contract #12407 #2 1 10/1997 - 9/1998
Bovay Northwest - Contract #12407 #1 1 10/1996 - 9 98
Bovay Northwest. Inc. - Contract #10798 #2 1 12/1995 - 6/1996
Bovay Northwest. Inc. Pay Estimates, Addenda, Amendments 9/1991 - 11/1995
 
SERIES 5: CREAMERY ANNEX
 
16Regents 8/1998 - 3/2001
E.I.S. 4/1999 - 5/1999
Finance. Audit, Capital Committee #1 5/1999
Attorney General Correspondence 6/1999 RESTRICTED
Strata CO #13259 5/1999 - 10/1999
Strata Test Reports 7/1999 - 11/1999
Notice to Applicants (Original)
Field Orders 12/1999
General E-Mail 12/1998 - 4/2000
General Correspondence 4/1998 - 1/2004
Northwest Architectural Company - Clarification 7/1999 - 10/1999
Northwest Architectural Company - Meeting Minutes 1/1999 - 12/1999
Northwest Architectural Company - Requests for Information 6/1999 - 1/2000
Northwest Architectural Company - E-Mail 9/1999 - 3/2001
Northwest Architectural Company Contract 13 109 12/1998 - 1/2001
Lydig Construction CO 13249 5/1996
Northwest Architectural Company - General Correspondence #2 12/1999 - 10/2000
Northwest Architectural Company - Construction Observation Reports 9/1999 - 12/1999
Lydig - General Correspondence 5/1999 - 2/2001
Lydig Contract Change Proposals #s 011 - 001
Statement of Compliance
Rejected Bids - Bid Opening 4/1999
Strata - Creamery Annex - Final Project Binder
Northwest Architectural Company General Correspondence #1 11/1998 - 11/1999

Archives 271
Capital Planning
Building Files, 1980-2001.

ACQUISITION AND PROCESSING INFORMATION

These records were transfered to Manuscripts, Archives, and Special Collections from Capital Planning on July 11, 2005 (UA 2005-11). The records were processed by Tim Mace and University Archivist Mark O'English in early 2009.

EXTENT/QUANTITY INFORMATION

Number of containers: 24 boxes
Linear feet of shelf space: 24

COLLECTION DESCRIPTION & ARRANGEMENT

The collection consists of correspondence and contracts relating to several WSU construction projects from the early 1990s. The collection is held in its original order, consisting of several series organized by building (there appears to be no discernible order to the buildings).

PREFERRED CITATION

The suggested citation for the collection is:

[Item Description]
Capital Planning Building Files, 1980-2001 (UA 271)
Manuscripts, Archives, and Special Collections
Washington State University Libraries
Pullman, WA

Box Description
 
HOLLAND LIBRARY ADDITION (& PACKAGE No.2)
1Budgets 8/1989 - 8/1994
Regents Reports 4/1989 - 3/1994
Burke/Lee, A Joint Venture 3/1988 - 4/1991
Mahan DeSalvo 12/1989 - 3/1994
Robert Fossatti 5/1994 - 9/1994
Coopers & Lybrand 3/1994
E.I.S. 4/1990
Gifford Consultants, Inc. Summary Report of Geotechnical Material Testing
Pitsburgh Testing - Concrete Tests
Morson Knudson Weekly Activity reports 5/1991 7/1991
Building Committee Meeting Minutes 7/1980 - 7/1989
General Correspondence 7/1987 - 3/1990
Artwork Correspondence 6/1990
Addendums 1991
Wyatt Jaykirn #2 4/1993 - 11/1993
ALSC R.F.I.?s 7/1993
Construction Reports #4 9/1993 - 1/1994
ALSC - Submittals 2/1991 - 12/1992
ALSC - Contract #7 6/1994 - 6/1995
MA Mortenson Contract 2/1993 - 6/1995
Shea Construction Contract #2 7/1991 5/1992
General Correspondence #14 5/1995 - 8/1997
2M.A. Mortenson - General Correspondence #6 9/1994 - 12/1996
ALSC - General Correspondence #21 10/1994 - 12/1996
Shea Construction - 1 of 2 Delay Claim 4/26/1991
Pending Change Proposals & Log
Pending Change Proposals & Log
Pending Change Proposals & Log
Holland Early Bird Photos
Shelving Layouts and other Shelving Information
Shelving & Compact Storage System General Correspondence 8/1993 - 1/1996
Shelving & Compact Storage System General Correspondence 7/1993 - 9/1996
Tab Product CO - Shelving & Compact Storage System 8/1993 - 7/1994
Rejected Bids Shelving & Compact Storage System 6/1993 - 9/1993
Rejected Bids
Construction Reports #3 3/1993 - 8/1993
3Library Un - Marked Folder Possibly Architect Selection 1988
Construction Reports #2 7/1992 - 2/1993
Wyatt - Jaykim #1 9/1989 3/1993
General Correspondence #13 6/1994 - 4/1995
General Correspondence #12 1/1994 - 5/1994
4General Correspondence #11 8/1993 - 12/1993
General Correspondence #10 2/1993 7/1993
General Correspondence #9 7/1992 - 1/1993
General Correspondence #8 10/1991 - 9/1991
General Correspondence #7 3/1991 - 5/1991
General Correspondence #6 3/1991 5/1991
General Correspondence #5 10/1990 - 1/1991
General Correspondence #4 5/1990 - 1/1991
General Correspondence #3 2/1990 - 4/1990
5General Correspondence #2 8/1989 - 1/1990
General Correspondence #1 4/1988 7/1989
ALSC Architect General Correspondence #20 3/1994 - 9/1994
ALSC Architect General Correspondence #19 9/1993 - 2/1994
ALSC Architect General Correspondence #18 3/1993 - 8/1993
ALSC Architect General Correspondence #17 10/1992 2/1993
ALSC Architect General Correspondence #16 7/1992 - 9/1992
ALSC Architect General Correspondence #15 3/1992 6/1992
ALSC Architect General Correspondence #14 11/1991 2/1992
ALSC Architect General Correspondence #13 8/1991 - 10/1991
6ALSC Architect General Correspondence #12 6/1991 - 7/1991
ALSC Architect General Correspondence #11 5/1/1991 - 5/30/1991
ALSC Architect General Correspondence #10 4/1/1991/ - 4/30/1991
ALSC Architect General Correspondence # 9 2/1991 - 3/1991
ALSC Architect General Correspondence #8 1/1991 - 2/1991
ALSC Architect General Correspondence #7 11/1990 - 12/1990
ALSC Architect General Correspondence #6 9/1990 - 10/1990
ALSC Architect General Correspondence #5 5/1990 - 8/1990
ALSC Architect General Correspondence #3 9/1989 - 2/1990
7ALSC Architect General Correspondence #2 7/1989 - 8/1989
ALSC Architect General Correspondence #1 9/1988 6/1989
For Student Projects
MA Mortenson Correspondence #5 9/1993 - 8/1994
MA Mortenson Correspondence #4 4/1993 - 8/1993
MA Mortenson Correspondence #3 2/1993 - 3/1993
MA Mortenson Correspondence #2 7/1992 1/1993
MA Mortenson Correspondence #1 10/1991 - 6/1992
ALSC Contract #9801 #6 12/1992 - 6/1994
8ALSC Contract #980 1 #5 12/1991 - 1/1993
ALSC Contract #9801 #4 3/1991 - 10/1991
ALSC Contract #9801 #3 11/1989 - 2/1991
ALSC Contract #980 1 #2 7/1989
ALSC Contract #9801 #1 2/1989 - 6/1989
MA Mortenson Contract Correspondence # 14 10/1991 - 11/1993
MA Mortenson Contract Correspondence #13 10/1991 - 10/1993
MA Mortenson Contract Correspondence #12 10/1991 - 4/1993
MA Mortenson Contract Correspondence #11 10/1991 - 10/1993
MA Mortenson Contract Correspondence #10 9/7/1993 - 9/16/1993
MA Mortenson Contract Correspondence #9 11/1992 - 8/1993
9MA Mortenson Contract Correspondence #8 10/1991 - 7/1993
MA Mortenson Contract Correspondence #6 & #7 8/1992 - 6/1993
MA Mortenson Contract Correspondence #5 1/1993 - 2/1993
MA Mortenson Contract Correspondence #4 12/1992
MA Mortenson Contract Correspondence #3 11/1992
MA Mortenson Contract Correspondence #2 8/1992 - 10/1992
MA Mortenson Contract Correspondence #1 9/1991 - 7/1992
Shea Construction - Contract #1 5/1990 - 6/1991
 
HANDICAPPED ACCESS IMPROVEMENTS
Budget 1 1/1980 12/1992
 
HOLLAND LIBRARY RENEWAL
10Budget 1/1993 - 3/1993
Holland Library Fire Pump. - Creighton Brooked Engineers. General Correspondence 5/1994 - 7/1994
Mahan & Desalvo 12/1992
Building Committee Meeting 10/1991 - 7/1992
General Correspondence 3/1992 - 4/1997
Handicapped Accessibility Improvements - General Correspondence 1990 - 4/1994
ALSC Architect Correspondence #1 2/1992 - 7/1994
ALSC Architect Contract 10975 4/1992 - 7/1994
 
WSU VANCOUVER PHASE II - FEMA
General Correspondence E-Mail 3/1997 - 8/1997
General Correspondence 3/1997 - 6/1998
Meeting Minutes 4/1997
Heery International General Correspondence 8/1997 - 9/1997
Z.G.F. - General Correspondence 2/1997 - 9/1997
Z.G.F. E-Mail 4/1997
General Correspondence - Drawings
 
STUDENT ALUMNI CENTER
Budget Empty
Project Planning Committee 5/1993 - 4/1999
Attorney General Correspondence 7/1995 - 5/1999 RESTRICTED
Studioz/Architects Associates E-Mail 3/1996
Studioz/Architects Associates - General Correspondence 4/1995 - 5/1996
Z.G.F. E-Mail 7/1995
Z.G.F. General Correspondence 6/1995 - 8/1995
Z.G.F. Contract 8/1995
 
NORTH CAMPUS SUBSTATION
11General Correspondence #1 4/1995
 
GC/CM REVIEW
General Contractor/Construction Manager Program Review 1/1999
Proposal By Vanir 12/1998
GC/CM Program Assessment 12/1998
Statement of Qualifications Presented to WSU Proposal to Provide Program Review & Risk Assessment of Alternative Public Works Procedures
 
RESIDENCE HALL FIRE SPRINKLERS
Budget - Empty
Residence Hall Implementation
General Correspondence 6/1991 - 5/2001
Patriot Fire Protection Contract 10/1994
Rolf Jenson & Associates Various Projects
Rolf Jenson & Associates - Residence Hall Sprinkler Feasibility Study
 
SEPTIC SYSTEM REPLACEMENT IAREC - PROSSER
Preliminary Engineering Report for Large On - Site Sewage System at WSU - IAREC Prepared by J.U.B. 11/1993
Preliminary Engineering Evaluation - Task 5 Alternative Comparison Prepared by J.U.B. 8/1993
 
OLYMPIC WEIGHT ROOM EXPANSION
Budget - Empty
Regents 2/1995
Attorney - Empty
General E-Mail 11/1994 - 1/1996
Project Planning Committee 11/1994 - 1/1996
General Correspondence 11/1994 - 2/1998
ALSC General Correspondence 10/1995 - 4/1996
ALSCCO 1/1996 - 4/1996
 
SOUTH CAMPUS ELECTRICAL
CO 12709 12/1997 - 6/1998
 
STEVENS HALL RENOVATION
Budget 8/1997
General Correspondence 5/1997 - 6/1997
Kovalenko Architects - General Correspondence 9/1995
 
STUDENT HOUSING PROJECT
Regents 1/1995
IRA Fink & Associates CO 11923 2/1995
Unmarked Folder 2/1994
General Correspondence #2 2/1995 - 4/1996
General Correspondence #1 11/1993 - 8/1994
 
BOHLER GYM ADDITION
Budget 8/1992 - 4/1998
Regents 10/1991 - 6/1998
E.I.S. 6/1995
Attorney General Correspondence 7/1998 RESTRICTED
Public Information Requests 5/1999
Burke/Lee Correspondence 9/1992
Disputes Review Board - Thomas P. Cochran 9/1996 - 12/1996
Hainline & Associates CO #1 5/1996 - 8/1997
HCI Howard Consultants Inc./Strata CO 12254 1/1996 - 6/1997
The Redicheck Firm 11/1995
12Robert Fossatti Associates 8/1994 - 5/1997
Disputes Review Board General Correspondence #1
Strata Geotechnical Engineering & Material Testing Co. 2/1997 - 6/1997
Professional Services Industries - Inspection Reports 8/1996 - 11/1996
Strata Geotechnical Engineering - Concrete Test Reports 8/1997 10/1997
Geotechnical Report 12/1994
General E-Mail Correspondence 8/1996 - 3/1997
General Correspondence #3 11/1996 - 8/1998
Value Engineering Study 1/1995 - 3/1995
Shea Construction #2 7/1997 - 2/1998
Shea Construction Non - Compliance Reports 10/1996 - 4/1997
Shea Construction General Correspondence #3 3/1997 10/1998
Buhler Gym Addition Pre - Design Study
Sasaki Associates General Correspondence #8 6/1997 1/01
Shea Contract Change Proposals #s 88 - 01
Rejected Bids - Bid Opening 3/1996
Sasaki Associates Construction meeting minutes #1 4/1996
13Sasaki General Correspondence #7 1/1997 - 5/1997
Strata Geotech. Engineering Concrete Testing Reports 4/1996 - 10/1996
Strata Geotech. Engineering - #2 11/1996 - 7/1997
Shea General Correspondence #2 8/1996 - 3/1997
Sasaki General Correspondence #2 8/1994 - 2/1995
Sasaki General Correspondence #1 2/1991 - 7/1994
Shea General Correspondence #1 3/1996 - 7/1996
Sasaki General #6 9/1996 - 12/1996
Sasaki General #5 6/1996 - 8/1996
Sasaki General #4 1/1996 - 5/1996
14Sasaki General #3 3/1995 - 12/1995
General Correspondence #2 9/1995 - 10/1996
General Correspondence #1 10/1991 - 8/1995
Shea - Contract #1 3/1996 - 6/1997
Sasaki Architects Contract 3/1992 - 6/1995
Sasaki Architects - Contract #2 5/1992 - 9/1996
Sasaki Architects Contract #3 10/1996 - 6/1998
Requests for Information #s 176 - 256
CD/Logs/Bulletins
Requests for Information #s 101 - 175
15Requests for Information 1 - 100
 
CHILLED WATER STORAGE
Regents 9/1992 - 9/1994
Budget 9/1991 - 2/1992
Mahan Partnership Correspondence 3/1997 - 4/1997
Robt. Bein, WM. Frost & Associates General Correspondence 3/1997 4/1997
E.I.S. 11/1991 - 1/1991
General Correspondence #1 5/1990 - 4/1995
Shea Construction General Correspondence #1 4/1993 6/1993
Shea Construction Contract 8/1993
 
VANCOUVER PHASE II EARLY CHILDHOOD EDUCATION FACILITY
Budget 3/1995 - 3/1998
Regents 1/1996 - 9/1999
Finance, Audit, Capital Comm. (FAC) 7/1999 - 9/1999
Attorney General Correspondence 2/1996 - 7/1997 RESTRICTED
AGRA Earth & Environmental, Inc. 10/1997 - 7/1998
Carlson Testing, Inc. #1 9/1996 - 10/1996
AGRA Earth & Environmental, Inc. - Concrete Test Reports 9/1997 - 1/1998
Consultant Value Specification CO 12285 4/1996 6/1990
Heery Int. CO 12306
Heery Int. CO 12308
Value Engineering Study 5/23/1996
Project Planning Committee
Ileery Tnt. E-Mail #1 6/1996 3/1992
I leery Jut. General Correspondence #1 4/1996 5/1998
Meeting Minutes #1 4/1992 - 2/1998
General E-Mail 9/1995 - 4/1998
General Correspondence #7 4/1997
ZGF Contract 12128 #3 11/1997 - 8/1999
ZGF General Correspondence 3/1997 9/1998
Shimizu America Corp. General Correspondence #1 6/1997 - 11/1999
16Shimzu Contract 6/1997 - 11/1998
Certified Payroll Reports 1/1999 - 2/1999
Shirnizu Contract Change Proposals Numbers 079 - 1R
Rejected Bids Re-Bid Date 6/12/1997
Rejected Bids Bid Date 4/1997
Closeout File 6/1999 - 8/1999
General Correspondence #6 11/1996 - 3/1997
General Correspondence #5 6/1996 - 10/1996
General Correspondence #4 2/1996 - 5/1996
General Correspondence #3 12/1995 - 1/1996
General Correspondence #2 11/1/1995 - 11/30/1995
17General Correspondence #1 6/1995 - 10/1995
Z.G.F. General Correspondence #7 12/1996 - 3/1997
Z. G. F General Correspondence #6 9/1996 - 11/1996
Z.G.F General Correspondence #5 7/1996 - 8/1996
Z.G.F General Correspondence #4 5/1996 - 6/1996
Z.G.F General Correspondence #3 2/1996 1/1996
7.G.F General Correspondence #2 1/1996 - 1/1996
Z.G.F General Correspondence #1 1/1995 - 12/1996
Z.G.F. Contract #2 9/1996 - 10/1997
Z.G.F. Contract #1 10/1995 - 8/1996
 
CAMPUS INFRASTRUCTURE - VANCOUVER PH II
18Design Development - Preliminary Calculations & Cut Sheets 2/1996
Budget 4/1996 - 3/1998
Attorney General Correspondence 4/1997 RESTRICTED
AGRA Earth & Environmental 2/1996 - 5/1997
AGRA Earth & Environmental CO 12022 6/1997
Consulting Value Specialists 4/1996 - 6/1996
Disputes Review Board - General Correspondence 4/1997 - 6/1997
Disputes Review Board E-Mail 4/1997 - 6/1997
Disputes Review Board Agreement 12658 - Kim DeRubcrtis
Disputes Review Board Agrcemcnt 12658 - Kerry Lawrence
Heery International CO 12309
Heery International CO 12307
Mayer/Reed C013368 9/1999
Value Engineering Study 4/1996 - 6/1996
Project Meeting Minutes 4/1997 - 9/1997
Heery International - E-Mail Correspondence 6/1996 - 5/1997
Heery International General Correspondence #2 7/1997 - 4/1998
Storm water Pollution Prevention Plan 6/1996
Heery Constructability Review 7/1996
Project Planning Committee 10/1995 - 2/1996
General E-Mail Correspondence 11/1995 - 2/1998
Landis & Staefa Submittal data for WSU, Phase II Infrastructure 8/1997
Zimmer Gunsul Frasca (Z.G.F.) - General E-Mail 7/1996 - 5/1997
Z.G.F. General Correspondence 10/1997 - 8/1998
Z.G.F. General Correspondence #4 7/1997 - 10/1999
Z.G.F. Contract #3 6/1997 - 3/1999
Good Fellow Brothers General E-Mail 7/1997
Good Fellow Brothers General Correspondence 3/1997 - 1/1999
Good Fellow Brothers - Contract 7/1997 - 2/1998
Good Fellow Brother - Certified Payroll Reports 5/1997 - 1/1998
19Statement of Compliance 5/1997 - 1/1998
Submittal for Section 16402 Prepared by Leed Electric, Inc. for Good Fellow Brothers Inc
Nutter Underground 8/1996 - 9/1997
Good Fellow Contract #?s32 - 01
Rejected Bids Bid Date 3/4/1997
Estimate of Probable Construction Cost
Constructability Review
Value Engineering Study for Campus Infrastructure
Preliminary Design Campus Infrastructure Work
General Correspondence #3 12/1996 - 6/1997
General Correspondence #2 4/1996 - 11/1996
General Correspondence #1 11/1995 - 3/1996
Heery International - General Correspondence 11/1995 - 7/1997
Z.G.F. General Correspondence #6 4/1997 - 9/1997
20Z.G.F. - General Correspondence #5 1/1997 - 3/1997
Z.G.F. - General Correspondence #4 9/1996 12/1996
Z.G.F. General Correspondence #3 7/1996 - 8/1996
Z.G.F. - General Correspondence #2 3/1996 - 6/1996
Z.G.F. - General Correspondence #1 1 10/1995 - 2/1996
Z.G.F Contract 12138 #2 9/1996 - 5/1997
Z.G.F. Contract 12138 #1 10/1995 - 8/1996
Second Draft Report 1 12/1995
Z.G.F. - Campus Infrastructure Work Preliminary Design - Estimation of Probable Construction Cost 2/1996
Campus Infrastructure Project Program - Prepared by Project Planning Committee 2/1996
 
TWO ACADEMIC BUILDINGS
Budget - Empty
Attorney General Correspondence - Empty
Project Planning Committee 2/1996
General Correspondence E-Mail 1/1996 - 6/1997
General Correspondence #3 4/1996 - 5/1996
General Correspondence #2 4/1996 - 3/1996
General Correspondence #1 1/1995 - 3/1996
Z. G. F. - General Correspondence #1 6/1995 - 1/1998
Z.G.F. - CO#l 12147 11/1995 - 3/1998
 
21USGS VOLCANO LABORATORY
Budget 8/1996
Regents 8/1996
Project Planning Committee 9/1995 - 6/1996
Attorney General Correspondence 8/1995 - 2/1997 RESTRICTED
General E-Mail Correspondence 3/1995 - 2/1998
General Correspondence #3 11/1996
Z.G.F. E-Mail #1 4/1996 5/1997
Z.G.F. General Correspondence #2 11/1996 - 8/1998
Z.G.F. Contract CO 12178 #1 1/1996 - 7/1997
General Correspondence #2 4/1996 - 1 0/1996
General Correspondence #1 10/1992 - 3/1996
Z.G.F. General Correspondence 3/1995 - 10/1996
Estimate for Probable Construction Cost for USGS Cascades Volcano Observatory
Program Requirements
 
HILLTOP HOUSING PROJECT
Regents 9/1996
E.I.S. 6/1996
General E-Mail 8/1996
General Correspondence 7/1995 - 5/1997
Long General Correspondence 9/1996
Ground Lease Housing Development Application Providence Court Partners
Long Association LLC. - Response to Requests for Information for the Ground Lease
 
HOLLLINGBERY FIELDHOUSE RENOVATION
Regents - Empty
Project Planning Committee - Empty
General Correspondence 8/1997 - 8/1999
Hollinghery General Folder Un-Named 8/1996
22Housing Development of Student Housing Facilities at WSU
Ground Lease Housing Proposal /Providence Court Partners
Ground Lease Housing TRIAD Development Inc.
 
JOINT CENTER FOR HIGHER EDUCATION
Budget - Empty
Regents - Empty
BEST Study 10/1996
Project Planning Committee
General C-Mail 1/1996
Integrus Architecture. Executive Committee Minutes 1/1995 - 8/1997
Integrus - General Correspondence 12/1995 - 5/1998
General Correspondence 9/1995 - 1/1998
Pinnacle - Realty Management Package
PinnaclE-Monthly Financial Statement 5/1996
 
FACILITIES SERVICES CENTER
Kruegel/McAllister Residence Halls - SCM Consultants Correspondence 4/1990 - 4/1993
UnMarked Folder Architect Correspondence 2/1992 - 4/1993
General Correspondence 4/1996
 
FACILITY CONDITION SURVEY KRUEGEL/McALLISTER
Budget 4/1990
Burke/Lee Correspondence 3/1990
SCM Consultants - Contract # 10153 3/1990 - 7/1990
SCM Consultants - Contract # 11063 9/1991 - 2/1993
 
CONSULTANT SELECTION
23Carpenter - McCoy - Neill Hall: Architect Selection + Letter of Interest NBBJ Interview Evaluation Forms 1986
Dairy Forage Facility - Interview Evaluations Pullman 1986
Food - Human Nutrition Facility Phase II + NAC letter of Interest - Interview Evaluation Forms 1987
Holland Library Addition & Renewal Interview Evaluation Forms + Letter of Interest from WMFL
Spokane Center - Interview Evaluation Forms + WMFL Letter of Interest
Tn - Cities Center Addition - Interview Evaluations + Letter of Interest from McKinley
Veterinary Teaching Hospital - Evaluation 1987
Veterinary Teaching Hospital - Diagnostic Center - Evaluation 1987
Consultant Selection/3rd Package #3 1991
Consultant Selection/3rd Package #2 - General Correspondence
Consultant Selection/2nd Package (4 Projects) 1991
Projects: Coliseum Asbestos Removal
Childcare Facility
Wilson Hall Renewal
Residence Hall Fire Sprinklers Systems
Student Services Building - To French Administration Building
Records Maintenance Material Storage
South Fairway Intramural Fields
Hazardous. Pathological, Radioactive Waste Handling Facilities
Veterinary Teaching Hospital Misc. Correspondence
Holland Library Addition - Miscellaneous Correspondence 1991
USDA Greenhouse. Head house - Master plan
Animal Sciences Laboratory Building - WSU Consultant Selection Second Package 1991
 
MISCELLANEOUS
24Pullman Memorial Hospital - Power Operated Entry Doors 10/1991
New University Water Well No. 7 10/1987
City Entry Sign 6/1982
City of Pullman Capital improvement Program (C.I.P.) 4/1989
Veterans Memorial (Bldg.No. 791) 3/1992
Burger King (Colorado/D Street) Bldg.No.831 10/1988
Daggy Hall - Audiometric Booths - Handicapped Accessible (Bldg.No.808) 6/1985
Tennis Courts (Bldg.No. 31 9C) 4/1982
Buckley Lagoon (WWREC) - Bldg.No. 1510 10/1986
WSU - Depot (Visitor Information Center) Bldg.No. 830 2/1989
Consultant Selection
Vancouver - Phase I Campus Development - Project Submittals 1991
Student Services Addition - Project Submittals 1991
Hazardous Waste (Pathological/Radioactive Handling Facility Records, Maintenance Materials Storage & Recycling, Phase I (Archos) 1991; South Fairway Intramural Field (Carothers) 1991; Asbestos Removal - Coliseum (Alpha) 1991; Residence Hall Fire Sprinkler System (Jensen) 1991
Consultant Selection - Plant Growth Facility 1991
Consolidated Information Center - Tri-Cities Consultant Selection (Integrus) 1993
Greenhouse Replacements Puyallup - Consultant Selection (Stafford Architects)1 993
ICNE Nursing Center - Yakima - Consultant Selection (Integrus) 1993
Animal Sciences Laboratory. Second Package Interview of Finalists/General Correspondence: Bouillon Christofferson & Schairer Inc.; MBT; Mahlum Nordfors McKinley Gordon; Northwest Architectural Company. 9/1991
WSU Spokane - Building Plan 7/1988

Archives 272
Capital Planning
Building Files, 1962-2003.

ACQUISITION AND PROCESSING INFORMATION

These records were transfered to Manuscripts, Archives, and Special Collections from Capital Planning on May 25, 2005 (UA 2005-07). The records were processed by Tim Mace and University Archivist Mark O'English in early 2009.

EXTENT/QUANTITY INFORMATION

Number of containers: 46 boxes
Linear feet of shelf space: 45

COLLECTION DESCRIPTION & ARRANGEMENT

The collection consists of correspondence and contracts relating to several WSU construction projects from the late 1990s. The collection is held in its original order, consisting of several series organized by building (there appears to be no discernible order to the buildings).

PREFERRED CITATION

The suggested citation for the collection is:

[Item Description]
Capital Planning Building Files, 1962-2003 (UA 272)
Manuscripts, Archives, and Special Collections
Washington State University Libraries
Pullman, WA

Box Description
 
Consolidated Information Center (C.I.C.). Building No. 9512
1Budget 8/1993 - 10/1997
E.I.S. 4/1989 - 4/1999
Regents Reports 9/1993 - 9/1998
Public Records Request 4/1996 - 9/1996
Attorney General Correspondence 3/1996 - 1/1999 RESTRICTED
Disputes Review Board - General Corresp 1/1996 - 2/1997
Disputes Review Board - Three Party Agreement #12204
Landscaping Claim 7/1997
James P. Donaldson - Construction Consulting 5/1996 - 2/1997
Robert Fossatti Associates 8/1994 - 9/1995
Steven M. Gold blatt CO # 12204 3/1996 - 2/1997
Ruth I. Johnson 12/1995 - 6/1998
The Red icheck Firm CO # 11621 7/1995 - 8/1995
Howard Consultants, Inc.! Strata CO # 12210 12/1995 - 8/1996
Time & Cost Management CO # 12156 11/1995 - 8/15
Time & Cost Management General Corresp. #5 6/1997
Time & Cost Management - Non Conformance Reports 5/1996 - 7/1997
HCI Howard Consultants, Inc./Strata Inspection & Test Reports 2/1996 - 4/1997
Value Engineering Study 8/1994 - 12/1994
Geotechnical Report 12/1994
Project Planning Report 1/1992 - 11/1994
Building Plan 5/1994
Daily Construction Reports (Time & Cost Management) #3 1/1997 - 8/1991
General E-Mail Correspondence #1 8/1995 - 8/1999
General Correspondence #7 1/1997 - 6/1999
2Integrus Architecture E-Mail #1 5/1996 - 3/1999
Integrus Architecture - Requests for Information 12/1995 - 8/1997
Integrus Architecture - Construction Meeting Minutes 12/1995 - 6/1997
Integurs Architecture - General Correspondence 1/1998 - 4/2000
Contractors Northwest, Inc. - E-Mail Correspondence 12/1997 - 10/1998
Contractors Northwest, Inc. #6 6/1997 - 8/2003
Contractors Northwest, Inc. - Certified Payroll #1 6/1996 - 7/1996
Non - Numbered Change Proposals 4/1996 - 9/1997
Change Proposals # 167 - 121
3Contractors Northwest Change Proposals # 1 - 120
Rejected Bids (Bid Opening 10/17/1995)
4Time & Cost Management - General Correspondence #4 11/1996 - 6/1997
Time & Cost Management - General Correspondence #3 5/1996 - 11/1996
Time & Cost Management - General Correspondence #2 3/1996 - 4/1996
Time & Cost Management - General Correspondence #1 10/1995 - 2/1996
Time & Cost Management - Daily Construction Reports #2 6/1996 - 12/1996
Time & Cost Management - Daily Construction Reports #1 12/1995 - 5/1996
General Correspondence #6 4/1996 - 12/1996
General Correspondence #5 11/1995 - 3/1996
General Correspondence #4 8/1995 - 10/1995
General Correspondence # 3 3/1995 - 7/1995
5General Correspondence #2 3/1994 - 2/1995
General Correspondence #1 2/1993 - 3/1994
Integrus Architecture General Correspondence # 9 8/1997 - 12/1997
Integrus Architecture General Correspondence # 8 2/1997 - 8/1997
lntegrus Architecture General Correspondence # 7 8/1996 - 2/1997
Integrus Architecture General Correspondence # 6 3/1996 - 7/1996
Integrus Architecture General Correspondence # 5 11/1995 - 2/1996
Integrus Architecture General Correspondence # 4 9/1995 - 10/1995
Integrus Architecture General Correspondence # 3 1/1995 - 8/1995
6Integrus Architecture General Correspondence # 2 10/1994 - 10/1994
Integrus Architecture General Correspondence # 1 1/1993 - 9/1994
Integrus Architecture Contract Payment #3 6/1996 - 6/1998
Integrus Architecture Contract Payment #2 3/1995 - 5/1996
Integrus Architecture Contract Payment #1 1/1994 - 2/1995
Contractors Northwest General Corresp. #5 4/1997 - 5/1997
Contractors Northwest General Corresp. (All Star Corresp.) #5 4/1/1997 - 4/30/1997
Contractors Northwest General Corresp. #4 11/1996 - 3/1997
Contractors Northwest General Corresp. #3 8/1996 - 10/1996
7Contractors Northwest General Corresp. #2 2/1996 - 7/1996
Contractors Northwest General Corresp. #1 10/1995 - 1/1996
Contractors Northwest Contract #1 10/1995 - 4/1997
 
Chemical Storage Building. Eastlick 82A, Wegner 45, Engineering (Sloan) 78
8Budget 7/1993 - 9/1995
Building Planning Committee 10/1993 - 12/1993
General Correspondence #2 6/1994 - 3/1995
Bovey Northwest, Inc. - Contract CO 10798 10/1991 - 6/1994
Bovay Northwest General Corresp. #2 5/1994 - 1/1995
Bovay Northwest General Corresp. # 1 10/1993 - 4/1994
General Correspondence # 1 7/1993 - 5/1994
 
Chemical Waste Collection Sites. Eastlick 82A, Wegner 45, Engineering (Sloan) 78
Budget 10/1993 - 9/1998
E.l.S. 8/1994 - 9/1998
Regents Report 5/1994 - 9/1998
Professional Services Industries CO # 12206 11/1994 - 1/1997
Fossatti Associates 12/1994 - 9/1995
Professional Services Industries - Concrete Test Reports 5/1996 - 2/1997
Program Planning Committee 10/1993
Construction Meeting Minutes (Vet.Med.) 12/1997 - 6/1998
General E-Mail #1 12/1995 - 4/1998
General Correspondence # 3 1/1997 - 10/1998
Bovay Northwest Inc. E-Mail #1 6/1996
Bovay Northwest Inc. - General Correspondence #7 1/1998 - 2/1999
Bovay Northwest #2 - CO # 10798 9/1996 - 4/1999
Bouten General Correspondence #1 11/1995 - 10/1997
Bouten Construction #1, CO 12150 10/1995 - 2/1997
Mike Coman General Correspondence #1 10/1997 - 12/1998
Mike Coman Construction (College of Veterinary Med.) CO 12798 10/1997 - 9/1998
Mike Coman Contract Change Proposals 1,4 - 5 - 1 1
Bouten Construction Co. - Contract Change Proposal 29r - 24
9Bouten Construction Change Proposals 23 - 1
Rejected Bids - Bid Opening (College of Veterinary Medicine) 10/1997
Rejected Bids - Bid Opening 10/1995
General Correspondence #2 10/1995 - 12/1996
General Correspondence # 1 7/1993 - 9/1995
Bovay Northwest General Corresp. #6 5/1996 - 12/1997
Bovay Northwest General Corresp. #5 2/1996 - 4/1996
Bovay Northwest General Corresp. #4 6/1995 - 1/1996
Bovay Northwest General Corresp. #3 12/1994 - 5/1995
10Bovay Northwest General Corresp. #2 7/1994 - 11/1994
Bovay Northwest General Corresp. # 1 10/1993 - 6/1994
Schematic Design Brochure - Vet Complex 9/1996
Schematic Design Brochure - Eastlick Hall, Wegner Hall, Engineering Complex, and Silver Recovery Units Preliminary Design Brochure - Fulmer Hall Chemical Waste 11/1994
Preliminary Design Brochure - Fulmer Hall Chemical Waste 6/1994
 
Classroom Auditoria Building (Closed project. No building # assigned)
Budget 10/1992 - 5/1993
Regents 1/1992 - 5/1994
Building Meeting Minutes 1/1992 - 5/1992
Burke/Lee Correspondence 4/1991 - 11/1992
Classroom Auditoria/Univ. Center Subcommittee Mtg. minutes #1 1/1972 - 4/1992
General Correspondence #2 1/1992 - 11/1994
The Callison Partnership General Correspondence #2 6/1992 - 6/1993
The Callison Partnership Agreement, Pavement - CO 10973 2/1992 - 12/1992
The Callison Partnership Agreement, #1 1/1992 - 5/1992
General Correspondence #1 12/1991
 
Compost Facility. Building No. 359
Budget (empty folder)
E.I.S. 4/1993 - 9/1998
Building Committee 9/1992 - 1/1997
General Correspondence #1 10/1992 - 10/1997
Burke/Lee Correspondence 11/1992
 
Plant Growth Wheat Research Center. Building No. 1040
11Budget 1/1997 - 5/1998
Regents 4/1994 - 9/1998
Attorney General Correspondence 11/1995 - 2/1997 RESTRICTED
Disputes Review Board - General Correspondence 9/1996 - 7/1997
Federal Grant Correspondence #2 1/1996 - 4/2001
DRB Contract CO# 12540 5/1997
DRB 5/1997 - 6/1997
Fossatti CO# 6060 1/1995
Frank Noble CO# DRB 11/1996 - 5/1997
Conviron Inc. 3/1997 - 3/1998
Strata Geotechnical Engineering & Materials Testing C0#12380 6/1996 - 6/1997
Strata Plant Growth Wheat Research Facility File: WASUNI - M9602A CO 12380
Giflord Consultants, Inc. - Geotechnical Report 9/1995
Project Planning Committee #1 2/1994 - 10/1996
Daily Construction Reports #1 11/1996
General Correspondence #3 10/1996 - 12/1999
General Correspondence E-Mail 9/1997
Tan Heyamoto Architects - General Correspondence #5 12/1996 - 2/1999
Calculations 7/1996 - 12/1996
Tan Heyamoto Architects - Design Clarifications 8/1996 - 7/1997
Tan Heyamoto Architects - Daily Inspection Reports 3/1997
12Tan Heyamoto - Requests for Information #2 5/1997 - 10/1997
Tan Heyamoto - Submittals #1 8/1996 - 7/1997
Tan Heyamoto - Contract Payments #1 7/1994 - 1/1999
Schedules #1 - 8/1996
Construction Meeting Minutes #1 8/1996 - 8/1997
Lydig Construction General Correspondence #2 1/1998 - 12/1999
Lydig Construction Contract #1 7/1996 - 4/1998
Lydig Construction, Inc. CO Change Proposals Numbers 90 - 56
13Lydig Construction, Inc. CO Change Proposals Numbers 55 - 001
Rejected Bids - Bid Opening Jun 25 1996 6/1996
Close Out 1/1998 - 6/1999
Strata Geotech Engr. & Mat. Testing Reports Concrete Test reports # 1 9/1996 - 3/1997
Calculations #1 2/1996 - 6/1996
14Close out File #1 3/1997 - 12/1997
Federal Grant Correspondence # 1 12/1994 - 12/1995
Tan Heyamoto Architects Requests for Information #1 9/1996 - 5/1997
General Correspondence #2 10/1995 - 9/1996
General Correspondence #1 4/1992 - 9/1995
Tan Heyamoto Architects General Corresp. #4 5/1996 - 11/1996
Tan Heyamoto Architects General Corresp. #3 3/1996 - 4/1996
Tan Heyamoto Architects General Corresp. #2 10/1995 - 2/1996
Tan Heyamoto Architects General Corresp. #1 5/1994 - 9/1995
Lydig Construction, Inc. General Corresp. #1 6/1996 - 12/1997
 
Todd Hall Renewal. Building No. 55A
15Budget 4/1992 - 3/1997
Regents Reports 6/1991 - 4/1996
Halvorson, Beach & Bower 3/1995
Agra Earth & Environmental CO #11569 2/1994 - 9/1994
Burke/Lee Associates Correspondence 12/1990 - 8/1992
Robert Fossatti Associates 11/1993 - 9/1996
Mahan & DeSalvo Correspondence 11/1991 - 9/1993
Building Committee 10/1989 - 3/1995
Construction field Reports 6/1994 - 4/1995
Professional Service Industries - Concrete Testing 4/1994 - 6/1995
Wind Tunnel Report 10/1993 - 2/1996
Henry Klein Partnership - Design Clarification/Verification Reg. 5/1995 - 8/1995
E-Mail Correspondence 9/1995 - 7/1998
General Correspondence 8/1996 - 7/1999
Henry Klein Partnership - Architect Correspondence 5/1991 - 3/1997
Lydig Construction, Inc. - Contract CO’S Pay Ests. 8/1995 - 4/1996
Lydig Construction, Inc. - Contract Change Proposals Numbers 230 - 009
16Lydig Construction, Inc. Change Proposals Numbers 113 - 009
General Correspondence 12/1990 - 6/1992
General Correspondence 7/1992 - 7/1993
General Correspondence 8/1993 - 2/1994
General Correspondence # 4 3/1994 - 2/1995
General Correspondence #5 3/1995 - 6/1995
General Correspondence #6 7/1/1995 - 7/31/1995
General Correspondence #7 8/1/1995 - 7/31/1996
Todd Hall Renewal Building Program 5/1990
Henry Klein Partnership Design Clarification/Verification Reg. #3
17Henry Klein Partnership Design ClarificationNerification Reg. #2 9/1994 - 12/1994
Henry Klein Partnership Design Clarification/Verification Reg. #1 3/1994 - 8/1994
Henry Klein Partnership General Correspondence #8 9/1995 - 3/1997
Henry Klein Partnership General Correspondence #7 3/1995 - 8/1995
Henry Klein Partnership General Correspondence #6 6/1994 - 3/1995
Henry Klein Partnership General Correspondence # 5 2/1994 - 5/1995
18Henry Klein Partnership General Correspondence #1 12/1990 - 10/1992
Henry Klein Contract #10804 10/1991 - 12/1996
Henry Klein Partnership Agreement # 10193 5/1990 - 9/1991
Lydig Construction General Correspondence 2/1995 - 10/1996
Lydig Construction General Correspondence 1/1994 - 1/1995
Lydig Construction Pay Estimates, Change Orders. #6 1/1994 - 6/1995
Lydig Construction Pay Estimates, Change Orders. #5 1/1994 - 5/1995
Lydig Construction Pay Estimates, Change Orders. #4 1/1994 - 4/1995
Lydig Construction Pay Estimates, Change Orders. #3 1/1994 - 2/1995
Lydig Construction Pay Estimates, Change Orders #2 12/1994 - 2/1995
Lydig Construction Pay Estimates, Change Orders. #1 1/1994 - 11/1994
Rejected Bids 1/1994
Todd Hall Renewal Schematic Design 4/1992
Todd Hall Renewal Schematic Design 7/1992
Todd Hall Renewal Renovation Feasibility Study 5/1992
 
Glenn Terrell Mall. Building No. 790
19Regents 8/1993
Budget 1995
Burke/Lee Correspondence (Comprehensive Physical Planning Process) 03/1991 - 03/1992
E.l.S. 03/1993
Request for Information
Rejected Bids
Pending Change Proposals 9/2003
Atkinson Construction Company., Correspondence 7/1993 - 1/1995
Atkinson Construction Co., Contract, Pay applications #1 7/1993 - 1/1995
ALSC Construction Meeting Minutes 08/1993 - 11/2002
General Correspondence 12/1993 - 03/1997
AISC - Architect Correspondence 12/1992 - 2/1994
File Un - named #1 (General Correspondence) 9/1986 - 12/1992
ALSC Architects - General Correspondence 3/1994 - 5/1995
General Correspondence #2 1/1993 - 11/1993
 
Fulmer Hall Annex Building No. 003
20Budget 5/1992 - 7/1997
Regents 1/1993 - 7/1997
Public Information Requests 5/1/1999
Steven M. Goldblatt CO # 12117 9/1995 - 7/1996
James P. Donaldson CO# 1211 7 8/1995 - 10/1996
Patrick Sullivan 10/1995
Bovay Northwest, Inc. General Correspondence 6/1995 - 8/1997
Agra Earth & Environmental 10/1995 - 11/1996
Mahan & Desalvo 4/1992 - 5/1993
Robert Fossatti 7/1993 - 8/1
The Redicheck Firm CO # 11621 7/1994 - 9/1994
Value Engineering 8/1993
Meng Associates - Value Engineering Study
Fulmer Hall/Annex Renewal - Schematic Design Submittal
Fulmer Hall/ Fulmer Annex - Program Statement
Fulmer Hall Remodeling - Building Program Statement Phase II
NSF Grant Application 3/1993
Determination of Non - significance (E.l .S.) 9/1994
Building Committee Meetings 7/1991 - 9/1995
General Correspondence E-Mail #1 1/1994 - 2/1997
General Correspondence #7 8/1996 - 11/1997
Mahlum & Nordfors McKinley Gordon - Design Information Request #1 1/1994 - 12/1995
Mahlum & Nordfors McKinley Gordon - Construction Meeting Minutes 7/1995 - 10/1996
Mahlum & Nordfors McKinley Gordon - General Correspondence #9 12/1996 - 4/1998
Inland Construction Co. General Correspondence #2 3/1997 - 7/1998
Mahlum & Nordfors McKinley Gordon - Co 10921 3/1997 - 8/1998
21Inland Construction CO # 12000 5/1995 - 6/1997
Inland Construction Contract Change Proposals #109 - 001
22Palouse Empire Inc. Request for Equitable Adjustment for Fulmer Annex Renewal
Rejected Bids 6/1995
RZAAGRA, Inc. CO# 11569 6/1992 - 5/1994
RZAAGRA, Inc. CO #11569 6/1994 - 9/1995
General Correspondence #6 6/1995 - 7/1996
General Correspondence #5 7/1994 - 5/1995
General Correspondence #4 12/1993 - 6/1994
General Correspondence #3 1/1993 - 11/1993
Mahlum & Nordfors Mckinley Gordon General Correspondence #8 11/1995 - 11/1996
Mahlum & Nordfors Mckinley Gordon General Correspondence #7 4/1995 - 10/1995
23Mahlum & Nordfors Mckinley Gordon General Correspondence #6 7/1994 - 3/1995
Mahlum & Nordfors Mckinley Gordon General Correspondence #5 1/1994 - 6/1994
Mahlum & Nordfors Mckinley Gordon General Correspondence #4 9/1993 - 12/1993
Mahlum & Nordfors Mckinley Gordon General Correspondence #3 6/1993 - 8/1993
Mahlum & Nordfors Mckinley Gordon General Correspondence #2 11/1992 - 5/1993
Mahlum & Nordfors Mckinley Gordon General Correspondence #1 6/1991 - 10/1992
Mahlum & Nordfors Mckinley Gordon Contract No. 10921 #3 9/1995 - 2/1997
Mahlum & Nordfors Mckinley Gordon Contract No. 10921 #2 11/1994 - 8/1995
24McKinley & Nordfors McKinley Gordon Contract No. 10921 #1 1/1992 - 9/1994
Inland Construction Requests for Information #2 11/1995 - 12/1996
Inland Construction Requests for Information #1 7/1995 - 10/1995
Inland Construction General Correspondence #1 5/1995 - 2/1997
Inland Construction General Correspondence #2 1/1992 - 2/1993
General Correspondence #1 8/1991 - 12/1991
 
Veterinary Teaching Hospital. Building No. 818
25Professional Services Industry #2 6/1994 - 8/1994
Professional Services Industry #1 1/1994 - 5/1994
Construction Diary Reports #1 8/1991 - 1/1996
General Correspondence #15 4/1996 - 10/1996
General Corresp. #14 9/1995 - 3/1996
General Corresp. #13 1/1995 - 8/1995
General Corresp. #12 7/1994 - 12/1994
26General Correspondence #10 9/1993 - 2/1994
General Corresp. #9 3/1993 - 8/1993
General Corresp. #8 6/1992 - 2/1993
General Corresp. #7 4/1992 - 5/1992
General Corresp. #6 8/1991 - 3/1992
General Corresp. #5 5/1991 - 7/1991
General Corresp. #4 3/1991 - 4/1991
General Corresp. #3 4/1990 - 2/1991
27General Corresp. #2 1/1989 - 3/1990
General Corresp. #1 7/1987 - 12/1988
DeNeff Deeble Barton Associates General Corresp. #20 12/1996 - 1/1997
DeNeff Deeble Barton Associates General Corresp. #19 10/1996 - 1/1997
DeNeff Deeble Barton Associates General Corresp.#18 6/1996 - 9/1996
DeNeff Deeble Barton Associates General Corresp.#17 3/1996 - 5/1996
DeNeff Deeble Barton Associates General Corresp.#16 12/1995 - 2/1996
DeNeff Deeble Barton Associates General Corresp.#15 9/1995 - 11/1995
DeNeff Deeble Barton Associates General Corresp.#14 6/1995 - 8/1995
DeNeff Deeble Barton Associates General Corresp.#13 3/1995 - 5/1995
28DeNeff Deeble Barton Associates General Corresp. #12 11/1994 - 2/1995
DeNeff Deeble Barton Associates General Corresp. #11 9/1994 - 10/199????????
DeNeff Deeble Barton Associates General Corresp.#10 6/1994 - 8/1994
DeNeff Deeble Barton Associates General Corresp. #9 4/1994 - 5/1994
DeNeff Deeble Barton Associates General Corresp. #8 1/1994 - 3/1994
DeNeff Deeble Barton Associates General Corresp. #7 7/1993 - 12/1993
DeNeff Deeble Barton Associates General Corresp. #6 3/1993 - 6/1993
Pending Change Proposals 10/2008 - 7/1994
29DeNeff Deeble Barton Associates General Corresp. #5 8/1992 - 2/1993
DeNeff Deeble Barton Associates General Corresp. #4 11/1991 - 7/1992
DeNeff Deeble Barton Associates General Corresp. #3 4/1991 - 10/1991
DeNeff Deeble Barton Associates General Corresp. #2 3/1990 - 3/1991
DeNeff Deeble Barton Associates General Corresp #1 8/1987 - 2/1990
DeNeff Deeble Barton Assoc. Contract, Pay Est. #5 5/1996 - 1/1997
DeNeff Deeble Barton Assoc. Contract, Pay Est. #4 4/1995 - 5/1996
DeNeff Deeble Barton Assoc. Contract, Pay Est. #3 5/1992 - 3/1995
DeNeff Deeble Barton Assoc. Contract, Pay Est. #2 2/1990 - 4/1992
30DeNeff Deeble Barton Associates Contract NO.9152 #1 1/1988 - 12/1988
DeNeff Deeble Barton Associates Construction Meeting Minutes #1 10/1993 - 12/1995
Morgan & Oswood Construction Co. Requests for Clarification 11/1993 - 12/1994
Morgan & Oswood Construction Co. General Corresp. #3 3/1996 - 1/1997
Morgan & Oswood Construction Co. General Corresp. #2 1/1995 2/1996
Morgan & Oswood Construction Co. General Corresp. #1 6/1993 - 12/1994
Morgen & Oswood Construction Co. Contract #9 3/1995 - 12/1996
31Morgen & Oswood Construction Co. Contract #8 10/1995 - 2/1996
Morgen & Oswood Construction Co. Contract #7 5/1995 - 11/1995
Morgen & Oswood Construction Co. Contract #6 9/1994 - 7/1995
Morgen & Oswood Construction Co. Contract #5 3/1995 - 6/1995
Morgen & Oswood Construction Co. Contract #4 11/1994 - 11/1995
Morgen & Oswood Construction Co. Contract #3 8/1994 - 10/1994
Morgen & Oswood Construction Co. Contract #2 3/1994 - 6/1994
Morgen & Oswood Construction Co. Contract #1 8/1993 - 2/1994
32Site Grading - Motley & Motley Corresp. #1 8/1991 - 1/1992
Motley & Motley Contractors Contract Payments, C.O.#1 7/1991 - 1/1992
Note Book Contract Info. Inserts Tabs: Inland Coatings Inc. Aztec Electric, Inc. McClintock & Turk, Inc.
Rejected Bids - General/Rebid Opening 8/12/1993
Rejected Bids - Electrical (Opening) 5/4/1993
Rejected Bids - Mechanical (Opening) 5/4/1993
Issues & Claims 3/1996 - 4/1996 RESTRICTED
Issues & Claims 11/1996 - 12/1996 & 5/1996 RESTRICTED
Issues & Claims 11/1996 - 12/1996 RESTRICTED
Phase I: Site Grading Rejected Bids 7/1991
Rejected Bids Phase II - General Opening #2 5/1993
Rejected Bids Phase II - General Opening #1 5/1993
33Construction Diary Reports 2/1996 - 6/1996
DeNeff Deeble Barton Associates Construction Mtg. Minutes #2 1/1996 - 5/1996
Deneff Deeble Barton Associates General Corresp. #21 3/1997 - 3/1998
Deneff Deeble Barton Associates Consultant’s Site Visitation Reports #1 4/1994 - 4/1997
Allotment Request for Construction 4/1993
Equipment/Furnishings 1/1994
Morgen & Oswood Construction Contract, Payment, Co’s #10 3/1996 - 10/1996
Morgen & Oswood Construction #1 General Corresp # 1 12/1996 - 7/1998
Morgen & Oswood Construction Certified Payroll Reports #1 - 44 6/1994 - 10/1994
Morgen & Oswood Construction Request for Clarification 1/1995 - 4/1996
Morgen & Oswood Construction Contract Change Proposals (missing many) #171 - 15
Pending Change Proposals 10/1994 - 4/1995
34Building Committee Meetings 9/1987 - 11/1993
Design Development
Problems & Pitfalls in Water Treatment Specifications Cooling Tower Institute 2/1990
Pitting Corrosion of Cooling Water Systems
The Impact of Environmental Considerations on Corrosion Control Economics & Technology
Fingerprints of Errors - Failures in Cooling Water Systems
“Water in Boilers - A Retrospective & A Perspective”
Practical Consideration in High Cycle Cooling Water Operations 2/1992
Microbiologically Influenced Corrosion: A State of the Art Technology
Some Guidelines for Optimizing the Operation of Raw Water Cooling Systems
Fail Safe Cooling Water Operations 2/1991
Drinking Water System Components - Health Effects
MW Consulting Engineers - General Corresp. #1 10/1993 - 10/1994
Tomasi - Dubois & Associates General Corresp. 7/1997 - 11/1998
Professional Services Industries Inc. #3 11/1994 - 12/1997
Wyatt jaykim Engineers 11/1990 - 8/1992
Privileged Information 2/1996 - 5/1997
Bidding Information 5/1993 - 8/1993
E-Mail Correspondence #1 2/1996 - 9/1998
General Correspondence # 16 11/1996 - 8/1998
35Budget 3/1989 - 9/1998
E.I.S. 3/1991 - 6/1997
Regents Reports
Public Records Request 2/1996 - 6/1997
Attorney General Corresp. 1/1997 - 9/1997 RESTRICTED
Issues & Claims RESTRICTED
Notebook: Phase II, WSU Veterinary Teaching Hospital Revised Claim for additional Compensation 11/1996
Disputes Resolution Board 7/1994 - 10/1995
Burke/Lee A joint Venture 12/1987 - 9/1991
Long & Associates 5/1997 - 11/1997
Paul E. Pederson Agreement No. 12115 1/1997 - 5/1997
Robert Fossatti Associates 7/1993 - 9/1993
URS Consultants, Inc. 2/1996 - 1/1997
Heery Correspondence 8/1990 - 5/1994
Mahan & DeSalvo 3/1990 - 9/1993
Cooling Coils Issues 12/1996 - 8/1997
MW Consulting Engineers - Protection Study 6/5/1992
Value Engineering and Constructability Review 5/1992
Geotechnical Report 2/1991
 
Greenhouse Replacements WWREC Puyallup. Building No. 1034
36Budget 5/1999
E.l.S 5/1995
Regents 10/1997
Construction Testing Laboratories, Inc. CO No. 12241 7/1996
Robert Fossatti & Associates General Corresp. 3/1995
SCM Consultants 8/1995 - 9/1995
SCM Consultants, Inc. - Toxic Leaching Characteristic Procedure 10/1995
SCM Consultants, Inc. - Lead Based Paint Survey 4/1995
Construction Testing Laboratories In. Testing Reports 7/1996 - 3/1997
Program Planning Committee 7/1994 - 7/1994
Moza Construction, Inc. - Contract 3 General Correspondence #1 5/1995 - 6/1995
Christopher Stafford Architects, Inc. #3 General Correspondence #3 10/1996 - 8/1998
The Stafford Architects, Inc. Co. 3/1994 - 4/1997
MOZA Construction, Inc. Co. Pay Estimates #1 10/1995 - 2/1996
John Korsmo Construction, Inc. CO 1 Headhouse & Site Improve. #1 5/1996 - 10/1997
General Correspondence Co. #2 Co. #2 1/1996 - 11/1997
John Korsmo Construction inc. - Co. #1 5/1996 - 7/1997
John Korsmo Contract Change Proposals No. 20 - 01
Rejected Bids - Co. 1 Headhouse & Site Improvement - Bid Opening 4/18/1996
Hartford Contracting, Inc. Co #2 Greenhouse 5/1996 - 2/1999
General Correspondence #2 5/1996 - 2/1999
Stafford Harris, Inc. General Correspondence #2 1/1996 - 9/1996
The Stafford Architects, Inc. General Correspondence. #1 3/1994 - 11/1995
 
Student Services Addition. Building No. 6504
37Budget 4/1992 - 5/1999
Regents 6/1991 - 9/1996
E.I.S.
Attorney General Correspondence #1 4/1996 RESTRICTED
Burke/Lee Correspondence 5/1991 - 6/1991
Robert Fossatti Associates 9/1993 - 1/1997
The Mahan Partnership 10/1992 - 2/1993
The Redicheck Firm - Amends & Ext. Serv. Contr. 11621 3/1994 - 4/1994
Value Engineering Study 10/1993
Construction Reports #1 9/1994
Geotechnical Report 10/1992
Building Committee Minutes 4/1991 - 8/1994
General E-Mail Correspondence #1 8/1996 - 2/1997
General Correspondence #7 9/1996 - 6/1997
Mahlum & Nordfors McKinley Gordon General Correspondence #10 4/1996 - 9/1996
Preliminary Estimate for Student Services Addition Prepared 6/1991
Construction Meeting Minutes 9/1994 - 2/1996
Lydig Construction General Correspondence #2 8/1996 - 3/1997
Lydig Construction Contract 9/1995 - 4/1997
Mahlum & Nordfors Mckinley Gordon Contract 8/1996 - 3/1997
Lydig Construction Change Proposals #'s 51 - 001
38Rejected Bid Summaries (Bid Opening July 12, 1994)
SSA Sound
SSA Directories & Signs 9/1996 - 1/1997
General Correspondence #6 6/1995 - 7/1996
General Correspondence #5 6/1994 - 5/1995
General Correspondence #4 2/1994 - 4/1994
General Correspondence #3 10/1993 - 2/1994
General Correspondence #2 3/1992 - 9/1993
General Correspondence #1 2/1990 - 2/1992
Mahlum & Nordfors McKinley Gordon General Correspondence #9 7/1995 - 3/1996
Mahlum & Nordfors McKinley Gordon General Correspondence #8 7/1994 - 6/1995
Mahlum & Nordfors McKinley Gordon General Correspondence #7 4/1994 - 6/1994
39Mahium & Nordfors Mckinley Gordon General Correspondence #6 2/1994 - 3/1994
Mahium & Nordfors McKinley Gordon General Correspondence #5 12/1994 - 1/1994
Mahium & Nordfors Mckinley Gordon General Correspondence #4 10/1993 - 11/1990
Mahium & Nordfors McKinley Gordon General Correspondence #3 8/1993 - 9/1993
Mahium & Nordfors McKinley Gordon General Correspondence #2 10/1992 - 7/1993
Mahium & Nordfors McKinley Gordon General Correspondence #1 6/1991 - 8/1993
Mahium & Nordfors McKinley Gordon Contract #1 9/1991 - 12/1994
Mahlum & Nordfors McKinley Gordon Contract #2 1/1995 - 7/1996
Lydig Construction Contract #2 6/1995 - 8/1995
Lydig Construction Contract #1 3/1994 - 4/1995
Lydig Construction General Correspondence # 1 6/1994 - 7/1996
 
Greenhouse Replacement WWREC Puyallup. Building No. 1034 (Continued From Box #36)
40Hartford Contracting Contract #2 2/1997 - 8/1996
Hartford Contracting Contract #1 5/1996 - 5/1997
Hartford Contracting Change Proposals #‘s012 - 001
Rejected Bids - Contract #2 (Bid Opening 4/18/1996)
General Correspondence #1 Contract #3 New Campus Elec. Upgrade 6/1995 - 7/1996
New Campus Elec. Upgrade - Rejected Bids (Bid Opening 6/23/1995)
General Correspondence #1 5/1993 - 4/1996
 
Miscellaneous
University Housing Apartment Project (Yakima Village - Building #680) Regents 1/1994 - 1/1996
Dairy Forage Facility Phase II (Building #1516) - Regents 1/1994 - 9/1995
Food Science Human Nutrition Phase II (Building #81 6) - Regents 1/1994
Records Maintenance Materials & Recycling (Building #357) Regents 6/1991 - 10/1994
 
ICNE - Yakima Permanent Facility. Building No. 9401
41Budget 4/1995 - 3/1995
E.I.S. 1/1995
Regents Reports 10/1992 - 9/1996
Attorney General Correspondence #1 12/1995 - 1/1996 RESTRICTED
Burke/Lee Architects 3/1993 - 9/2003
AGRA Earth & Environmental 3/1995
Bovay Northwest 11/1994 - 3/1995
Robert Fossatti Associates 12/1994 - 4/1995
Loofburrow Architects Contract # 11 955 3/1995 - 6/1996
GN Consulting Engineers Contract #11 987 5/1995 - 11/1995
Project Planning Committee 7/1993
GN Northen Consultants Concrete/Steel Reinforcing Test Reports 5/1995 - 11/1995
General E-Mail Correspondence 1/1996
General Correspondence 8/1995 - 5/1997
Integrus Architecture - General Correspondence #2 11/1995 - 12/1996
Moen - Garza - Lehman, Joint Venture Agreement 2/1995
ALSC Architects - Hollingbery Fieldhouse Concept Study 8/1997
Integrus Architecture - Construction Meeting Minutes 5/1994 - 5/1996
Integrus Architecture - Contract #1 10/1993 - 7/1996
Kranz Construction, Inc. - General Correspondence #1 2/1995 - 9/1996
Kranz Construction, Inc. - Contract #1 2/1995 - 9/1996
Kranz Construction Contract Change Proposals #‘s 065 - 16
42/43Kranz Construction Contract Change Proposals #'s 15 - 01
Rejected Bids 2/1995 - 4/1995
YAKIMA ICNE Balance Report Copy 3
ICNE - Yakima site studies (Draft)
General Correspondence #1 9/1992 - 7/1995
Integrus Architecture - General Correspondence 10/1993 - 10/1995
SITING 8/1992 - 11/1993
Site Information Overheads/Transparencies
Facilities Conditions Survey - Ad Annex, Commons, Van Doren Elec. General Correspondence
 
Family Student Housing Replacement
42/43Married Student Housing project - Budget 2/1982 - 12/1984
Burke/Lee Correspondence
E.l.S. 4/1983
General Correspondence 7/1980 - 2/1992
 
Foley Institute for Public Policy & Public Service at Thompson Hall. Building No. 001
General Correspondence #1 1/1995 - 10/1999
 
Animal Science Laboratory Building. Building No. 100
44Budget 10/1992 - 4/1999
E.I.S. 4/1994 - 6/1994
Regents Reports 10/1991 - 8/1994
HCI Howard Consultants, Inc./ Strata 7/1996 - 8/1996
HCI Howard Consultants, Inc. /Strata Concrete Test Reports 3/1996 - 4/1996
Professional Services Industries 11/1994 - 9/1996
Redicheck Firm Agreement Contract # 621 3/1995 - 5/1995
Robert Fossatti Associates Inc. 1/1994 - 6/1998
Geotechnical Report 6/1994 - 7/1994
HVAC Duct Problem General Correspondence 3/1997 - 6/1997
Wind Tunnel Study 8/1987
Sandblasting Correspondence 10/1996 - 9/1996
General Correspondence E-Mail 4/1996 - 8/1996
General Correspondence #3 1/1997 - 7/1998
General Correspondence #2 9/1995 - 12/1996
MBT Architecture General Correspondence #5 12/1996 - 4/1999
MBT Architecture General Correspondence #2 10/1994 - 6/1995
MBT Architecture Contract # 10907 Payments #2 3/1996 - 11/1997
MBT Architecture Contract # 10907 Payments #1 2/1992 - 4/1995
Lydig Construction, Inc. General Correspondence 9/1997 - 4/1998
Lydig Construction, Inc. Contract # 121 37/Pay Estimates 10/1995 - 9/1997
45Lydig Construction, Inc. Contract Change Proposal # 93 - 69 6/1997 - 12/1996
Lydig Construction, Inc. Contract Change Proposal # 67 - 65 7/1997 - 12/1996
Lydig Construction, Inc. Contract Change Proposal # 63 1/1997
Lydig Construction, Inc. Contract Change Proposal # 62 - 32 11/1996 - 7/1996
Lydig Construction, Inc. Contract Change Proposal # 30 - 1 6/1996 - 11/1995
Rejected Bids 10/1995 - 12/1995
ASC - Sound 2/1997 - 5/1997
Drawings
Energy Conservation Report/Life Sciences Cost Analysis 2/1995
46MBT Associates General Correspondence #1 1/1992 - 9/1994
MBT Associates General Correspondence #4 10/1995 - 12/1996
MBT Associates General Correspondence #3 7/1995 - 9/1995
Construction Documents Estimate by ACKROYD 8/1995
MBT Associates Architect Contract Payment 4/1995 - 7/1996
Lydig Construction, Inc. General Correspondence #1 9/1995 - 8/1997
MBT Architects - Schematic Design Submittal

Archives 273
Capital Planning
Building Files, 1957-1998.

ACQUISITION AND PROCESSING INFORMATION

These records were transfered to Manuscripts, Archives, and Special Collections from Capital Planning on February 10, 2004 (UA 2004-01). The records were processed by Tim Mace and University Archivist Mark O'English in early 2009.

EXTENT/QUANTITY INFORMATION

Number of containers: 32 boxes
Linear feet of shelf space: 31.5

COLLECTION DESCRIPTION & ARRANGEMENT

The collection consists of reports, plans, designs, and schematics relating to a large number of WSU Buildings; thgough a few earlier materials are included, the majority of the materials dates from the late 1980s to early 1990s. The collection is maintained in its original order, and loosely consists of two series in a close-to-alphabetical order.

PREFERRED CITATION

The suggested citation for the collection is:

[Item Description]
Capital Planning Building Files, 1957-1998 (UA 273)
Manuscripts, Archives, and Special Collections
Washington State University Libraries
Pullman, WA

Box Description
1College of Agriculture. Controlled Environment Laboratories and Growth Chambers. 1/1976.
Agriculture Sciences Building - Program Statement. Clark & Hulbert Halls. 11/1965.
Agriculture Sciences Building - Clark Hall Preliminary Design. 7/1968.
     Lloyd J. Lovegren & Associates Architects
Agriculture Sciences Building - Preliminary Design. 11/1969.
     Lloyd J. Lovegren & Associates Architects
Animal Disease Biotechnology Facility Value Engineering Design Development.12/1992.
     KIM & Associates, Ltd.
Animal Disease Biotechnology (ADBF) Facility Site Selection Study. 6/1991.
     Burke Lee Architects, Planners & Landscape Architects
ADBF - Design Development. 12/1992.
     Northwest Architectural Company
ADBF - Schematic Design Brochure. 6/1992.
     Northwest Architectural Company
ADBF - Program Statement. 1/1992.
ADBF Partial Specifications (Third Submittal). 12/1992.
     Northwest Architectural Company
ADBF - Construction Document Phase/Structural Calculation. Vol. I Final Submittal. 2/1994.
     Structural Design Northwest, Inc.
     Garrick A. Dung - Professional Engineer
ADBF - Construction Document Phase/Structural Calculation. Vol. II - Final Submittal. 2/1994.
     Structural Design Northwest, Inc.
     Garrick A. Dung - Professional Engineer
ADBF - Construction Document Phase/Structural Calculation. Vol. III - Final Submittal. 2/1994.
     Structural Design Northwest. Inc.
     Garrick A. Dung - Professional Engineer
ADBF - Architectural Specifications - Volume I of 2. 2/1992.
     Northwest Architectural Company
ADBF - Mechanical & Electrical Specification - Volume II of II. 3/1994.
     Northwest Architectural Company
2Alumni Center - Schematic Design Brochure.
     Northwest Architectural Company
Alumni Center - Interior Design. 4/1988.
     Northwest Architectural Company
Alumni Center - Furnishings Presentations. 7/1988.
     Northwest Architectural Company
Alumni Center - Specifications. 12/1987.
     Northwest Architectural Company
Athletic Facilities Study - ALSC Architects. 6/1996.
     ALSC Architects, P.S.
Animal Sciences Laboratory Building (ASLB) - Schematic Design Submittal.
     MBT Associates
ASLB Building - Schematic Design Submittal.
     MBT Associates
ASLB - Project Manual, Vol. I. Sec 0 - 14. 9/1995.
     MBT Architecture
ASLB - Project Manual, Vol. II. Sec 15 - 16. 9/1995.
     MBT Architecture
ASLB - Design Development Value Engineering. 11/1994.
     Ehninger Fetzer Tholen
ASLB - ***Revised*** Construction Documents Estimate. 8/1995.
     Ackroyd Cost Control Consultants
ASLB - Energy Conservation Report/Life Cycle Cost Analysis. 2/1995.
     Affiliated Engineers NW, Inc.
ASLB - Schematic Design Estimate (Final). 4/1994.
     Ackroyd Cost Control Consultants
ASLB - Addendum NO. 1. 9/1995.
     MBT Architecture
ASLB - Addendum NO. 2. 9/1995.
     MBT Architecture
ASLB - Addendum NO. 4. 10/1995.
     MBT Architecture
ASLB - Addendum NO. 5. 10/1995.
     MBT Architecture
Completion Of Laboratory - Central Animal Laboratory Facility. 5/1975.
     Barnard & Holloway, Architects
Veterinary Animal Holding & Quarantine Facilities Isolation Building Specification. 11/1979.
     Architects: Barnard & Holloway
     Mechanical: Rice & Lunh
     Electrical: Stingle - Atwood
Completion of Large Animal Isolation Facility - Specifications. 3/1982.
     Barnard & Holloway
The Architecture Interior Design Landscape Architecture Facility @ WSU Design Report. 5/1981.
     Architects: Adkison Leigh Sims Cuppage
     Design Associates: Simmer Gunsul Frasca Partnership.
     Landscape Architects: Jongejan Gerard McNeal
A Study of Alternative Sites - Architecture, Interior Design, Landscape Architecture Facility. 3/1980.
     Architects: Adkison Leigh Sims Cuppage
     Design Associates: Simmer Gunsul Frasca Partnership
     Landscape Architects: Jongejan Gerard McNeal
Avery Hall - English Building Phase 1. 11/1970.
     Architects: Fred Bassetti & Company
     Mechanical Engineers: Valentine, Fisher & Tomlinson
     Electrical Engineers: Beverly A. Travis & Associates
     Landscape Architects: Richard Haag Associates
3Multi Purpose Coliseum (Beasley) Program & Site Analysis. 12/1968.
     John Graham & Company - Architects/Planners/Engineers
Multi Purpose Coliseum Schematic Design. 4/1969.
     John Graham & Company - Architects/Planners/Engineers
Multi Purpose Coliseum - Preliminary Design. 10/1969.
     John Graham & Company - Architects/Planners/Engineers
Beasley Performing Arts Coliseum. Roof Structure Evaluation - Volume 1 Report. 5/1988.
     Peden Petersen Lee, R. S. Consulting Engineers
Beasley Performing Arts Coliseum. Roof Structure Evaluation - Volume 2 Calculations. 5/1988.
     Peden Petersen Lee, R.S. Consulting Engineers
Biosciences Building Phase II - Program. 11/1973.
Biosciences Building Phase II - Preliminary Design (Kolb & Stansfield). 7/1974.
Biosciences Building Phase II - Specifications (Kolb & Stansfield). 3/1975.
Biological Sciences Building (Eastlick) - Preliminary Presentation. 11/1959.
     Decker & Christenson AIA Architects
Bohler Gymnasium Addition - Predesign Study. 10/1992.
     Sasaki Associates, Inc.
     Stewart Associates
Bohler Gym Addition - Schematic Design. 11/1994.
     Architect: Sasaki Associates
     Associated Architect: Stewart Associates
     Structural & Civil Engineers: Summit Technology
     Mechanical Engineers: Notkin Engineering
     Electrical Engineers: Elcon Associates
     Cost Estimators: C3 Management Group
Bohler Gym Addition - 100% Design Development Submittal 1 of 2. 5/1995.
     Architect: Sasaki Associates. Inc.
     Mechanical Engineer: Notkin Engineering. Inc.
Bohler Gym Addition - 100% Design Development Submittal 2 of 2. 5/1995.
     Architect: Sasaki Associates, Inc.
Bohler Gym Addn. - Structural Calculations 1 of 2. 2/1996.
     Prepared by Summit Technology
Bohler Gym Add. - Structural Calculations 2 of 2. 2/1996.
     Prepared by Summit Technology
Bohler Gym Add. - Construction Bid Documents 1 of 2. 2/1996.
     Sasaki Architects, Inc.
Bohler Gym Add. - 100% Design Mechanical Calculations. 5/1996.
     Architect: Sasaki Associates, Inc.
     Mechanical Engineer: Notkin Engineering In.
Bohler Gym Renovation - Schematic Design Value Engineering. 6/1996.
     EFT Architects/Planners/Project Managers
Bohler Gym Renovation - Schematic Design. 6/1996.
     Sasaki Architects
Bohler Gym Add. - Load Calculations. 5/1996.
     Elcon Associates. inc.
Boiler No. 8 - Proposal for Engineering Services. 11/1975.
     Bovay Engineers, Inc.
Bryan Hall Remodel - Schematic Design Brochure. 7/1972.
     James & Hicks, Architects
     Rice & Luhn, Mechanical Engineers
     Joseph Dyole & Assoc. Electrical Engineers
     Atwood - Hinzman, Structural Engineers
4Child & Family Studies Center - Building Program. 10/1967.
Child Care Center - Bldg Assessments Report (Rogers Orton Dining Hall). 12/1991.
     The Tsang Partnership, Inc.
Child Care Center Building Program. 6/1991.
     The Tsang Partnership, Inc.
Child Care Facility - Design Development Phase. 7/1992.
     The Tsang Partnership. Inc.
Child Care Center - Schematic Design Phase Report. 1/1992.
     The Tsang Partnership, Inc.
Child Care Facility - Schematic Design. 4/1992.
     The Tsang Partnership. Inc.
Child Care Facility - Design Development Phase. 7/1992.
Child Care Facility Project Manual. 2/1993.
     Architect: The Tsang Partnership, Inc.
     Structural Engineer: Chulker, Putnam Collins & Scott, Inc.
     Mechanical Engineer: Thomas J. Gerard & Assoc.
     Electrical Engineers. Doyle Engineering, Inc.
Child Care Center Playground. Report of Subsurface Exploration & Geotechnical Studies. 4/1994.
     Gifford Consultants. inc.
Chemistry Building - Project Manual General Volume I of III. 6/1987.
     Architect: Brooks Hensley Creager Architects P.S.
     Landscape Architect: Hellstorm Associates
     Electrical Engineers: Doyle Engineering Inc.
     Vibration Consultants: Applied Dynamics Inc.
     Structural Engineers: Suden, Golden & Guest
     Mechanical Engineers: Thomas J Gerard & Associates Inc.
     Laboratory Consultants: Early Walls Associates
     Geotechnical Consultants: Shannon & Wilson, Inc.
Chemistry Building - Project Manual. Mechanical Specifications Volume II of III. 6/1987.
     Architect: Brooks Hensley Creager Architects P.S.
Chemistry Building - Project Manual. Electrical Specification Volume III of III. 6/1987.
     Architect: Brooks Hensley Creager Architects P.S.
Chemistry Building - Index/ Sec. 16000 - 16851.
Chemistry Building - Section 15010 - General Provisions.
Chemistry Building - Engineering Calculations.
     Brooks Hensley Creager Architects, P.S.
Chemistry Building - Schematic Design Documents. 11/1984.
     Brooks Hensley Creager Architects, P.S.
Chemistry Building - Schematic Design Documents. 9/1986.
     Brooks Hensley Creager Architects, P.S.
Chemistry Building - Pedestrian Corridor Design Development of College Avenue From Library Road to Stadium Way.
     Brooks Hensley Creager Architects P.S.
Chemistry Building - Site Study Selection. 3/1984.
     Burke/Lee A joint venture
5Specifications for a Crew Shellhouse. 2/8/1984.
Fulmer Hall: Chemical Waste Collection Site Facility. 6/24/1994.
Schematic Design Brochure: Chemical Waste Collection Sites - Vet Complex. 9/3/1996.
Schematic Design Brochure: Chemical Waste Collection Sites - Eastlick Hall, Wegner Hall, Engineering Complex and Silver Recovery Units. 11/18/1994.
Creamery Annex: Schematic Design Brochure. 11/10/1998.
Chemical Sciences Bld: Site Selection Study. 11/1980.
Chemistry Building: Program Statement. 3/1984.
Chemistry Building #3 Section 15010 - General Provisions.
Site Study: Cancer Research and Training Center. 11/1976.
Building Program, Preliminary Draft: Cancer Research and Training Center. 11/1976.
Proposal: Carpenter Hall Renewal. 5/1984.
Carpenter Hall Schematic Design. 4/24/1987.
Carpenter Hall Design Development. 10/16/1987.
Carpenter Hall Renewal Addendums. .
Centeral Chilled Water System. 1973 - 1974.
Centeral Water Chilling & Dist. A Feasibility Study. 1973 - 1974.
Centeral Campus Storm Sewer and Circulation Improvements Study. 4/1984.
Cleveland Hall. 10/1961.
Cleveland Hall, Addition to.
Department of Anthropology.
College Hall Renovation: Design Development. 1/1982.
College Hall.
Project Manual: College Hall Renovation. 8/12/1982.
Comp. Sci. Bld. Martin Academic/Stadium. 7/1971.
Computer Sciences - Mathmatics Building, Phase 1, Martin Stadium/Academic Center Phase II. 10/22/1976.
Schematic Design: Martin Stadium Academic Center Phase II Computer Science Building. 3/15/1975.
Computer Sciences - Mathmatics Building, Phase 1, Martin Stadium/Academic Center Phase II. 5/1976.
Open Plan Feasibility Study: Computer Sciences/Mathmatics Building. 4/1980.
Cancer Research: Preliminary Concepts (along side of box). 12/1976.
6Campus Downtown Pedestrian Corridor.
West Entrance Pedestrian Way - Specifications. 7/1986.
     Burke/Lee A Joint Venture Architects/Landscape Architects
Compton Union (Wilson) - Expansion Program Statement.
Compton Union Building - Technical Report. Graphical Results from a Telephone Survey of WSU Student. Faculty, & Staff on the Compton Union Building (CUB) and Campus Recreation Facilities. 9/1996.
SESRC (Social & Economic Sciences Research Center) Report # 96 - 22 (CUB6 # 1265).
Comparative Behavior Laboratory - Schematic Design Brochure “Addition to”. 1/1966.
     Victor Louis Wulff Architect. AIA & Associates
Colorado Street preliminary Design - Technical Memorandum. 10/1994.
     CH2M Hill Engineers Planners Economists Scientists
Commons Remodeling Program for Ground Floor. Listings of Projected Uses & Requirements. 5/1971.
Dairy Forage Facility - Master Plan. 11/1988.
     The BJSS Group Architecture & Planners AIA
Dairy Forage Facility - Schematic Design Submittal. 1/1989.
     The BJSS Group Architecture & Planners AIA
Dairy Forage Facilities - Proposed Phase 1 Additions. Subsurface Exploration & Geotechnical Engineering Report. 1/1989.
     RittenHouse-Zeman & Associates/Geotechnical & Hydrogeological Experts
Dairy Forage Facility - Buckley Cost Estimate. 2/1989.
     The BJSS Group Architecture & Planners AIA
Dairy Forage Facility - Volume 1 - Specifications. 11/1989.
     The BJSS Group Architecture & Planners AIA
Dairy Forage Facility - Volume 2 - Architectural Details. 11/1989.
     The BJSS Group Architecture & Planners AIA
Dairy Forage Facility - Project Manual Volume 1 Specifications. 4/1990.
     The BJSS Group Architecture & Planners AIA
Dairy Forage Facility - Cost Estimate & Area Comparison Charts. Schematic Design Phase. 4/1992.
     The BJSS Group Architecture & Planners AIA
Dairy Forage Facility - Phase II Schematic Design Submittal The BJSS Group Architecture & Planners AIA. 4/1992.
Dairy Forage Facility - Design Development Submittal (Buckley WA): Design Description, Cost Estimate, Area Comparison, Proposed Time Schedule. 9/1992.
     The BJSS Group Architecture & Planners AIA
Dairy Forage Facility - Outline Specifications (Buckley WA). 9/1992.
     The BJSS Group Architecture & Planners AIA
Dairy Forage Facility - Phase II Project Manual Volume 1 Specifications. 4/1993.
     The BJSS Group Architecture & Planners AIA
Dairy Forage Facility - Phase II Project Manual Volume 2 Details & Schedule. 4/1993.
     The BJSS Group Architects & Planners, AIA
Dairy Forage Facility - Phase II Project Manual Volume 1 Specifications. 10/1993.
     The BJSS Group Architects & Planners, AIA
Dairy Forage Facility - Phase II Project Manual Volume 2 Details & Schedule. 10/1993.
     The BJSS Group Architects & Planners, AIA
Dairy Forage Facility - Phase II - Structural Calculations. 1/1993.
     AKB Consulting Engineers/BJSS
Dairy Forage Facility - Western Washington Research & Extension Center (Puyallup) Veterinary Research - Diagnostic Center. 8/1987.
     Gross, Thurman & DeMers, Joe, P.S.
7Electrical/Mechanical Engineering Building. 11/1982 - Revised 12/1983.
     The Callison Partnership, Ltd.
Electrical/Mechanical Engineering Bldg. Site Selection Study. 8/1982.
     Burke/Lee A Joint Venture
Electrical/Mechanical Engineering Bldg. Design Development. 7/1983.
Electrical/Mechanical Engineering Bldg. - Building Program (Original). 12/1983.
Electrical/Mechanical Engineering Bldg. - (Revised). 12/1983.
Electrical/Mechanical Engineering Bldg. - Specifications Cummings Schiatter Associates. 4/1984.
     Loschky Marquardt & Nesholm
Engineering Teaching Research Laboratory Building (ETRL). Project Manual Volume 1. 3/1996.
     Callison Architecture. Inc.
ETRL Building - Project Manual Volume 2. 3/1996.
     Callison Architecture, Inc.
ETRL - Project Manual Volume I - (Placed On Top in Box). 5/1995.
     Callison Architecture, Inc.
ETRL Building - Electrical Panel Schedule. 5/1995.
     Callison Architecture, Inc.
ETRL Building Schematic Design Submittal - Scheme T.
     Callison Architecture, Inc.
ETRL Building - Design Development outline Specifications. 7/1994.
     Callison Architecture
ETRL Building - Addendum #1 & Addendum #2. 3/1996.
     Callison Architecture
ETRL Building - Project Manual - Volume I Bid Set. 3/1996.
     Callison Architecture, Inc.
Electrical/Mechanical Engineering Bldg. - Addendums No. 2&3. 1984.
     The Callison Partnership, Ltd. - Predesign Consultant
8Engineering Teaching Research Laboratory Building. Energy Conservation Report - Life Cycle Cost Analysis. 7/1994.
     Riley Engineering, Inc.
     The Callison Partnership Ltd.
English Building - Phase 1 - Avery Hall.
     Architects: Fred Bassetti & Company
     Mechanical Engineers: Valentine, Fisher & Tomlinson
     Electrical Engineers: Beverly A. Travis & Associates
     Landscape Architects: Richard Haag Associates
Experimental Animal Laboratory - Program. 6/1975.
Experimental Animal Laboratory - Waste Treatment Facilities - Engineering Report.
     Parametrix, Inc.
Experimental Animal Laboratory - Design Development. 10/1975.
     Architects: Kirk, Wallace, McKinley, AIA & Associates
     Structural Engineers: Skilling, Helle, Christiansen, Robertson
     Mechanical & Electrical: Valentine, Fisher & Tomlinson
     Electrical: Sparling & Associates, Inc.
     Engineering & Environmental Sciences: Parametrix
Experimental Animal Laboratory - Draft Impact Statement. 12/1976.
     Parametrix, Inc.
Facility Condition Survey - McAllister/ Kruegel Resident Halls CO 11063.
     SCM Consultants , Inc.
Facility Condition Survey - Administration Annex CO 10153. 7/1990.
     SCM Consultants, Inc.
Facility Condition Survey - Van Doren Hall CO 10153. 7/1990.
     SCM Consultants. Inc.
Facility Condition Survey - Chemical Engineering Building CO 10153. 7/1990.
     SCM Consultants, Inc.
Facility Condition Survey - Commons Building CO 10153. 7/1990.
     SCM Consultants, Inc.
Family Student Housing Environmental Checklist. 5/1994.
     Burke/Lee Architects/Landscape Architects/Planners
Fulmer Hall Remodeling - Phase II. 5/1980.
Fulmer Hall/Annex Renewal - Value Engineering Study. 8/1993.
     Meng Associates
Fulmer Hall & Annex - Fume Hood Survey - Draft. 11/1993.
     Mclellen & Copenhagan
     Mahium & Nordfors, McKinley, Gordon
Fulmer Hall/Annex Renewal - Schematic Design Submittal.
     McKinley Gordon PSC, Architect - McKinley Gordon PSC
     Ratti Swenson Perbix, Inc. - Structural Engineer.
     H.K. Kim Engineers, Inc. - MBE Structural Engineer.
     Riley Engineering - Mechanical & Electrical Engineers
     The Greenbusch Group. Inc. - Acoustical Consultant
Fulmer Hall Remodeling - Building Program Statement - Phase II.
Fulmer Hall - Fulmer Hall Annex Renewal - Construction Documents. Project Manual Volume 1. Specification 0 - 4. 4/1995.
     Mahlum & Nordfors McKinley Gordon
Fulmer Hall Remodeling - Building Program Statement. Phases II & III. 8/1979.
Fulmer Hall Phases I & II Completion - Specifications. 12/1983.
     Waldron Pomeroy Smith Foote & Akira Architects
Fulmer Hall Remodeling - Program Statement. 11/1992.
Fulmer Hall/Fulmer Annex - Program Statement. 5/1993.
Fine Arts Building Program - Building Program - Design Disciplines Building Phase II (worn brown unbound notebook).
     Prepared as a collaborative effort by the Departments of Architecture, Fine Arts, Interior Design & Landscape Architecture
Fine Arts Center Mechanical Systems Renovations - Specifications.
     Halvorson, Beach & Bower Inc.
     Waldron Pomeroy Smith Foote & Akira Architects
     Robert Fossatti Associates
Fine Arts Center - Mechanical Systems Renovations. 95% Construction Document Submittal. 3/1988.
     Halvorson, Beach & Bower, Inc.
     Waldron Pomeroy Smith Foote & Akira Architects
     Robert Fossatti Associates Sparling & Associates, Inc.
Fine Arts Plaza - Project Manual. 5/1995.
     Architect: ALSC Architects
     Structural Consultant: Structural Design NW
     Landscape Consultant: T.C. Sherry & Associates, P.S.
     Electrical Engineer: DEI Electrical Consultants, Inc.
Fine Arts - Building Program. Life Safety Requirements - Mechanical Systems Renovation. 10/1987.
Fine Arts - Design Disciplines Building. 6/1967.
     Naramore, Bain, Brady & Johanson
Fine Arts Building - Mechanical Systems Renovations. Schematic Design Phase Submittal. 11/1987.
     Halvorson, Beach & Bower, Inc.
     Waldron, Pomeroy, Smith, Foote & Akira, Architects
     Robert Fossatti Associates
     Sparling & Associates, Inc.
Fine Arts Building Plaza - Schematic Design Analysis. 1/1995.
     ALSC Architects
9Food & Nutrition Facility - Site Selection Study. 9/1983.
     Burke/Lee A Joint Venture
Food Proc. & Pilot Plant - Proposed Building Plan. 6/1983.
Food - Human Nutrition Facility - Building Program. 9/1984.
Food & Human Nutrition Facility - Schematic Design Phase. 5/1986.
     Northwest Architectural Company
Food - Human Nutrition Facility - Phase II Schematic Design Presentation. Area Comparison Table & Cost Estimate. 10/1988.
     Northwest Architectural Company
Food - Human Nutrition Facility. Phase II - 95% Construction Document Submittal/Program updates. 11/1989.
     Northwest Architectural Company
Food - Human Nutrition Facility Phase II - Design Development Presentation. 4/1989.
     Northwest Architectural Company
     Structural Design Northwest. Inc. and Peden, Petersen & Lee. P.S.
     Thomas J. Gerard & Associates, Inc.
     Wanless-Cook Associates
     Miltenherger Architects, Inc.
     Alberter Staeger Associates
     C3 Management Group, Inc.
     Dr. Robert L. Bradley, Jr., Carl Kehret & Albert F. Harms
     Michael R. Yantis Associates, Inc., P.S.
     Gifford Consultants, Inc.
Food - Human Nutrition Facility Phase II - Plan Holders List, Addendum #3 & Bid Tabulation Form. 3/1990.
     Northwest Architectural Company
Food - Human Nutrition Facility Phase II - Project manual. Volume I of II Architectural/Structural. 2/1990.
     Northwest Architectural Company
Food - Human Nutrition Facility Phase II - Project Manual. Volume II of II Mechanical/Electrical. 2/1990.
     Northwest Architectural Company
Food - Human Nutrition Facility - Specifications. 6/1989.
     Northwest Architectural Company
Food & Nutrition Facility (New Science Facility) - Proposal for Architectural Services - Support Document.
     Hummel Jones Miller Hunsucker, P.A. Arthru Erickson Architects
Food - Service Building Addition - Building Program. 4/1985.
Food - Service (Housing & Food Service Facility) - Design Development. 11/1985.
     Miller/Hull Partnership
Food - Service Equipment Specifications. 8/1985.
     Walker McGough Foltz Lyeria, P.S.
Food - Service Building Addition - Specifications. 9/1986.
     Miller/Hull
Food Services Building Addition - Specifications Landscape Work. 4/1988.
     Miller/Hull
Food Services Building Addition - Specifications Landscape Bid. 1989.
     Miller/Hull
Food Service (Housing) Facility - Schematics. 6/1985.
     Miller/Hull
10Feed Preparation Mixing & Storage Facility - Site Study. 12/1985.
     Burke/Lee A Joint Venture. Architects, Landscape Architects, Planners
Feed Preparation, Mixing & Storage Facility - Building Program. 7/1985.
Feed Preparation Mixing & Storage Facility - Design Development. 7/1986.
     ARC Architects
Feed Preparation Mixing & Storage Facility - Schematic Design.
     ARC Architects
Feed Preparation Mixing & Storage Facility - Project Manual. 5/1987.
     ARC Architects
Fieldhouse - Concept Study. 7/1997.
     ALSC Architects, P.S.
     Riley Engineering - Mechanical & Electrical Engineers
     Structural Design Northwest - Structural Engineers
New Administration Building - Program Statement. 12/1964.
New Administration Building - Schematic Design Brochure. 12/1964.
     Worthington. Skilling, Helle & Jackson - Structural Engineers
     James B. Notkin. & Associates - Mechanical Engineers
     Thomas E. Sparling & Associates - Electrical Engineers
     Richard Haag & Associates - Landscape Architects
     Robin M. Towne & Associates - Acoustical Consultants
Greenhouse Replacements Contract 1 - Headhouse & Site Improvements, Puyallup Research & Extension Center. 3/1996.
     Stafford Harris, Inc.
     Bouillon Christofferson & Schairer. Inc.
Greenhouse Replacements Contract 2 - Greenhouses, Puyallup Research & Extension Center. 3/1996.
     Stafford Harris , Inc.
     Bouillon Christofferson & Schairer, inc.
Greenhouse Replacements Contract 3 - New Campus Electrical Upgrade, Puyallup Research & Extension Center - Specifications. 4/1995.
     Stafford Harris. Inc.
     Bouillon Christofferson & Schairer, Inc.
Greenhouse - Headhouse Facilities Building Program, Puyallup Research & Extension Center. 9/1994.
Greenhouse Replacements Puyallup - Schematic Design CO 11611. 12/1994.
     Stafford Harris, Inc.
     Sub-Consultants: Bouillon Christofferson & Schairer. Inc.; AKB Consulting Engineers
Greenhouse Replacements - Design Development/Puyallup WWREC. 2/1995.
     Stafford Harris, Inc.
Greenhouse Replacements - Schematic Design Submittal WWREC.
     Stafford Harris, Inc.
Golf Storage Building - Specifications. 2/1984.
     Cambell Engineers, Inc.
Goldsworthy Hall Renovation - Building Program. 8/1985.
Gannon/Golds - Men’s Residence Halls - Design & Cost Submittal. 6/1959.
     Lea, Pearson & Richards Architects
Glenn Terrell Friendship Mall - Project Manual. 5/1993.
     Architect: ALSC Architects, P.S.
     Landscape Consultant: Thorson Partnership
     Electrical Engineer: Doyle Engineering
General Services Complex - Schematic Design Brochure. 1967.
     Architect: Victor Louis Wulff, Architect. AIA & Associates
     Consultants: T. R. Hance - Structural Engineers
     Rice & Luhn - Mechanical Engineers
     Wanless - Cook - Electrical Engineers
General Services Complex Phase II - Program Statement. 10/1975.
     Victor Louis Wulff Architect, A.LA. Associates
     Atwood - Hinzman, Structural
Graduate Student Residence Hall - Specifications. Drawings & Cost Estimate. 7/1969.
     Walker/McGough/Foltz, Architects
     Lyerla/Peden, Engineers
Hazardous Waste Facilities - Schematic Design Brochure. 6/1996.
     Bovay Northwest
Hazardous Materials Survey - Mechanical Engineering Laboratory. 8/1994.
     AGRA Earth & Environmental
Hazardous Waste Facilities - Predesign Study. 6/1994.
     Bovay Northwest
Hazardous Material Survey - Fulmer Hall/Fulmer Annex Renovation. 7/1994.
     RZA AGRA, Inc. Engineering Environmental Services
11Handicapped Accessibility Improvements - Report Summary Volume I The Pence Associates, Inc.
     Campanella Murakami Brummitt Inc.
Handicapped Accessibility Guide - Memorandum, Mobility Related Improvements. 8/1988.
Handicapped Persons Transition Plan for Facilities Access, Draft Number Four - University of Washington Main Campus, Pack Forest, Friday Harbor Laboratories, Richland Graduate Center. 9/1978.
Handicapped Accessibility Improvements - Part A. Schematic Design and Design Improvement. 11/1980.
     The Pence Associates, Inc.
     Campanella Murakami Brummitt, Inc.
Handicapped Accessibility Improvements - Schematic Design. Part B The Pence Associates, Inc. 11/1980.
     Campanella Murakami Brummitt. Inc.
Handicapped Accessibility Improvements - Schematic Design & Development. Supplement - Part A. 11/1980.
     The Pence Associates, Inc.
     Campanella Murakami Brummitt Inc.
Handicapped Accessibility - Building/Site Survey (Stapled). 8/1/1998.
     Campanella Murakami Brummitt Inc.
     The Pence Associates, Inc.
Handicapped Accessibility Improvements - Outline Specifications, Phase 1/Part B - 2 (Physical Plant). 6/1981.
Survey of Physical Barriers Which Affect the Handicapped. 12/1977.
Handicapped Accessibility Improvements - Construction Specifications. Phase 1. Part C - Building Retrofit
     The Pence Associates, Inc.
     Chisom Murakami Brummitt Inc.
Handicapped Accessibility Improvements - Construction Documents. Phase 1, Part - Elevator Controls. 3/1981.
     The Pence Associates, Inc.
     Chisom Murakami Brummitt Inc.
Handicapped Accessibility Improvements - Specs. Phase 1, Part C-1 - Building Retrofit - Nez Perce Village Unit F-Apt. 17. 9/1982.
     The Pence Associates, Inc.
     Chisom Murakami Brummitt Inc.
Handicapped Accessibility Improvements - Phase I, Parts B & C Design Development. 3/1981.
     The Pence Associates, Inc.
     Chisom Murakami Brummitt Inc.
Handicapped Accessibility Improvements - Construction Specifications. Phase I, part B - I Site Improvements. 10/1981.
     The Pence Associates. Inc.
     Chisom Murakami Brummitt Inc.
Handicapped Accessibility Improvements - Structural Calculations.
     Atwood Hinzman Consulting Engineers
Handicapped Accessibility Improvements - Report Summary Volume 1.
     The Pence Associates, Inc.
     Chisom Murakami Brummitt Inc.
Remodeling for the Handicapped - Specifications. 11/1974.
     Douglas C. Durkoop
Remodeling for the Handicapped - Kamiak Apartments. 10/1979.
Handicapped Accessibility Improvements - Schematic Design Part C.
     The Pence Associates, Inc.
     Campanella Murakami Brummitt Inc.
WSU Map - Campus & Vicinity Wheelchair Routes & Building Access. 1978.
     The Pence Associates. Inc.
     Campanella Murakami Brummitt Inc.
Heald Hall Fifth Floor Addition - Schematic Design Brochure. 1966.
     Decker, Kolb & Stansfield Architects
Heald Hall Renewal - Predesign Study. 9/1992.
     The Miller Hull Partnership
Hollingbery Annex - Handball/Racquet Phases I & II. Building Program. 3/1979.
Hollingbery Field House Annex - Handball/Racquet - Design Development. 6/1979.
     Architects: Adkison, Leigh. Sims, Cuppage
     Structural Engineers: Atwood/Hinzman
     Mechanical & Electrical: Riley Engineering
Holland Library Renewal - Project Scope Development. 1/1994.
     ALSC Architects
Holland Library Addition - Shelving & Compact Storage Systems. Project Manual. 6/1993.
     ALSC Architects. P.S.
Holland Library - Specifications for Fire Pump Installation - Bid Set Drawings & Specifications/ Fire Protection & Suppression Design Alternatives. 12/1993.
     Creighton Brook Engineers
Holland Library Addition - Project Manual - General Construction. Volume 1 of 2. 8/1991.
     ALSC Architects
Holland Library Addition - Project Manual - Mechanical & Electrical. Volume 2 of 2. 8/1991.
     ALSC Architects
Holland Library Addition Specifications. 5/1990.
     ALSC Architects, P.S.
Holland Library Addition - Design Development Appendix ALSC Architects. 2/1990.
     Zimmer Gunsul Frasca Partnership
12Holland Library Addition - Design Development. 1/1990.
     Architects. ALSC Architects, Zimmer Gunsul Frasca
     Structural Engineer. Structural Design Northwest
     Mechanical Engineer: Riley Engineering
     Electrical Engineer: Doyle Engineering
     Civil Engineer: Wyatt - Jaykim
     Specifications: Matson Carlson Whitacre
     Early Bid Package Structure: Anne Symonds & Associates
     Elevator Consultant: Lerch Bates Associates
     Acoustical Consultant: Towne Richards & Chaudiere
     Landscape Architect: The Thomson Partnership
     Library Planning Consultant: Phil Leighton
Holland Library Addition - Design Development Specification. 1/1990.
     ALSC Architects, P.S.
     Zimmer Gunsul Grasca Partnership
Holland Library Addition - Preliminary Design. 11/1989.
     Architects: ALSC Architects. Zimmer Gunsul Frasca
     Structural Engineer: Structural Design Northwest
     Mechanical Engineer: Riley Engineering
     Electrical Engineer: Doyle Engineering
     Civil Engineer: Wyatt - Jaykim
     Specifications: Matson Carlson Whitacre
     Early Bid Package Structure: Anne Symonds & Associates
     Elevator Consultant: Lerch Bates Associates
     Acoustical Consultant: Towne Richards & Chaudiere
     Landscape Architect: The Thomson Partnership
     Library Planning Consultant: Phil Leighton
Holland Library Addition & Renewal. Site Design & Building Massing Studies. 5/1989.
     ALSC Architects, Zimmer Gunsul Frasca Partnership
     Structural: Suden Golden & Guest
     Mechanical: Riley Engineering
     Electrical: Wanless Cook
     Civil: Wyatt Jaykim
     Library Planning: Phil Leighton
Holland Library Addition - Preliminary Site Studies & Cost Estimates. 3/1989.
     Architects: ALSC Architects
     Design Architects: Zimmer Gunsul Frasca Partnership
Holland Library Addition - Schematic Design Architects: ALSC Architects. 7/1989.
     Design Architects: Zimmer Gunsul Frasca Partnership
Holland Library Addition & Renewal - Architect Selection Interview. 9/1988.
     Architects: ALSC Architects
     Design Architects: Zimmer Gunsul Frasca Partnership
Holland Library Renovation - Partial Schematic Design for Full Renovation & Design Development for Phase One. 9/1980.
     Joyce/Nordfors & Associates, P.S.
Holland Renovation - Program. 3/1980.
Holland Library for State College of Washington. 1947.
     Schematic Design Brochure
HVAC Design Analysis (Incinerator). 10/1997.
     Prepared By Bovay Northwest, Inc.
Incinerator Building - Specifications - Volume 1. 8/1998.
Incinerator Building - Specifications - Volume 2. 8/1998.
Incinerator Project - Civil Design Analysis. 10/1997.
     Prepared By Bovay Northwest, Inc.
Incinerator Study - Incinerator Report. 8/1991.
     Wieland, Lindgren & Associates, Inc.
Incinerator Study - Reasonable Available Control Technology. 11/1994.
     Bovay Northwest
     Enviromech
     Dames & Moore
Incinerator - Site Selection Study for Pathological Waste incinerator. 2/1995.
     Bovay Northwest
Incinerator Opinion of Probable Costs for Pathological & Solid Waste Incinerators. 3/1995.
     Bovay Northwest
Incinerator - Environmental Impact Statement for Replacement Medical Waste. Incinerator, Volume 1 of II. (Needs to Be Pulled & Tossed. A Complete Set Volume I & II are in Box # 29.). 10/1996.
     WSU
Incinerator - Geotechnical Report on Storage Building Gifford Consultants, Inc. 11/1992.
Incinerator - Environmental Health & Safety Plan Review Record. Notice of Construction. 1/1998.
     Envirotech Drawings
Incinerator - Notice of Construction Application Declaring Intent to Construct, Install, or Establish A New Air Contaminant Source or Replacement or Substantial Alteration of Emission Control Technology on an Existing Stationary Source. Attachment: Process Flow Diagram. 1/1998.
     Environmental Health & Safety
     McCully Frick & Gilman, Inc.
     Advanced Combustion Systems, Inc.
Incinerator.
     Envirotech Drawings
Incinerator - New incinerator Building - Utility Study. 2/1997.
     Bovay Northwest A Dames & Moore Subsidiary
Incinerator - Schematic Design Brochure. 3/1997.
     Bovay Northwest, Inc.
     EnviroMech
Incinerator - Design Development Submittal. 7/1997.
     Bovay Northwest
Incinerator - Conceptual Design Analysis for Medical Waste Incinerator. 1/1997.
     Bovay Northwest
     EnviroMech
Incinerator Project - Design Development: Outline Specifications Submittal. 7/1997.
     Bovay Northwest A Dames & Moore Subsidiary
Incinerator - Bidder’s Equipment List, Technical Data & Guarantees. 1/1998.
     Bovay Northwest
13Incinerator Upgrades - Trade Specifications. 9/1995.
     Bovay Northwest
Intercollegiate Center For Nursing Education - Project Manual (Yakima). 1/1995.
     Architect: Integrus Architecture, P.S.
     Structural Engineer: Structural Design Northwest. Inc.
     Mechanical & Electrical Engineers: MW Consulting Engineers
Intercollegiate Center for Nursing Education - Project Manual (Yakima). 11/1994.
     Architect: Integrus Architecture. P.S.
     Structural Engineer: Structural Design Northwest, Inc.
     Mechanical & Electrical Engineers: MW Consulting Engineers
Intercollegiate Center for Nursing Education (Spokane) - Design Development
     Walker McGough Foltz Lyerla. 10/1976.
Intercollegiate Center for Nursing Education - Joint EWSC - WSU Building Program. 3/1976.
Intercollegiate Center for Nursing Education (Yakima) - Design Development. 8/1994.
     Architect: Integrus Architecture, P.S.
     Structural Engineer: Structural Design Northwest, Inc.
     Mechanical & Electrical Engineers: MW Consulting Engineers
Johnson Hall Specifications for Remodel Rooms 101,122,184,190,387,396&39. By the Board of Regents Of WSU. 6/1994.
Johnson Hall Addition - Schematic Design Brochure. 10/1978.
     Architect: Gayne L Jones & Associates
     Structural: Charles E. Kitchin
     Mechanical: Valentine. Fisher, & Tomlinson
     Electrical: Beverly A. Travis
Kimbrough Hall - Specifications for General Contract - Books 1,2, & 3. 2/1964.
     Ralph E. Decker, AIA Architects
     Administrative Architect: Gary L. Shavey. AIA
     University Architect: Philip E. Keene, AIA
Kimbrough Hall Addition - Predesign Study - Books 1,2, & 3. 6/1992.
     Predesign Consultants: Thompson Vaivoda & Associates, Architects AIA
     In Association With Heylman Martin & Associates, Architects, AIA
14Kimbrough Hall - Asbestos Abatement Submittals by Tektoniks Corp. 6/1997.
     Tektonics Corporation
Kimbrough Music Building - Pictures & Design Plans. 3/1966.
     Ralph E. Decker AIA Architects
Kimbrough Hall - Preliminary Presentation. 1/1963.
     Ralph E. Decker AIA Architects
Kimbrough Music Building - A Program for an Addition to. 5/1970.
Kimbrough Hall Addition & Renewal - Bid Set Volume One. 3/1998.
     Architect: Thompson Vaivoda & Assoc. Arch‘s
     Structural: kpff Consulting Engineers
     Civil: Rosewater Engineering
     Mechanical & Electrical Glumac
     Landscape: Murase & Associates
     Acoustical: Russ Berger Design Group
     Elevator Consultants: Lerch. Bates, & Associates, Inc.
     Cost Management Consultants: Roen Associates
Kimbrough Hall Addition & Renewal - Bid Set Volume Two. 3/1998.
     Architect: Thompson Vaivoda & Assoc. Arch's
     Structural: kpff Consulting Engineers
     Civil: Rosewater Engineering
     Mechanical & Electrical: Glumac
     Landscape: Murase & Associates
     Acoustical: Russ Berger Design Group
     Elevator Consultants: Lerch, Bates, & Associates. Inc.
     Cost Management Consultants. Roen Associates
Kimbrough Hall Addition & Renewal - Addendum Two . 4/1998.
     Prepared by Thompson Vaivoda & Associates, Architects AIA.
Kimbrough Hall Addition & Renewal - Design Development Set Project Manual. 5/1996.
     Thompson Vaivoda & Associates Architects, Inc.
Kimbrough Hall Renovation - Hazardous Materials Abatement Project.
Abatement Specifications & Contract Documents. 5/1997.
     Prepared By: Edward S. DeLorme While Employed By: SCM Consultants, Inc.
Kimbrough Hall - Asbestos Abatement Project - Final Report. 12/1997.
     Prepared by Richard A. Johnson, CIH SCM Consultants, Inc.
Kimbrough Hall - Addition & Renewal - Schematic Design. 1/1996.
     Architect: Thompson Vaivoda & Associates Architects AIA
     Associated Architect: Heylman Martin & Associates
     Structural: kpff Consulting Engineers
     Mechanical & Electrical: Glumac International
     Landscape: Murase Cost Management: Roen Associates
Launch Boathouse & Dock - Building Program 84 - 85.
     McKinley Nance Director of Facilities Planning
Laboratory Animal Resources Facility - Building Program. 8/1970.
     Mr. Owen Bradvold - Office of Facilities Planning Liaison & Advisory Architect
McCoy Hall Additions - Second Floor. 10/1969.
     Architects: Culler Gale Martell Ericson
     Engineer: Kenneth P. Norrie
McCoy Hall - South Addition. 4/1970.
     Architects: Culler Gale Martell Ericson
     Engineer: Kenneth P. Norrie
McCoy Hall - Completion of South & Anatomy Refrigeration Room. 11/1971.
     Architects: Culler Gale Martell Ericson
     Engineer: Kenneth P. Norrie
McCoy Hall Remodeling - Building Program 1 of 2. 4/1978.
McCoy Hall Remodeling - Building Program 2 of 2. 4/1978.
McCoy Hall Remodeling - Schematic Design Brochure. 10/1978.
     Culler Gale Martell & Ericson. Architects
McCoy Hall Remodeling - General Specifications. 9/1979.
     Culler Gale Martell Ericson P.S.
McCoy Hall Phase 11 - Building Program. 6/1982.
McCoy Hall Remodeling Phase 11 - Schematic Design Brochure. 2/1983.
     Culler Gale Marteil & Ericson, Architects
McCoy Hall Remodeling/Renovation Program. 11/1985.
McCoy Hall Remodeling/Renewal Program Phase II. 4/1986.
McCoy Hall Renewal - Schematic Phase. 3/1987.
     De Neff Deeble Barton Associates
     Peter A. Suden
     Tres West Engineers, Inc.
McCoy Hall Renewal - Project Manual. 12/1987.
     De Neff Deeble Barton Associates
Martin Stadium & Academic Center North Stands Replacement - Schematic Design Brochure/Some Pictures.
     Naramore Bain Brady & Johanson Architects Engineers Planners
Martin Stadium - Fire Lane Route Study. 7/1997.
     PPL Coffman Project# 95027-03
Martin Stadium - Schematic Design Brochure, Academic Athletic Complex (Lengthwise along box). 3/1972.
     Naramore Bain Brady & Johanson Architects Engineers Planners
15Murrow Hall Renovation/Addition - Predesign Study. 6/1998.
     Northwest Architectural Company
Morrill Hall Remodeling - Design Development. 9/1979.
     Ralph D. Anderson & Partners
     Booth & Koch Architects
Morrill Hall Remodeling - Construction Details, As Built. 12/1981.
     Ralph D. Anderson & Partners/Booth & Koch Architects & Environmental Planners
Murrow Remodeling - Schematic Design Brochure. 1971.
     Architects & Planners: De Neff Deeble Barton Associates
     Mechanical: Rice & Luhn
     Electrical: Wanless - Cook
Murrow - Schematic Design Brochure. 7/1969.
     Architects & Planners: De Neff Deeble Barton Associates
     Mechanical: Rice & Luhn
     Electrical: Wanless - Cook
     Structural: Peter Suden
Murrow - Department of Communications Student Publications Radio - Television Services - Building Program Statement.
Memorial Hospital Study - Schematic Design Brochure. 1/1976.
     Architects & Planners: De Neff Deeble Barton Associates
     Mechanical: Rice & Luhn
     Electrical: Wanless - Cook
     Structural: Peter Suden
Meats Laboratory - Schematic Design Brochure. 9/1964.
     Barnard & Holloway Architects
Meats Laboratory - Schematic Design Brochure Phase II.
     Barnard & Holloway Architects
Married Student Apartments - Kamiak 100 Unit. 1964.
     McClure & Adkison Architects AIA
Neill Hall Renewal - Specifications. 2/1988.
     Anderson Koch & Duane
Neill Hall Renewal - Final Cost Estimate. 3/1989.
     Duarte Bryant Architecture
Neill Hall Renewal - Schematic Phase. 1988.
     Anderson Koch & Duarte
     United Pacific Engineers
     Lee Engineering
     Travis Fitzmaurice & Associates, Inc.
Neill Hall Renewal - Building Program. 5/1987.
North-South Ski Lodge - Design Development Phase I. 2/1976.
     Architects: Adkison Leigh Sims Cuppage
     Structural: L.C. Campbell
     Mechanical & Electrical: Riley Engineering
Nuclear Reactor Building. Addition to. 3/1967.
     Miller & Fiedler - Architects AIA
Orton Hall - Schematic Design Brochure. 6/1962.
     Philip E. Keene - University Architect
     Lea, Pearson & Richards - Architects
Rogers Hall - Men’s Residence Tower. 5/1961.
     Philip E. Keene - University Architect
     Lea, Pearson, & Richards - Architects
Rogers/Orton Site Plan for Residence Halls. 6/1962.
     Resume of Richard Haag Associates
     Landscape Architects - Planning Consultants
Owen Science Library - Foundation Investigation. 6/1974.
     For Harris, Reed & Litzenberger Architects, AIA
     By: Shannon & Wilson, Inc. - Geotechnical Consultants
Owen Science Library Design Development. 1979.
     Harris, Reed & Litzenberger, AIA, Architects
     Abam Engineers, Inc., Structural Engineers
     Valentine, Fisher & Tomlinson, Mechanical & Electrical Engineers
Olympic Weight Room Expansion - Revised. Description of Project; Building Committee; Statement of Problem; Statement of Goals; Planning Criteria; General Considerations; Space Requirements; Specific Requirements. 12/1995.
Olympic Weight Room Addition - Design Development. 4/1988.
     ALSC Architects, P.S.
     Campbell Engineers - Structural
     Riley Engineering - Mechanical & Electrical Engineers
Olympic Weight Room Addition - Specifications (construction set). 12/1988.
     ALSC Architects, P.S.
     Campbell Engineers - Structural
     Riley Engineering - Mechanical & Electrical Engineers
Olympic Weight Room Addition Building Program. 8/1987.
Olympic Weight Room Facility - Specifications. 6/1985.
     ALSC Architects, P.S.
     Campbell Engineers - Structural
     Riley Engineering - Mechanical & Electrical Engineers
Olympic Weight Room Facility - Design Development. 3/1985.
     Adkison Leigh Sims Cuppage - Architects
     Campbell Engineers - Structural
     Riley Engineering - Mechanical & Electrical Engineers
Olympic Weight Room Building Addition - Building Program, Hollingbery Field House. 12/1984.
P.E Building - Program for the Proposed Gymnasium. 11/1965.
P.E. Building - Schematic Design Brochure. 11/1966.
     Paddock & Hollingbery AIA Architects
Parking Facility - Design Criteria & Outline Specification. 1500 Car Parking Facility Preliminary Design. 8/1970.
     John Graham & Company Architects - Planners - Engineers
President’s Residence. Additions & Remodeling to. 1967.
     Trogdon-Smith, AIA Architects
     Philip E Deene, AIA, Director of Facilities Planning
     Mechanical & Electrical: Rice. Strecker, & Cook
     Structural: Lyerla & Peden
     Landscape Architect: L Keith Hellstrom
     Interior Design: D. W. Trogdon
Physical Science Building - Schematic Design Brochure. 2/1970.
     Naramore Bain Brady & Johanson
     Skilling, Helle, Christiansen, Robertson - Structural
     Bouillon, Christofferson & Schairer - Mechanical
     Naramore, Bain, Brady & Johanson - Electrical
     Paul S. Veneklausen & Associates - Acoustical Consultants
Physical Science Building Phase II - Schematic Design Brochure. 7/1970.
     Naramore Bain Brady & Johanson
     Skilling, Helle, Christiansen, Robertson - Structural
     Bouillon, Christofferson & Schairer - Mechanical
     Naramore, Bain, Brady & Johanson - Electrical
     Paul S. Veneklausen & Associates - Acoustical Consultants
Physical Science Building Elevator Data. 5/1970.
     Prepared By Charles W Larch & Associates
Physical Science Building - Preliminary Design. 11/1968.
     Naramore Bain Brady & Johanson Architects
     Skilling, Helle, Christiansen, Robertson - Structural
     Bouillon, Christofferson & Schairer - Mechanical
     Naramore, Bain, Brady & Johanson - Electrical
     Earl L Walls Associates - Laboratory Consultant
Publications Building - Schematic Design Brochure. 1967.
     Architects: Evanoff & Kabush, AIA
     Structural Engineers: Lyerla & Peden
     Mechanical & Electrical: James S. Latenser
Puyallup - Controlled Environment - Lab & Greenhouse. 1970.
     Research & Extension Center
     Carlson & James Architect
     Andrew T. Bingham - Structural
     Stingle-Atwood & Associates - Mechanical & Electrical
Puyallup - Office & Lab Facilities. Research & Extension Center. 5/1966.
     Naramore Bain Brady & Johanson - Architects
     Bouillon, Christofferson & Schairer - Mechanical & Electrical
     Worthington Skilling Helle & Jackson - Structural
Prosser - Rogers Hamilton Laboratory Building. Institute of Agriculture Sciences Irrigation Experiment Station. 9/1961.
     Philip E. Deene, AIA
     Cowan & Paddock, AIA
Regents Dining Hall Remodeling - Schematic Design Brochure. 2/1979.
     Tan Brookie Kundig Architects
     Structural: L. C. Campbell
     Mechanical: Gerard & Associates
     Electrical: Wanless - Cook Associates
     Good Service Consultants: George E. Bundy & Associates
Research & Technology Park - Project Manual - Building One. Phase 3 Tenant Improvements. 11/1985.
     Taber Chaitin Associates - Architecture, Landscape Architecture, Planning, Interior Design
     Charlie Capital Group - Developer
Research & Technology Park - Project Manual Phase 2 - Site & Weatherskin. 7/1985.
     Taber Chaitin Associates - Architecture. Landscape Architecture, Planning, Interior Design
     Charlie Capital Group - Developer
Research & Technology Park - Building One Phase 2. Replaces Addendum No. 1 ENTIRELY.
     Taber Chaitin Associates
Research & Technology Park - Building One Phase 3 - Addendum #6. 2/1986.
     Taber Chaitin Associates
Rogers/Orton Din. Hall - Schematic Design Brochure.
     Kenneth W. Brooks, AIA Architects
16Rotunda Dining Hall (RDH) - Renovation Proposal; Packet of Pictures.
     John Graham & Company
Rotunda Dining Hall - Selective Demolition & Asbestos removal. 5/1985.
     Walker McGough Goltz Lyerla P.S. - Architect & Engineers
     Centrac Associates, Inc. - Asbestos Removal Consultants
Rotunda D.H. Design Development - Outline Specifications. Construction Cost Estimate. 5/1985.
     Walker McGough, Foltz Lyerla, P.S. - Architects & Engineers
Rotunda D.H - Design Development. 6/1985.
     Walker McGough Foltz Lyerla, P.S. - Architects & Structural Engineers
     Mechanical & Electrical: Riley Engineering
     Asbestos Removal & Lighting Consultants: Centrac Associates
     Design Collaborative - Interior Design Consultant - Christine Johnson, Principal
     Design International - Food Service Consultant - Les Jones, Consultant
Rotunda D.H - Remodel Engineers’ Calculations. 9/1985.
     Architects & Engineers: Walker McGough Foltz Lyerla P.S.
     Mechanical & Electrical: Riley Engineering, Inc.
     Lighting Engineer. Centrac Associates, Inc.
Rotunda D.H - Renovation - Building Program. 1/1985.
Rotunda D.H - Life Cycle Cost Analysis. 4/1985.
     Prepared by Riley Engineering, Inc. & Walker McGough Foltz Lyerla
Rotunda D.H - Project Manual. 9/1985.
     Walker, McGough Foltz Lyerla, P.S.
Rotunda D.H - Project Manual. Selective Demolition & Asbestos Abatement. 5/1985.
     Walker McGough Foltz Lyerla, P.S. - Architects & Engineers.
     Centrac Associates - Asbestos Abatement Consultant
     Riley Engineering - Mechanical/Electrical
Rotunda D.H. Remodel - Schematic Design Brochure. 4/1985.
     Walker McGough Goltz Lyerla. P.S. - Architects & Engineers
Stimson Hall - Renovation - Project Manual. 10/1985.
     Warren Cummings Heylmnan & Partners - Architects
Stimson Hall Renovation - Life Cycle Cost Analysis. 5/1984.
     Warren Cummings Heylman & Partners/Architects Stingle - Atwood & Associates/Engineers
Stimson Hall Renovation- Design Development. 4/1984.
     Warren Cummings Heylman & Partners/Architects
Stimson Hall Renovation- Hall Residents Proposal. 8/1983.
     Warren Cummings Heylman & Partners/Architects 3/
Stimson Hall Remodel Building Program. 8/1982.
Stimson Hall Renovation Design Development. 3/1984.
     Warren Cummings Heylman & Partners/Architects
Stimson Hall Renovation - Schematic Design Submittal. Design Analysis Tabulations; Construction Cost Estimate; Outline Specifications. 12/1982.
     Warren Cummings Heylman & Partners/Architects
Stimson Hall Renovation - Project Manual Draft Copy. 9/1985.
     Warren Cummings Heylman & Partners/Architects
Stimson Hall Landscaping - Project Manual. 2/1987.
     Warren Cummings Heylman & Partners/Architects
Science Hall Remodel Phase 2. Volume 2 Sec 15/16. 1/1988.
     Architect & Planners: Decker/Fukui Davison
     Structural Engineers: Engineers Northwest, Inc.
     Mechanical Engineers: Halvorson, Beach & Bower. Inc.
     Electrical Engineers. Sparling & Associates, Inc.
     Interior Designers: Anne Fisher Associates
     Acoustical Engineers: Michail R. Yantis Associates
     Health Physicist. Ralph M. Baltzo
     Estimators: Constructioneering
Science Hall Remodel Phase 1 - Project Manual, Volume 1. 6/1983.
     Architect & Planners: Decker/Fukui Davison
     Structural Engineers: Engineers Northwest, Inc.
Science Hall Remodeling Phase 1 - Project Manual, Volume 2.
     Architect & Planners: Decker/Fukui Davison
Science Hall Remodeling - Building Program. 10/1977.
Science Hall Remodeling - Building Program Phase 1. 5/1982.
     Architect & Planners: Decker/Fukui Davison
Science Hall Remodeling - Phase 1 Schematic Design Brochure. 11/1982.
Science Hall Remodeling - Building Program Phase 2. 5/1982.
Science Hall Remodeling - Building Program Phase 2. 12/1985.
Science Hall Remodeling - Schematic Design Phase 2.
17Safety Building - Schematic Design Submittal (Placed alongside of box due to length).
     Doudna Williams Phipps Architects
Student Services Addition - Energy Conservation Report, Life Cycle Cost Analysis. 11/1993.
     Riley Engineering, Inc.
     Mahlum & Nordfors. McKinley, Gordon
Student Services Addition - Value Engineering Study Mahlum & Nordfors, McKinley, Gordon. 10/1993.
Student Services Addition - Scheme E McKinley Gordon. 10/1992.
Student Services Addition - Schematic Design Submittal McKinley Gordon Architect. 11/1992.
Student Health Service Remodeling & Addition Schematic Design Brochure.
     De Neff Deeble Barton Associates - Architects & Planners
     Rice & Luhn - Mechanical Engineers
     Wanless-Cook Associates - Electrical Engineers
     Peter A. Suden - Structural Engineers
     Robert L. Woerner Landscape Architect
Students’ Bookstore - Schematic Design Submittal.
     Architect: Trogdon - Smith AIA
     Bookstore Planning: Henry Berry Associates, Inc.
     Structural Engineers Lyerla & Peden
     Mechanical Engineers: Rice & Strecker
     Electrical Engineers: Joseph M. Doyle & Associates
Student Bookstore - Addition to. 9/1978.
     TSG Architects
     Structural: Peter A. Suden
     Mechanical: Rice & Luhn
     Electrical: Wanless-Cook
Student Residential Community (Steptoe). Schematic Design Brochure 200 Apartments. 4/1969.
     Architect. Durham Anderson Freed AIA
     Landscape Architect: Richard Carothers Associates
     Structural: Harold K. Roe, CE, SE
     Mechanical: Benjamin S. Notkin & Associates
     Electrical: Beverly A. Travis & Associates
     Civil: Hammond, Collier & Wade and Associates
     Acoustical: Rovin M. Towne & Associates, Inc.
Student Recreation Center - Project Update. 4/1998.
     Architect: Yost Grube Hall Architects
Student Recreation Center - Schematic Design. 4/1998.
     Architect: Yost Grube Hall Architects
Student Health - Student Health Service Clinic Building Preliminary Brochure (Placed alongside of box due to length). 1963.
     Prepared by McClure & Adkison Architect AIA
Streit - Perham Remodel - Project Manual. 12/1985.
     Clayton R. Joyce Architects
     Interior Design: Design Collaborative
     Structural: H.K. Kim Engineers, Inc.
     Mechanical: D. W Thompson Consultant, Ltd.
     Electrical Engineers: Louis C. Warner & Co.
Streit - Perham Remodel - Design Development. 4/1985.
     Clayton R. Joyce Architects
     Interior Design: Design Collaborative
     Structural: H.K. Kim Engineers, Inc.
     Mechanical: D. W. Thompson Consultant, Ltd.
     Electrical Engineers: Louis C. Warner & Co.
Streit - Perham Remodel - Specifications - Asbestos Abatement & Demolition. 7/1985.
     Clayton & Joyce Architects
     Centrac Associates - Asbestos Abatement Consultant
South Fairway Intramural Field - Schematic Design Report. 2/1992.
     Richard Carothers Associates - Landscape Architects. Planners, Civil Engineers, & Surveyors
     Subconsultants: Tam, Boyle Heyamoto - Architects
     Riley Engineers - Mechanical/Electrical
South Fairway Intramural Field - Construction Document Submittal. 5/1993.
     Richard Carothers Associates - Landscape Architects, Planners, Civil Engineers, & Surveyors
     Subconsultants: Tan, Boyle Heyamoto - Architects
     Riley Engineers - Mechanical/Electrical
     Guifford Consultants - Geotechnical
Swine Center - Design Development Phase II. Livestock Teaching & Research Facilities. 1975.
     Architects: ORB Architects Planners Engineers
     EISI Engineered Industrial Systems. Inc.
Swine Center - Design Development Phase II. Livestock Teaching & Research Facilities (Booklet is titled the same as above, contains different supplemental material). 1975.
     Architects: ORB Architects Planners Engineers
     EISI Engineered Industrial Systems, Inc.
Sloan - Technology Building - Engineering Addition Preliminary Design. 5/1959.
     Culler Gale Martell Norrie Architects & Engineers
Stephenson Residence Center - Preliminary Design Submittal - Third Tower. 1967.
     Architects: Walker & McGough, AIA
     Mechanical Engineers Lyle Marque & Associates
     Electrical Engineers: Joseph M. Doyle
     Landscape Architect Keith L. Hellstrom
Smith Agricultural Engineering Building - Alterations & Additions. 1966.
     Architects: Evanoff & Kabush, AIA
     Structural: Lyerla & Peden
     Mechanical & Electrical: James S Latenser
Spokane Intercollegiate Research & Technology Institute (SIRTI) Design Development. 7/1990.
     WMFL, P.S. Architect & Engineers in Association with Arthur Erickson Architects
     Structural: WMFL, P.S. Architects, & Engineers
     Electrical: Riley Engineering
     Landscape Architecture: SKU
SIRTI Geotechnical Information - Stone Column/Vibro - Replacement Foundation Improvement Work, SIRTI Site, Spokane WA.
     Gifford Consultants, Inc. - Geotechnical Consultants
SIRTI - Project Manual. 4/1991.
     WMFL Architects & Engineers
     MW Consulting Engineers: Mechanical
     Riley Engineering: Electrical
     SKU: Civil Engineering/ Landscape Architecture
SIRTI - Building Program. 4/1988.
Spokane Riverpoint - Health Sciences Building - Schematic Design.
     Architect: Integrus Architecture
     Structural: Integrus Architecture
     Mechanical/Electrical: MW Consulting Engineers
     Cost Estimating: Roen Associates
Spokane Riverpoint - Health Sciences Building - Predesign Study at the Riverpoint Higher Education Park For The Joint Center for Higher Education Integrus Architecture, P.S. 7/1996.
Spokane Riverpoint - State Archives Facility Eastern Washington Region & Cooperative Academic Library Services (CALS) - Riverpoint Higher Education Park Management. 10/1998.
     Prepared for: the Office of the Secretary of State Archives & Records Division, Ralph Munro, Secretary of State.
     Prepared By: Integrus Architecture, P.S.
Spokane - Joint Center for Higher Education. 6/1993.
     Trent & Riverside Avenue Properties
     Architectural & Structural: Integrus Architecture
     Mechanical & Electrical: MW Consulting Engineers
     Property Management: R.W. Robideaux & Company
Spokane University District Development - Preplanning & Schematic Design. 9/1988.
     W.M.F.L., P.S. Associate Architects: Arthur Erickson Architects
18Todd Hall Addition - Building Program DCVRs To be Kept With as Built Drawings. 1963.
     C. D. Contractors, Inc.
Todd Hall Addition - Specifications Volume I of II. 4/1989.
     The Henry Klein Partnership
     Mechanical: Notkin Engineer, Inc.
     Electrical: Sparling & Associates
     Structural: ABKJ
     Landscape Consultant: Jongejan/Gerrard/McNeal Kitchen Consultant: Forma
     Civil Engineer: Munir Daud & Associates
Todd Hall Addition - Specification Volume II of II, Mechanical & Electrical With Addendums Attached. 4/1989.
     The Henry Klein Partnership
     Mechanical: Notkin Engineer, Inc.
     Electrical: Sparling & Associates
     Structural: ABKJ
     Landscape Consultant. Jongejan/Gerrard/McNeal
     Kitchen Consultant: Forma
     Civil Engineer: Munir Daud & Associates
Todd Hall Renewal - Specifications (three binders). 12/1993.
     The Henry Klein Partnership, Architects
Thompson Hall Renewal - Building Program. 6/1992.
     Architect: Cardwell/Thomas & Associates/Architects
Thompson Hall - Feasibility Study, Foley Institute for Public Policy and Public Service. 1/1995.
     Architect. Cardwell/Thomas & Associates/Architects
Thompson Hall Renewal - Schematic Design. 6/1994.
     Architect: Cardwell/Thomas & Associates/Architects
     Structural: Ratti, Swenson, Perbix
     Mechanical: Path Engineers, Inc.
     Electrical: Elcon Associates, Inc.
     Cost Control: Ackroyd. Inc.
Thompson Hall Renewal - Design Development Supplemental Information. Estimate of Construction Cost; Program Area Comparison; Architectural Details; Structural Notes; Mechanical Narrative; Light Fixture Schedule. 11/1994.
     Ackroyd, Inc. Cardwell/Thomas & Associates/Architects
Thompson Hall Remodel Project. Results of Subsurface Explorations & Floor Slab Moisture Survey. 6/1995.
     Gifford Consultants, Inc. - Geotechnical Engineers
Thompson Hall Remodeling - Former Administration Building Remodeling De Neff Deeble & Barton Architects. 1975.
     Rice, Strecker & Cook Professional Engineers
Supplemental Appendix to the Energy Conservation Report & Life Cycle Cost Analysis. 12/1992.
     Mechanical: Path Engineers. Inc.
     Electrical Engineer: Elcon Associates, Inc.
     Architect: Cardwell/ Thomas & Associates
19Todd Hall Addition - Schematic Design Brochure. 1963.
     Architect: John W. Maloney, AIA
     University Architect: Philip E. Keene, AIA
Todd Hall Addition - Building Program Statement. 12/1983.
Todd Hall Addition - Site Selection Study. 2/1984.
     Burke/Lee A Joint Venture
Todd Hall Addition to - Schematic Design. 11/1987.
     Burke/Lee A Joint Venture
Todd Hall Renovation - Remodeling Program. 5/1990.
     The Henry Klein Partnership
     Structural: KPFF
     Mechanical: Nolkin Engineering
     Electrical: Sparling & Associates
Todd Hall Renewal - Preplanning Documents - Outline Specifications, Cost Estimate & Drawings. 7/1990.
     The Henry Klein Partnership, Architects
Todd Hall Renewal - Schematic Design. 4/1992.
     Architects: The Henry Klein Partnership,
     Structural: Andersen Bjornstad, Kane, Jacobs
     Halvorson, Beach & Bower Sparling & Associates, Inc.
     Acoustical: Michael R. Yantis Associates
Todd Hall Renewal - Design Development Submittal. 7/1992.
     Henry Klein Partnership, Architects
Todd Hall Renewal - Schematic Design Submittal. 7/1992.
     Andersen Bjornstad Kane Jacobs, Inc.
Todd Hall Renewal - Renovation Feasibility Study. 5/1992.
     Morrison Knudsen Corporation
Todd Hall Renovation - Health & Safety Plan, Demolition of Lead Paint Containing Material. 3/1994.
     RZA AGRA, Inc. - Earth & Environmental Group
Troy Hall Remodeling - Schematic Design Brochure. 1971.
     Duglas C. Durkoop, Architect
     Rice & Luhn, Mechanical Engineers
     Joseph M. Doyle & Associates, Electrical Engineers
Tri-Cities University Center - Building Addition. 2/1988.
Tri-Cities University Center - Master Planning Report. 6/1988.
     Architect: The McKinley Architects, PSC
     Associate Architect: Dillman - Luvaas Architects, P.S.
     Civil & Structural Engineers: KPFF: Consulting
     Civil Engineering Consultant to KPFF: Lin & Associates
     Landscape Architects: Murase
Tri-Cities University Center - Schematic Design.
     Architect: The McKinley Architects, PSC
     Associate Architect: Dillman - Luvaas Architects, P.S.
     Civil & Structural Engineers: KPFF Consulting Engineers
     Civil Engineering Consultant to KPFF: Lin & Associates
Tri-Cities University Center Addition Addendum No. 1. 2/1990.
     The McKinley Architects PSC
Tri-Cities Campus - Consolidated Information Center (C.I.C.). 12/1993.
     Integrus Architecture, P.S.
Tri-Cities C.I.C. - Schematic Design. 10/1994.
     Integrus Architecture, P.S.
Tri-Cities Campus - Science & Education Center - Predesign Report. 6/1998.
     SRG Partnership, PC
Tri-Cities C.I.C - Predesign Study. 5/1994.
     Prime Architect & Structural Engineers Integrus Architecture P.S.
     Mechanical & Communications Electronics Consultants: MW Consulting Engineers
     Electrical Consultants: Elcon Associates, Inc.
     Cost Estimating Consultants: C3 Management Group
     Civil Engineers: Rose Water Engineering, Inc.
     Food Service Consultants: George Bundy & Associates
20Thompson Hall Renewal - Project Manual - 99% Construction Documents Submittal, Division 1 - 14. 6/1995.
     Cardwell/Thomas & Associates
     Structural: Senson Say Faget
     Mechanical: Path Engineers
     Electrical: Elcon Associates
     Estimate: Ackroyd & Associates
     Fire Protection: Accurate Design
     Specifications: Eskilsson Architecture
     Survey: Munir Daud Associates
     Code Review: Robert Fossatti Associates
Thompson Hall Renewal - Project Manual - 99% Construction Documents Submittal, Division 15 - 16. 6/1995.
     Cardwell/Thomas & Associates
     Structural: Senson Say Faget
     Mechanical: Path Engineers
     Electrical: Elcon Associates
     Estimate: Ackroyd & Associates
     Fire Protection: Accurate Design
     Specifications: Eskilsson Architecture
     Survey: Munir Daud Associates
     Code Review: Robert Fossatti Associates
Thompson Hall Renewal - Bid Package No. 2. Specification for Appendix A - Hazardous Materials Abatement Project. 3/1998.
     Prepared by Ed Delorme, OHST AHERA Project Designer # 940511-05 while employed by: SCM Consultants. Inc.
Thompson Hall Renovation - Abatement Specifications & Contract Documents. 6/1995.
     Prepared by: Edward S. DeLorme, OHST AHERA Project Designer #940511-05 while employed by: SCM Consultants, Inc.
Thompson Hall Renewal - Division 15 Mechanical. 4/1998.
Thompson Hall Renewal - Bid Package II - Project Manual. Volume I Divisions 0-8 Project No. 94-1-024.
Thompson Hall Renewal - Bid Package I: Demolition - Project Manual. 6/1997.
     Cardwell/Thomas & Associates/Architects
Thompson Hall Renewal - Bid Package II Project Manual. Volume I Divisions 1-7 Project No. 94-1-024. 3/1998.
     Cardwell/Thomas & Associates
Thompson Hall Renewal - Bid Package II Project Manual. Volume II Divisions 8-16. 3/1998.
     Cardwell Thomas & Associates
21Valley Road Multi - Use Recreation Fields - Phase 2 Developments. 3/1998.
     RCA/Huitt - Zollars, Inc., Prime Consultants
     Tan-Heyamoto, Architect
     Riley Engineering, Mechanical-Electrical Engineers
     Gifford Consultants, Geotechnical
Van Doren Hall - Facility Condition Survey. 7/1990.
     SCM Consultants, Inc. Architects & Engineers
Visitor Center Site Study - Comprehensive Physical Planning Process. 11/1988.
     Burke/Lee A Joint Venture
New Veterinary Teaching Hospital - Design Development. 3/1990.
     De Neff Deeble Barton Associates - Architects & Planners
New Veterinary Teaching Hospital - Schematic Design. 3/1990.
     De Neff Deeble Barton Associates - Architects & Planners
Veterinary Research - Diagnostic Center - Schematic Design Material, Western WA Research & Extension Center. 12/1988.
     Gtde Weisenbach
     Foil Wyatt Mckewen
Veterinary Teaching Hospital Interim Report. 2/1988.
     De Neff Deeble Barton Associates - Architects & Planners
Veterinary Teaching Hospital - A Report on Site Planning. 11/1988.
     Burke/Lee A Joint Venture, Campus Planners
Veterinary Science Building - Design Development, Multipurpose Animal Holding Facility. 9/1981.
     Naramore Bain Brady & Johanson
Veterinary Science Building - Site Evaluation & Recommendation, Multipurpose Animal Holding Facility. 9/1980.
     The NBBJ Group
Veterinary Animal Holding Facilities - Schematic Design Brochure. 6/1978.
     Barnard & Holloway, Architects
Veterinary Science Building (Bustad) - Design Development. 1/1975.
     Architects: Maloney, Herrington. Freesz & Lund
     Structural: Skilling, Helle, Christiansen & Robertson
     Mechanical & Electrical: Valentine, Fisher & Tomlinson
Vancouver - Engineering/Life Science Building - Schematic Design. 6/1998.
     Architect: Zimmer Gunsul Grasca Partnership
     Electrical: PAE Consulting Engineers, Inc
     Landscape Architect: Zimmer Gunsul Frasca Partnership
     Civil Engineer: Kato & Warren, Inc.
     Soils: Geotechnical Resources, Inc.
     Planning & Environmental Services: the J.D. White Company
     Cost Estimator: Zimmer Gunsul Frasca
     Mechanical: PAE Consulting Engineers, Inc.
     Structural: Kramer Gehlen Associates
     Signage: Mayer/Reed
     Survey: Minister Glaeser
     Acoustical: the Greenbusch Group
     Telecommunication: Path Engineers
     Specifications: Eskilson Architecture
     Irrigation: SVR Design Company
     Laboratory Design: Earl Walls Associates
Vancouver Campus Circulation - Preliminary Design. 6/1998.
     Architect: Zimmer Gunsul Frasca Partnership Electrical : PAE Consulting ,Inc.
     Landscape: Zimmer Gunsul Frasca
     Civil: Kato & Warren, Inc.
     Soils Engineer. Geotechnical Resources
     Planning & Environmental Services: The JD White Company
     Cost Estimator: Zimmer Gunsul Frasca
Vancouver Physical Plant Maintenance Shops - Schematic Design. 6/1998.
     Architect: Zimmer Gunsul Frasca
     Structural Engineer: Kramer Gehlen
     Mechanical: PAE Consulting Engineers, Inc.
     Electrical: PAE Consulting Engineers, Inc.
     Landscape Architect: Zimmer Gunsul Frasca
     Civil: Kato & Warren, Inc.
     Soils Engineer: Geotechnical Resources, Inc.
     Planning & Environmental Services: The JD White Company
     Cost Estimator. Zimmer Gunsul Frasca
Vancouver - Multimedia Classroom Building - Schematic Design. 6/1998.
     Architect: Zimmer Gunsul Frasca Partnership,
     Electrical: PAE Consulting Engineers, Inc.
     Landscape Architect: Zimmer Gunsul Frasca Partnership
     Civil Engineer: Kato & Warren, Inc.
     Soils: Geotechnical Resources, Inc.
     Planning & Environmental Services: the J.D. White Company
     Cost Estimator: Zimmer Gunsul Frasca
     Mechanical: PAE Consulting Engineers, Inc.
     Structural: Kramer Gehlen Associates Signage: Mayer/Reed
     Survey: Minister Glaeser Acoustical: the Greenbusch Group
     Telecommunication: Path Engineers
     Specifications: Eskilson Architecture
     Irrigation: SVR Design Company
Vancouver - Phase 1 Campus Development - Schematic Design. Classroom Building Library Building; Student Services & Classroom Building 6504 or 6526; Physical Plant Building 1. 10/1993.
     Architect: Zimmer Gunsul Frasca
     Structural: Kramer Gehlen
     Mechanical: PAE Consulting Engineers. Inc.
     Electrical: PAE Consulting Engineers, Inc.
     Laboratory Designer: the Estime Group
     Food Service: Halliday Associates, Inc.
     Library: Philip D. Leighton
     Audio Visual: MRG Consulting
     Acoustical: Daly Standlee & Associates, Inc.
     Landscape Architect: Mayer/Reed
     Civil Engineer: Parametrix. Inc.
     Soils Engineer: Geotechnical Resources, cin.
     Planning & Environmental Services: the JD white Company
     Cost Estimator: Zimmer Gunsul Frasca Partnership
Vancouver - Phase II Campus Development Schematic Design. Early Childhood/Education Facility. 12/1995.
     Architect: Zimmer Gunsul Frasca, Partnership
     Structural Engineer: Keramer Gehlen & Associates
     Mechanical: PAE Consulting Engineers
     Electrical Engineer: PAE Consulting Engineers
     Acoustical: Alternatt Associates
     Landscape Architect: Mayer/Reed
     Civil: Kato & Warren, Inc.
     Soils Engineer: Geotechnical Resources, Inc Planning & Environmental Services: The JD White Company
     Cost Estimator: Zimmer Gunsul Frasca Partnership
Vancouver - Phase II Campus Development - Preliminary Design. Campus Infrastructure Work. 3/1996.
     Architect: Zimmer Gunsul Frasca Partnership
     Structural: Kramer Gehlen & Associates
     Civil: Kato & Warren Inc.,
     Mechanical: PAE Consulting Engineers
     Electrical: PAE Consulting Engineers
     Landscape: Mayer/Reed
     Geotechnical Engineer: Geotechnical Resources, Inc.
Vancouver - Cascades Volcano Observatory - United States Geological Survey. Conceptual Panning Submittal. 6/1996.
     By: General Services Administration, United States Geological Survey United States Department of the Interior
     Washington State University Vancouver Campus Dean
     WSU Office of Business Affairs
     Department of Facilities Development
     Zimmer Gunsul Frasca Partnership Architectural Consultant
Vancouver - Phase II Academic Buildings - Predesign Study. Engineering Life Sciences Building; Multimedia/Electronic Communications Building. 5/1996.
     Prepared By Zimmer Gunsul Frasca Partnership
Vancouver Campus Master Plan. 9/1992.
     Prepared by: Zimmer Gunsul Frasca
     Moyer/Reed
     Parametrix, inc.
     The JD White Company
     The Basmaciyan Group
     PAE Engineering
     Geotechnical Resources Incorporated
Vancouver Campus Master Plan Appendix: Wetlands, Wildfire & Fisheries Report; Geotechnical Investigation; Master Plan Utility Report; Master Plan Electrical Report; Master Plan Mechanical Report; Transportation; Technical Report.
     Zimmer Gunsul Frasca
Vancouver - A special Report to the Presidents & Regents from the ADVISORY COUNCIL VANCOUVER - Vancouver Long Range Planning Report. 3/1988.
Vancouver & Clark College Bauer Hall - Second Phase Building Program - State Project # 88-030. 6/1988.
Vancouver - Clark College Bauer Hall Phase II - State Project # 88-030. Project Manual for Construction Documents. 3/1989.
     Gary Rogowski - Architect AIA
     Structural: Kramer/Gehlen Associates Inc.
     Mechanical: Paraclete, PS
     Electrical: Dean J. Alhay & Associates, Inc.
     Landscape Architect: Walsh & Associates, Inc.
22Vancouver - Draft Supplemental Environmental Impact Statement. 12/1992.
     The JD White Company, Inc.
Vancouver - Summary Master Plan. 7/1992.
     Zimmer Gunsul Frasca Partnership
Vancouver - An Addition for The Southwest Washington Joint Center for Education & WSU At the Evergreen State College Building in Vancouver 1986 - 1987.
     Andy Bremmeyer with Advisors
     Don Heil, Robert Patton, & Dave Scott
     Dr. George Condon, Director of WSU - Vancouver
     College of Engineering & Architecture
     School of Architecture - Fifth Year Program
Vancouver - Campus Infrastructure Preliminary Design Specifications. 2/1996.
     Zimmer Gunsul Frasca Partnership
Vancouver - Campus Infrastructure Work - Phase II Development Construction Documents, WSU Review, Not for Construction. 5/1996.
     Zimmer Gunsul Frasca Partnership
Vancouver - Mechanical & Electrical Calculation for the Phase II Campus Infrastructure Project & The Early Childhood/Education Facility Project. 8/1996.
     PAE Consulting Engineers. Inc.
Vancouver - Phase II Development Campus Infrastructure Work Construction Document Set. 1/1997.
     Zimmmer Gunsul Frasca Partnership
Vancouver - Early Childhood Education Facility. 7/1996.
     Zimmer Gunsul Frasca Partnership
     Kramer Gehlen Associates Consulting Engineers/Structural/Civil
Water System Plan Update. 12/1994.
     Thomas, Dean & Hoskins, Inc.
Water Research Center - Schematic Design Brochure.
     Carlson & James Architects
     Stingle & Atwood & Associates
     Lyerla & Peden
Waste Management Program Evaluation. Technical & Economic Feasibility Report - Appendix Section. 5/1990.
     Doucet & Mainka, P.C.
Wegner Hall - Specification (TRA Architecture Engineering Planning Interiors). General Work Project Manual Volume 1 of 3. 9/1979.
     TRA Architecture Engineering Planning Interiors
Wegner Hall - Specifications. Mechanical & Electrical Project Manual Volume 2 of 3. 9/1979.
     TRA Architecture Engineering Planning Interiors
Wegner Hall - Schedules - Project Manual Volume 3 of 3. 9/1979.
     TRA Architecture Engineering Planning Interiors
Wegner Hall - Library Addition - Schematic Design Brochure.
     J. Kimball Barnard, AIA
     Bovay Engineers, Inc., Structural Mechanical & Electrical
Wegner Hall - Design Development Remodeling/Addition. 9/1978.
Wegner Hall - Design Development Renovation/Addition. 10/1978.
     TRA Architecture Engineering Planning Interiors
Wegner Hall - Remodeling & Addition Building Program. 9/1977.
Wenatchee - Tree Fruit Research Center - Office & Laboratory Building. 1966.
     Fraley & Leighton Architects
Wenatchee - Tree Fruit Research Center - USDA Addition. 1977.
     Fraley & Leighton Architects
Wilson Hall Remodeling - Schematic Design Brochure. 1971.
     Architects: De Neff Deeble Barton Associates
     Mechanical: Rice & Luhn
     Electrical: Wanless-Cook
Wilson Compton Union Building Addition. 1966.
     Architects: Maloney, Herrington, Greesz & Lund
     Structural: Worthington, Skilling, Helle & Jackson
     Mechanical & Electrical: Valentine, Fisher, & Tomlinson
     Food Service Consultants: John R. Carlson Associates Ltd.
Wilmer Davis Hall - Food Services Facility - Design Development Documents. Proposed Alterations & Additions. 6/1970.
     Architects: James & Hicks
     Mechanical: Rice & Luhn
     Electrical: Wanless & Cook
     Structural: Paul Panagakis
     Food Service Consultants: James Lambert & Associates
Women’s Residence Hall - Schematic Design Brochure (Streit Perham). 1959.
     Walker McGough & Trogdon Architects AIA
23Daggy Phase I Humanities Building. 4/1970.
     Architects: Fred Bassetti & Company
     Mechanical: Valentine, Fisher & Tomlinson
     Electrical: Beverly A. Travis & Associates
     Theatrical Consultants: George C. Izenour & Associates
     Acoustical Consultants. Robin M. Towne & Associates
     Landscape Architects: Richard Haag Associates
Daggy Phase I Humanities/Speech Building - Building Program.
Dana Hall Remodeling. 6/1973.
     Architect: De Neff Deeble Barton Associates
     Mechanical: Rice & Luhn
     Electrical: Wanless-Cook
Athletic Facilities Study - Analysis of Existing Facilities! Improvements & Additions: 812S Martin Stadium; 0009 Hollingbery Field House; 372 Bailey Field; 171 Mooberry Track; 319C Stadium Way Tennis Courts; 013 Lower Soccer Fields; 365E WSU Golf Course ;319C Intramural/Practice Fields.
     ALSC Architects, P.S.
AMID/Landscape Architecture Building Predesign Study. 5/1998.
     Northwest Architectural Company
Consolidated Information Center (C.I.C.) - Project Manual Volume 1. 9/1995.
     Integrus Architecture. P.S.
Consolidated Information Center (C.I.C.) - Project Manual Volume 2. 9/1995.
     Integrus Architecture, P.S.
Campus infrastructure & Road improvements - Phase I. Schematic Design Brochure. 1/1998.
     KPFF Consulting Engineers, Prime Civil Engineer
     Wood/Harbinger, Mechanical/Electrical
     C3 Management Group, Cost Estimator
     White Shield, Surveyor/Geologist
Carpenter Hall Renewal Building Program. 7/1987, 1/1988.
Chemical Storage Building Environmental Health Services Facility. 5/1994.
     Bovay Northwest, Inc.
Cleveland Hall Renovation - Value Engineering Study. 6/1927.
     Roen Associates
Elevator Planning - Independent Counsel for Elevators in New Construction or Modernization "old".
     Charles W. Lerch & Associates - Elevator Consulting & Engineers
24Hazardous Waste Facility - Dangerous Waste Permit WADO 0414853301. Chemical Storage Facility, Incinerator Basement, Hazardous Waste Treatment & Waste Water Discharge Facility. 9/1989.
     Bovay Northwest Inc.
Hazardous, Pathological, & Radiological Waste Handling Facilities. Building Program - Physical Plant Draft,. 11/1991.
     Parametrix, Inc.
Hydrogeologic Investigation of the Proposed Coal Ash Disposal Facility. Physical Plant, Parametrix, Final Report. 12/1991.
     Parametrix, Inc.
Intercollegiate Center for Nursing Education - Joint Eastern Washington State College. Capital Budget Requests. 1977-1979.
     Walker McGough Foltz Lyerla
Records, Maintenance Materials Storage & Recycling - Project Manual. Phase I, Re - Bid Specifications, Archos Corporation. 10/1994.
     Archos Corporation
Records Maintenance, Material, Storage - Schematic Design, Inactive Records, Maintenance Materials Storage & Recycle Building: Phase I. 12/1992.
     Archos Corporation
Records, Maintenance Materials Storage, & Recycling Building - Phase I Building Program. 8/1991.
Storm & Sanitary Sewer System Study - Physical Plant (Where is it located?). 8/1990.
     CH2M Hill Engineers Planners Economists Scientists
Student Services Addition - Project Manual Volume I Divisions 0 - 7 (Lighty Student Services). 9/1993.
     Mahlum & Nordfors McKinley Gordon
Student Services Addition - Project Manual Volume II Divisions 8 - 16 (Lighty Student Services). 9/1993.
     Mahlum & Nordfors McKinley Gordon
Stadium Way Programming Analysis - Draft Report.
     KPFF Consulting Engineers
25Bohler Gymnasium Addition - Predesign Study. 10/1992.
     Sasaki Associates, Inc.
     Stewart Associates
Bohler Gymnasium Renovation - Predesign Study. 6/1994.
     Sasaki Associates, Inc.
     Stewart Associates - Predesign Consultant
Bohler Gymnasium Renovation - Capital Project Review Submittal. Allotment Request for Construction. 6/1994.
     Prepared BY: WSU Department of Facilities Development
Animal Science Building - Predesign Study. 7/1992.
     MBT Associates - Predesign Consultants
Engineering/Life Sciences Building. Multimedia/Electronic Communications Building. Phase II Academic Buildings - Predesign Study - Vancouver. 5/1996.
     Zimmer Gunsul Frasca
Chemical Storage Building. Environmental Health Services Facility - Predesign Study. 5/1994.
     Bovay Northwest - Predesign Consultant
Phase II Science Hall Remodeling - Building Program (Murrow East). 12/1985.
26Veterinary Teaching Hospital - Building Program (Bldg. Communication, Value Engineering Report, Physical Plant, Schedule & Equipment) +Slides & Pictures. 1991.
     De Neff Deeble Barton Associates Architects & Planners
WSU Tri-Cities Early Building Specifications. 1964 -1981.
TriCities University Center Addition - Project Manual. 2/1990.
     McKinley Architects - Volume 1 Divisions 0 - 7
TriCities University Center Addition - Project Manual.
     McKinley Architects - Volume 2 Divisions 8 - 16
TriCities University Center Addition - Addendum No. 3. 3/1990.
     McKinley Architects
TriCities University Center Addition - Project Manual “As Built”.
     McKinley Architects - Volume 1 Divisions 0 - 14
27Animal Disease Biotechnology Facility - Project Data Base - Second Submittal. 11/1993.
     Northwest Architectural Company
     Wyatt - Jaykim Engineers - Surveyors
     Gifford Consulting Northwest - Geotechnical Consultants to Wyatt - Jaykim
     C3 Management Group, Inc. - Cost Estimating & Economic Analysis
     Michael R. Yantis & Associates. Inc. - Acoustical
ADBF - Responses to Review Comments - (These annotated comments accompany the Bid Set, responding to review comments from earlier submittals.). 7/1994.
     Northwest Architectural Company
ADBF - Area Comparison/Cost estimate/Mechanical Calculations/Fire Protection Calculations/Electrical Calculations - Final Review Submittal. 2/1994.
     Northwest Architectural Company
ADBF - Schematic Design Slides - BD. Of Regents Presentation.
ADBF - Energy Conservation Report & Life Cycle Cost Analysis. 3/1993.
     Northwest Architectural Company - Architects/Engineers
ADBF - Fixed Equipment - Third Submittal. 12/1993.
     Northwest Architectural Company
ADBF - A landmark facility dedicated to serving the state of Washington. the Western Region. and the Nation. College of Veterinary; Medicine Facility Program Goals/Financial Summary of ADBF; Grants, Licenses & Selected Refereed Publications in 93 & 94. 2/1995.
ADBF Slide - College of Veterinary Medicine.
ADBF NAC Aerial Drawing of CVM (photo & slide). 7/1994.
ADBF - College of Veterinary Medicine - Design Development Manual Volume II. Structural/Mechanical/Electrical Calculations. 11/1992.
     Northwest Architectural Company
ADBF College of Veterinary Medicine - Design Development Manual - Volume I. Project Description/Cost Estimate/Equipment Schedule/Code Analysis. 11/1992.
     Northwest Architectural Company
     Structural Design Northwest
     Gerard & Associates - Mechanical
     Creighton Consulting NW - Fire Protection Consultants
     NAC Engineers - Electrical
     Foil & Wyatt Architects - Laboratory & Animal Facility Consultants
     Gail Staeger & Associates - Landscape Architects
     Wyatt Jaykim w/ Gifford & Associates - Survey & Geotechnical Consultants
ADBF - Cost Estimate - Third Submittal - Cost Estimate. 12/1993.
     Northwest Architectural Company
ADBF - Krieger Steel Products - Brochure Material. 12/1990.
ADBF - Water Saver Faucet Co. - Brochure Material: Laboratory & Hospital Faucet Fixtures; Emergency Eye Wash & Shower Equipment. 7/1990.
Animal Sciences Laboratory - Construction Documents Estimate Prepared For MBT. 5/1995.
     Ackroyd - Cost Control Consultants
Animal Sciences Laboratory - Won - Door Corporation (fire guard) Brochure Material. 8/1991.
Animal Sciences Laboratory Building - Value Engineering Services. 8/1994.
     EFT - Architects/Planners/Project Managers
Animal Sciences Laboratory Building - Value Engineering Study Proposal. 8/1994.
     Meng Associates, Analysis Group - Architecture Planning/Value Engineering/Construction Research
Asbestos Removal Plans - Alpha Engineering Group, Inc.
Beasley Performing Arts Coliseum - Asbestos Removal & Abatement Specifications. 4/1992.
     By the Board of Regents - Physical Plant Department
Beasley Performing Arts Coliseum - Asbestos Survey Report for the Department of Physical Plant.
     Alpha Engineering Group, Inc.
Bohler Addition - Summary of Field and Laboratory Test Results File: WASUMI - M9601 A/ Contract 12254. 8/1997.
     Strata Geotechnical Engineering & Materials Testing
Bohler Gym Addition/Renewal - Statement of Qualifications. 10/1991.
     Sasaki Associates, Inc.
Bohler Gym Addition - Revised OFM Predesign Submittal.
     Prepared for Sasaki Associates, Inc. By C3 Management Group
Bohler Gymnasium Addition - 50% Design Development Value Engineering! Workbook & Preliminary Idea Listing Test & Screen Alternatives - Optimize Total Costs & Total Performance.
     Ehninger Fetzer Tholen - Architects/Planners/Project Managers
Bohler Gymnasium Remodel - OFM Predesign Submittal. 5/1994.
     C3 Management Group, Inc.
Bohler Gymnasium Addition - Life Cycle Cost Analysis (Report Some Plans Included). 2/1995.
     Notkin Engineering, inc.
Chemistry Building Cost Estimate Analysis. 3/1986.
     Brooks Hensley Creager Architects,
Chemistry Building - Program Statement. 3/1984.
Chemistry Building - Design Development. Pedestrian Corridor Development of College Avenue From Library Road to Stadium Way.
     Brooks Hensley Creager Architects
Child Care Playground - Project Manual. 4/1994.
     Architect: The Tsang Partnership. inc.
     Landscape Architect: Douglas H. Tuma, ASLA
Child Care Center - Building Program. 6/1991.
Child Care Facility Playground - Specifications. 4/1994.
     Architect: The Tsang Partnership, Inc.
     Landscape Architect: Douglas H. Tuma, ASIA
28Request for Proposal, Strategic Partner in Communications - WSU Systems & Computing. 4/1991.
University Center/Classroom Auditoria Building - Predesign Study. 5/1992.
     Predesign Consultant: The Callison Partnership. Ltd.
University Center - Site Considerations. 5/1992.
     Burke/Lee A Joint Venture, Architects, Planners & Landscape Architects
Communication Infrastructure Renewal Project - Submitted July 1, 1993 to the CIR Review Team for Approval of the Format, Approval Requested Zone 2 - Sloan MCF - Communications Closet Drawings. 7/1993.
     JWP information Systems Network Integration Services
Composting Facility - Preliminary Design Report Draft - Project #0901-001.01. 3/1994.
     Prepared for WSU by EMCON Northwest
Dairy Forage Facility - Phase II Cost Estimate & Area Comparison Charts - Schematic Design Phase. 4/1992.
     The BJSS Group - Architects & Planners AIA
Dairy Forage Facility - Phase II Construction Documents - Cost Estimate. 2/1993.
     The BJSS Group - Architects & Planners, AIA
Dairy Forage Facility - Phase II Addendum No. 2. 6/1993.
     The BJSS Group
Dairy Forage Facility - Phase II Addendum No. 3.
     The BJSS Group
Kruegel Hall McAllister Hall Neill Hall - Photo Album. 4/1957.
Mechanical Engineering Laboratory - Hazardous Materials Survey AGRA E & E’s Job No. 12-1195-00. 8/1994.
     AGRA Earth & Environmental
ETRL - Preliminary Environmental Assessment. 5/1994.
     Prepared by Hart Crowser for The Callison Partnership
ETRL - Pre-Design Building Program Draft - College of Engineering & Architecture. 7/1992.
ETRL - Value Engineering Study. 5/1994.
     Meng Analysis Group - Value Engineering/Construction Research
ETRL - Value Engineering Study - (different from above). 5/1994.
     Meng Associates - Analysis Group/Architecture/Planning/Value Engineering/Construction Research
McAllister/Kruegel Residence Halls Consultant Agreement No. 11063. 2/1993.
     SCM Consultants, Inc. Architects & Engineers
McAllister/Kruegel Residence Halls Consultant Agreement No. 11063 - Part C Structural Analysis. 2/1993.
     SCM Consultants Inc. Architects & Engineers
Fulmer Hall/Fulmer Annex Renewal - Budget Estimate. 6/1993.
     Mahlum & Nordfor McKinley Gordon
Fulmer Hall - Mckinley Gordon Architects Statement of Qualifications. 3/1993.
Fulmer Hall/Fulmer Annex - Operations & Maintenance Plan for Asbestos. 3/1994.
     RZA AGRA, Inc.
Fulmer Hall/Fulmer Annex Renovation Project - Consultant Roster Registration Environmental Consulting Services & Proposal for the Renovation Project. 11/1993.
     Hart Crowser - Earth & Environmental Technologies
Fulmer Hall/Fulmer Annex Renewal - Lab Layout Drawings for user Group Meetings. 11/1993.
     Mahlum & Nordfors McKinley Gordon
Fulmer Annex Renewal - Energy Conservation Report. 4/1994.
     Prepared by Riley Engineering, Inc. Mahlum & Nordfors Mckinley Gordon
Glenn Terrell Friendship Mall & Extended Areas - Technical Report. 5/1987.
     By Landscape Architecture Students in Landscape Architecture 361
     Department of Horticulture & Landscape Architecture
Glenn Terrell Friendship Mall - Schematic Design Brochure.
     Design Team Catherin Howett/George Trakas
     A Partnership Project of WSU & the WSU Arts Commission
Greenhouse Replacements - Design Development/Puyallup WWREC with Slides Included. 2/1995.
     Stafford Harris, Inc.
Hazardous Waste Sites Phase II - Preliminary Construction Budget Estimate. 1/1994.
     Bovay Northwest Inc.
Chemical Waste Collection Sites - Schematic Design Brochure.
Eastlick Hall/Wegner Hall/Engineering Complex/Silver Recovery Units. 11/1994.
     Bovay Northwest Inc.
Chemical Storage Building/Environmental Health Services Facility - Predesign Study (DRAFT). 4/1994.
     Bovey Northwest, Inc.
29Hill Residence Halls - Condition Survey/Review - Stevens & McCroskey Halls. Duarte Bryant Architecture - Statement of Qualifications. 3/1995.
Stevens Hall Dormitory - Exterior Renovation - Design Submittal. Lateral Study/Outline Specifications/Cost Estimate. 12/1992.
     Duarte Bryant Architecture
Stevens Hall Dormitory - Exterior Restoration - Building Survey. 8/1992.
     Duarte Bryant Architecture
Heald Hall - Rebar Study (Reinforcing Investigation). 7/1993.
     Miller Hull Partnership
Heald Hall - Expanded Options Study. 8/1995.
     The Miller/Hull Partnership
Heald Hall Renewal - Predesign Phase Proposal. 3/1992.
     The Miller/Hull Partnership
Heald Hall Renewal - Options Phase Document. 6/1992.
     The Miller/Hull Partnership
Holland Library Addition - Design Development.
     ALSC Architects/ Zimmer Gunsul Frasca Partnership - Design Architect
     Structural: Structural Design Northwest
     Mechanical: Riley Engineering
     Electrical: Doyle Engineering
     Civil: Wyatt - Jaykim
Libraries - A Guide to Spacesaver High - Density Compact Storage Systems for the Library Environment The Space Saver Group.
Holland Library Renewal - Project Scope Development. 1/1994.
     ALSC Architects, P.S.
Holland Library Addition - Design Development Cost Estimate. 2/1990.
     ALSC Architects/Zimmer Gunsul Frasca Partnership - Design Architect
Holland Library Addition - Holland Library Addition - Package No. 2. 8/1993.
     Mortenson - The Construction Organization
Holland Library Addition - Design Development/Cost Estimate. 1/1989.
     C3Management Group, Inc.
Library - An Assessment of Current and Projected Library Space Needs @ WSU. 3/1988.
     P. Genie Trapp - Office of Institutional Research
ICNE - Yakima Permanent Facility - Proposed Site Study. Location: Between Glenn, Palmer & Prior Halls & the Brown Dental Clinic. 2/1994.
     Integrus Architecture, P.S.
ICNE Yakima Site Studies Log Project No. 93091. 1993.
     SCM Consultant, Inc.
Wheat Research Center - New Plant Growth.
     Tan Boyle Heyamota Architects
     Architects Design Group, Design Consultants
     Peden Petersen Lee, Structural Consultants
     MW Consulting Engineers, Mechanical & Electrical Consultants
     Ricard Carothers Associates, Landscape Consultants
Plant Growth Wheat Research Center - Schematic Design (Layouts).
New Plant Growth - Wheat Research Center - Schematic Design Submittal. 11/1994.
     Tan Boyle Heyamota/Architects Design Group
New plant Growth Facility - Submittal of Qualifications. 5/1994.
     Tan Boyle Heyamoto Architects/Architect Design Group
Inactive Records, Maintenance Materials Storage, and Recycle Building: Phase 1 - Schematic Design. 12/1992.
     Archos Corporation
Records, Maintenance Materials Storage, & Recycling Building - Construction Document Submittal. 9/1993.
     Archos Corporation
Records, Maintenance Material Storage, & Recycling building - Phase I - First Design Submittal. 4/1992.
     Archos Corporation
Records, Maintenance Material Storage, & Recycling Building - Phase I - Revised Schematic Design Submittal. 10/1992.
Records Storage & Recycle Building - Schematic Design Cost Estimate. 11/1992.
     Archos Corporation/C3 Management Group, Inc.
Records, Maintenance Materials Storage, & Recycling Building Phase I - Supplementary Building Program. 3/1992.
     Archos Corporation
University Facilities Planning & Student Housing Research - Qualifications Submittal Document. 1/1995.
     MGT of America, Inc.
The University of Connecticut Residential Life Facilities Study - Summary Report. 1/1991.
     Division of Student Affairs and Services
     Dober, Lidsky, Craig & Associates, Inc.
Proposed Undergraduate Housing Facility Program - Babson College. Babson College 1991 New Housing Study Committee. 3/1991.
     Dober, Lidsky, Craig & Associates, Inc., Consultants
Student Housing Proposal/Statement of Qualifications. 1/1995.
     IBI Group - Architects & Engineers
Graduate Student Housing - Massachusetts Institute of Technology/ 143 Albany Street. 5/1988.
     Facility Program Dober & Associates, Incorporated Planning Consultants
Plant Growth Wheat Research Facility - Summary of Field and laboratory Test Results. 8/1997.
     File: WASUNI - M9602A Contract: 12380
     Strata Geotechnical Engineering & Materials Testing
Incinerator - Replacement Medical Waste Incinerator - Environmental Impact Statement Volume I of II WSU. 10/1996.
Incinerator - Replacement Medical Waste Incinerator - Environmental Impact Statement Volume II of II WSU. 10/1996.
Incinerator - Design Development Submittal for Incinerator Project. Civil Design Analysis/Preliminary Structural Calculations/Mechanical/Electrical. 7/1997.
     Bovay Northwest
30Incinerator - Design Development Submittal for Incinerator Project. 7/1997.
     Bovay Northwest
Incinerator - New Incineration Facility/Wastewater Pre-Treatment Study. 2/1997.
     Bovay Northwest
Incinerator - Engineering Report Chapter 6 Site Selection. 7/1993.
     Bovay Northwest
Waste Management Evaluations - Proposal for Consulting Services. 2/1990.
     Doucet & Mainka, P.C.
Incinerator - Multicare Medical Center Incineration Project. Final Environmental Impact Statement. Pursuant to the State Environmental Policy Act of 1984 Chapter 43.2 (RCW 2/1990).
Waste Management Program Evaluation - Technical & Economic Feasibility Report. 2/1990.
     Doucet & Mainka, P.C.
Final Waste Management Program Evaluation - Report (DM347). 5/1990.
     Doucet & Mainka, P.C.
Yakama Village - One - Year Warranty Inspection Final Report Checklist. 1/1997.
     Design West
Student Services Addition - Mechanical Fixture Information Booklet. 9/1993.
     Mahlum & Nordfors Mckinley Gordon
Student Services Addition - Design Development Phase - Schematic Design Review Comments. 3/1993.
     McKinley Gordon - A Professional Service Corporation
French Administration Building Addition - Proposal to provide Value Engineering Services. 6/1993.
     Presented to: Mahlum & Nordfors Mckinley Gordon
     Submitted by: KJM & Associates, LTD
Student Services Addition Design Development Estimate - Draft. 10/1993.
     Turner Construction Company
Student Services Addition - Electrical Fixture Information Booklet. 9/1993.
     Mahlum & Nordfors Mckinley Gordon
Thompson Hall Renewal - Design Development Supplemental Information: Estimate of Construction Cost; Program Area Comparison; Architectural Details; Structural Notes; Mechanical Narrative; Light Fixture Schedule. 11/1994.
     Cardwell/Thomas & Associates/Architects
Thompson Hall Renewal - Schematic Design. 6/1994.
     Cardwell/Thomas & Associates/Architects
Thompson Hall Renewal - Selected Product Information. Division 8 Doors & Windows/Division 9 Finishes/Division 10 Specialties. 3/1995.
     Cardwell/Thomas & Associates/Architects
Thompson Hall Renewal - Addenda 1 - 6 Bid Package II. 5/1998.
     Cardwell/Thomas & Associates
Thompson Hall - Hazardous Material Survey - Addendum No. 1. 10/1997.
     SCM Consultants Inc.
Thompson Hall Renewal - Value Engineering Study. 10/1994.
     Olympic Associates Company
Thompson Hall Hazardous Materials Survey Project 3710.010. 2/1995.
     SCM Consultants, Inc. - Architects & Engineers
Thompson Hall Renewal Project - Value Engineering Services. 7/1994.
     Cardwell/Thomas & Associates
Todd Hall - Health & Safety Observations. 9/1994.
     AGRA Earth & Environment, Inc.
Todd Hall Renewal - Copy Finish Hardware Schedule for your review and comment. 3/1994.
     The Henry Klein Partnership
Todd Hall Renewal - Value Engineering Study. 10/1992.
     The Henry Klein Partnership
Todd Hall Renovation - Schematic Drawings. 7/1990.
     The Henry Klein Partnership
     Structural: ABJK
     Mechanical: Halvorson, Beach & Bower
     Electrical: Sparling & Assoc., Inc.
Todd Hall Renovation - Room Capacity Chart along with drawings. 10/1991.
     The Henry Klein Partnership
Todd Hall Renovation - Health & Safety Plan - Demolition of Lead Paint Containing Material R14. 3/1994.
     AGRA - Engineering & Environmental Services
Todd Hall Renewal - Allotment Request for Construction - Renovation - renovation will bring fire, safety, & handicapped compliance up to date. 12/1993.
Todd Hall Addition - Construction Cost Estimate. 1/1989.
     Olympic Associates Company
Todd Hall Addition - Foundation Investigation. 7/1984.
     c/o Henry Klein Partnership
     Shannon & Wilson, Inc.
Todd Hall Addition - Fire Alarm & Clock Control System. 12/1989.
     Simplex
Todd Hall Addition - C.D. Contractors, Inc. Certified Payroll Reports beginning with period ending 6/23/1989 to date. 11/1989.
     C & D General Contractors.
31Todd Hall Addition - Equipment Brochures Job # 3147. 12/1988.
     FORMA - Interior Design Planning & Purchasing
Consolidated Information Center (C.I.C.) - Design Development Outline Specifications. 12/1994.
     Integrus Architecture
Consolidated Information Center - Drainage Report (Tri-Cities). 12/1994.
     Rose Water Engineering, Inc.
Consolidated Information Center - Energy Conservation Report (Tri-Cities). 1/1995.
     MW Consulting Engineers
Consolidated Information Center - Value Engineering Study - Tri-Cities Branch. 11/1994.
     Roen Associates
Hazardous Communication - Hazardous Chemical Program Manual. 7/1989.
     Contractors Northwest; Inc.
Consolidated Information Center - Design Development Cost Estimate (Tri-Cities). 1/1995.
Consolidated Information Center Preliminary Program Information. 12/1993.
     Integrus Architecture, P.S.
Tri-Cities WSU - Campus Expansion Traffic Impact Study - Level of Service Reports - Existing Condition Year Traffix System Version 6.7. 1994.
     Licensed To INCA Engineers, Inc.
Tri-Cities Campus Expansion - Traffic Impact Study. 8/1994.
     Prepared by INCA Engineers, Inc.
Consolidated Information Center - Phase I Geotechnical Studies. 12/1994.
     Shannon & Wilson, Inc. - Geotechnical & Environmental Consultants
Center for Northwest Anthropology - A Cultural Resources Survey of the WSU Tri-Cities Branch Campus Properties Contributions in Cultural Resource Management No. 49. 2/1995.
Veterinary Teaching Hospital - Phase 11 Building Construction - Quality Control Program.
     Morgen & Oswood Construction Co., Inc.
Veterinary Teaching Hospital - Site Preparation Phase I - Information for Preparation of Bids on Excavation & Fill.
Veterinary Teaching Hospital - Phase II: Building Construction Contract No. 11470. Environmental & Pollution Prevention Plan.
     Morgen & Oswood Construction Co., Inc,
Veterinary Teaching Hospital - Project Information & Procedures. Owner’s Project # 11470.
     Morgen & Oswood Project Number 9304
Veterinary Teaching Hospital - Value Engineering & Constructability Study. 5/1992.
Morrison Knudsen Corporation
Veterinary Teaching Hospital - Project Manual for Phase I: Site Grading/ Job Number 5-88-328A. 6/1991.
     De Neff Deeble Barton Associates Architects & Planners
Veterinary Teaching Hospital - Clinic Building - Environmental Analysis. Volume Five of Six Oregon State University Environmental Quality Study (Item 10.10). Submitted to Grants & Contracts Management Branch - Public Health Service.
     Submitted by Mr. Milosh Popovich Vice Pres. Of Administration/Oregon State University
Environmental Quality Study for (Exhibit D). Veterinary Research Laboratory Addition, Moscow Idaho. Caldwell Veterinary Medical Center, Caldwell, Idaho. Caldwell Veterinary Medical Center Isolation Building. Caldwell, Idaho. Volume Six of Six - University of Idaho (Item 10.10). 6/1977.
College of Veterinary Medicine Capital Budget Request - Construction of New Veterinary Teaching Hospital. 1989 -1999.
McCoy /Bustad Complex - Veterinary Teaching Hospital - Site Study. 4/1988.
     De Neff Deeble Barton Associates - Architects & Planners
New Veterinary Teaching Hospital - College of Veterinary Medicine - Schematic Design.
     De Neff Deeble Barton Associates - Architects & Planners
     Thomas J. Gerard & Associates, Inc. - Mechanical
     Suden, Golden & Guest, Inc. - Structural
     Foil - Wyatt - Mckewen - Veterinary Consultant
     TresWest Engineers, Inc. - Electrical
     Thorson Partnership - Landscape Architect
Veterinary Teaching Hospital - A Report on Site Planning. 11/1988.
     Burke/Lee A Joint Venture - Campus Planners
Veterinary Teaching Hospital - Interview. 10/1987.
     Project Design Team: De Neff Deeble Barton Associates Architects & Planners
     Foil - Wyatt - McKewen - Veterinary Planning Consultant
     Suden, Golden & Guest, Inc. - Structural Engineers
     Thorson Partnership - Landscape Architects
     TresWest Engineers, Inc. - Mechanical/Electrical
Veterinary Hospital - Benefit & Life Cycle Cost Analysis Summary.
32Veterinary Teaching Hospital Complex - Review Copy of Program. 7/1988.
     De Neff Deeble Barton Associates - Architects & Planners
     Program Consultant: Foil - Wyatt - Mckewen
New Veterinary Teaching Hospital - College of Veterinary Medicine. 12/1990.
     De Neff Deeble Barton Associates Program consultant - Foil - Wyatt - Mckewen
New Veterinary Teaching Hospital Complex Program (Needs Not Meet In New Construction). 12/1990.
     De Neff Deeble Barton Associates Foil - Wyatt - Mckewen
Health Professions Educational Facilities Construction Grant - Volume One of Six. 7/1977.
     Submitted by: Washington State University, Oregon State University, University of Idaho,