| Back to Finding Aids | |
| Washington State University Libraries Manuscripts, Archives, and Special Collections Pullman, WA 99164-5610 USA (509) 335-6691 Inquiries |
Archives 269, 270, 271, 272, 273
W.S.U. Capital Planning
Building Files and Reports, 1957-2007 (bulk 1985-2002)
ORGANIZATIONAL HISTORY
A University Architect served as the construction officer at Washington State University from 1911 forward. The modern form of the office dates from 1947 when it became a full-time, staffed administrative department. In 1967 the University Architect office was renamed as Facilities Planning, and then to Facilities Development in 1993. In 2001 it was renamed as Capital Planning. While Capital Planning is responsible for major planning and development, smaller projects are conducted by Facilities Operations. Facilities Operations descended from the Physical Plant in 1998, which in turn descended from Building and Grounds in 1967. While each line of programs has existed separately, some migration in function has occurred over the years. The primary difference between Capital Planning and Facilities Operations is the cost of the project in question - initially items costing less than $1,000,000 were assigned to Fac Ops, and those costing more to CP. By 2009, this break point is between $1,500,000 and $2,000,000.
COLLECTION ARRANGEMENT
This page compiles a number of collections received from Capital Planning between 2004 and 2009, in reverse chronological (newest to oldest) order. In requesting materials, please make sure you have identified the correct collection. This page compiles:
Archives 269. Student Rec Center Reports, 1997-2009. UA 2009-01. Received Feb. 4, 2009.
Archives 270. Building Files and Records, 1962-2007 (bulk 1990-1999). UA 2007-01. Received March-May, 2007.
Archives 271. Building Files and Records, 1980-2001. UA 2005-11. Received July 11, 2005.
Archives 272. Building Files and Records, 1962-2003. UA 2005-07. Received May 25, 2005.
Archives 273. Building Files and Records, 1957-1998. UA 2004-01. Received February 10, 2004.
Each collection is maintained in the order in which it was received in the Archives from Capital Planning.
ACCESS
The majority of these are open and available for research use, though a few files are marked as confidential or classified (these are primarily identified as Attorney General files or Issues & Claims files; please contact Capital Planning if you wish access to these) and access to those may be restricted. These files are labeled in this page as RESTRICTED, each box containing restricted material is so labeled, and individual restricted folders are stickered as such. Copyright restrictions may apply.
RELATED MATERIALS
The WSU Archives hold a number of other Capital Plannng collections; to locate these please view our Archives' Collections List and our Accessions List, looking for the various names under which this department has operated: University Architect, Facilities Planning, Facilities Development, Capital Planning.
Archives 269
Capital Planning
Student Recreation Center Reports, 1997-2009
ACQUISITION AND PROCESSING INFORMATION
Capital Planning's Student Recreation Center records were transfered to Manuscripts, Archives, and Special Collections on February 4, 2009 (UA 2009-01) by Anne Pinard. One additional document was received in June, 2009 and added to the General Correspondence file in Box 2. The records were processed by Tim Mace and University Archivist Mark O'English in early 2009.
EXTENT/QUANTITY INFORMATION
COLLECTION DESCRIPTION
The collection consists of contractual, construction, and maintenance papers related to the Student Recreation Center, which opened in early 2001. Please note that operational or personal records pertaining to the Student Rec Center are not included here.
PREFERRED CITATION
The suggested citation for the collection is:
[Item Description]
Capital Planning Student Rec Center Reports, 1997-2009 (UA 269)
Manuscripts, Archives, and Special Collections
Washington State University Libraries
Pullman, WA
| Box | Description |
| 1 | Budget 1997 |
| E.I.S. 4/1998 | |
| Finance, Audit, and Capital (FAC) Comm 1/1999 | |
| FAC Committee 2001 | |
| Public Information Requests 4/1999 | |
| Regents Items 5/1997 | |
| Attorney General Correspondence 6/1997 RESTRICTED | |
| Gilbane Building Company Contract 13039 5/1998 | |
| Gilbane Settlement 12/1999 RESTRICTED | |
| Disputes Review Board- Stephen Goldblatt General Correspondence 12/1998 RESTRICTED | |
| Avista Utilities 7/1999 | |
| Contract 12684 Brailsford and Dunlavey 3/1997 | |
| Disputes Review Board Stephen Goldblatt 12/1998 RESTRICTED | |
| Gilbane Building Company- Preconstruction Contract 12980 1/1999 | |
| Hainline and Associates 4/1999 | |
| KJM and Associates, Ltd. Contract 13232 Pay Estimates 5/1999 | |
| Musgrove Engineering CO 15649 Boiler Failure Evaluation 5/2004 | |
| EMCON Contract 12965 5/1998 | |
| KJM E-mail 4/1999 | |
| KJM and Associates General Correspondence 1/2000 | |
| O’Brien Kreitzberg Consultant E-mail 4/1998 | |
| O’Brien Kreitzberg Contract 12879 5/1998 | |
| Reil Middleton General Correspondence E-mail 2/2000 | |
| 2 | Reid Middletion, Inc. Contract 12968 |
| Roen Associates E-mail Correspondence | |
| Roen Associates Contract 12961 | |
| Team Tech | |
| Walker Inspectorate Contract 13047 | |
| Value Engineering Study | |
| Feasibility Study- Final Report Brailsford and Dunlavey | |
| Walker Inspectorate Test Reports | |
| Project Planning Committee | |
| Chlorine Gas System Alternates | |
| Gymnasium Wall Mock-Ups | |
| Draft- Program of Architecture Requirements Brailsford and Dunlavey | |
| Brailsford and Dunlavey General Correspondence | |
| Geotechnical Report | |
| WSU Field Authorizations | |
| WSU Field Reports | |
| General Correspondence- E-mail | |
| General Correspondence | |
| Yost Grube Hall Architecture E-mail | |
| A/E Consulting Services Selection | |
| Yost Grube Hall Architecture C012810 | |
| Yost Grube Hall Architecture General Correspondence | |
| Susan D. Musselman CO. 12765 | |
| 3 | Yost Grube Hall Architect’s Supplemental Instructions (ASI) 11/1998 |
| Yost Grube Hall Site Observation Reports 5/1999 | |
| Gilbane Building Company E-mail 6/1999 | |
| Gilbane Building Company Contract 13160 3/2001 | |
| Gilbane Building Company Submittals 8/1998 | |
| GC/CM Selection Part 2 3/1998 | |
| GC/CM Selection Part 1 3/1998 | |
| Gilbane Building Company General Correspondence 2/2000 | |
| Yost Grube Hall- Energy Life Cycle Cost Analysis 12/1998 | |
| Gilbane Quality Control Activity 3/2000 | |
| Gilbane Building Company Daily Construction Reports 7/2000 | |
| Gilbane Building Company Construction Meeting Minutes 4/2000 | |
| Gilbane Building Company Monthly Reports 7/2000 | |
| Gilbane- Scope Review Meeting Minutes 1/1999 | |
| Project Progress Photographs 3/2000 | |
| 4 | Gilbane- Weekly Safety Meetings 3/1999 |
| Project Schedule 2/2000 | |
| Gilbane Building Company (RFI) Request for Information 300-360 1999 | |
| Gilbane Building Company (RFI) Request for Information 240-299 1999 | |
| Gilbane Building Company (RFI) Request for Information 180-204 1999 | |
| Gilbane Building Company (RFI) Request for Information 120-178 1999 | |
| Gilbane Building Company (RFI) Request for Information 66-119 1999 | |
| Gilbane Building Company (RFI) Request for Information 1-65 1998 | |
| RFI Review Reports/ Closed RFI Lists 12/1998 | |
| Gilbane Building Company (RFI) Request for Information 1281-1320 2000 | |
| Gilbane Building Company (RFI) Request for Information 1321-1360 2000 | |
| Gilbane Building Company (RFI) Request for Information 1241-1280 2000 | |
| Gilbane Building Company (RFI) Requests for Information 1201-1240 2000 | |
| Gilbane Building Company Requests for Information 1161-1200 2000 | |
| 5 | Gilbane Building Company (RFI) Request for Information 1121-1160 2000 |
| Gilbane Building Company (RFI) Request for Information 1041-1080 2000 | |
| Gilbane Building Company (RFI) Request for Information 1081-1120 2000 | |
| Gilbane Building Company (RFI) Request for Information 1001-1040 2000 | |
| Gilbane Building Company (RFI) Request for Information 961-1000 2000 | |
| Gilbane Building Company (RFI) Request for Information 921-960 2000 | |
| Gilbane Building Company (RFI) Request for Information 881-920 2000 | |
| Gilbane Building Company (RFI) Request for Information 841-880 2000 | |
| Gilbane Building Company (RFI) Request for Information 801-840 1999 | |
| Gilbane Building Company (RFI) Request for Information 761-800 1999 | |
| Gilbane Building Company (RFI) Request for Information 721-760 1999 | |
| Gilbane Building Company (RFI) Request for Information 681-720 1999 | |
| Gilbane Building Company (RFI) Request for Information 641-680 1999 | |
| 6 | Gilbane Building Company (RFI) Request for Information 601-640 1999 |
| Gilbane Building Company (RFI) Request for Information 561-600 1999 | |
| Gilbane Building Company (RFI) Request for Information 521-560 1999 | |
| Gilbane Building Company (RFI) Request for Information 481-520 1999 | |
| Gilbane Building Company (RFI) Request for Information 420-480 1999 | |
| Gilbane Building Company (RFI) Request for Information 360-419 1999 | |
| Gilbane Monthly Reports 1998-1999 | |
| PM/CA Procedures 4/1999 | |
| RFP For PM/CA Consulting Services 2/1998 | |
| 7 | Schematic Estimates |
| Post Sale Summary Book | |
| Statement Of Qualifications | |
| Certified Payroll Reports | |
| Gilbane Building Company Contract Change Proposal 10-22 | |
| 8 | Gilbane Building Company Contract Change Proposal 1-8 And 51-90 |
| 9 | Gilbane Building Company Contract Change Proposal 23-50 And 97-115 |
| 10 | Gilbane Building Company Contract Change Proposal 91-96 |
| Close-Out File 4/2000 | |
| Rejected Bids GC/CM Proposal Opening 5/1998 | |
| Brailsford And Dunlavey General Correspondence 4/1997 | |
| KJM General Correspondence 12/1999 | |
| General Correspondence E-Mail2 6/1999 | |
| General Correspondence E-Mail 1 11/1998 | |
| General Correspondence 5 8/2000 | |
| General Correspondence 4 3/1999 | |
| 11 | General Correspondence 3 7/1998 |
| General Correspondence 2 2/1998 | |
| General Correspondence 1 8/1997 | |
| Yost Grube Hall Architecture General Correspondence 9 10/1999 | |
| Yost Grube Hall Architecture General Correspondence 8 5/1999 | |
| Yost Grube Hall Architecture General Correspondence 7 4/1999 | |
| Yost Grube Hall Architecture General Correspondence 7A 2/1999 | |
| Yost Grube Hall Architecture General Correspondence 6 11/1998 | |
| 12 | Yost Grube Hall Architecture 5 8/1998 |
| Yost Grube Hall Architecture 4 7/1998 | |
| Yost Grube Hall Architecture 3 6/1998 | |
| Yost Grube Hall Architecture General Correspondence 2 4/1998 | |
| Yost Grube Hall Architecture General Correspondence 1 2/1998 | |
| Yost Grube Hall Architecture C012810 9 3/2000 | |
| Yost Grube Hall Architecture C012810 7 2/2000 | |
| 13 | Yost Grube Hall Architecture C012810 6 8/1999 |
| Yost Grube Hall Architecture C012810 5 7/1999 | |
| Yost Grube Hall Architecture C012810 4 2/1999 | |
| Yost Grube Hall Architecture C012810 3 11/1998 | |
| Yost Grube Hall Architecture C012810 2 9/1998 | |
| Yost Grube Hall Architecture C012810 1 1/1999 | |
| Project Schedule 3 1/2000 | |
| Project Schedule 2 12/1999 | |
| 14 | Project Schedule 1 9/1999 |
| Gilbane Building Company Construction Meeting Minutes 2 3/2000 | |
| Gilbane Building Company Construction Meeting Minutes 1 7/1999 | |
| Gilbane Weekly Quality Control Activity 2 2/2000 | |
| Gilbane Weekly Quality Control Activity Report 8/1999 | |
| Gilbane Building Company Monthly Reports 6/2000 | |
| Gilbane Building Company Daily Construction Reports 6 6/2000 | |
| Gilbane Building Company Daily Construction Report 5 3/2000 | |
| 15 | Gilbane Building Company Daily Construction Reports 4 1/2000 |
| Gilbane Building Company Daily Construction Reports 3 11/1999 | |
| Gilbane Building Company Daily Construction Reports 2 10/1999 | |
| Gilbane Building Company Daily Construction Reports 1 9/1999 | |
| General Correspondence E-Mail 2 1/2000 | |
| Gilbane Building Company E-Mail 5/1999 | |
| Gilbane Building Company General Correspondence 16 1/2000 | |
| Gilbane Building Company General Correspondence 15 11/1999 | |
| Gilbane Building Company General Correspondence 14 10/1999 | |
| Gilbane Building Company General Correspondence 13 9/1999 | |
| Gilbane Building Company General Correspondence 12 7/1999 | |
| Gilbane Building Company General Correspondence 11 6/1999 | |
| 16 | Gilbane Building Company General Correspondence 10 6/1999 |
| Gilbane Building Company General Correspondence 9 6/1999 | |
| Gilbane Building Company General Correspondence 8 6/1999 | |
| Gilbane Building Company General Correspondence 7 5/1999 | |
| Gilbane Building Company General Correspondence 6 5/1999 | |
| Gilbane Building Company General Correspondence 5 4/1999 | |
| Gilbane Building Company General Correspondence 3 1/1999 | |
| Gilbane Building Company General Correspondence 2 8/1998 | |
| Gilbane Building Company General Correspondence 1 7/1998 | |
| 17 | Gilbane Building Company Contract 13160 8 2/2001 |
| Gilbane Building Company Contract 13160 7 11/2000 | |
| Gilbane Building Company Contract 13160 6 6/2000 | |
| Gilbane Building Company Contract 13160 5 5/2000 | |
| Gilbane Building Company Contract 13160 4 2/2000 | |
| Gilbane Building Company Contract 13160 3 11/1999 | |
| Gilbane Building Company Contract 13160 2 8/1999 | |
| 18 | Statement of Qualifications for Gilbane 4/1998 |
| Maximum Allowable Construction Cost Proposal 12/1998 | |
| Program Of Architectural Requirements 10/1997 | |
| 19 | CCP11R Review Log Books 1 and 2 |
| Energy Life Cycle Cost Analysis 12/1998 |
Archives 270
Capital Planning
Building Files & Records, 1962-2007 (bulk 1990-1999).
ACQUISITION AND PROCESSING INFORMATION
These records were transfered to Manuscripts, Archives, and Special Collections from Capital Planning between March and May, 2007 (UA 2007-01). The records were processed by Tim Mace and University Archivist Mark O'English in early 2009.
EXTENT/QUANTITY INFORMATION
COLLECTION DESCRIPTION & ARRANGEMENT
The collection consists of five series: WSU Buildings Files (generally organized alphabetically by building name), Capital Improvements and Correspondence, and then reports from three specific projects: Incinerator Upgrade, Waste handling facilities for the Pathological/Biomed Incinerator, and the Creamery Annex.
PREFERRED CITATION
The suggested citation for the collection is:
[Item Description]
Capital Planning Building Files & Records, 1962-2007 (UA 270)
Manuscripts, Archives, and Special Collections
Washington State University Libraries
Pullman, WA
| Box | Description |
| 1 | Adams/Gladish School 8/1980 - 9/1983 |
| Administration Annex 7/1996 - 1/1999 | |
| Albrook Lab 10/1981 - 2/1985 | |
| Alumni Centre 9/1997 - 9/1998 | |
| Animal Sciences Feed Plant 4/1994 - 10/1998 | |
| Anthropology Laboratory Building 9/1983 - 10/1994 | |
| Athletic Merger 3/1982 - 9/1982 | |
| Avery Hall 5/1978 - 9/1995 | |
| Bear Facility and Research 1/1990 - 12/1993 | |
| Beef Cattle Center Manure Separator Building 2/1993 - 3/1993 | |
| Beef Cattle Reproduction Barn 2/1984 - 11/1984 | |
| Black Footed Ferret Facility 11/1984 | |
| Bohler Gym With Phase I Remodeling for Athletic Merger Notebook. 12/1977 - 4/1998 | |
| Boiler Plant 12/1994 | |
| Bryan Hall 2/1974 - 5/1997 | |
| Bustad Hall 1/1991 - 10/1998 | |
| Campus Trails 5/1998 | |
| Carpenter Hall 4/1979 - 6/1997 | |
| Central Stores 12/1993 | |
| Child Care Facility 1/1990 - 4/1995 | |
| Clark Hall 4/1982 - 4/1998 | |
| Classroom Improvements. Part of 1988 15 Bldg. Classroom Improvement Plan 5/1986 - 9/1991 | |
| Co-Generation Facility: Production of Energy as a by Product of Steam Generation 1/1990 - 2/199 1 | |
| College Hall 7/1985 - 8/1996 | |
| Compost Facility 8/1997 | |
| Compton Union Building 11/1984 - 4/1997 | |
| Computer Sciences 6/1990 - 1/1991 | |
| Cooper Publications 8/1979 - 11/1995 | |
| Counseling Career Services Building 8/1978 - 9/1989 | |
| Daggy Hall 5/1979 - 6/1995 | |
| Day Care Center 10/1987 - 11/1987 | |
| Dean Robbins College of Agriculture 12/1978 - 7/1997 | |
| Department of Facilities Planning - Move to Commons Hall 2/1991 - 9/1992 | |
| Eastlick Hall 8/1983 - 4/1998 | |
| Energy Institute 1/1981 - 5/1981 | |
| Ensminger Beef Center 12/1997 | |
| Equine Center 3/1986 - 8/1991 | |
| Equine Exercise Track 12/1975 - 7/1978 | |
| Fine Arts Building 10/1982 - 7/1998 | |
| Fine Arts Plaza 8/1999 | |
| Food Service and Human Nutrition 5/1994 - 4/1998 | |
| Food Service Building 1/1998 | |
| 2 | Freeway Plaza 12/1985 - 11/1985 |
| Fulmer Hall 8/1983 - 9/1995 | |
| Gannon - Goldsworthy 9/1985 - 2/1998 | |
| General Storage 12/1992 | |
| Glen Terrell Mall 8/1996 | |
| Graham Farm Coal Ash Disposal Site 7/1987 - 6/1996 | |
| Greenhouses 5/1987 - 8/1993 | |
| Grimes Way Playfield 6/1996 - 11/1996 | |
| Hazardous Waste 10/1987 - 7/1987 | |
| Heald Hall 1/1980 - 1/1997 | |
| Heritage House 11/1980 - 6/1996 | |
| Hermosa Day Care 8/1985 - 9/1985 | |
| Hitchhock Research Track 8/1980 - 9/1991 | |
| Hollingberry Field House 1/1998 10/1998 | |
| Hulbert Hall 11/1979 - 3/1998 | |
| Ice Rink 10/1999 | |
| ICNE Spokane 2/1986 1/1999 | |
| Johnson Tower 9/1979 - 3/1996 | |
| Johnson Fire Services Training Facility 6/1985 - 10/1988 | |
| Kimbrough Music Building 2/1970 - 8/1995 | |
| Knott Dairy Farm 3/1995 - 12/1995 | |
| Libraries 12/1983 8/1999 | |
| Lighty Student Services Building 8/1997 - 5/1994 | |
| Lower Soccer Field 2/1994 - 8/1994 | |
| Meats Laboratory 1/1990 - 3/1990 | |
| McCluskey Building 6/1979 1/1999 | |
| McCoy Hall 5/1984 - 2/1998 | |
| McCroskey 1/1983 - 6/1994 | |
| McEachern Residence 8/1989 4/1996 | |
| Meyer’s Point 3/1993 - 7/1994 | |
| Morrill Hall 1/1995 | |
| Shoreline Master Program for Thurston Region (Notebook) 1990 | |
| Henderson Inlet Watershed Action Plan - Final - Thurston County Planning Department Notebook 10/1989 | |
| Thurston County - Critical Areas - Thurston County Advance Planning & Historic Preservation Board Proposed Revisions (Notebook) 10/1993 | |
| Murrow Hall 7/1979 - 7/1995 | |
| Parking Lots: AGRA Earth & Environmental - Phase I Site Assessment 6/1995 | |
| Parking Projects 1995 2/1995 - 8/1995 | |
| Parking Structures Daggy/Fine Arts 12/1994 | |
| Perham Hall Fire Damage Repairs 9/1980 | |
| Physical Sciences Building: Marine Mineral RSRC. Museum 3/1987 - 5/1987 | |
| 3 | Pine Manor Building 8/1996 - 5/1999 |
| Planetarium Classroom Building 6/1985 | |
| Plant Science Teaching Greenhouse 9/1991 | |
| Poultry Center Building 2/1990 | |
| Presidents Residence 4/1998 | |
| Primate Research Center 2/1983 - 10/1988 | |
| Buildings to be Razed 9/1981 - 3/1988 | |
| WSU Research & Technology Park: BLDG #2 6/1993 - 4/1996 | |
| Research & Technology Park Design Advisory Board 8/1995 - 4/1998 | |
| Ring Road 5/1998 - 6/1998 | |
| Rock Point Housing Complex 12/1985 - 2/1986 | |
| Roundtop Memorial Park 4/1992 - 1/1993 | |
| Safety Building 12/1975 - 11/1997 | |
| Science Hall 7/1993 - 7/1994 | |
| Seed Storage Facility USDA: Ken Abby's Old Files Transferred to FAC.DLN 2/1976 - 12/1976 | |
| Seed Storage Facility WSCIA: Ken Abby’ s Old Files Transferred to FAC.DL. 1/1962 - 4/1977 | |
| Shepard’s Residence 3/1994 | |
| Smith Gym 4/1980 - 2/1999 | |
| L.J. Smith Hall 5/1978 - 3/1998 | |
| Steffen Center 2/1981 - 9/1994 | |
| Stephenson - North 12/1989 | |
| Stevens Hall 10/1979 - 5/1996 | |
| Stimson Hall 6/1992 - 2/1993 | |
| Tennis Courts 6/64 - 4/1995 | |
| Terrace Apartments 2/1996 | |
| Thompson Hall 3/1974 - 5/1997 | |
| Troy Hall 8/1975 - 12/1979 | |
| Tukey Horticulture Orchard - Field Buildings 7/1989 - 3/1998 | |
| University Storage Buildings 12/198 1 - 7/1983 | |
| Various New Veterinary Science Pole Framed Buildings 9/1983 11/1983 | |
| WSU Veteran’s Memorial 1/1993 - 12/1998 | |
| Waller Hall 9/1995 - 2/1997 | |
| Wegner Hall 2/1985 - 4/1998 | |
| White Hall 5/1978 - 5/1996 | |
| Wilmer Davis Residence Hall 5/1997 | |
| Wilson Hall 6/1980 - 7/1993 | |
| WSU Vancouver 2/1995 | |
| WSU /CWU /YVCC “Shared Building - Yakima Center 9/1997 - 9/1997 | |
| Yakima Village 3/1998 | |
| USDA/General 6/1997 | |
| USDA/ARS Green - House/Headhouse Complexes 4/1988 - 6/1996 | |
| USDA Pesticide Chemical Storage Building 1/1981 - 4/1981 | |
| Washington Archeological Research Center 1978 - 1988 | |
| Research & Extension Units 10/1982 - 3/1998 | |
| Wenatchee Tree Fruit Research Center 10/1994 - 6/1998 | |
| Western Sudan Agricultural Research Project 12/1977 - 2/1980 | |
| College of Agriculture & Home Economics - McClellan & Copenhagen Strategic Master Plan 4/1999 | |
| 4 | College of Agriculture and Home Economics Major Capital Budget Request 1997 - 2007 |
| College of Agriculture & Home Economics - McClellen & Copenhagen. Inc, CO 13222 4/1999 | |
| College of Business & Economics Dean Gale SullenBerger 4/1984 - 2/1995 | |
| College of Engineering & Architecture 10/1983 - 1/1997 | |
| Extended University Affairs - Vice President Thomas Purce 1/1996 | |
| Extended University Services Muriel Oake 7/1987 | |
| Graduate School Dean R.V. Smith 8/1981 - 12/1994 | |
| School of Music & Theatre Arts Director Erich Lear 5/1992 - 5/1996 | |
| College of Pharmacy M.M Abdel Monem 2/1984 - 3/1993 | |
| College of Sciences & Arts (Division of Sciences) Dean L.J. Radziemski 1/1983 - 6/1996 | |
| Administrative Review Reports 11/1990 - 12/1990 | |
| AEA Committee & A/E Fee Task Force 1/1994 - 5/1996 | |
| AEA Committee & A/E Fee Task Force 3/1992 - 4/1993 | |
| AEA Committee & A/E Fee Task Force 7/1991 - 3/1992 | |
| AEA Committee & A/F Fee Task Force 9/1987 - 6/1991 | |
| AEA Committee & A/F Fee Task Force 2/1985 - 1/1986 | |
| AEA Committee & A/E Fee Task Force 5/1981 - 1/1985 | |
| AGC SFC Committee Information Minutes 9/1995 - 3/1999 | |
| AGC - SFC Committee Information Minutes 1/1992 - 8/1995 | |
| 5 | AGC - SFC Committee Information Minutes. (Associated General Contractors Stale Facilities Construction,) 6/1989 - 12/2001 |
| AGC - SFC Committee Information Minutes. (Associated General Contractors State Facilities Construction,) 8/1987 - 3/1989 | |
| AGC - SFC Committee Information Minutes. (Associated General Contractors State Facilities Construction,) 7/1985 - 7/1987 | |
| American Arbitration Association 1989 - 1996 | |
| Artwork Correspondence Details 1980 1/1980 - 7/1998 | |
| Attorney General Correspondence 1978 - 12/1995 RESTRICTED | |
| AUA Correspondence (Associated University Architects) 8/1994 - 8/1996 | |
| AUA Correspondence (Associated University Architects) 11/1979 - 4/1994 | |
| Major Capital Budget 12/1997 - 5/2000 | |
| Major Capital Budget 4/1996 - 11/1997 | |
| Operating & Capital Budget Guidelines Biennium 1997 - 1999 | |
| Status of Capital Appropriations 1991 - 1993 | |
| Capital Project Summary (Current Status) 1997 - 1999 | |
| Minor Capital Improvements Accounting/Project Summaries 1/1996 - 9/1997 | |
| 6 | MCI/MCR Capital Improvements Allocations 12/1995 - 7/1997 |
| Business Services/Real Estate 9/1987 - 1/1993 | |
| Regents MCI Projects 6/1995 | |
| Arts Electric, Inc./DBA Palouse Country Electric - Various Projects 12/1993 | |
| Atkinson Construction Co . - Various Projects 12/1993 | |
| Blue Sage Corporation - Various Projects 7/1994 | |
| Bovay Northwest 9/1995 | |
| Capital Communications Industries, Inc. 1/1994 | |
| Cosco Fire Protection. Inc. 12/1993 - 3/1994 | |
| Creighton - Brook Engineers Various Projects 8/1993 - 3/1994 | |
| Design West Architects 7/1993 - 1/1995 | |
| Don Brigham Plus Associates Various Projects 6/1994 - 8/1994 | |
| Elliot Electrical Engineers - Various Projects 7/1993 2/1994 | |
| Ellis - Feeney, Architects & Planners 7/1993 - 11/1994 | |
| Emcon Northwest. Inc. Various Projects 3/1994 | |
| Far West Services, Inc . - Various Projects 6/1993 | |
| G.Craig Lee. P.E.. S.E. - Various Projects 10/1993 | |
| Hamre Construction. Inc. - Various Projects 3/1994 | |
| Hodge & Associates Various Projects 1/1994 | |
| Inland Coatings, Inc - Various Projects 5/1994 | |
| Intermountain Electric. - Various Projects 3/1994 | |
| John Graham Associates/ DLR Group 5/1995 | |
| Lindgren & Associates, Inc. - Various Projects 12/1993 | |
| MCGowan Construction 2/1994 | |
| Morrison Knudsen Corporation 3/1992 - 8/1995 | |
| Munir Daud & Associates - Various Projects 1/1994 - 12/1994 | |
| MW Consulting Engineers - Various Projects 5/1993 - 6/1994 | |
| Palouse Country Electric - Various Projects 2/1994 | |
| Peden, Petersen, Lee. P.S. - Various Projects 4/1994 | |
| Riley Engineering Inc. 5/1993 - 5/1995 | |
| RZA AGRA - Various Projects 2/1994 | |
| S.G. Morin & Son, Inc - Various Projects 9/1993 | |
| Tektoniks Corporation - Various Projects 7/1993 | |
| 3-H Mechanical - Various Projects 6/1993 | |
| T.J. Gerard & Associates Inc. - Various Projects 1/1994 | |
| TKTM(Tectum) Corporation - Various Projects 4/1994 | |
| W.B. Lehner & Associates - Various Projects 3/1994 | |
| Weiland Lindgren & Associates - Various Projects 12/1993 | |
| MCI/MCR Contract Summary Reports 7/1996 - 9/1996 | |
| MCI/MCR Allocations 1995 - 1997 | |
| MCI (Minor Capital Improvements)/MCR (Minor Capital Renewal) 9/1995 - 6/1995 | |
| MCI/MCR - 12/1992 - 8/1995 | |
| Major & Minor Capital Improvements 1991 - 1993 | |
| Capital Budget Request 1995 - 2005 | |
| Major Capital Budget Requests 6/1987 - 3/1996 | |
| Capital Improvements Six Year Plan 1993 - 1999 | |
| Capital Improvement Program 1987 - 1997 | |
| Capital Improvements 1993 - 1995 | |
| Major Capital Improvement 1991 - 1999 | |
| 7 | Major Capital Improvements 1989 - 1995 |
| Minor Capital Improvements 1989 - 1991 | |
| Benefit Services & Risk Management 5/67 - 9/1999 | |
| Budget Office 1976 - 6/1994 | |
| CP/CC Small Projects Subcommittee 6/1997 - 9/1997 | |
| OFM/CPCC Subcommittee on Maintenance 12/1995 - 4/1997 | |
| CP/CC Risk Assessment Subcommittee 9/1998 - 1/1999 | |
| CP/CC Project Management Survey Responses 6/1996 - 9/1996 | |
| CP/CC Project Management Survey 7/1996 - 8/1996 | |
| OFM/CPCC Project Management Subcommittee 1/1995 - 8/1999 | |
| Capital Policy/Communications Committee - General Corresp. 8/1995 - 5/1998 | |
| CP/CC Subcommittee on Maintenance Standards 10/1994 - 11/1995 | |
| CPCC - Maintenance Standards - Closed 12/1996 | |
| Carpet Policy 9/1982 - 4/1993 | |
| Central Stores 3/1990 - 8/1998 | |
| Chairs’ Workshop 1/1992 | |
| Commute Reduction 7/1993 - 9/1993 | |
| Conference and Institutes 12/1994 - 7/1998 | |
| 8 | WSU Construction/Design Standards 4/1989 - 3/1996 |
| Declaration of Emergency - Emergency Funds for unplanned repairs/maintenance etc. 6/1995 - 8/1996 | |
| Dining Services 9/1993 - 8/1997 | |
| Environmental Health Correspondence 8/1994 - 4/1999 | |
| Craig Benjamin. Assistant Director - General Correspondence 4/1992 - 5/1997 | |
| Laura Hubbard. Director Budget & Accounting Services 10/1998 - 3/1999 | |
| Extended University Services 2/1990 - 5/1997 | |
| Flammable/Combustible - Liquid Storage 12/1984 - 11/1988 | |
| General Administration - Dept of Public Works 5/1992 - 4/2000 | |
| Exterior Graphics 1/1988 - 4/1995 | |
| Graphics (Interior) 1/1986 - 9/1998 | |
| Hazardous Waste Program 8/1983 - 12/1989 | |
| Hazardous Waste Abatement 3/1995 - 11/2000 | |
| Heliport Correspondence 2/1982 - 5/1987 | |
| Honors Program 8/1994 | |
| Washington State Master Plan Higher Education 1988 | |
| Human Resource Services 8/1992 - 12/1999 | |
| Center for Human Rights 5/1980 - 2/1999 | |
| WSU Local Union #1066: WA FED. Of State Employees - AFL - CIO. Council #28 Bargaining Unit #IX 1999 | |
| Information Technology E-Mail, Intercom Phone System 11/1994 - 9/1995 | |
| Interinstitutional Committee 3/1995 - 11/2000 | |
| Internal Auditor 5/1990 - 5/1996 | |
| Journal of Business 8/2000 | |
| Key Card Security 12/1995 - 9/1996 | |
| 9 | Leadership Conference 1/1989 - 9/1995 |
| Legal/Legislative House Bill 1 509 5/1993 - 8/1996 | |
| The Libraries 5/1992 - 5/1995 | |
| Material Maintenance. Discontinuance of Office Machine & Furniture, Recycling System Changes, Recyclable Material Assignments etc. 9/1989 - 7/1997 | |
| Minority Women’s Business Enterprise 2/1987 - 11/1998 | |
| NAFH National Affordable Family Housing: 2/1995 | |
| National Trust for Historic Preservation 9/1992 - 5/1993 | |
| News Bureau & University Relations 12/1975 - 8/1998 | |
| Payroll 1/1990 - 3/2000 | |
| Peer Institutions 5/1992 | |
| Public Safety Correspondence 5/1994 - 11/1998 | |
| Safety Division Correspondence 1/1991 - 5/1994 | |
| Regional/Urban Design Assistance Team (RIUDAT) 5/1996 - 6/1996 | |
| Residence Life & Housing 5/1989 - 10/1994 | |
| Staff Senate 9/1991 - 3/1998 | |
| Larry Ganders - Director Statewide Affairs 6/1994 - 3/1999 | |
| Whitman County Wildlife Habitat Advisory Committee 10/1995 - 3/1996 | |
| Whitman County Dillon Property/Gravel Pit 6/1995 - 8/1999 | |
| Port of Whitman Project 1/1998 - 3/1999 | |
| Whitman County Zoning 10/1993 - 10/1998 | |
| Whitman Regional Transportation Planning 9/1991 - 10/1995 | |
| Washington State Furniture Contracts 5/1995 - 2/1996 | |
| Jay Becker - WWP/WSU Electrical Distribution System 8/1997 - 7/1999 | |
| Burke Lee Consulting Firm Contract No. 11635 - Various Projects 3/24/1994 | |
| Stadium Way Entrance Restoration Log#105946 10/1994 - 6/1998 | |
| Botany Greenhouse Steffen Center 8/1994 - 11/1994 | |
| Wegner Hall - Installation of Fume hoods 10/1993 | |
| Wilson Hall Remodel - Log#8593 1 4/1993 - 9/1994 | |
| WSU Water System Plan Log#5 1402 11/1993 - 5/1995 | |
| MCI Bid Summaries May - June 1995 | |
| Johnson Tower Connect to Central Chilled Water Log#89881 5/1994 - 1/1995 | |
| Johnson Hall - Room 122 Log#91017 10/1993 - 3/1995 | |
| Martin Stadium - Repairs to Tunnel Log# 66282 12/1993 - 4/1995 | |
| Martin Stadium Sound Reinforcement System 10/1993 - 3/1994 | |
| New Library Fire Sprinklers Log# 120279 4/1995 - 5/1995 | |
| 10 | Pea & Lentil Greenhouse 4/1994 - 11/1994 |
| Potato Storage Facility - Prosser 12/1996 | |
| Power Plant, Ash Receiver/Dustless Unloader Replacement Log#90533 11/1993 | |
| Eastlick Plaza Repair Log#42568 1/1994 - 9/1994 | |
| Fire Sprinklers for Physical Sci. Bldg. Log#89324 7/1993 - 2/1995 | |
| George Severance Memorial Plaza Log# 100881 11/1993 - 1/1994 | |
| Holland Library Addition Security System 7/1994 10/1994 | |
| IBC Greenhouse Project Log#61 170 2/1988 - 8/1994 | |
| Colorado Street Log# 90550. 89410 5/1994 - 7/1995 | |
| Animal Resources Unit (ARU) Farm Shop Log#46679 8/1993 - 2/1994 | |
| Clark Hall Room 212 log#89344 10/1993 - 1/1994 | |
| Colorado Street Renovation Log# 90550 & 89410 8/1995 - 4/1996 | |
| Architectural/Engineering Services for Existing Facilities Survey and Transition Plan in compliance with Americans with Disabilities Act (ADA) for W.S.U. By CLARK Architects PS. July 13, 1992 | |
| Americans With Disabilities Act Advice and Miscellaneous Information 1993 | |
| Americans With Disabilities ACT (ADA) General Correspondence#1 10/1991 - 12/1992 | |
| Americans With Disabilities ACT (ADA) General Correspondence #2 1/1993 - 8/1993 | |
| Americans With Disabilities ACT (ADA) General Correspondence #3 5/1993 - 12/1994 | |
| Americans With Disabilities ACT (ADA) General E-Mail Corresp. 11/1993 6/1997 | |
| Americans With Disabilities ACT (ADA) Clark Architects General Corresp. 5/1992 - 1/1993 | |
| Americans With Disabilities ACT (ADA) General Corresp. #4 12/1995 - 10/1999 | |
| Americans With Disabilities ACT (ADA) Advisory Committee 11/1992 - 4/1998 | |
| Americans With Disability Compliance Burke/Lee 9/1992 - 2/1992 | |
| Americans With Disabilities ACT (ADA) Consultant Selection 2/1992 - 5/1992 | |
| Americans With Disabilities ACT (ADA) Robert Fossatti Associates 8/1994 - 10/1994 | |
| Americans With Disabilities ACT (ADA) Budget 4/1993 - 10/1997 | |
| 11 | Regents 4/1996 |
| E.I.S. 7/1996 - 2/2000 | |
| General C - Mail Correspondence #1 1/1995 | |
| Bovay Northwest - Request for Information 1/1996 | |
| Bovay General Correspondence #1 8/1995 - 8/1997 | |
| Advanced Combustion Systems Inc. - General Correspondence 9/1995 | |
| Advanced Combustion Systems Inc. - Contract Change Proposal #1 8/1995 - 8/1997 | |
| Advanced Combustion Systems Inc. Contract 9/1995 - 3/1996 | |
| General Correspondence 8/1995 - 3/1999 | |
| Budget 11/1992 - 2/1999 | |
| Regents 6/1991 - 11/2000 | |
| Environmental Impact Statement for Replacement of Medical Waste Incinerator Vol. 1. of II | |
| Environmental Impact Statement for Replacement of Medical Waste Incinerator Vol. II of II | |
| Finance, Audit, Capital Committee 1/2000 | |
| B.A.I.T. 1/2000 | |
| Issues & Claims (Empty) | |
| Operations & Maintenance Manual Correspondence 10/1999 - 5/2000 | |
| Public Records Request 1/1997 - 3/1999 | |
| Autoclave Correspondence 7/1999 - 1/2000 | |
| Air Emission Compliance - Test Correspondence 7/1999 - 5/2000 | |
| Wastewater Discharge Correspondence 5/1999 - 3/2000 | |
| Low Level Radiation Waste (LLRW) 8/1999 - 6/2000 | |
| Forklift Correspondence 36373 | |
| Critzer Box Truckload Correspondence 7/1999 - 8/1999 | |
| Attorney General Correspondence 34182 RESTRICTED | |
| Burke/Lee Correspondence 33664 | |
| Doucet & Mainka, P.C. General Correspondence (empty) 4/1990 - | |
| Envitech 4/1998 - 10/2000 | |
| Robert Fossatti Associates CO 6060 35643 | |
| Roen & Associates CO 12619 35551 | |
| Stoel & Rives LLP Attorneys CO 12559 5/1997 - 5/1998 | |
| Strata Geotechnical Engineers CO 13094 3/1998 - 7/1999 | |
| Strata Test Reports 35643 | |
| Building Committee 34851 | |
| Construction Meeting Minutes 9/1998 10/2000 | |
| File - Unnamed | |
| General Correspondence E-Mail 1/1995 - 2/1999 | |
| General Correspondence 1/2000 - 10/2000 | |
| Bovay Northwest Estimates 4/1997 - 8/1998 | |
| Bovay General Correspondence E-Mail 9/1998 - 10/1999 | |
| 12 | Bovay Contract 12407 5/1999 - 10/2000 |
| Bovay Contract 10798 #3 7/1996 - 7/1997 | |
| General Correspondence #12 4/1999 | |
| Lydig Construction General Correspondence 9/1998 - 11/1998 | |
| L dig Construction Contract 13064 9/1998 - 8/2000 | |
| Contract Change Proposals 016 - 001 | |
| Rejected Bids - Bid Opening 9/1998 | |
| Rejected Bids - Bid Opening 12/1997 | |
| Close Out Items 5/2000 | |
| CBP Engineering Corp - Notebook | |
| Analysis & Recommendation Related to the Consultant Report of May 1, 1990 | |
| E.I.S. #2 9/1996 - 7/1998 | |
| E.I.S. #1 8/1993 - 8/1996 | |
| 13 | Program for the Incineration Facility 10/1996 |
| Schematic Design Brochure 3/1997 | |
| Conceptual Design Analysis for Medical Waste Incinerator Prepared by Bovay 1/1997 | |
| Project Final Binder 6/1999 | |
| Project Plan for WSIJ Medical Waste Incinerator | |
| Tuttnauer Co. Ltd. - Operation & Maintenance Manual - Steam Heated Medical Waste Sterilizer | |
| URS Review of Operations & Maintenance Manual | |
| General Correspondence #9 11/1999 - 12/1999 | |
| General Correspondence #8 8/1998 - 12/1998 | |
| General Correspondence #7 2/1998 - 7/1998 | |
| General Correspondence #6 1/1997 - 6/1997 | |
| General Correspondence #5 6/1993 - 12/1994 | |
| 14 | General Correspondence #4 5/1992 - 6/1993 |
| General Correspondence #3 6/1991 - 4/30 | |
| General Correspondence #2 1990 | |
| General Correspondence #1 11/1986 - 2/1988 | |
| Bovay Northwest - General Correspondence #11 11/1998 - 3/1999 | |
| Bovay Northwest - General Correspondence #10 1/1998 - 10/1998 | |
| Bovay Northwest - General Correspondence #9 10/1997 - 4/1998 | |
| Bovay Northwest General Correspondence #8 9/1997 - 10/1997 | |
| Bovay Northwest - General Correspondence #7 8/1997 | |
| Bovay Northwest - General Correspondence #6A 2/1997 - 7/1997 | |
| 15 | Bovay Northwest - General Correspondence #5 7/1995 - 10/1996 |
| Bovay Northwest General Correspondence #4 10/1993 - 6/1995 | |
| Bovay Northwest - General Correspondence #3 5/1993 - 9/1993 | |
| Bovay Northwest - General Correspondence #2 3/1993 - 4/1993 | |
| Bovay Northwest General Correspondence #1 1 10/1991 - 2/1993 | |
| Bovay Northwest - Contract #12407 #3 1 10/1998 - 4/1999 | |
| Bovay Northwest - Contract #12407 #2 1 10/1997 - 9/1998 | |
| Bovay Northwest - Contract #12407 #1 1 10/1996 - 9 98 | |
| Bovay Northwest. Inc. - Contract #10798 #2 1 12/1995 - 6/1996 | |
| Bovay Northwest. Inc. Pay Estimates, Addenda, Amendments 9/1991 - 11/1995 | |
| 16 | Regents 8/1998 - 3/2001 |
| E.I.S. 4/1999 - 5/1999 | |
| Finance. Audit, Capital Committee #1 5/1999 | |
| Attorney General Correspondence 6/1999 RESTRICTED | |
| Strata CO #13259 5/1999 - 10/1999 | |
| Strata Test Reports 7/1999 - 11/1999 | |
| Notice to Applicants (Original) | |
| Field Orders 12/1999 | |
| General E-Mail 12/1998 - 4/2000 | |
| General Correspondence 4/1998 - 1/2004 | |
| Northwest Architectural Company - Clarification 7/1999 - 10/1999 | |
| Northwest Architectural Company - Meeting Minutes 1/1999 - 12/1999 | |
| Northwest Architectural Company - Requests for Information 6/1999 - 1/2000 | |
| Northwest Architectural Company - E-Mail 9/1999 - 3/2001 | |
| Northwest Architectural Company Contract 13 109 12/1998 - 1/2001 | |
| Lydig Construction CO 13249 5/1996 | |
| Northwest Architectural Company - General Correspondence #2 12/1999 - 10/2000 | |
| Northwest Architectural Company - Construction Observation Reports 9/1999 - 12/1999 | |
| Lydig - General Correspondence 5/1999 - 2/2001 | |
| Lydig Contract Change Proposals #s 011 - 001 | |
| Statement of Compliance | |
| Rejected Bids - Bid Opening 4/1999 | |
| Strata - Creamery Annex - Final Project Binder | |
| Northwest Architectural Company General Correspondence #1 11/1998 - 11/1999 |
Archives 271
Capital Planning
Building Files, 1980-2001.
ACQUISITION AND PROCESSING INFORMATION
These records were transfered to Manuscripts, Archives, and Special Collections from Capital Planning on July 11, 2005 (UA 2005-11). The records were processed by Tim Mace and University Archivist Mark O'English in early 2009.
EXTENT/QUANTITY INFORMATION
COLLECTION DESCRIPTION & ARRANGEMENT
The collection consists of correspondence and contracts relating to several WSU construction projects from the early 1990s. The collection is held in its original order, consisting of several series organized by building (there appears to be no discernible order to the buildings).
PREFERRED CITATION
The suggested citation for the collection is:
[Item Description]
Capital Planning Building Files, 1980-2001 (UA 271)
Manuscripts, Archives, and Special Collections
Washington State University Libraries
Pullman, WA
| Box | Description |
| HOLLAND LIBRARY ADDITION (& PACKAGE No.2) | |
| 1 | Budgets 8/1989 - 8/1994 |
| Regents Reports 4/1989 - 3/1994 | |
| Burke/Lee, A Joint Venture 3/1988 - 4/1991 | |
| Mahan DeSalvo 12/1989 - 3/1994 | |
| Robert Fossatti 5/1994 - 9/1994 | |
| Coopers & Lybrand 3/1994 | |
| E.I.S. 4/1990 | |
| Gifford Consultants, Inc. Summary Report of Geotechnical Material Testing | |
| Pitsburgh Testing - Concrete Tests | |
| Morson Knudson Weekly Activity reports 5/1991 7/1991 | |
| Building Committee Meeting Minutes 7/1980 - 7/1989 | |
| General Correspondence 7/1987 - 3/1990 | |
| Artwork Correspondence 6/1990 | |
| Addendums 1991 | |
| Wyatt Jaykirn #2 4/1993 - 11/1993 | |
| ALSC R.F.I.?s 7/1993 | |
| Construction Reports #4 9/1993 - 1/1994 | |
| ALSC - Submittals 2/1991 - 12/1992 | |
| ALSC - Contract #7 6/1994 - 6/1995 | |
| MA Mortenson Contract 2/1993 - 6/1995 | |
| Shea Construction Contract #2 7/1991 5/1992 | |
| General Correspondence #14 5/1995 - 8/1997 | |
| 2 | M.A. Mortenson - General Correspondence #6 9/1994 - 12/1996 |
| ALSC - General Correspondence #21 10/1994 - 12/1996 | |
| Shea Construction - 1 of 2 Delay Claim 4/26/1991 | |
| Pending Change Proposals & Log | |
| Pending Change Proposals & Log | |
| Pending Change Proposals & Log | |
| Holland Early Bird Photos | |
| Shelving Layouts and other Shelving Information | |
| Shelving & Compact Storage System General Correspondence 8/1993 - 1/1996 | |
| Shelving & Compact Storage System General Correspondence 7/1993 - 9/1996 | |
| Tab Product CO - Shelving & Compact Storage System 8/1993 - 7/1994 | |
| Rejected Bids Shelving & Compact Storage System 6/1993 - 9/1993 | |
| Rejected Bids | |
| Construction Reports #3 3/1993 - 8/1993 | |
| 3 | Library Un - Marked Folder Possibly Architect Selection 1988 |
| Construction Reports #2 7/1992 - 2/1993 | |
| Wyatt - Jaykim #1 9/1989 3/1993 | |
| General Correspondence #13 6/1994 - 4/1995 | |
| General Correspondence #12 1/1994 - 5/1994 | |
| 4 | General Correspondence #11 8/1993 - 12/1993 |
| General Correspondence #10 2/1993 7/1993 | |
| General Correspondence #9 7/1992 - 1/1993 | |
| General Correspondence #8 10/1991 - 9/1991 | |
| General Correspondence #7 3/1991 - 5/1991 | |
| General Correspondence #6 3/1991 5/1991 | |
| General Correspondence #5 10/1990 - 1/1991 | |
| General Correspondence #4 5/1990 - 1/1991 | |
| General Correspondence #3 2/1990 - 4/1990 | |
| 5 | General Correspondence #2 8/1989 - 1/1990 |
| General Correspondence #1 4/1988 7/1989 | |
| ALSC Architect General Correspondence #20 3/1994 - 9/1994 | |
| ALSC Architect General Correspondence #19 9/1993 - 2/1994 | |
| ALSC Architect General Correspondence #18 3/1993 - 8/1993 | |
| ALSC Architect General Correspondence #17 10/1992 2/1993 | |
| ALSC Architect General Correspondence #16 7/1992 - 9/1992 | |
| ALSC Architect General Correspondence #15 3/1992 6/1992 | |
| ALSC Architect General Correspondence #14 11/1991 2/1992 | |
| ALSC Architect General Correspondence #13 8/1991 - 10/1991 | |
| 6 | ALSC Architect General Correspondence #12 6/1991 - 7/1991 |
| ALSC Architect General Correspondence #11 5/1/1991 - 5/30/1991 | |
| ALSC Architect General Correspondence #10 4/1/1991/ - 4/30/1991 | |
| ALSC Architect General Correspondence # 9 2/1991 - 3/1991 | |
| ALSC Architect General Correspondence #8 1/1991 - 2/1991 | |
| ALSC Architect General Correspondence #7 11/1990 - 12/1990 | |
| ALSC Architect General Correspondence #6 9/1990 - 10/1990 | |
| ALSC Architect General Correspondence #5 5/1990 - 8/1990 | |
| ALSC Architect General Correspondence #3 9/1989 - 2/1990 | |
| 7 | ALSC Architect General Correspondence #2 7/1989 - 8/1989 |
| ALSC Architect General Correspondence #1 9/1988 6/1989 | |
| For Student Projects | |
| MA Mortenson Correspondence #5 9/1993 - 8/1994 | |
| MA Mortenson Correspondence #4 4/1993 - 8/1993 | |
| MA Mortenson Correspondence #3 2/1993 - 3/1993 | |
| MA Mortenson Correspondence #2 7/1992 1/1993 | |
| MA Mortenson Correspondence #1 10/1991 - 6/1992 | |
| ALSC Contract #9801 #6 12/1992 - 6/1994 | |
| 8 | ALSC Contract #980 1 #5 12/1991 - 1/1993 |
| ALSC Contract #9801 #4 3/1991 - 10/1991 | |
| ALSC Contract #9801 #3 11/1989 - 2/1991 | |
| ALSC Contract #980 1 #2 7/1989 | |
| ALSC Contract #9801 #1 2/1989 - 6/1989 | |
| MA Mortenson Contract Correspondence # 14 10/1991 - 11/1993 | |
| MA Mortenson Contract Correspondence #13 10/1991 - 10/1993 | |
| MA Mortenson Contract Correspondence #12 10/1991 - 4/1993 | |
| MA Mortenson Contract Correspondence #11 10/1991 - 10/1993 | |
| MA Mortenson Contract Correspondence #10 9/7/1993 - 9/16/1993 | |
| MA Mortenson Contract Correspondence #9 11/1992 - 8/1993 | |
| 9 | MA Mortenson Contract Correspondence #8 10/1991 - 7/1993 |
| MA Mortenson Contract Correspondence #6 & #7 8/1992 - 6/1993 | |
| MA Mortenson Contract Correspondence #5 1/1993 - 2/1993 | |
| MA Mortenson Contract Correspondence #4 12/1992 | |
| MA Mortenson Contract Correspondence #3 11/1992 | |
| MA Mortenson Contract Correspondence #2 8/1992 - 10/1992 | |
| MA Mortenson Contract Correspondence #1 9/1991 - 7/1992 | |
| Shea Construction - Contract #1 5/1990 - 6/1991 | |
| HANDICAPPED ACCESS IMPROVEMENTS | |
| Budget 1 1/1980 12/1992 | |
| HOLLAND LIBRARY RENEWAL | |
| 10 | Budget 1/1993 - 3/1993 |
| Holland Library Fire Pump. - Creighton Brooked Engineers. General Correspondence 5/1994 - 7/1994 | |
| Mahan & Desalvo 12/1992 | |
| Building Committee Meeting 10/1991 - 7/1992 | |
| General Correspondence 3/1992 - 4/1997 | |
| Handicapped Accessibility Improvements - General Correspondence 1990 - 4/1994 | |
| ALSC Architect Correspondence #1 2/1992 - 7/1994 | |
| ALSC Architect Contract 10975 4/1992 - 7/1994 | |
| WSU VANCOUVER PHASE II - FEMA | |
| General Correspondence E-Mail 3/1997 - 8/1997 | |
| General Correspondence 3/1997 - 6/1998 | |
| Meeting Minutes 4/1997 | |
| Heery International General Correspondence 8/1997 - 9/1997 | |
| Z.G.F. - General Correspondence 2/1997 - 9/1997 | |
| Z.G.F. E-Mail 4/1997 | |
| General Correspondence - Drawings | |
| STUDENT ALUMNI CENTER | |
| Budget Empty | |
| Project Planning Committee 5/1993 - 4/1999 | |
| Attorney General Correspondence 7/1995 - 5/1999 RESTRICTED | |
| Studioz/Architects Associates E-Mail 3/1996 | |
| Studioz/Architects Associates - General Correspondence 4/1995 - 5/1996 | |
| Z.G.F. E-Mail 7/1995 | |
| Z.G.F. General Correspondence 6/1995 - 8/1995 | |
| Z.G.F. Contract 8/1995 | |
| NORTH CAMPUS SUBSTATION | |
| 11 | General Correspondence #1 4/1995 |
| GC/CM REVIEW | |
| General Contractor/Construction Manager Program Review 1/1999 | |
| Proposal By Vanir 12/1998 | |
| GC/CM Program Assessment 12/1998 | |
| Statement of Qualifications Presented to WSU Proposal to Provide Program Review & Risk Assessment of Alternative Public Works Procedures | |
| RESIDENCE HALL FIRE SPRINKLERS | |
| Budget - Empty | |
| Residence Hall Implementation | |
| General Correspondence 6/1991 - 5/2001 | |
| Patriot Fire Protection Contract 10/1994 | |
| Rolf Jenson & Associates Various Projects | |
| Rolf Jenson & Associates - Residence Hall Sprinkler Feasibility Study | |
| SEPTIC SYSTEM REPLACEMENT IAREC - PROSSER | |
| Preliminary Engineering Report for Large On - Site Sewage System at WSU - IAREC Prepared by J.U.B. 11/1993 | |
| Preliminary Engineering Evaluation - Task 5 Alternative Comparison Prepared by J.U.B. 8/1993 | |
| OLYMPIC WEIGHT ROOM EXPANSION | |
| Budget - Empty | |
| Regents 2/1995 | |
| Attorney - Empty | |
| General E-Mail 11/1994 - 1/1996 | |
| Project Planning Committee 11/1994 - 1/1996 | |
| General Correspondence 11/1994 - 2/1998 | |
| ALSC General Correspondence 10/1995 - 4/1996 | |
| ALSCCO 1/1996 - 4/1996 | |
| SOUTH CAMPUS ELECTRICAL | |
| CO 12709 12/1997 - 6/1998 | |
| STEVENS HALL RENOVATION | |
| Budget 8/1997 | |
| General Correspondence 5/1997 - 6/1997 | |
| Kovalenko Architects - General Correspondence 9/1995 | |
| STUDENT HOUSING PROJECT | |
| Regents 1/1995 | |
| IRA Fink & Associates CO 11923 2/1995 | |
| Unmarked Folder 2/1994 | |
| General Correspondence #2 2/1995 - 4/1996 | |
| General Correspondence #1 11/1993 - 8/1994 | |
| BOHLER GYM ADDITION | |
| Budget 8/1992 - 4/1998 | |
| Regents 10/1991 - 6/1998 | |
| E.I.S. 6/1995 | |
| Attorney General Correspondence 7/1998 RESTRICTED | |
| Public Information Requests 5/1999 | |
| Burke/Lee Correspondence 9/1992 | |
| Disputes Review Board - Thomas P. Cochran 9/1996 - 12/1996 | |
| Hainline & Associates CO #1 5/1996 - 8/1997 | |
| HCI Howard Consultants Inc./Strata CO 12254 1/1996 - 6/1997 | |
| The Redicheck Firm 11/1995 | |
| 12 | Robert Fossatti Associates 8/1994 - 5/1997 |
| Disputes Review Board General Correspondence #1 | |
| Strata Geotechnical Engineering & Material Testing Co. 2/1997 - 6/1997 | |
| Professional Services Industries - Inspection Reports 8/1996 - 11/1996 | |
| Strata Geotechnical Engineering - Concrete Test Reports 8/1997 10/1997 | |
| Geotechnical Report 12/1994 | |
| General E-Mail Correspondence 8/1996 - 3/1997 | |
| General Correspondence #3 11/1996 - 8/1998 | |
| Value Engineering Study 1/1995 - 3/1995 | |
| Shea Construction #2 7/1997 - 2/1998 | |
| Shea Construction Non - Compliance Reports 10/1996 - 4/1997 | |
| Shea Construction General Correspondence #3 3/1997 10/1998 | |
| Buhler Gym Addition Pre - Design Study | |
| Sasaki Associates General Correspondence #8 6/1997 1/01 | |
| Shea Contract Change Proposals #s 88 - 01 | |
| Rejected Bids - Bid Opening 3/1996 | |
| Sasaki Associates Construction meeting minutes #1 4/1996 | |
| 13 | Sasaki General Correspondence #7 1/1997 - 5/1997 |
| Strata Geotech. Engineering Concrete Testing Reports 4/1996 - 10/1996 | |
| Strata Geotech. Engineering - #2 11/1996 - 7/1997 | |
| Shea General Correspondence #2 8/1996 - 3/1997 | |
| Sasaki General Correspondence #2 8/1994 - 2/1995 | |
| Sasaki General Correspondence #1 2/1991 - 7/1994 | |
| Shea General Correspondence #1 3/1996 - 7/1996 | |
| Sasaki General #6 9/1996 - 12/1996 | |
| Sasaki General #5 6/1996 - 8/1996 | |
| Sasaki General #4 1/1996 - 5/1996 | |
| 14 | Sasaki General #3 3/1995 - 12/1995 |
| General Correspondence #2 9/1995 - 10/1996 | |
| General Correspondence #1 10/1991 - 8/1995 | |
| Shea - Contract #1 3/1996 - 6/1997 | |
| Sasaki Architects Contract 3/1992 - 6/1995 | |
| Sasaki Architects - Contract #2 5/1992 - 9/1996 | |
| Sasaki Architects Contract #3 10/1996 - 6/1998 | |
| Requests for Information #s 176 - 256 | |
| CD/Logs/Bulletins | |
| Requests for Information #s 101 - 175 | |
| 15 | Requests for Information 1 - 100 |
| CHILLED WATER STORAGE | |
| Regents 9/1992 - 9/1994 | |
| Budget 9/1991 - 2/1992 | |
| Mahan Partnership Correspondence 3/1997 - 4/1997 | |
| Robt. Bein, WM. Frost & Associates General Correspondence 3/1997 4/1997 | |
| E.I.S. 11/1991 - 1/1991 | |
| General Correspondence #1 5/1990 - 4/1995 | |
| Shea Construction General Correspondence #1 4/1993 6/1993 | |
| Shea Construction Contract 8/1993 | |
| VANCOUVER PHASE II EARLY CHILDHOOD EDUCATION FACILITY | |
| Budget 3/1995 - 3/1998 | |
| Regents 1/1996 - 9/1999 | |
| Finance, Audit, Capital Comm. (FAC) 7/1999 - 9/1999 | |
| Attorney General Correspondence 2/1996 - 7/1997 RESTRICTED | |
| AGRA Earth & Environmental, Inc. 10/1997 - 7/1998 | |
| Carlson Testing, Inc. #1 9/1996 - 10/1996 | |
| AGRA Earth & Environmental, Inc. - Concrete Test Reports 9/1997 - 1/1998 | |
| Consultant Value Specification CO 12285 4/1996 6/1990 | |
| Heery Int. CO 12306 | |
| Heery Int. CO 12308 | |
| Value Engineering Study 5/23/1996 | |
| Project Planning Committee | |
| Ileery Tnt. E-Mail #1 6/1996 3/1992 | |
| I leery Jut. General Correspondence #1 4/1996 5/1998 | |
| Meeting Minutes #1 4/1992 - 2/1998 | |
| General E-Mail 9/1995 - 4/1998 | |
| General Correspondence #7 4/1997 | |
| ZGF Contract 12128 #3 11/1997 - 8/1999 | |
| ZGF General Correspondence 3/1997 9/1998 | |
| Shimizu America Corp. General Correspondence #1 6/1997 - 11/1999 | |
| 16 | Shimzu Contract 6/1997 - 11/1998 |
| Certified Payroll Reports 1/1999 - 2/1999 | |
| Shirnizu Contract Change Proposals Numbers 079 - 1R | |
| Rejected Bids Re-Bid Date 6/12/1997 | |
| Rejected Bids Bid Date 4/1997 | |
| Closeout File 6/1999 - 8/1999 | |
| General Correspondence #6 11/1996 - 3/1997 | |
| General Correspondence #5 6/1996 - 10/1996 | |
| General Correspondence #4 2/1996 - 5/1996 | |
| General Correspondence #3 12/1995 - 1/1996 | |
| General Correspondence #2 11/1/1995 - 11/30/1995 | |
| 17 | General Correspondence #1 6/1995 - 10/1995 |
| Z.G.F. General Correspondence #7 12/1996 - 3/1997 | |
| Z. G. F General Correspondence #6 9/1996 - 11/1996 | |
| Z.G.F General Correspondence #5 7/1996 - 8/1996 | |
| Z.G.F General Correspondence #4 5/1996 - 6/1996 | |
| Z.G.F General Correspondence #3 2/1996 1/1996 | |
| 7.G.F General Correspondence #2 1/1996 - 1/1996 | |
| Z.G.F General Correspondence #1 1/1995 - 12/1996 | |
| Z.G.F. Contract #2 9/1996 - 10/1997 | |
| Z.G.F. Contract #1 10/1995 - 8/1996 | |
| CAMPUS INFRASTRUCTURE - VANCOUVER PH II | |
| 18 | Design Development - Preliminary Calculations & Cut Sheets 2/1996 |
| Budget 4/1996 - 3/1998 | |
| Attorney General Correspondence 4/1997 RESTRICTED | |
| AGRA Earth & Environmental 2/1996 - 5/1997 | |
| AGRA Earth & Environmental CO 12022 6/1997 | |
| Consulting Value Specialists 4/1996 - 6/1996 | |
| Disputes Review Board - General Correspondence 4/1997 - 6/1997 | |
| Disputes Review Board E-Mail 4/1997 - 6/1997 | |
| Disputes Review Board Agreement 12658 - Kim DeRubcrtis | |
| Disputes Review Board Agrcemcnt 12658 - Kerry Lawrence | |
| Heery International CO 12309 | |
| Heery International CO 12307 | |
| Mayer/Reed C013368 9/1999 | |
| Value Engineering Study 4/1996 - 6/1996 | |
| Project Meeting Minutes 4/1997 - 9/1997 | |
| Heery International - E-Mail Correspondence 6/1996 - 5/1997 | |
| Heery International General Correspondence #2 7/1997 - 4/1998 | |
| Storm water Pollution Prevention Plan 6/1996 | |
| Heery Constructability Review 7/1996 | |
| Project Planning Committee 10/1995 - 2/1996 | |
| General E-Mail Correspondence 11/1995 - 2/1998 | |
| Landis & Staefa Submittal data for WSU, Phase II Infrastructure 8/1997 | |
| Zimmer Gunsul Frasca (Z.G.F.) - General E-Mail 7/1996 - 5/1997 | |
| Z.G.F. General Correspondence 10/1997 - 8/1998 | |
| Z.G.F. General Correspondence #4 7/1997 - 10/1999 | |
| Z.G.F. Contract #3 6/1997 - 3/1999 | |
| Good Fellow Brothers General E-Mail 7/1997 | |
| Good Fellow Brothers General Correspondence 3/1997 - 1/1999 | |
| Good Fellow Brothers - Contract 7/1997 - 2/1998 | |
| Good Fellow Brother - Certified Payroll Reports 5/1997 - 1/1998 | |
| 19 | Statement of Compliance 5/1997 - 1/1998 |
| Submittal for Section 16402 Prepared by Leed Electric, Inc. for Good Fellow Brothers Inc | |
| Nutter Underground 8/1996 - 9/1997 | |
| Good Fellow Contract #?s32 - 01 | |
| Rejected Bids Bid Date 3/4/1997 | |
| Estimate of Probable Construction Cost | |
| Constructability Review | |
| Value Engineering Study for Campus Infrastructure | |
| Preliminary Design Campus Infrastructure Work | |
| General Correspondence #3 12/1996 - 6/1997 | |
| General Correspondence #2 4/1996 - 11/1996 | |
| General Correspondence #1 11/1995 - 3/1996 | |
| Heery International - General Correspondence 11/1995 - 7/1997 | |
| Z.G.F. General Correspondence #6 4/1997 - 9/1997 | |
| 20 | Z.G.F. - General Correspondence #5 1/1997 - 3/1997 |
| Z.G.F. - General Correspondence #4 9/1996 12/1996 | |
| Z.G.F. General Correspondence #3 7/1996 - 8/1996 | |
| Z.G.F. - General Correspondence #2 3/1996 - 6/1996 | |
| Z.G.F. - General Correspondence #1 1 10/1995 - 2/1996 | |
| Z.G.F Contract 12138 #2 9/1996 - 5/1997 | |
| Z.G.F. Contract 12138 #1 10/1995 - 8/1996 | |
| Second Draft Report 1 12/1995 | |
| Z.G.F. - Campus Infrastructure Work Preliminary Design - Estimation of Probable Construction Cost 2/1996 | |
| Campus Infrastructure Project Program - Prepared by Project Planning Committee 2/1996 | |
| TWO ACADEMIC BUILDINGS | |
| Budget - Empty | |
| Attorney General Correspondence - Empty | |
| Project Planning Committee 2/1996 | |
| General Correspondence E-Mail 1/1996 - 6/1997 | |
| General Correspondence #3 4/1996 - 5/1996 | |
| General Correspondence #2 4/1996 - 3/1996 | |
| General Correspondence #1 1/1995 - 3/1996 | |
| Z. G. F. - General Correspondence #1 6/1995 - 1/1998 | |
| Z.G.F. - CO#l 12147 11/1995 - 3/1998 | |
| 21 | USGS VOLCANO LABORATORY |
| Budget 8/1996 | |
| Regents 8/1996 | |
| Project Planning Committee 9/1995 - 6/1996 | |
| Attorney General Correspondence 8/1995 - 2/1997 RESTRICTED | |
| General E-Mail Correspondence 3/1995 - 2/1998 | |
| General Correspondence #3 11/1996 | |
| Z.G.F. E-Mail #1 4/1996 5/1997 | |
| Z.G.F. General Correspondence #2 11/1996 - 8/1998 | |
| Z.G.F. Contract CO 12178 #1 1/1996 - 7/1997 | |
| General Correspondence #2 4/1996 - 1 0/1996 | |
| General Correspondence #1 10/1992 - 3/1996 | |
| Z.G.F. General Correspondence 3/1995 - 10/1996 | |
| Estimate for Probable Construction Cost for USGS Cascades Volcano Observatory | |
| Program Requirements | |
| HILLTOP HOUSING PROJECT | |
| Regents 9/1996 | |
| E.I.S. 6/1996 | |
| General E-Mail 8/1996 | |
| General Correspondence 7/1995 - 5/1997 | |
| Long General Correspondence 9/1996 | |
| Ground Lease Housing Development Application Providence Court Partners | |
| Long Association LLC. - Response to Requests for Information for the Ground Lease | |
| HOLLLINGBERY FIELDHOUSE RENOVATION | |
| Regents - Empty | |
| Project Planning Committee - Empty | |
| General Correspondence 8/1997 - 8/1999 | |
| Hollinghery General Folder Un-Named 8/1996 | |
| 22 | Housing Development of Student Housing Facilities at WSU |
| Ground Lease Housing Proposal /Providence Court Partners | |
| Ground Lease Housing TRIAD Development Inc. | |
| JOINT CENTER FOR HIGHER EDUCATION | |
| Budget - Empty | |
| Regents - Empty | |
| BEST Study 10/1996 | |
| Project Planning Committee | |
| General C-Mail 1/1996 | |
| Integrus Architecture. Executive Committee Minutes 1/1995 - 8/1997 | |
| Integrus - General Correspondence 12/1995 - 5/1998 | |
| General Correspondence 9/1995 - 1/1998 | |
| Pinnacle - Realty Management Package | |
| PinnaclE-Monthly Financial Statement 5/1996 | |
| FACILITIES SERVICES CENTER | |
| Kruegel/McAllister Residence Halls - SCM Consultants Correspondence 4/1990 - 4/1993 | |
| UnMarked Folder Architect Correspondence 2/1992 - 4/1993 | |
| General Correspondence 4/1996 | |
| FACILITY CONDITION SURVEY KRUEGEL/McALLISTER | |
| Budget 4/1990 | |
| Burke/Lee Correspondence 3/1990 | |
| SCM Consultants - Contract # 10153 3/1990 - 7/1990 | |
| SCM Consultants - Contract # 11063 9/1991 - 2/1993 | |
| CONSULTANT SELECTION | |
| 23 | Carpenter - McCoy - Neill Hall: Architect Selection + Letter of Interest NBBJ Interview Evaluation Forms 1986 |
| Dairy Forage Facility - Interview Evaluations Pullman 1986 | |
| Food - Human Nutrition Facility Phase II + NAC letter of Interest - Interview Evaluation Forms 1987 | |
| Holland Library Addition & Renewal Interview Evaluation Forms + Letter of Interest from WMFL | |
| Spokane Center - Interview Evaluation Forms + WMFL Letter of Interest | |
| Tn - Cities Center Addition - Interview Evaluations + Letter of Interest from McKinley | |
| Veterinary Teaching Hospital - Evaluation 1987 | |
| Veterinary Teaching Hospital - Diagnostic Center - Evaluation 1987 | |
| Consultant Selection/3rd Package #3 1991 | |
| Consultant Selection/3rd Package #2 - General Correspondence | |
| Consultant Selection/2nd Package (4 Projects) 1991 | |
| Projects: Coliseum Asbestos Removal | |
| Childcare Facility | |
| Wilson Hall Renewal | |
| Residence Hall Fire Sprinklers Systems | |
| Student Services Building - To French Administration Building | |
| Records Maintenance Material Storage | |
| South Fairway Intramural Fields | |
| Hazardous. Pathological, Radioactive Waste Handling Facilities | |
| Veterinary Teaching Hospital Misc. Correspondence | |
| Holland Library Addition - Miscellaneous Correspondence 1991 | |
| USDA Greenhouse. Head house - Master plan | |
| Animal Sciences Laboratory Building - WSU Consultant Selection Second Package 1991 | |
| MISCELLANEOUS | |
| 24 | Pullman Memorial Hospital - Power Operated Entry Doors 10/1991 |
| New University Water Well No. 7 10/1987 | |
| City Entry Sign 6/1982 | |
| City of Pullman Capital improvement Program (C.I.P.) 4/1989 | |
| Veterans Memorial (Bldg.No. 791) 3/1992 | |
| Burger King (Colorado/D Street) Bldg.No.831 10/1988 | |
| Daggy Hall - Audiometric Booths - Handicapped Accessible (Bldg.No.808) 6/1985 | |
| Tennis Courts (Bldg.No. 31 9C) 4/1982 | |
| Buckley Lagoon (WWREC) - Bldg.No. 1510 10/1986 | |
| WSU - Depot (Visitor Information Center) Bldg.No. 830 2/1989 | |
| Consultant Selection | |
| Vancouver - Phase I Campus Development - Project Submittals 1991 | |
| Student Services Addition - Project Submittals 1991 | |
| Hazardous Waste (Pathological/Radioactive Handling Facility Records, Maintenance Materials Storage & Recycling, Phase I (Archos) 1991; South Fairway Intramural Field (Carothers) 1991; Asbestos Removal - Coliseum (Alpha) 1991; Residence Hall Fire Sprinkler System (Jensen) 1991 | |
| Consultant Selection - Plant Growth Facility 1991 | |
| Consolidated Information Center - Tri-Cities Consultant Selection (Integrus) 1993 | |
| Greenhouse Replacements Puyallup - Consultant Selection (Stafford Architects)1 993 | |
| ICNE Nursing Center - Yakima - Consultant Selection (Integrus) 1993 | |
| Animal Sciences Laboratory. Second Package Interview of Finalists/General Correspondence: Bouillon Christofferson & Schairer Inc.; MBT; Mahlum Nordfors McKinley Gordon; Northwest Architectural Company. 9/1991 | |
| WSU Spokane - Building Plan 7/1988 |
Archives 272
Capital Planning
Building Files, 1962-2003.
ACQUISITION AND PROCESSING INFORMATION
These records were transfered to Manuscripts, Archives, and Special Collections from Capital Planning on May 25, 2005 (UA 2005-07). The records were processed by Tim Mace and University Archivist Mark O'English in early 2009.
EXTENT/QUANTITY INFORMATION
COLLECTION DESCRIPTION & ARRANGEMENT
The collection consists of correspondence and contracts relating to several WSU construction projects from the late 1990s. The collection is held in its original order, consisting of several series organized by building (there appears to be no discernible order to the buildings).
PREFERRED CITATION
The suggested citation for the collection is:
[Item Description]
Capital Planning Building Files, 1962-2003 (UA 272)
Manuscripts, Archives, and Special Collections
Washington State University Libraries
Pullman, WA
| Box | Description |
| Consolidated Information Center (C.I.C.). Building No. 9512 | |
| 1 | Budget 8/1993 - 10/1997 |
| E.I.S. 4/1989 - 4/1999 | |
| Regents Reports 9/1993 - 9/1998 | |
| Public Records Request 4/1996 - 9/1996 | |
| Attorney General Correspondence 3/1996 - 1/1999 RESTRICTED | |
| Disputes Review Board - General Corresp 1/1996 - 2/1997 | |
| Disputes Review Board - Three Party Agreement #12204 | |
| Landscaping Claim 7/1997 | |
| James P. Donaldson - Construction Consulting 5/1996 - 2/1997 | |
| Robert Fossatti Associates 8/1994 - 9/1995 | |
| Steven M. Gold blatt CO # 12204 3/1996 - 2/1997 | |
| Ruth I. Johnson 12/1995 - 6/1998 | |
| The Red icheck Firm CO # 11621 7/1995 - 8/1995 | |
| Howard Consultants, Inc.! Strata CO # 12210 12/1995 - 8/1996 | |
| Time & Cost Management CO # 12156 11/1995 - 8/15 | |
| Time & Cost Management General Corresp. #5 6/1997 | |
| Time & Cost Management - Non Conformance Reports 5/1996 - 7/1997 | |
| HCI Howard Consultants, Inc./Strata Inspection & Test Reports 2/1996 - 4/1997 | |
| Value Engineering Study 8/1994 - 12/1994 | |
| Geotechnical Report 12/1994 | |
| Project Planning Report 1/1992 - 11/1994 | |
| Building Plan 5/1994 | |
| Daily Construction Reports (Time & Cost Management) #3 1/1997 - 8/1991 | |
| General E-Mail Correspondence #1 8/1995 - 8/1999 | |
| General Correspondence #7 1/1997 - 6/1999 | |
| 2 | Integrus Architecture E-Mail #1 5/1996 - 3/1999 |
| Integrus Architecture - Requests for Information 12/1995 - 8/1997 | |
| Integrus Architecture - Construction Meeting Minutes 12/1995 - 6/1997 | |
| Integurs Architecture - General Correspondence 1/1998 - 4/2000 | |
| Contractors Northwest, Inc. - E-Mail Correspondence 12/1997 - 10/1998 | |
| Contractors Northwest, Inc. #6 6/1997 - 8/2003 | |
| Contractors Northwest, Inc. - Certified Payroll #1 6/1996 - 7/1996 | |
| Non - Numbered Change Proposals 4/1996 - 9/1997 | |
| Change Proposals # 167 - 121 | |
| 3 | Contractors Northwest Change Proposals # 1 - 120 |
| Rejected Bids (Bid Opening 10/17/1995) | |
| 4 | Time & Cost Management - General Correspondence #4 11/1996 - 6/1997 |
| Time & Cost Management - General Correspondence #3 5/1996 - 11/1996 | |
| Time & Cost Management - General Correspondence #2 3/1996 - 4/1996 | |
| Time & Cost Management - General Correspondence #1 10/1995 - 2/1996 | |
| Time & Cost Management - Daily Construction Reports #2 6/1996 - 12/1996 | |
| Time & Cost Management - Daily Construction Reports #1 12/1995 - 5/1996 | |
| General Correspondence #6 4/1996 - 12/1996 | |
| General Correspondence #5 11/1995 - 3/1996 | |
| General Correspondence #4 8/1995 - 10/1995 | |
| General Correspondence # 3 3/1995 - 7/1995 | |
| 5 | General Correspondence #2 3/1994 - 2/1995 |
| General Correspondence #1 2/1993 - 3/1994 | |
| Integrus Architecture General Correspondence # 9 8/1997 - 12/1997 | |
| Integrus Architecture General Correspondence # 8 2/1997 - 8/1997 | |
| lntegrus Architecture General Correspondence # 7 8/1996 - 2/1997 | |
| Integrus Architecture General Correspondence # 6 3/1996 - 7/1996 | |
| Integrus Architecture General Correspondence # 5 11/1995 - 2/1996 | |
| Integrus Architecture General Correspondence # 4 9/1995 - 10/1995 | |
| Integrus Architecture General Correspondence # 3 1/1995 - 8/1995 | |
| 6 | Integrus Architecture General Correspondence # 2 10/1994 - 10/1994 |
| Integrus Architecture General Correspondence # 1 1/1993 - 9/1994 | |
| Integrus Architecture Contract Payment #3 6/1996 - 6/1998 | |
| Integrus Architecture Contract Payment #2 3/1995 - 5/1996 | |
| Integrus Architecture Contract Payment #1 1/1994 - 2/1995 | |
| Contractors Northwest General Corresp. #5 4/1997 - 5/1997 | |
| Contractors Northwest General Corresp. (All Star Corresp.) #5 4/1/1997 - 4/30/1997 | |
| Contractors Northwest General Corresp. #4 11/1996 - 3/1997 | |
| Contractors Northwest General Corresp. #3 8/1996 - 10/1996 | |
| 7 | Contractors Northwest General Corresp. #2 2/1996 - 7/1996 |
| Contractors Northwest General Corresp. #1 10/1995 - 1/1996 | |
| Contractors Northwest Contract #1 10/1995 - 4/1997 | |
| Chemical Storage Building. Eastlick 82A, Wegner 45, Engineering (Sloan) 78 | |
| 8 | Budget 7/1993 - 9/1995 |
| Building Planning Committee 10/1993 - 12/1993 | |
| General Correspondence #2 6/1994 - 3/1995 | |
| Bovey Northwest, Inc. - Contract CO 10798 10/1991 - 6/1994 | |
| Bovay Northwest General Corresp. #2 5/1994 - 1/1995 | |
| Bovay Northwest General Corresp. # 1 10/1993 - 4/1994 | |
| General Correspondence # 1 7/1993 - 5/1994 | |
| Chemical Waste Collection Sites. Eastlick 82A, Wegner 45, Engineering (Sloan) 78 | |
| Budget 10/1993 - 9/1998 | |
| E.l.S. 8/1994 - 9/1998 | |
| Regents Report 5/1994 - 9/1998 | |
| Professional Services Industries CO # 12206 11/1994 - 1/1997 | |
| Fossatti Associates 12/1994 - 9/1995 | |
| Professional Services Industries - Concrete Test Reports 5/1996 - 2/1997 | |
| Program Planning Committee 10/1993 | |
| Construction Meeting Minutes (Vet.Med.) 12/1997 - 6/1998 | |
| General E-Mail #1 12/1995 - 4/1998 | |
| General Correspondence # 3 1/1997 - 10/1998 | |
| Bovay Northwest Inc. E-Mail #1 6/1996 | |
| Bovay Northwest Inc. - General Correspondence #7 1/1998 - 2/1999 | |
| Bovay Northwest #2 - CO # 10798 9/1996 - 4/1999 | |
| Bouten General Correspondence #1 11/1995 - 10/1997 | |
| Bouten Construction #1, CO 12150 10/1995 - 2/1997 | |
| Mike Coman General Correspondence #1 10/1997 - 12/1998 | |
| Mike Coman Construction (College of Veterinary Med.) CO 12798 10/1997 - 9/1998 | |
| Mike Coman Contract Change Proposals 1,4 - 5 - 1 1 | |
| Bouten Construction Co. - Contract Change Proposal 29r - 24 | |
| 9 | Bouten Construction Change Proposals 23 - 1 |
| Rejected Bids - Bid Opening (College of Veterinary Medicine) 10/1997 | |
| Rejected Bids - Bid Opening 10/1995 | |
| General Correspondence #2 10/1995 - 12/1996 | |
| General Correspondence # 1 7/1993 - 9/1995 | |
| Bovay Northwest General Corresp. #6 5/1996 - 12/1997 | |
| Bovay Northwest General Corresp. #5 2/1996 - 4/1996 | |
| Bovay Northwest General Corresp. #4 6/1995 - 1/1996 | |
| Bovay Northwest General Corresp. #3 12/1994 - 5/1995 | |
| 10 | Bovay Northwest General Corresp. #2 7/1994 - 11/1994 |
| Bovay Northwest General Corresp. # 1 10/1993 - 6/1994 | |
| Schematic Design Brochure - Vet Complex 9/1996 | |
| Schematic Design Brochure - Eastlick Hall, Wegner Hall, Engineering Complex, and Silver Recovery Units Preliminary Design Brochure - Fulmer Hall Chemical Waste 11/1994 | |
| Preliminary Design Brochure - Fulmer Hall Chemical Waste 6/1994 | |
| Classroom Auditoria Building (Closed project. No building # assigned) | |
| Budget 10/1992 - 5/1993 | |
| Regents 1/1992 - 5/1994 | |
| Building Meeting Minutes 1/1992 - 5/1992 | |
| Burke/Lee Correspondence 4/1991 - 11/1992 | |
| Classroom Auditoria/Univ. Center Subcommittee Mtg. minutes #1 1/1972 - 4/1992 | |
| General Correspondence #2 1/1992 - 11/1994 | |
| The Callison Partnership General Correspondence #2 6/1992 - 6/1993 | |
| The Callison Partnership Agreement, Pavement - CO 10973 2/1992 - 12/1992 | |
| The Callison Partnership Agreement, #1 1/1992 - 5/1992 | |
| General Correspondence #1 12/1991 | |
| Compost Facility. Building No. 359 | |
| Budget (empty folder) | |
| E.I.S. 4/1993 - 9/1998 | |
| Building Committee 9/1992 - 1/1997 | |
| General Correspondence #1 10/1992 - 10/1997 | |
| Burke/Lee Correspondence 11/1992 | |
| Plant Growth Wheat Research Center. Building No. 1040 | |
| 11 | Budget 1/1997 - 5/1998 |
| Regents 4/1994 - 9/1998 | |
| Attorney General Correspondence 11/1995 - 2/1997 RESTRICTED | |
| Disputes Review Board - General Correspondence 9/1996 - 7/1997 | |
| Federal Grant Correspondence #2 1/1996 - 4/2001 | |
| DRB Contract CO# 12540 5/1997 | |
| DRB 5/1997 - 6/1997 | |
| Fossatti CO# 6060 1/1995 | |
| Frank Noble CO# DRB 11/1996 - 5/1997 | |
| Conviron Inc. 3/1997 - 3/1998 | |
| Strata Geotechnical Engineering & Materials Testing C0#12380 6/1996 - 6/1997 | |
| Strata Plant Growth Wheat Research Facility File: WASUNI - M9602A CO 12380 | |
| Giflord Consultants, Inc. - Geotechnical Report 9/1995 | |
| Project Planning Committee #1 2/1994 - 10/1996 | |
| Daily Construction Reports #1 11/1996 | |
| General Correspondence #3 10/1996 - 12/1999 | |
| General Correspondence E-Mail 9/1997 | |
| Tan Heyamoto Architects - General Correspondence #5 12/1996 - 2/1999 | |
| Calculations 7/1996 - 12/1996 | |
| Tan Heyamoto Architects - Design Clarifications 8/1996 - 7/1997 | |
| Tan Heyamoto Architects - Daily Inspection Reports 3/1997 | |
| 12 | Tan Heyamoto - Requests for Information #2 5/1997 - 10/1997 |
| Tan Heyamoto - Submittals #1 8/1996 - 7/1997 | |
| Tan Heyamoto - Contract Payments #1 7/1994 - 1/1999 | |
| Schedules #1 - 8/1996 | |
| Construction Meeting Minutes #1 8/1996 - 8/1997 | |
| Lydig Construction General Correspondence #2 1/1998 - 12/1999 | |
| Lydig Construction Contract #1 7/1996 - 4/1998 | |
| Lydig Construction, Inc. CO Change Proposals Numbers 90 - 56 | |
| 13 | Lydig Construction, Inc. CO Change Proposals Numbers 55 - 001 |
| Rejected Bids - Bid Opening Jun 25 1996 6/1996 | |
| Close Out 1/1998 - 6/1999 | |
| Strata Geotech Engr. & Mat. Testing Reports Concrete Test reports # 1 9/1996 - 3/1997 | |
| Calculations #1 2/1996 - 6/1996 | |
| 14 | Close out File #1 3/1997 - 12/1997 |
| Federal Grant Correspondence # 1 12/1994 - 12/1995 | |
| Tan Heyamoto Architects Requests for Information #1 9/1996 - 5/1997 | |
| General Correspondence #2 10/1995 - 9/1996 | |
| General Correspondence #1 4/1992 - 9/1995 | |
| Tan Heyamoto Architects General Corresp. #4 5/1996 - 11/1996 | |
| Tan Heyamoto Architects General Corresp. #3 3/1996 - 4/1996 | |
| Tan Heyamoto Architects General Corresp. #2 10/1995 - 2/1996 | |
| Tan Heyamoto Architects General Corresp. #1 5/1994 - 9/1995 | |
| Lydig Construction, Inc. General Corresp. #1 6/1996 - 12/1997 | |
| Todd Hall Renewal. Building No. 55A | |
| 15 | Budget 4/1992 - 3/1997 |
| Regents Reports 6/1991 - 4/1996 | |
| Halvorson, Beach & Bower 3/1995 | |
| Agra Earth & Environmental CO #11569 2/1994 - 9/1994 | |
| Burke/Lee Associates Correspondence 12/1990 - 8/1992 | |
| Robert Fossatti Associates 11/1993 - 9/1996 | |
| Mahan & DeSalvo Correspondence 11/1991 - 9/1993 | |
| Building Committee 10/1989 - 3/1995 | |
| Construction field Reports 6/1994 - 4/1995 | |
| Professional Service Industries - Concrete Testing 4/1994 - 6/1995 | |
| Wind Tunnel Report 10/1993 - 2/1996 | |
| Henry Klein Partnership - Design Clarification/Verification Reg. 5/1995 - 8/1995 | |
| E-Mail Correspondence 9/1995 - 7/1998 | |
| General Correspondence 8/1996 - 7/1999 | |
| Henry Klein Partnership - Architect Correspondence 5/1991 - 3/1997 | |
| Lydig Construction, Inc. - Contract CO’S Pay Ests. 8/1995 - 4/1996 | |
| Lydig Construction, Inc. - Contract Change Proposals Numbers 230 - 009 | |
| 16 | Lydig Construction, Inc. Change Proposals Numbers 113 - 009 |
| General Correspondence 12/1990 - 6/1992 | |
| General Correspondence 7/1992 - 7/1993 | |
| General Correspondence 8/1993 - 2/1994 | |
| General Correspondence # 4 3/1994 - 2/1995 | |
| General Correspondence #5 3/1995 - 6/1995 | |
| General Correspondence #6 7/1/1995 - 7/31/1995 | |
| General Correspondence #7 8/1/1995 - 7/31/1996 | |
| Todd Hall Renewal Building Program 5/1990 | |
| Henry Klein Partnership Design Clarification/Verification Reg. #3 | |
| 17 | Henry Klein Partnership Design ClarificationNerification Reg. #2 9/1994 - 12/1994 |
| Henry Klein Partnership Design Clarification/Verification Reg. #1 3/1994 - 8/1994 | |
| Henry Klein Partnership General Correspondence #8 9/1995 - 3/1997 | |
| Henry Klein Partnership General Correspondence #7 3/1995 - 8/1995 | |
| Henry Klein Partnership General Correspondence #6 6/1994 - 3/1995 | |
| Henry Klein Partnership General Correspondence # 5 2/1994 - 5/1995 | |
| 18 | Henry Klein Partnership General Correspondence #1 12/1990 - 10/1992 |
| Henry Klein Contract #10804 10/1991 - 12/1996 | |
| Henry Klein Partnership Agreement # 10193 5/1990 - 9/1991 | |
| Lydig Construction General Correspondence 2/1995 - 10/1996 | |
| Lydig Construction General Correspondence 1/1994 - 1/1995 | |
| Lydig Construction Pay Estimates, Change Orders. #6 1/1994 - 6/1995 | |
| Lydig Construction Pay Estimates, Change Orders. #5 1/1994 - 5/1995 | |
| Lydig Construction Pay Estimates, Change Orders. #4 1/1994 - 4/1995 | |
| Lydig Construction Pay Estimates, Change Orders. #3 1/1994 - 2/1995 | |
| Lydig Construction Pay Estimates, Change Orders #2 12/1994 - 2/1995 | |
| Lydig Construction Pay Estimates, Change Orders. #1 1/1994 - 11/1994 | |
| Rejected Bids 1/1994 | |
| Todd Hall Renewal Schematic Design 4/1992 | |
| Todd Hall Renewal Schematic Design 7/1992 | |
| Todd Hall Renewal Renovation Feasibility Study 5/1992 | |
| Glenn Terrell Mall. Building No. 790 | |
| 19 | Regents 8/1993 |
| Budget 1995 | |
| Burke/Lee Correspondence (Comprehensive Physical Planning Process) 03/1991 - 03/1992 | |
| E.l.S. 03/1993 | |
| Request for Information | |
| Rejected Bids | |
| Pending Change Proposals 9/2003 | |
| Atkinson Construction Company., Correspondence 7/1993 - 1/1995 | |
| Atkinson Construction Co., Contract, Pay applications #1 7/1993 - 1/1995 | |
| ALSC Construction Meeting Minutes 08/1993 - 11/2002 | |
| General Correspondence 12/1993 - 03/1997 | |
| AISC - Architect Correspondence 12/1992 - 2/1994 | |
| File Un - named #1 (General Correspondence) 9/1986 - 12/1992 | |
| ALSC Architects - General Correspondence 3/1994 - 5/1995 | |
| General Correspondence #2 1/1993 - 11/1993 | |
| Fulmer Hall Annex Building No. 003 | |
| 20 | Budget 5/1992 - 7/1997 |
| Regents 1/1993 - 7/1997 | |
| Public Information Requests 5/1/1999 | |
| Steven M. Goldblatt CO # 12117 9/1995 - 7/1996 | |
| James P. Donaldson CO# 1211 7 8/1995 - 10/1996 | |
| Patrick Sullivan 10/1995 | |
| Bovay Northwest, Inc. General Correspondence 6/1995 - 8/1997 | |
| Agra Earth & Environmental 10/1995 - 11/1996 | |
| Mahan & Desalvo 4/1992 - 5/1993 | |
| Robert Fossatti 7/1993 - 8/1 | |
| The Redicheck Firm CO # 11621 7/1994 - 9/1994 | |
| Value Engineering 8/1993 | |
| Meng Associates - Value Engineering Study | |
| Fulmer Hall/Annex Renewal - Schematic Design Submittal | |
| Fulmer Hall/ Fulmer Annex - Program Statement | |
| Fulmer Hall Remodeling - Building Program Statement Phase II | |
| NSF Grant Application 3/1993 | |
| Determination of Non - significance (E.l .S.) 9/1994 | |
| Building Committee Meetings 7/1991 - 9/1995 | |
| General Correspondence E-Mail #1 1/1994 - 2/1997 | |
| General Correspondence #7 8/1996 - 11/1997 | |
| Mahlum & Nordfors McKinley Gordon - Design Information Request #1 1/1994 - 12/1995 | |
| Mahlum & Nordfors McKinley Gordon - Construction Meeting Minutes 7/1995 - 10/1996 | |
| Mahlum & Nordfors McKinley Gordon - General Correspondence #9 12/1996 - 4/1998 | |
| Inland Construction Co. General Correspondence #2 3/1997 - 7/1998 | |
| Mahlum & Nordfors McKinley Gordon - Co 10921 3/1997 - 8/1998 | |
| 21 | Inland Construction CO # 12000 5/1995 - 6/1997 |
| Inland Construction Contract Change Proposals #109 - 001 | |
| 22 | Palouse Empire Inc. Request for Equitable Adjustment for Fulmer Annex Renewal |
| Rejected Bids 6/1995 | |
| RZAAGRA, Inc. CO# 11569 6/1992 - 5/1994 | |
| RZAAGRA, Inc. CO #11569 6/1994 - 9/1995 | |
| General Correspondence #6 6/1995 - 7/1996 | |
| General Correspondence #5 7/1994 - 5/1995 | |
| General Correspondence #4 12/1993 - 6/1994 | |
| General Correspondence #3 1/1993 - 11/1993 | |
| Mahlum & Nordfors Mckinley Gordon General Correspondence #8 11/1995 - 11/1996 | |
| Mahlum & Nordfors Mckinley Gordon General Correspondence #7 4/1995 - 10/1995 | |
| 23 | Mahlum & Nordfors Mckinley Gordon General Correspondence #6 7/1994 - 3/1995 |
| Mahlum & Nordfors Mckinley Gordon General Correspondence #5 1/1994 - 6/1994 | |
| Mahlum & Nordfors Mckinley Gordon General Correspondence #4 9/1993 - 12/1993 | |
| Mahlum & Nordfors Mckinley Gordon General Correspondence #3 6/1993 - 8/1993 | |
| Mahlum & Nordfors Mckinley Gordon General Correspondence #2 11/1992 - 5/1993 | |
| Mahlum & Nordfors Mckinley Gordon General Correspondence #1 6/1991 - 10/1992 | |
| Mahlum & Nordfors Mckinley Gordon Contract No. 10921 #3 9/1995 - 2/1997 | |
| Mahlum & Nordfors Mckinley Gordon Contract No. 10921 #2 11/1994 - 8/1995 | |
| 24 | McKinley & Nordfors McKinley Gordon Contract No. 10921 #1 1/1992 - 9/1994 |
| Inland Construction Requests for Information #2 11/1995 - 12/1996 | |
| Inland Construction Requests for Information #1 7/1995 - 10/1995 | |
| Inland Construction General Correspondence #1 5/1995 - 2/1997 | |
| Inland Construction General Correspondence #2 1/1992 - 2/1993 | |
| General Correspondence #1 8/1991 - 12/1991 | |
| Veterinary Teaching Hospital. Building No. 818 | |
| 25 | Professional Services Industry #2 6/1994 - 8/1994 |
| Professional Services Industry #1 1/1994 - 5/1994 | |
| Construction Diary Reports #1 8/1991 - 1/1996 | |
| General Correspondence #15 4/1996 - 10/1996 | |
| General Corresp. #14 9/1995 - 3/1996 | |
| General Corresp. #13 1/1995 - 8/1995 | |
| General Corresp. #12 7/1994 - 12/1994 | |
| 26 | General Correspondence #10 9/1993 - 2/1994 |
| General Corresp. #9 3/1993 - 8/1993 | |
| General Corresp. #8 6/1992 - 2/1993 | |
| General Corresp. #7 4/1992 - 5/1992 | |
| General Corresp. #6 8/1991 - 3/1992 | |
| General Corresp. #5 5/1991 - 7/1991 | |
| General Corresp. #4 3/1991 - 4/1991 | |
| General Corresp. #3 4/1990 - 2/1991 | |
| 27 | General Corresp. #2 1/1989 - 3/1990 |
| General Corresp. #1 7/1987 - 12/1988 | |
| DeNeff Deeble Barton Associates General Corresp. #20 12/1996 - 1/1997 | |
| DeNeff Deeble Barton Associates General Corresp. #19 10/1996 - 1/1997 | |
| DeNeff Deeble Barton Associates General Corresp.#18 6/1996 - 9/1996 | |
| DeNeff Deeble Barton Associates General Corresp.#17 3/1996 - 5/1996 | |
| DeNeff Deeble Barton Associates General Corresp.#16 12/1995 - 2/1996 | |
| DeNeff Deeble Barton Associates General Corresp.#15 9/1995 - 11/1995 | |
| DeNeff Deeble Barton Associates General Corresp.#14 6/1995 - 8/1995 | |
| DeNeff Deeble Barton Associates General Corresp.#13 3/1995 - 5/1995 | |
| 28 | DeNeff Deeble Barton Associates General Corresp. #12 11/1994 - 2/1995 |
| DeNeff Deeble Barton Associates General Corresp. #11 9/1994 - 10/199???????? | |
| DeNeff Deeble Barton Associates General Corresp.#10 6/1994 - 8/1994 | |
| DeNeff Deeble Barton Associates General Corresp. #9 4/1994 - 5/1994 | |
| DeNeff Deeble Barton Associates General Corresp. #8 1/1994 - 3/1994 | |
| DeNeff Deeble Barton Associates General Corresp. #7 7/1993 - 12/1993 | |
| DeNeff Deeble Barton Associates General Corresp. #6 3/1993 - 6/1993 | |
| Pending Change Proposals 10/2008 - 7/1994 | |
| 29 | DeNeff Deeble Barton Associates General Corresp. #5 8/1992 - 2/1993 |
| DeNeff Deeble Barton Associates General Corresp. #4 11/1991 - 7/1992 | |
| DeNeff Deeble Barton Associates General Corresp. #3 4/1991 - 10/1991 | |
| DeNeff Deeble Barton Associates General Corresp. #2 3/1990 - 3/1991 | |
| DeNeff Deeble Barton Associates General Corresp #1 8/1987 - 2/1990 | |
| DeNeff Deeble Barton Assoc. Contract, Pay Est. #5 5/1996 - 1/1997 | |
| DeNeff Deeble Barton Assoc. Contract, Pay Est. #4 4/1995 - 5/1996 | |
| DeNeff Deeble Barton Assoc. Contract, Pay Est. #3 5/1992 - 3/1995 | |
| DeNeff Deeble Barton Assoc. Contract, Pay Est. #2 2/1990 - 4/1992 | |
| 30 | DeNeff Deeble Barton Associates Contract NO.9152 #1 1/1988 - 12/1988 |
| DeNeff Deeble Barton Associates Construction Meeting Minutes #1 10/1993 - 12/1995 | |
| Morgan & Oswood Construction Co. Requests for Clarification 11/1993 - 12/1994 | |
| Morgan & Oswood Construction Co. General Corresp. #3 3/1996 - 1/1997 | |
| Morgan & Oswood Construction Co. General Corresp. #2 1/1995 2/1996 | |
| Morgan & Oswood Construction Co. General Corresp. #1 6/1993 - 12/1994 | |
| Morgen & Oswood Construction Co. Contract #9 3/1995 - 12/1996 | |
| 31 | Morgen & Oswood Construction Co. Contract #8 10/1995 - 2/1996 |
| Morgen & Oswood Construction Co. Contract #7 5/1995 - 11/1995 | |
| Morgen & Oswood Construction Co. Contract #6 9/1994 - 7/1995 | |
| Morgen & Oswood Construction Co. Contract #5 3/1995 - 6/1995 | |
| Morgen & Oswood Construction Co. Contract #4 11/1994 - 11/1995 | |
| Morgen & Oswood Construction Co. Contract #3 8/1994 - 10/1994 | |
| Morgen & Oswood Construction Co. Contract #2 3/1994 - 6/1994 | |
| Morgen & Oswood Construction Co. Contract #1 8/1993 - 2/1994 | |
| 32 | Site Grading - Motley & Motley Corresp. #1 8/1991 - 1/1992 |
| Motley & Motley Contractors Contract Payments, C.O.#1 7/1991 - 1/1992 | |
| Note Book Contract Info. Inserts Tabs: Inland Coatings Inc. Aztec Electric, Inc. McClintock & Turk, Inc. | |
| Rejected Bids - General/Rebid Opening 8/12/1993 | |
| Rejected Bids - Electrical (Opening) 5/4/1993 | |
| Rejected Bids - Mechanical (Opening) 5/4/1993 | |
| Issues & Claims 3/1996 - 4/1996 RESTRICTED | |
| Issues & Claims 11/1996 - 12/1996 & 5/1996 RESTRICTED | |
| Issues & Claims 11/1996 - 12/1996 RESTRICTED | |
| Phase I: Site Grading Rejected Bids 7/1991 | |
| Rejected Bids Phase II - General Opening #2 5/1993 | |
| Rejected Bids Phase II - General Opening #1 5/1993 | |
| 33 | Construction Diary Reports 2/1996 - 6/1996 |
| DeNeff Deeble Barton Associates Construction Mtg. Minutes #2 1/1996 - 5/1996 | |
| Deneff Deeble Barton Associates General Corresp. #21 3/1997 - 3/1998 | |
| Deneff Deeble Barton Associates Consultant’s Site Visitation Reports #1 4/1994 - 4/1997 | |
| Allotment Request for Construction 4/1993 | |
| Equipment/Furnishings 1/1994 | |
| Morgen & Oswood Construction Contract, Payment, Co’s #10 3/1996 - 10/1996 | |
| Morgen & Oswood Construction #1 General Corresp # 1 12/1996 - 7/1998 | |
| Morgen & Oswood Construction Certified Payroll Reports #1 - 44 6/1994 - 10/1994 | |
| Morgen & Oswood Construction Request for Clarification 1/1995 - 4/1996 | |
| Morgen & Oswood Construction Contract Change Proposals (missing many) #171 - 15 | |
| Pending Change Proposals 10/1994 - 4/1995 | |
| 34 | Building Committee Meetings 9/1987 - 11/1993 |
| Design Development | |
| Problems & Pitfalls in Water Treatment Specifications Cooling Tower Institute 2/1990 | |
| Pitting Corrosion of Cooling Water Systems | |
| The Impact of Environmental Considerations on Corrosion Control Economics & Technology | |
| Fingerprints of Errors - Failures in Cooling Water Systems | |
| “Water in Boilers - A Retrospective & A Perspective” | |
| Practical Consideration in High Cycle Cooling Water Operations 2/1992 | |
| Microbiologically Influenced Corrosion: A State of the Art Technology | |
| Some Guidelines for Optimizing the Operation of Raw Water Cooling Systems | |
| Fail Safe Cooling Water Operations 2/1991 | |
| Drinking Water System Components - Health Effects | |
| MW Consulting Engineers - General Corresp. #1 10/1993 - 10/1994 | |
| Tomasi - Dubois & Associates General Corresp. 7/1997 - 11/1998 | |
| Professional Services Industries Inc. #3 11/1994 - 12/1997 | |
| Wyatt jaykim Engineers 11/1990 - 8/1992 | |
| Privileged Information 2/1996 - 5/1997 | |
| Bidding Information 5/1993 - 8/1993 | |
| E-Mail Correspondence #1 2/1996 - 9/1998 | |
| General Correspondence # 16 11/1996 - 8/1998 | |
| 35 | Budget 3/1989 - 9/1998 |
| E.I.S. 3/1991 - 6/1997 | |
| Regents Reports | |
| Public Records Request 2/1996 - 6/1997 | |
| Attorney General Corresp. 1/1997 - 9/1997 RESTRICTED | |
| Issues & Claims RESTRICTED | |
| Notebook: Phase II, WSU Veterinary Teaching Hospital Revised Claim for additional Compensation 11/1996 | |
| Disputes Resolution Board 7/1994 - 10/1995 | |
| Burke/Lee A joint Venture 12/1987 - 9/1991 | |
| Long & Associates 5/1997 - 11/1997 | |
| Paul E. Pederson Agreement No. 12115 1/1997 - 5/1997 | |
| Robert Fossatti Associates 7/1993 - 9/1993 | |
| URS Consultants, Inc. 2/1996 - 1/1997 | |
| Heery Correspondence 8/1990 - 5/1994 | |
| Mahan & DeSalvo 3/1990 - 9/1993 | |
| Cooling Coils Issues 12/1996 - 8/1997 | |
| MW Consulting Engineers - Protection Study 6/5/1992 | |
| Value Engineering and Constructability Review 5/1992 | |
| Geotechnical Report 2/1991 | |
| Greenhouse Replacements WWREC Puyallup. Building No. 1034 | |
| 36 | Budget 5/1999 |
| E.l.S 5/1995 | |
| Regents 10/1997 | |
| Construction Testing Laboratories, Inc. CO No. 12241 7/1996 | |
| Robert Fossatti & Associates General Corresp. 3/1995 | |
| SCM Consultants 8/1995 - 9/1995 | |
| SCM Consultants, Inc. - Toxic Leaching Characteristic Procedure 10/1995 | |
| SCM Consultants, Inc. - Lead Based Paint Survey 4/1995 | |
| Construction Testing Laboratories In. Testing Reports 7/1996 - 3/1997 | |
| Program Planning Committee 7/1994 - 7/1994 | |
| Moza Construction, Inc. - Contract 3 General Correspondence #1 5/1995 - 6/1995 | |
| Christopher Stafford Architects, Inc. #3 General Correspondence #3 10/1996 - 8/1998 | |
| The Stafford Architects, Inc. Co. 3/1994 - 4/1997 | |
| MOZA Construction, Inc. Co. Pay Estimates #1 10/1995 - 2/1996 | |
| John Korsmo Construction, Inc. CO 1 Headhouse & Site Improve. #1 5/1996 - 10/1997 | |
| General Correspondence Co. #2 Co. #2 1/1996 - 11/1997 | |
| John Korsmo Construction inc. - Co. #1 5/1996 - 7/1997 | |
| John Korsmo Contract Change Proposals No. 20 - 01 | |
| Rejected Bids - Co. 1 Headhouse & Site Improvement - Bid Opening 4/18/1996 | |
| Hartford Contracting, Inc. Co #2 Greenhouse 5/1996 - 2/1999 | |
| General Correspondence #2 5/1996 - 2/1999 | |
| Stafford Harris, Inc. General Correspondence #2 1/1996 - 9/1996 | |
| The Stafford Architects, Inc. General Correspondence. #1 3/1994 - 11/1995 | |
| Student Services Addition. Building No. 6504 | |
| 37 | Budget 4/1992 - 5/1999 |
| Regents 6/1991 - 9/1996 | |
| E.I.S. | |
| Attorney General Correspondence #1 4/1996 RESTRICTED | |
| Burke/Lee Correspondence 5/1991 - 6/1991 | |
| Robert Fossatti Associates 9/1993 - 1/1997 | |
| The Mahan Partnership 10/1992 - 2/1993 | |
| The Redicheck Firm - Amends & Ext. Serv. Contr. 11621 3/1994 - 4/1994 | |
| Value Engineering Study 10/1993 | |
| Construction Reports #1 9/1994 | |
| Geotechnical Report 10/1992 | |
| Building Committee Minutes 4/1991 - 8/1994 | |
| General E-Mail Correspondence #1 8/1996 - 2/1997 | |
| General Correspondence #7 9/1996 - 6/1997 | |
| Mahlum & Nordfors McKinley Gordon General Correspondence #10 4/1996 - 9/1996 | |
| Preliminary Estimate for Student Services Addition Prepared 6/1991 | |
| Construction Meeting Minutes 9/1994 - 2/1996 | |
| Lydig Construction General Correspondence #2 8/1996 - 3/1997 | |
| Lydig Construction Contract 9/1995 - 4/1997 | |
| Mahlum & Nordfors Mckinley Gordon Contract 8/1996 - 3/1997 | |
| Lydig Construction Change Proposals #'s 51 - 001 | |
| 38 | Rejected Bid Summaries (Bid Opening July 12, 1994) |
| SSA Sound | |
| SSA Directories & Signs 9/1996 - 1/1997 | |
| General Correspondence #6 6/1995 - 7/1996 | |
| General Correspondence #5 6/1994 - 5/1995 | |
| General Correspondence #4 2/1994 - 4/1994 | |
| General Correspondence #3 10/1993 - 2/1994 | |
| General Correspondence #2 3/1992 - 9/1993 | |
| General Correspondence #1 2/1990 - 2/1992 | |
| Mahlum & Nordfors McKinley Gordon General Correspondence #9 7/1995 - 3/1996 | |
| Mahlum & Nordfors McKinley Gordon General Correspondence #8 7/1994 - 6/1995 | |
| Mahlum & Nordfors McKinley Gordon General Correspondence #7 4/1994 - 6/1994 | |
| 39 | Mahium & Nordfors Mckinley Gordon General Correspondence #6 2/1994 - 3/1994 |
| Mahium & Nordfors McKinley Gordon General Correspondence #5 12/1994 - 1/1994 | |
| Mahium & Nordfors Mckinley Gordon General Correspondence #4 10/1993 - 11/1990 | |
| Mahium & Nordfors McKinley Gordon General Correspondence #3 8/1993 - 9/1993 | |
| Mahium & Nordfors McKinley Gordon General Correspondence #2 10/1992 - 7/1993 | |
| Mahium & Nordfors McKinley Gordon General Correspondence #1 6/1991 - 8/1993 | |
| Mahium & Nordfors McKinley Gordon Contract #1 9/1991 - 12/1994 | |
| Mahlum & Nordfors McKinley Gordon Contract #2 1/1995 - 7/1996 | |
| Lydig Construction Contract #2 6/1995 - 8/1995 | |
| Lydig Construction Contract #1 3/1994 - 4/1995 | |
| Lydig Construction General Correspondence # 1 6/1994 - 7/1996 | |
| Greenhouse Replacement WWREC Puyallup. Building No. 1034 (Continued From Box #36) | |
| 40 | Hartford Contracting Contract #2 2/1997 - 8/1996 |
| Hartford Contracting Contract #1 5/1996 - 5/1997 | |
| Hartford Contracting Change Proposals #‘s012 - 001 | |
| Rejected Bids - Contract #2 (Bid Opening 4/18/1996) | |
| General Correspondence #1 Contract #3 New Campus Elec. Upgrade 6/1995 - 7/1996 | |
| New Campus Elec. Upgrade - Rejected Bids (Bid Opening 6/23/1995) | |
| General Correspondence #1 5/1993 - 4/1996 | |
| Miscellaneous | |
| University Housing Apartment Project (Yakima Village - Building #680) Regents 1/1994 - 1/1996 | |
| Dairy Forage Facility Phase II (Building #1516) - Regents 1/1994 - 9/1995 | |
| Food Science Human Nutrition Phase II (Building #81 6) - Regents 1/1994 | |
| Records Maintenance Materials & Recycling (Building #357) Regents 6/1991 - 10/1994 | |
| ICNE - Yakima Permanent Facility. Building No. 9401 | |
| 41 | Budget 4/1995 - 3/1995 |
| E.I.S. 1/1995 | |
| Regents Reports 10/1992 - 9/1996 | |
| Attorney General Correspondence #1 12/1995 - 1/1996 RESTRICTED | |
| Burke/Lee Architects 3/1993 - 9/2003 | |
| AGRA Earth & Environmental 3/1995 | |
| Bovay Northwest 11/1994 - 3/1995 | |
| Robert Fossatti Associates 12/1994 - 4/1995 | |
| Loofburrow Architects Contract # 11 955 3/1995 - 6/1996 | |
| GN Consulting Engineers Contract #11 987 5/1995 - 11/1995 | |
| Project Planning Committee 7/1993 | |
| GN Northen Consultants Concrete/Steel Reinforcing Test Reports 5/1995 - 11/1995 | |
| General E-Mail Correspondence 1/1996 | |
| General Correspondence 8/1995 - 5/1997 | |
| Integrus Architecture - General Correspondence #2 11/1995 - 12/1996 | |
| Moen - Garza - Lehman, Joint Venture Agreement 2/1995 | |
| ALSC Architects - Hollingbery Fieldhouse Concept Study 8/1997 | |
| Integrus Architecture - Construction Meeting Minutes 5/1994 - 5/1996 | |
| Integrus Architecture - Contract #1 10/1993 - 7/1996 | |
| Kranz Construction, Inc. - General Correspondence #1 2/1995 - 9/1996 | |
| Kranz Construction, Inc. - Contract #1 2/1995 - 9/1996 | |
| Kranz Construction Contract Change Proposals #‘s 065 - 16 | |
| 42/43 | Kranz Construction Contract Change Proposals #'s 15 - 01 |
| Rejected Bids 2/1995 - 4/1995 | |
| YAKIMA ICNE Balance Report Copy 3 | |
| ICNE - Yakima site studies (Draft) | |
| General Correspondence #1 9/1992 - 7/1995 | |
| Integrus Architecture - General Correspondence 10/1993 - 10/1995 | |
| SITING 8/1992 - 11/1993 | |
| Site Information Overheads/Transparencies | |
| Facilities Conditions Survey - Ad Annex, Commons, Van Doren Elec. General Correspondence | |
| Family Student Housing Replacement | |
| 42/43 | Married Student Housing project - Budget 2/1982 - 12/1984 |
| Burke/Lee Correspondence | |
| E.l.S. 4/1983 | |
| General Correspondence 7/1980 - 2/1992 | |
| Foley Institute for Public Policy & Public Service at Thompson Hall. Building No. 001 | |
| General Correspondence #1 1/1995 - 10/1999 | |
| Animal Science Laboratory Building. Building No. 100 | |
| 44 | Budget 10/1992 - 4/1999 |
| E.I.S. 4/1994 - 6/1994 | |
| Regents Reports 10/1991 - 8/1994 | |
| HCI Howard Consultants, Inc./ Strata 7/1996 - 8/1996 | |
| HCI Howard Consultants, Inc. /Strata Concrete Test Reports 3/1996 - 4/1996 | |
| Professional Services Industries 11/1994 - 9/1996 | |
| Redicheck Firm Agreement Contract # 621 3/1995 - 5/1995 | |
| Robert Fossatti Associates Inc. 1/1994 - 6/1998 | |
| Geotechnical Report 6/1994 - 7/1994 | |
| HVAC Duct Problem General Correspondence 3/1997 - 6/1997 | |
| Wind Tunnel Study 8/1987 | |
| Sandblasting Correspondence 10/1996 - 9/1996 | |
| General Correspondence E-Mail 4/1996 - 8/1996 | |
| General Correspondence #3 1/1997 - 7/1998 | |
| General Correspondence #2 9/1995 - 12/1996 | |
| MBT Architecture General Correspondence #5 12/1996 - 4/1999 | |
| MBT Architecture General Correspondence #2 10/1994 - 6/1995 | |
| MBT Architecture Contract # 10907 Payments #2 3/1996 - 11/1997 | |
| MBT Architecture Contract # 10907 Payments #1 2/1992 - 4/1995 | |
| Lydig Construction, Inc. General Correspondence 9/1997 - 4/1998 | |
| Lydig Construction, Inc. Contract # 121 37/Pay Estimates 10/1995 - 9/1997 | |
| 45 | Lydig Construction, Inc. Contract Change Proposal # 93 - 69 6/1997 - 12/1996 |
| Lydig Construction, Inc. Contract Change Proposal # 67 - 65 7/1997 - 12/1996 | |
| Lydig Construction, Inc. Contract Change Proposal # 63 1/1997 | |
| Lydig Construction, Inc. Contract Change Proposal # 62 - 32 11/1996 - 7/1996 | |
| Lydig Construction, Inc. Contract Change Proposal # 30 - 1 6/1996 - 11/1995 | |
| Rejected Bids 10/1995 - 12/1995 | |
| ASC - Sound 2/1997 - 5/1997 | |
| Drawings | |
| Energy Conservation Report/Life Sciences Cost Analysis 2/1995 | |
| 46 | MBT Associates General Correspondence #1 1/1992 - 9/1994 |
| MBT Associates General Correspondence #4 10/1995 - 12/1996 | |
| MBT Associates General Correspondence #3 7/1995 - 9/1995 | |
| Construction Documents Estimate by ACKROYD 8/1995 | |
| MBT Associates Architect Contract Payment 4/1995 - 7/1996 | |
| Lydig Construction, Inc. General Correspondence #1 9/1995 - 8/1997 | |
| MBT Architects - Schematic Design Submittal |
Archives 273
Capital Planning
Building Files, 1957-1998.
ACQUISITION AND PROCESSING INFORMATION
These records were transfered to Manuscripts, Archives, and Special Collections from Capital Planning on February 10, 2004 (UA 2004-01). The records were processed by Tim Mace and University Archivist Mark O'English in early 2009.
EXTENT/QUANTITY INFORMATION
COLLECTION DESCRIPTION & ARRANGEMENT
The collection consists of reports, plans, designs, and schematics relating to a large number of WSU Buildings; thgough a few earlier materials are included, the majority of the materials dates from the late 1980s to early 1990s. The collection is maintained in its original order, and loosely consists of two series in a close-to-alphabetical order.
PREFERRED CITATION
The suggested citation for the collection is:
[Item Description]
Capital Planning Building Files, 1957-1998 (UA 273)
Manuscripts, Archives, and Special Collections
Washington State University Libraries
Pullman, WA
| Box | Description |
| 1 | College of Agriculture. Controlled Environment Laboratories and Growth Chambers. 1/1976. |
| Agriculture Sciences Building - Program Statement. Clark & Hulbert Halls. 11/1965. | |
| Agriculture Sciences Building - Clark Hall Preliminary Design. 7/1968. Lloyd J. Lovegren & Associates Architects | |
| Agriculture Sciences Building - Preliminary Design. 11/1969. Lloyd J. Lovegren & Associates Architects | |
| Animal Disease Biotechnology Facility Value Engineering Design Development.12/1992. KIM & Associates, Ltd. | |
| Animal Disease Biotechnology (ADBF) Facility Site Selection Study. 6/1991. Burke Lee Architects, Planners & Landscape Architects | |
| ADBF - Design Development. 12/1992. Northwest Architectural Company | |
| ADBF - Schematic Design Brochure. 6/1992. Northwest Architectural Company | |
| ADBF - Program Statement. 1/1992. | |
| ADBF Partial Specifications (Third Submittal). 12/1992. Northwest Architectural Company | |
| ADBF - Construction Document Phase/Structural Calculation. Vol. I Final Submittal. 2/1994. Structural Design Northwest, Inc. Garrick A. Dung - Professional Engineer | |
| ADBF - Construction Document Phase/Structural Calculation. Vol. II - Final Submittal. 2/1994. Structural Design Northwest, Inc. Garrick A. Dung - Professional Engineer | |
| ADBF - Construction Document Phase/Structural Calculation. Vol. III - Final Submittal. 2/1994. Structural Design Northwest. Inc. Garrick A. Dung - Professional Engineer | |
| ADBF - Architectural Specifications - Volume I of 2. 2/1992. Northwest Architectural Company | |
| ADBF - Mechanical & Electrical Specification - Volume II of II. 3/1994. Northwest Architectural Company | |
| 2 | Alumni Center - Schematic Design Brochure. Northwest Architectural Company |
| Alumni Center - Interior Design. 4/1988. Northwest Architectural Company | |
| Alumni Center - Furnishings Presentations. 7/1988. Northwest Architectural Company | |
| Alumni Center - Specifications. 12/1987. Northwest Architectural Company | |
| Athletic Facilities Study - ALSC Architects. 6/1996. ALSC Architects, P.S. | |
| Animal Sciences Laboratory Building (ASLB) - Schematic Design Submittal. MBT Associates | |
| ASLB Building - Schematic Design Submittal. MBT Associates | |
| ASLB - Project Manual, Vol. I. Sec 0 - 14. 9/1995. MBT Architecture | |
| ASLB - Project Manual, Vol. II. Sec 15 - 16. 9/1995. MBT Architecture | |
| ASLB - Design Development Value Engineering. 11/1994. Ehninger Fetzer Tholen | |
| ASLB - ***Revised*** Construction Documents Estimate. 8/1995. Ackroyd Cost Control Consultants | |
| ASLB - Energy Conservation Report/Life Cycle Cost Analysis. 2/1995. Affiliated Engineers NW, Inc. | |
| ASLB - Schematic Design Estimate (Final). 4/1994. Ackroyd Cost Control Consultants | |
| ASLB - Addendum NO. 1. 9/1995. MBT Architecture | |
| ASLB - Addendum NO. 2. 9/1995. MBT Architecture | |
| ASLB - Addendum NO. 4. 10/1995. MBT Architecture | |
| ASLB - Addendum NO. 5. 10/1995. MBT Architecture | |
| Completion Of Laboratory - Central Animal Laboratory Facility. 5/1975. Barnard & Holloway, Architects | |
| Veterinary Animal Holding & Quarantine Facilities Isolation Building Specification. 11/1979. Architects: Barnard & Holloway Mechanical: Rice & Lunh Electrical: Stingle - Atwood | |
| Completion of Large Animal Isolation Facility - Specifications. 3/1982. Barnard & Holloway | |
| The Architecture Interior Design Landscape Architecture Facility @ WSU Design Report. 5/1981. Architects: Adkison Leigh Sims Cuppage Design Associates: Simmer Gunsul Frasca Partnership. Landscape Architects: Jongejan Gerard McNeal | |
| A Study of Alternative Sites - Architecture, Interior Design, Landscape Architecture Facility. 3/1980. Architects: Adkison Leigh Sims Cuppage Design Associates: Simmer Gunsul Frasca Partnership Landscape Architects: Jongejan Gerard McNeal | |
| Avery Hall - English Building Phase 1. 11/1970. Architects: Fred Bassetti & Company Mechanical Engineers: Valentine, Fisher & Tomlinson Electrical Engineers: Beverly A. Travis & Associates Landscape Architects: Richard Haag Associates | |
| 3 | Multi Purpose Coliseum (Beasley) Program & Site Analysis. 12/1968. John Graham & Company - Architects/Planners/Engineers |
| Multi Purpose Coliseum Schematic Design. 4/1969. John Graham & Company - Architects/Planners/Engineers | |
| Multi Purpose Coliseum - Preliminary Design. 10/1969. John Graham & Company - Architects/Planners/Engineers | |
| Beasley Performing Arts Coliseum. Roof Structure Evaluation - Volume 1 Report. 5/1988. Peden Petersen Lee, R. S. Consulting Engineers | |
| Beasley Performing Arts Coliseum. Roof Structure Evaluation - Volume 2 Calculations. 5/1988. Peden Petersen Lee, R.S. Consulting Engineers | |
| Biosciences Building Phase II - Program. 11/1973. | |
| Biosciences Building Phase II - Preliminary Design (Kolb & Stansfield). 7/1974. | |
| Biosciences Building Phase II - Specifications (Kolb & Stansfield). 3/1975. | |
| Biological Sciences Building (Eastlick) - Preliminary Presentation. 11/1959. Decker & Christenson AIA Architects | |
| Bohler Gymnasium Addition - Predesign Study. 10/1992. Sasaki Associates, Inc. Stewart Associates | |
| Bohler Gym Addition - Schematic Design. 11/1994. Architect: Sasaki Associates Associated Architect: Stewart Associates Structural & Civil Engineers: Summit Technology Mechanical Engineers: Notkin Engineering Electrical Engineers: Elcon Associates Cost Estimators: C3 Management Group | |
| Bohler Gym Addition - 100% Design Development Submittal 1 of 2. 5/1995. Architect: Sasaki Associates. Inc. Mechanical Engineer: Notkin Engineering. Inc. | |
| Bohler Gym Addition - 100% Design Development Submittal 2 of 2. 5/1995. Architect: Sasaki Associates, Inc. | |
| Bohler Gym Addn. - Structural Calculations 1 of 2. 2/1996. Prepared by Summit Technology | |
| Bohler Gym Add. - Structural Calculations 2 of 2. 2/1996. Prepared by Summit Technology | |
| Bohler Gym Add. - Construction Bid Documents 1 of 2. 2/1996. Sasaki Architects, Inc. | |
| Bohler Gym Add. - 100% Design Mechanical Calculations. 5/1996. Architect: Sasaki Associates, Inc. Mechanical Engineer: Notkin Engineering In. | |
| Bohler Gym Renovation - Schematic Design Value Engineering. 6/1996. EFT Architects/Planners/Project Managers | |
| Bohler Gym Renovation - Schematic Design. 6/1996. Sasaki Architects | |
| Bohler Gym Add. - Load Calculations. 5/1996. Elcon Associates. inc. | |
| Boiler No. 8 - Proposal for Engineering Services. 11/1975. Bovay Engineers, Inc. | |
| Bryan Hall Remodel - Schematic Design Brochure. 7/1972. James & Hicks, Architects Rice & Luhn, Mechanical Engineers Joseph Dyole & Assoc. Electrical Engineers Atwood - Hinzman, Structural Engineers | |
| 4 | Child & Family Studies Center - Building Program. 10/1967. |
| Child Care Center - Bldg Assessments Report (Rogers Orton Dining Hall). 12/1991. The Tsang Partnership, Inc. | |
| Child Care Center Building Program. 6/1991. The Tsang Partnership, Inc. | |
| Child Care Facility - Design Development Phase. 7/1992. The Tsang Partnership. Inc. | |
| Child Care Center - Schematic Design Phase Report. 1/1992. The Tsang Partnership, Inc. | |
| Child Care Facility - Schematic Design. 4/1992. The Tsang Partnership. Inc. | |
| Child Care Facility - Design Development Phase. 7/1992. | |
| Child Care Facility Project Manual. 2/1993. Architect: The Tsang Partnership, Inc. Structural Engineer: Chulker, Putnam Collins & Scott, Inc. Mechanical Engineer: Thomas J. Gerard & Assoc. Electrical Engineers. Doyle Engineering, Inc. | |
| Child Care Center Playground. Report of Subsurface Exploration & Geotechnical Studies. 4/1994. Gifford Consultants. inc. | |
| Chemistry Building - Project Manual General Volume I of III. 6/1987. Architect: Brooks Hensley Creager Architects P.S. Landscape Architect: Hellstorm Associates Electrical Engineers: Doyle Engineering Inc. Vibration Consultants: Applied Dynamics Inc. Structural Engineers: Suden, Golden & Guest Mechanical Engineers: Thomas J Gerard & Associates Inc. Laboratory Consultants: Early Walls Associates Geotechnical Consultants: Shannon & Wilson, Inc. | |
| Chemistry Building - Project Manual. Mechanical Specifications Volume II of III. 6/1987. Architect: Brooks Hensley Creager Architects P.S. | |
| Chemistry Building - Project Manual. Electrical Specification Volume III of III. 6/1987. Architect: Brooks Hensley Creager Architects P.S. | |
| Chemistry Building - Index/ Sec. 16000 - 16851. | |
| Chemistry Building - Section 15010 - General Provisions. | |
| Chemistry Building - Engineering Calculations. Brooks Hensley Creager Architects, P.S. | |
| Chemistry Building - Schematic Design Documents. 11/1984. Brooks Hensley Creager Architects, P.S. | |
| Chemistry Building - Schematic Design Documents. 9/1986. Brooks Hensley Creager Architects, P.S. | |
| Chemistry Building - Pedestrian Corridor Design Development of College Avenue From Library Road to Stadium Way. Brooks Hensley Creager Architects P.S. | |
| Chemistry Building - Site Study Selection. 3/1984. Burke/Lee A joint venture | |
| 5 | Specifications for a Crew Shellhouse. 2/8/1984. |
| Fulmer Hall: Chemical Waste Collection Site Facility. 6/24/1994. | |
| Schematic Design Brochure: Chemical Waste Collection Sites - Vet Complex. 9/3/1996. | |
| Schematic Design Brochure: Chemical Waste Collection Sites - Eastlick Hall, Wegner Hall, Engineering Complex and Silver Recovery Units. 11/18/1994. | |
| Creamery Annex: Schematic Design Brochure. 11/10/1998. | |
| Chemical Sciences Bld: Site Selection Study. 11/1980. | |
| Chemistry Building: Program Statement. 3/1984. | |
| Chemistry Building #3 Section 15010 - General Provisions. | |
| Site Study: Cancer Research and Training Center. 11/1976. | |
| Building Program, Preliminary Draft: Cancer Research and Training Center. 11/1976. | |
| Proposal: Carpenter Hall Renewal. 5/1984. | |
| Carpenter Hall Schematic Design. 4/24/1987. | |
| Carpenter Hall Design Development. 10/16/1987. | |
| Carpenter Hall Renewal Addendums. . | |
| Centeral Chilled Water System. 1973 - 1974. | |
| Centeral Water Chilling & Dist. A Feasibility Study. 1973 - 1974. | |
| Centeral Campus Storm Sewer and Circulation Improvements Study. 4/1984. | |
| Cleveland Hall. 10/1961. | |
| Cleveland Hall, Addition to. | |
| Department of Anthropology. | |
| College Hall Renovation: Design Development. 1/1982. | |
| College Hall. | |
| Project Manual: College Hall Renovation. 8/12/1982. | |
| Comp. Sci. Bld. Martin Academic/Stadium. 7/1971. | |
| Computer Sciences - Mathmatics Building, Phase 1, Martin Stadium/Academic Center Phase II. 10/22/1976. | |
| Schematic Design: Martin Stadium Academic Center Phase II Computer Science Building. 3/15/1975. | |
| Computer Sciences - Mathmatics Building, Phase 1, Martin Stadium/Academic Center Phase II. 5/1976. | |
| Open Plan Feasibility Study: Computer Sciences/Mathmatics Building. 4/1980. | |
| Cancer Research: Preliminary Concepts (along side of box). 12/1976. | |
| 6 | Campus Downtown Pedestrian Corridor. |
| West Entrance Pedestrian Way - Specifications. 7/1986. Burke/Lee A Joint Venture Architects/Landscape Architects | |
| Compton Union (Wilson) - Expansion Program Statement. | |
| Compton Union Building - Technical Report. Graphical Results from a Telephone Survey of WSU Student. Faculty, & Staff on the Compton Union Building (CUB) and Campus Recreation Facilities. 9/1996. | |
| SESRC (Social & Economic Sciences Research Center) Report # 96 - 22 (CUB6 # 1265). | |
| Comparative Behavior Laboratory - Schematic Design Brochure “Addition to”. 1/1966. Victor Louis Wulff Architect. AIA & Associates | |
| Colorado Street preliminary Design - Technical Memorandum. 10/1994. CH2M Hill Engineers Planners Economists Scientists | |
| Commons Remodeling Program for Ground Floor. Listings of Projected Uses & Requirements. 5/1971. | |
| Dairy Forage Facility - Master Plan. 11/1988. The BJSS Group Architecture & Planners AIA | |
| Dairy Forage Facility - Schematic Design Submittal. 1/1989. The BJSS Group Architecture & Planners AIA | |
| Dairy Forage Facilities - Proposed Phase 1 Additions. Subsurface Exploration & Geotechnical Engineering Report. 1/1989. RittenHouse-Zeman & Associates/Geotechnical & Hydrogeological Experts | |
| Dairy Forage Facility - Buckley Cost Estimate. 2/1989. The BJSS Group Architecture & Planners AIA | |
| Dairy Forage Facility - Volume 1 - Specifications. 11/1989. The BJSS Group Architecture & Planners AIA | |
| Dairy Forage Facility - Volume 2 - Architectural Details. 11/1989. The BJSS Group Architecture & Planners AIA | |
| Dairy Forage Facility - Project Manual Volume 1 Specifications. 4/1990. The BJSS Group Architecture & Planners AIA | |
| Dairy Forage Facility - Cost Estimate & Area Comparison Charts. Schematic Design Phase. 4/1992. The BJSS Group Architecture & Planners AIA | |
| Dairy Forage Facility - Phase II Schematic Design Submittal The BJSS Group Architecture & Planners AIA. 4/1992. | |
| Dairy Forage Facility - Design Development Submittal (Buckley WA): Design Description, Cost Estimate, Area Comparison, Proposed Time Schedule. 9/1992. The BJSS Group Architecture & Planners AIA | |
| Dairy Forage Facility - Outline Specifications (Buckley WA). 9/1992. The BJSS Group Architecture & Planners AIA | |
| Dairy Forage Facility - Phase II Project Manual Volume 1 Specifications. 4/1993. The BJSS Group Architecture & Planners AIA | |
| Dairy Forage Facility - Phase II Project Manual Volume 2 Details & Schedule. 4/1993. The BJSS Group Architects & Planners, AIA | |
| Dairy Forage Facility - Phase II Project Manual Volume 1 Specifications. 10/1993. The BJSS Group Architects & Planners, AIA | |
| Dairy Forage Facility - Phase II Project Manual Volume 2 Details & Schedule. 10/1993. The BJSS Group Architects & Planners, AIA | |
| Dairy Forage Facility - Phase II - Structural Calculations. 1/1993. AKB Consulting Engineers/BJSS | |
| Dairy Forage Facility - Western Washington Research & Extension Center (Puyallup) Veterinary Research - Diagnostic Center. 8/1987. Gross, Thurman & DeMers, Joe, P.S. | |
| 7 | Electrical/Mechanical Engineering Building. 11/1982 - Revised 12/1983. The Callison Partnership, Ltd. |
| Electrical/Mechanical Engineering Bldg. Site Selection Study. 8/1982. Burke/Lee A Joint Venture | |
| Electrical/Mechanical Engineering Bldg. Design Development. 7/1983. | |
| Electrical/Mechanical Engineering Bldg. - Building Program (Original). 12/1983. | |
| Electrical/Mechanical Engineering Bldg. - (Revised). 12/1983. | |
| Electrical/Mechanical Engineering Bldg. - Specifications Cummings Schiatter Associates. 4/1984. Loschky Marquardt & Nesholm | |
| Engineering Teaching Research Laboratory Building (ETRL). Project Manual Volume 1. 3/1996. Callison Architecture. Inc. | |
| ETRL Building - Project Manual Volume 2. 3/1996. Callison Architecture, Inc. | |
| ETRL - Project Manual Volume I - (Placed On Top in Box). 5/1995. Callison Architecture, Inc. | |
| ETRL Building - Electrical Panel Schedule. 5/1995. Callison Architecture, Inc. | |
| ETRL Building Schematic Design Submittal - Scheme T. Callison Architecture, Inc. | |
| ETRL Building - Design Development outline Specifications. 7/1994. Callison Architecture | |
| ETRL Building - Addendum #1 & Addendum #2. 3/1996. Callison Architecture | |
| ETRL Building - Project Manual - Volume I Bid Set. 3/1996. Callison Architecture, Inc. | |
| Electrical/Mechanical Engineering Bldg. - Addendums No. 2&3. 1984. The Callison Partnership, Ltd. - Predesign Consultant | |
| 8 | Engineering Teaching Research Laboratory Building. Energy Conservation Report - Life Cycle Cost Analysis. 7/1994. Riley Engineering, Inc. The Callison Partnership Ltd. |
| English Building - Phase 1 - Avery Hall. Architects: Fred Bassetti & Company Mechanical Engineers: Valentine, Fisher & Tomlinson Electrical Engineers: Beverly A. Travis & Associates Landscape Architects: Richard Haag Associates | |
| Experimental Animal Laboratory - Program. 6/1975. | |
| Experimental Animal Laboratory - Waste Treatment Facilities - Engineering Report. Parametrix, Inc. | |
| Experimental Animal Laboratory - Design Development. 10/1975. Architects: Kirk, Wallace, McKinley, AIA & Associates Structural Engineers: Skilling, Helle, Christiansen, Robertson Mechanical & Electrical: Valentine, Fisher & Tomlinson Electrical: Sparling & Associates, Inc. Engineering & Environmental Sciences: Parametrix | |
| Experimental Animal Laboratory - Draft Impact Statement. 12/1976. Parametrix, Inc. | |
| Facility Condition Survey - McAllister/ Kruegel Resident Halls CO 11063. SCM Consultants , Inc. | |
| Facility Condition Survey - Administration Annex CO 10153. 7/1990. SCM Consultants, Inc. | |
| Facility Condition Survey - Van Doren Hall CO 10153. 7/1990. SCM Consultants. Inc. | |
| Facility Condition Survey - Chemical Engineering Building CO 10153. 7/1990. SCM Consultants, Inc. | |
| Facility Condition Survey - Commons Building CO 10153. 7/1990. SCM Consultants, Inc. | |
| Family Student Housing Environmental Checklist. 5/1994. Burke/Lee Architects/Landscape Architects/Planners | |
| Fulmer Hall Remodeling - Phase II. 5/1980. | |
| Fulmer Hall/Annex Renewal - Value Engineering Study. 8/1993. Meng Associates | |
| Fulmer Hall & Annex - Fume Hood Survey - Draft. 11/1993. Mclellen & Copenhagan Mahium & Nordfors, McKinley, Gordon | |
| Fulmer Hall/Annex Renewal - Schematic Design Submittal. McKinley Gordon PSC, Architect - McKinley Gordon PSC Ratti Swenson Perbix, Inc. - Structural Engineer. H.K. Kim Engineers, Inc. - MBE Structural Engineer. Riley Engineering - Mechanical & Electrical Engineers The Greenbusch Group. Inc. - Acoustical Consultant | |
| Fulmer Hall Remodeling - Building Program Statement - Phase II. | |
| Fulmer Hall - Fulmer Hall Annex Renewal - Construction Documents. Project Manual Volume 1. Specification 0 - 4. 4/1995. Mahlum & Nordfors McKinley Gordon | |
| Fulmer Hall Remodeling - Building Program Statement. Phases II & III. 8/1979. | |
| Fulmer Hall Phases I & II Completion - Specifications. 12/1983. Waldron Pomeroy Smith Foote & Akira Architects | |
| Fulmer Hall Remodeling - Program Statement. 11/1992. | |
| Fulmer Hall/Fulmer Annex - Program Statement. 5/1993. | |
| Fine Arts Building Program - Building Program - Design Disciplines Building Phase II (worn brown unbound notebook). Prepared as a collaborative effort by the Departments of Architecture, Fine Arts, Interior Design & Landscape Architecture | |
| Fine Arts Center Mechanical Systems Renovations - Specifications. Halvorson, Beach & Bower Inc. Waldron Pomeroy Smith Foote & Akira Architects Robert Fossatti Associates | |
| Fine Arts Center - Mechanical Systems Renovations. 95% Construction Document Submittal. 3/1988. Halvorson, Beach & Bower, Inc. Waldron Pomeroy Smith Foote & Akira Architects Robert Fossatti Associates Sparling & Associates, Inc. | |
| Fine Arts Plaza - Project Manual. 5/1995. Architect: ALSC Architects Structural Consultant: Structural Design NW Landscape Consultant: T.C. Sherry & Associates, P.S. Electrical Engineer: DEI Electrical Consultants, Inc. | |
| Fine Arts - Building Program. Life Safety Requirements - Mechanical Systems Renovation. 10/1987. | |
| Fine Arts - Design Disciplines Building. 6/1967. Naramore, Bain, Brady & Johanson | |
| Fine Arts Building - Mechanical Systems Renovations. Schematic Design Phase Submittal. 11/1987. Halvorson, Beach & Bower, Inc. Waldron, Pomeroy, Smith, Foote & Akira, Architects Robert Fossatti Associates Sparling & Associates, Inc. | |
| Fine Arts Building Plaza - Schematic Design Analysis. 1/1995. ALSC Architects | |
| 9 | Food & Nutrition Facility - Site Selection Study. 9/1983. Burke/Lee A Joint Venture |
| Food Proc. & Pilot Plant - Proposed Building Plan. 6/1983. | |
| Food - Human Nutrition Facility - Building Program. 9/1984. | |
| Food & Human Nutrition Facility - Schematic Design Phase. 5/1986. Northwest Architectural Company | |
| Food - Human Nutrition Facility - Phase II Schematic Design Presentation. Area Comparison Table & Cost Estimate. 10/1988. Northwest Architectural Company | |
| Food - Human Nutrition Facility. Phase II - 95% Construction Document Submittal/Program updates. 11/1989. Northwest Architectural Company | |
| Food - Human Nutrition Facility Phase II - Design Development Presentation. 4/1989. Northwest Architectural Company Structural Design Northwest. Inc. and Peden, Petersen & Lee. P.S. Thomas J. Gerard & Associates, Inc. Wanless-Cook Associates Miltenherger Architects, Inc. Alberter Staeger Associates C3 Management Group, Inc. Dr. Robert L. Bradley, Jr., Carl Kehret & Albert F. Harms Michael R. Yantis Associates, Inc., P.S. Gifford Consultants, Inc. | |
| Food - Human Nutrition Facility Phase II - Plan Holders List, Addendum #3 & Bid Tabulation Form. 3/1990. Northwest Architectural Company | |
| Food - Human Nutrition Facility Phase II - Project manual. Volume I of II Architectural/Structural. 2/1990. Northwest Architectural Company | |
| Food - Human Nutrition Facility Phase II - Project Manual. Volume II of II Mechanical/Electrical. 2/1990. Northwest Architectural Company | |
| Food - Human Nutrition Facility - Specifications. 6/1989. Northwest Architectural Company | |
| Food & Nutrition Facility (New Science Facility) - Proposal for Architectural Services - Support Document. Hummel Jones Miller Hunsucker, P.A. Arthru Erickson Architects | |
| Food - Service Building Addition - Building Program. 4/1985. | |
| Food - Service (Housing & Food Service Facility) - Design Development. 11/1985. Miller/Hull Partnership | |
| Food - Service Equipment Specifications. 8/1985. Walker McGough Foltz Lyeria, P.S. | |
| Food - Service Building Addition - Specifications. 9/1986. Miller/Hull | |
| Food Services Building Addition - Specifications Landscape Work. 4/1988. Miller/Hull | |
| Food Services Building Addition - Specifications Landscape Bid. 1989. Miller/Hull | |
| Food Service (Housing) Facility - Schematics. 6/1985. Miller/Hull | |
| 10 | Feed Preparation Mixing & Storage Facility - Site Study. 12/1985. Burke/Lee A Joint Venture. Architects, Landscape Architects, Planners |
| Feed Preparation, Mixing & Storage Facility - Building Program. 7/1985. | |
| Feed Preparation Mixing & Storage Facility - Design Development. 7/1986. ARC Architects | |
| Feed Preparation Mixing & Storage Facility - Schematic Design. ARC Architects | |
| Feed Preparation Mixing & Storage Facility - Project Manual. 5/1987. ARC Architects | |
| Fieldhouse - Concept Study. 7/1997. ALSC Architects, P.S. Riley Engineering - Mechanical & Electrical Engineers Structural Design Northwest - Structural Engineers | |
| New Administration Building - Program Statement. 12/1964. | |
| New Administration Building - Schematic Design Brochure. 12/1964. Worthington. Skilling, Helle & Jackson - Structural Engineers James B. Notkin. & Associates - Mechanical Engineers Thomas E. Sparling & Associates - Electrical Engineers Richard Haag & Associates - Landscape Architects Robin M. Towne & Associates - Acoustical Consultants | |
| Greenhouse Replacements Contract 1 - Headhouse & Site Improvements, Puyallup Research & Extension Center. 3/1996. Stafford Harris, Inc. Bouillon Christofferson & Schairer. Inc. | |
| Greenhouse Replacements Contract 2 - Greenhouses, Puyallup Research & Extension Center. 3/1996. Stafford Harris , Inc. Bouillon Christofferson & Schairer, inc. | |
| Greenhouse Replacements Contract 3 - New Campus Electrical Upgrade, Puyallup Research & Extension Center - Specifications. 4/1995. Stafford Harris. Inc. Bouillon Christofferson & Schairer, Inc. | |
| Greenhouse - Headhouse Facilities Building Program, Puyallup Research & Extension Center. 9/1994. | |
| Greenhouse Replacements Puyallup - Schematic Design CO 11611. 12/1994. Stafford Harris, Inc. Sub-Consultants: Bouillon Christofferson & Schairer. Inc.; AKB Consulting Engineers | |
| Greenhouse Replacements - Design Development/Puyallup WWREC. 2/1995. Stafford Harris, Inc. | |
| Greenhouse Replacements - Schematic Design Submittal WWREC. Stafford Harris, Inc. | |
| Golf Storage Building - Specifications. 2/1984. Cambell Engineers, Inc. | |
| Goldsworthy Hall Renovation - Building Program. 8/1985. | |
| Gannon/Golds - Men’s Residence Halls - Design & Cost Submittal. 6/1959. Lea, Pearson & Richards Architects | |
| Glenn Terrell Friendship Mall - Project Manual. 5/1993. Architect: ALSC Architects, P.S. Landscape Consultant: Thorson Partnership Electrical Engineer: Doyle Engineering | |
| General Services Complex - Schematic Design Brochure. 1967. Architect: Victor Louis Wulff, Architect. AIA & Associates Consultants: T. R. Hance - Structural Engineers Rice & Luhn - Mechanical Engineers Wanless - Cook - Electrical Engineers | |
| General Services Complex Phase II - Program Statement. 10/1975. Victor Louis Wulff Architect, A.LA. Associates Atwood - Hinzman, Structural | |
| Graduate Student Residence Hall - Specifications. Drawings & Cost Estimate. 7/1969. Walker/McGough/Foltz, Architects Lyerla/Peden, Engineers | |
| Hazardous Waste Facilities - Schematic Design Brochure. 6/1996. Bovay Northwest | |
| Hazardous Materials Survey - Mechanical Engineering Laboratory. 8/1994. AGRA Earth & Environmental | |
| Hazardous Waste Facilities - Predesign Study. 6/1994. Bovay Northwest | |
| Hazardous Material Survey - Fulmer Hall/Fulmer Annex Renovation. 7/1994. RZA AGRA, Inc. Engineering Environmental Services | |
| 11 | Handicapped Accessibility Improvements - Report Summary Volume I The Pence Associates, Inc. Campanella Murakami Brummitt Inc. |
| Handicapped Accessibility Guide - Memorandum, Mobility Related Improvements. 8/1988. | |
| Handicapped Persons Transition Plan for Facilities Access, Draft Number Four - University of Washington Main Campus, Pack Forest, Friday Harbor Laboratories, Richland Graduate Center. 9/1978. | |
| Handicapped Accessibility Improvements - Part A. Schematic Design and Design Improvement. 11/1980. The Pence Associates, Inc. Campanella Murakami Brummitt, Inc. | |
| Handicapped Accessibility Improvements - Schematic Design. Part B The Pence Associates, Inc. 11/1980. Campanella Murakami Brummitt. Inc. | |
| Handicapped Accessibility Improvements - Schematic Design & Development. Supplement - Part A. 11/1980. The Pence Associates, Inc. Campanella Murakami Brummitt Inc. | |
| Handicapped Accessibility - Building/Site Survey (Stapled). 8/1/1998. Campanella Murakami Brummitt Inc. The Pence Associates, Inc. | |
| Handicapped Accessibility Improvements - Outline Specifications, Phase 1/Part B - 2 (Physical Plant). 6/1981. | |
| Survey of Physical Barriers Which Affect the Handicapped. 12/1977. | |
| Handicapped Accessibility Improvements - Construction Specifications. Phase 1. Part C - Building Retrofit The Pence Associates, Inc. Chisom Murakami Brummitt Inc. | |
| Handicapped Accessibility Improvements - Construction Documents. Phase 1, Part - Elevator Controls. 3/1981. The Pence Associates, Inc. Chisom Murakami Brummitt Inc. | |
| Handicapped Accessibility Improvements - Specs. Phase 1, Part C-1 - Building Retrofit - Nez Perce Village Unit F-Apt. 17. 9/1982. The Pence Associates, Inc. Chisom Murakami Brummitt Inc. | |
| Handicapped Accessibility Improvements - Phase I, Parts B & C Design Development. 3/1981. The Pence Associates, Inc. Chisom Murakami Brummitt Inc. | |
| Handicapped Accessibility Improvements - Construction Specifications. Phase I, part B - I Site Improvements. 10/1981. The Pence Associates. Inc. Chisom Murakami Brummitt Inc. | |
| Handicapped Accessibility Improvements - Structural Calculations. Atwood Hinzman Consulting Engineers | |
| Handicapped Accessibility Improvements - Report Summary Volume 1. The Pence Associates, Inc. Chisom Murakami Brummitt Inc. | |
| Remodeling for the Handicapped - Specifications. 11/1974. Douglas C. Durkoop | |
| Remodeling for the Handicapped - Kamiak Apartments. 10/1979. | |
| Handicapped Accessibility Improvements - Schematic Design Part C. The Pence Associates, Inc. Campanella Murakami Brummitt Inc. | |
| WSU Map - Campus & Vicinity Wheelchair Routes & Building Access. 1978. The Pence Associates. Inc. Campanella Murakami Brummitt Inc. | |
| Heald Hall Fifth Floor Addition - Schematic Design Brochure. 1966. Decker, Kolb & Stansfield Architects | |
| Heald Hall Renewal - Predesign Study. 9/1992. The Miller Hull Partnership | |
| Hollingbery Annex - Handball/Racquet Phases I & II. Building Program. 3/1979. | |
| Hollingbery Field House Annex - Handball/Racquet - Design Development. 6/1979. Architects: Adkison, Leigh. Sims, Cuppage Structural Engineers: Atwood/Hinzman Mechanical & Electrical: Riley Engineering | |
| Holland Library Renewal - Project Scope Development. 1/1994. ALSC Architects | |
| Holland Library Addition - Shelving & Compact Storage Systems. Project Manual. 6/1993. ALSC Architects. P.S. | |
| Holland Library - Specifications for Fire Pump Installation - Bid Set Drawings & Specifications/ Fire Protection & Suppression Design Alternatives. 12/1993. Creighton Brook Engineers | |
| Holland Library Addition - Project Manual - General Construction. Volume 1 of 2. 8/1991. ALSC Architects | |
| Holland Library Addition - Project Manual - Mechanical & Electrical. Volume 2 of 2. 8/1991. ALSC Architects | |
| Holland Library Addition Specifications. 5/1990. ALSC Architects, P.S. | |
| Holland Library Addition - Design Development Appendix ALSC Architects. 2/1990. Zimmer Gunsul Frasca Partnership | |
| 12 | Holland Library Addition - Design Development. 1/1990. Architects. ALSC Architects, Zimmer Gunsul Frasca Structural Engineer. Structural Design Northwest Mechanical Engineer: Riley Engineering Electrical Engineer: Doyle Engineering Civil Engineer: Wyatt - Jaykim Specifications: Matson Carlson Whitacre Early Bid Package Structure: Anne Symonds & Associates Elevator Consultant: Lerch Bates Associates Acoustical Consultant: Towne Richards & Chaudiere Landscape Architect: The Thomson Partnership Library Planning Consultant: Phil Leighton |
| Holland Library Addition - Design Development Specification. 1/1990. ALSC Architects, P.S. Zimmer Gunsul Grasca Partnership | |
| Holland Library Addition - Preliminary Design. 11/1989. Architects: ALSC Architects. Zimmer Gunsul Frasca Structural Engineer: Structural Design Northwest Mechanical Engineer: Riley Engineering Electrical Engineer: Doyle Engineering Civil Engineer: Wyatt - Jaykim Specifications: Matson Carlson Whitacre Early Bid Package Structure: Anne Symonds & Associates Elevator Consultant: Lerch Bates Associates Acoustical Consultant: Towne Richards & Chaudiere Landscape Architect: The Thomson Partnership Library Planning Consultant: Phil Leighton | |
| Holland Library Addition & Renewal. Site Design & Building Massing Studies. 5/1989. ALSC Architects, Zimmer Gunsul Frasca Partnership Structural: Suden Golden & Guest Mechanical: Riley Engineering Electrical: Wanless Cook Civil: Wyatt Jaykim Library Planning: Phil Leighton | |
| Holland Library Addition - Preliminary Site Studies & Cost Estimates. 3/1989. Architects: ALSC Architects Design Architects: Zimmer Gunsul Frasca Partnership | |
| Holland Library Addition - Schematic Design Architects: ALSC Architects. 7/1989. Design Architects: Zimmer Gunsul Frasca Partnership | |
| Holland Library Addition & Renewal - Architect Selection Interview. 9/1988. Architects: ALSC Architects Design Architects: Zimmer Gunsul Frasca Partnership | |
| Holland Library Renovation - Partial Schematic Design for Full Renovation & Design Development for Phase One. 9/1980. Joyce/Nordfors & Associates, P.S. | |
| Holland Renovation - Program. 3/1980. | |
| Holland Library for State College of Washington. 1947. Schematic Design Brochure | |
| HVAC Design Analysis (Incinerator). 10/1997. Prepared By Bovay Northwest, Inc. | |
| Incinerator Building - Specifications - Volume 1. 8/1998. | |
| Incinerator Building - Specifications - Volume 2. 8/1998. | |
| Incinerator Project - Civil Design Analysis. 10/1997. Prepared By Bovay Northwest, Inc. | |
| Incinerator Study - Incinerator Report. 8/1991. Wieland, Lindgren & Associates, Inc. | |
| Incinerator Study - Reasonable Available Control Technology. 11/1994. Bovay Northwest Enviromech Dames & Moore | |
| Incinerator - Site Selection Study for Pathological Waste incinerator. 2/1995. Bovay Northwest | |
| Incinerator Opinion of Probable Costs for Pathological & Solid Waste Incinerators. 3/1995. Bovay Northwest | |
| Incinerator - Environmental Impact Statement for Replacement Medical Waste. Incinerator, Volume 1 of II. (Needs to Be Pulled & Tossed. A Complete Set Volume I & II are in Box # 29.). 10/1996. WSU | |
| Incinerator - Geotechnical Report on Storage Building Gifford Consultants, Inc. 11/1992. | |
| Incinerator - Environmental Health & Safety Plan Review Record. Notice of Construction. 1/1998. Envirotech Drawings | |
| Incinerator - Notice of Construction Application Declaring Intent to Construct, Install, or Establish A New Air Contaminant Source or Replacement or Substantial Alteration of Emission Control Technology on an Existing Stationary Source. Attachment: Process Flow Diagram. 1/1998.
Environmental Health & Safety McCully Frick & Gilman, Inc. Advanced Combustion Systems, Inc. | |
| Incinerator. Envirotech Drawings | |
| Incinerator - New incinerator Building - Utility Study. 2/1997. Bovay Northwest A Dames & Moore Subsidiary | |
| Incinerator - Schematic Design Brochure. 3/1997. Bovay Northwest, Inc. EnviroMech | |
| Incinerator - Design Development Submittal. 7/1997. Bovay Northwest | |
| Incinerator - Conceptual Design Analysis for Medical Waste Incinerator. 1/1997. Bovay Northwest EnviroMech | |
| Incinerator Project - Design Development: Outline Specifications Submittal. 7/1997. Bovay Northwest A Dames & Moore Subsidiary | |
| Incinerator - Bidder’s Equipment List, Technical Data & Guarantees. 1/1998. Bovay Northwest | |
| 13 | Incinerator Upgrades - Trade Specifications. 9/1995. Bovay Northwest |
| Intercollegiate Center For Nursing Education - Project Manual (Yakima). 1/1995. Architect: Integrus Architecture, P.S. Structural Engineer: Structural Design Northwest. Inc. Mechanical & Electrical Engineers: MW Consulting Engineers | |
| Intercollegiate Center for Nursing Education - Project Manual (Yakima). 11/1994. Architect: Integrus Architecture. P.S. Structural Engineer: Structural Design Northwest, Inc. Mechanical & Electrical Engineers: MW Consulting Engineers | |
| Intercollegiate Center for Nursing Education (Spokane) - Design Development Walker McGough Foltz Lyerla. 10/1976. | |
| Intercollegiate Center for Nursing Education - Joint EWSC - WSU Building Program. 3/1976. | |
| Intercollegiate Center for Nursing Education (Yakima) - Design Development. 8/1994. Architect: Integrus Architecture, P.S. Structural Engineer: Structural Design Northwest, Inc. Mechanical & Electrical Engineers: MW Consulting Engineers | |
| Johnson Hall Specifications for Remodel Rooms 101,122,184,190,387,396&39. By the Board of Regents Of WSU. 6/1994. | |
| Johnson Hall Addition - Schematic Design Brochure. 10/1978. Architect: Gayne L Jones & Associates Structural: Charles E. Kitchin Mechanical: Valentine. Fisher, & Tomlinson Electrical: Beverly A. Travis | |
| Kimbrough Hall - Specifications for General Contract - Books 1,2, & 3. 2/1964. Ralph E. Decker, AIA Architects Administrative Architect: Gary L. Shavey. AIA University Architect: Philip E. Keene, AIA | |
| Kimbrough Hall Addition - Predesign Study - Books 1,2, & 3. 6/1992. Predesign Consultants: Thompson Vaivoda & Associates, Architects AIA In Association With Heylman Martin & Associates, Architects, AIA | |
| 14 | Kimbrough Hall - Asbestos Abatement Submittals by Tektoniks Corp. 6/1997. Tektonics Corporation |
| Kimbrough Music Building - Pictures & Design Plans. 3/1966. Ralph E. Decker AIA Architects | |
| Kimbrough Hall - Preliminary Presentation. 1/1963. Ralph E. Decker AIA Architects | |
| Kimbrough Music Building - A Program for an Addition to. 5/1970. | |
| Kimbrough Hall Addition & Renewal - Bid Set Volume One. 3/1998. Architect: Thompson Vaivoda & Assoc. Arch‘s Structural: kpff Consulting Engineers Civil: Rosewater Engineering Mechanical & Electrical Glumac Landscape: Murase & Associates Acoustical: Russ Berger Design Group Elevator Consultants: Lerch. Bates, & Associates, Inc. Cost Management Consultants: Roen Associates | |
| Kimbrough Hall Addition & Renewal - Bid Set Volume Two. 3/1998. Architect: Thompson Vaivoda & Assoc. Arch's Structural: kpff Consulting Engineers Civil: Rosewater Engineering Mechanical & Electrical: Glumac Landscape: Murase & Associates Acoustical: Russ Berger Design Group Elevator Consultants: Lerch, Bates, & Associates. Inc. Cost Management Consultants. Roen Associates | |
| Kimbrough Hall Addition & Renewal - Addendum Two . 4/1998. Prepared by Thompson Vaivoda & Associates, Architects AIA. | |
| Kimbrough Hall Addition & Renewal - Design Development Set Project Manual. 5/1996. Thompson Vaivoda & Associates Architects, Inc. | |
| Kimbrough Hall Renovation - Hazardous Materials Abatement Project. | |
| Abatement Specifications & Contract Documents. 5/1997. Prepared By: Edward S. DeLorme While Employed By: SCM Consultants, Inc. | |
| Kimbrough Hall - Asbestos Abatement Project - Final Report. 12/1997. Prepared by Richard A. Johnson, CIH SCM Consultants, Inc. | |
| Kimbrough Hall - Addition & Renewal - Schematic Design. 1/1996. Architect: Thompson Vaivoda & Associates Architects AIA Associated Architect: Heylman Martin & Associates Structural: kpff Consulting Engineers Mechanical & Electrical: Glumac International Landscape: Murase Cost Management: Roen Associates | |
| Launch Boathouse & Dock - Building Program 84 - 85. McKinley Nance Director of Facilities Planning | |
| Laboratory Animal Resources Facility - Building Program. 8/1970. Mr. Owen Bradvold - Office of Facilities Planning Liaison & Advisory Architect | |
| McCoy Hall Additions - Second Floor. 10/1969. Architects: Culler Gale Martell Ericson Engineer: Kenneth P. Norrie | |
| McCoy Hall - South Addition. 4/1970. Architects: Culler Gale Martell Ericson Engineer: Kenneth P. Norrie | |
| McCoy Hall - Completion of South & Anatomy Refrigeration Room. 11/1971. Architects: Culler Gale Martell Ericson Engineer: Kenneth P. Norrie | |
| McCoy Hall Remodeling - Building Program 1 of 2. 4/1978. | |
| McCoy Hall Remodeling - Building Program 2 of 2. 4/1978. | |
| McCoy Hall Remodeling - Schematic Design Brochure. 10/1978. Culler Gale Martell & Ericson. Architects | |
| McCoy Hall Remodeling - General Specifications. 9/1979. Culler Gale Martell Ericson P.S. | |
| McCoy Hall Phase 11 - Building Program. 6/1982. | |
| McCoy Hall Remodeling Phase 11 - Schematic Design Brochure. 2/1983. Culler Gale Marteil & Ericson, Architects | |
| McCoy Hall Remodeling/Renovation Program. 11/1985. | |
| McCoy Hall Remodeling/Renewal Program Phase II. 4/1986. | |
| McCoy Hall Renewal - Schematic Phase. 3/1987. De Neff Deeble Barton Associates Peter A. Suden Tres West Engineers, Inc. | |
| McCoy Hall Renewal - Project Manual. 12/1987. De Neff Deeble Barton Associates | |
| Martin Stadium & Academic Center North Stands Replacement - Schematic Design Brochure/Some Pictures. Naramore Bain Brady & Johanson Architects Engineers Planners | |
| Martin Stadium - Fire Lane Route Study. 7/1997. PPL Coffman Project# 95027-03 | |
| Martin Stadium - Schematic Design Brochure, Academic Athletic Complex (Lengthwise along box). 3/1972. Naramore Bain Brady & Johanson Architects Engineers Planners | |
| 15 | Murrow Hall Renovation/Addition - Predesign Study. 6/1998. Northwest Architectural Company |
| Morrill Hall Remodeling - Design Development. 9/1979. Ralph D. Anderson & Partners Booth & Koch Architects | |
| Morrill Hall Remodeling - Construction Details, As Built. 12/1981. Ralph D. Anderson & Partners/Booth & Koch Architects & Environmental Planners | |
| Murrow Remodeling - Schematic Design Brochure. 1971. Architects & Planners: De Neff Deeble Barton Associates Mechanical: Rice & Luhn Electrical: Wanless - Cook | |
| Murrow - Schematic Design Brochure. 7/1969. Architects & Planners: De Neff Deeble Barton Associates Mechanical: Rice & Luhn Electrical: Wanless - Cook Structural: Peter Suden | |
| Murrow - Department of Communications Student Publications Radio - Television Services - Building Program Statement. | |
| Memorial Hospital Study - Schematic Design Brochure. 1/1976. Architects & Planners: De Neff Deeble Barton Associates Mechanical: Rice & Luhn Electrical: Wanless - Cook Structural: Peter Suden | |
| Meats Laboratory - Schematic Design Brochure. 9/1964. Barnard & Holloway Architects | |
| Meats Laboratory - Schematic Design Brochure Phase II. Barnard & Holloway Architects | |
| Married Student Apartments - Kamiak 100 Unit. 1964. McClure & Adkison Architects AIA | |
| Neill Hall Renewal - Specifications. 2/1988. Anderson Koch & Duane | |
| Neill Hall Renewal - Final Cost Estimate. 3/1989. Duarte Bryant Architecture | |
| Neill Hall Renewal - Schematic Phase. 1988. Anderson Koch & Duarte United Pacific Engineers Lee Engineering Travis Fitzmaurice & Associates, Inc. | |
| Neill Hall Renewal - Building Program. 5/1987. | |
| North-South Ski Lodge - Design Development Phase I. 2/1976. Architects: Adkison Leigh Sims Cuppage Structural: L.C. Campbell Mechanical & Electrical: Riley Engineering | |
| Nuclear Reactor Building. Addition to. 3/1967. Miller & Fiedler - Architects AIA | |
| Orton Hall - Schematic Design Brochure. 6/1962. Philip E. Keene - University Architect Lea, Pearson & Richards - Architects | |
| Rogers Hall - Men’s Residence Tower. 5/1961. Philip E. Keene - University Architect Lea, Pearson, & Richards - Architects | |
| Rogers/Orton Site Plan for Residence Halls. 6/1962. Resume of Richard Haag Associates Landscape Architects - Planning Consultants | |
| Owen Science Library - Foundation Investigation. 6/1974. For Harris, Reed & Litzenberger Architects, AIA By: Shannon & Wilson, Inc. - Geotechnical Consultants | |
| Owen Science Library Design Development. 1979. Harris, Reed & Litzenberger, AIA, Architects Abam Engineers, Inc., Structural Engineers Valentine, Fisher & Tomlinson, Mechanical & Electrical Engineers | |
| Olympic Weight Room Expansion - Revised. Description of Project; Building Committee; Statement of Problem; Statement of Goals; Planning Criteria; General Considerations; Space Requirements; Specific Requirements. 12/1995. | |
| Olympic Weight Room Addition - Design Development. 4/1988. ALSC Architects, P.S. Campbell Engineers - Structural Riley Engineering - Mechanical & Electrical Engineers | |
| Olympic Weight Room Addition - Specifications (construction set). 12/1988. ALSC Architects, P.S. Campbell Engineers - Structural Riley Engineering - Mechanical & Electrical Engineers | |
| Olympic Weight Room Addition Building Program. 8/1987. | |
| Olympic Weight Room Facility - Specifications. 6/1985. ALSC Architects, P.S. Campbell Engineers - Structural Riley Engineering - Mechanical & Electrical Engineers | |
| Olympic Weight Room Facility - Design Development. 3/1985. Adkison Leigh Sims Cuppage - Architects Campbell Engineers - Structural Riley Engineering - Mechanical & Electrical Engineers | |
| Olympic Weight Room Building Addition - Building Program, Hollingbery Field House. 12/1984. | |
| P.E Building - Program for the Proposed Gymnasium. 11/1965. | |
| P.E. Building - Schematic Design Brochure. 11/1966. Paddock & Hollingbery AIA Architects | |
| Parking Facility - Design Criteria & Outline Specification. 1500 Car Parking Facility Preliminary Design. 8/1970. John Graham & Company Architects - Planners - Engineers | |
| President’s Residence. Additions & Remodeling to. 1967. Trogdon-Smith, AIA Architects Philip E Deene, AIA, Director of Facilities Planning Mechanical & Electrical: Rice. Strecker, & Cook Structural: Lyerla & Peden Landscape Architect: L Keith Hellstrom Interior Design: D. W. Trogdon | |
| Physical Science Building - Schematic Design Brochure. 2/1970. Naramore Bain Brady & Johanson Skilling, Helle, Christiansen, Robertson - Structural Bouillon, Christofferson & Schairer - Mechanical Naramore, Bain, Brady & Johanson - Electrical Paul S. Veneklausen & Associates - Acoustical Consultants | |
| Physical Science Building Phase II - Schematic Design Brochure. 7/1970. Naramore Bain Brady & Johanson Skilling, Helle, Christiansen, Robertson - Structural Bouillon, Christofferson & Schairer - Mechanical Naramore, Bain, Brady & Johanson - Electrical Paul S. Veneklausen & Associates - Acoustical Consultants | |
| Physical Science Building Elevator Data. 5/1970. Prepared By Charles W Larch & Associates | |
| Physical Science Building - Preliminary Design. 11/1968. Naramore Bain Brady & Johanson Architects Skilling, Helle, Christiansen, Robertson - Structural Bouillon, Christofferson & Schairer - Mechanical Naramore, Bain, Brady & Johanson - Electrical Earl L Walls Associates - Laboratory Consultant | |
| Publications Building - Schematic Design Brochure. 1967. Architects: Evanoff & Kabush, AIA Structural Engineers: Lyerla & Peden Mechanical & Electrical: James S. Latenser | |
| Puyallup - Controlled Environment - Lab & Greenhouse. 1970. Research & Extension Center Carlson & James Architect Andrew T. Bingham - Structural Stingle-Atwood & Associates - Mechanical & Electrical | |
| Puyallup - Office & Lab Facilities. Research & Extension Center. 5/1966. Naramore Bain Brady & Johanson - Architects Bouillon, Christofferson & Schairer - Mechanical & Electrical Worthington Skilling Helle & Jackson - Structural | |
| Prosser - Rogers Hamilton Laboratory Building. Institute of Agriculture Sciences Irrigation Experiment Station. 9/1961. Philip E. Deene, AIA Cowan & Paddock, AIA | |
| Regents Dining Hall Remodeling - Schematic Design Brochure. 2/1979. Tan Brookie Kundig Architects Structural: L. C. Campbell Mechanical: Gerard & Associates Electrical: Wanless - Cook Associates Good Service Consultants: George E. Bundy & Associates | |
| Research & Technology Park - Project Manual - Building One. Phase 3 Tenant Improvements. 11/1985. Taber Chaitin Associates - Architecture, Landscape Architecture, Planning, Interior Design Charlie Capital Group - Developer | |
| Research & Technology Park - Project Manual Phase 2 - Site & Weatherskin. 7/1985. Taber Chaitin Associates - Architecture. Landscape Architecture, Planning, Interior Design Charlie Capital Group - Developer | |
| Research & Technology Park - Building One Phase 2. Replaces Addendum No. 1 ENTIRELY. Taber Chaitin Associates | |
| Research & Technology Park - Building One Phase 3 - Addendum #6. 2/1986. Taber Chaitin Associates | |
| Rogers/Orton Din. Hall - Schematic Design Brochure. Kenneth W. Brooks, AIA Architects | |
| 16 | Rotunda Dining Hall (RDH) - Renovation Proposal; Packet of Pictures. John Graham & Company |
| Rotunda Dining Hall - Selective Demolition & Asbestos removal. 5/1985. Walker McGough Goltz Lyerla P.S. - Architect & Engineers Centrac Associates, Inc. - Asbestos Removal Consultants | |
| Rotunda D.H. Design Development - Outline Specifications. Construction Cost Estimate. 5/1985. Walker McGough, Foltz Lyerla, P.S. - Architects & Engineers | |
| Rotunda D.H - Design Development. 6/1985. Walker McGough Foltz Lyerla, P.S. - Architects & Structural Engineers Mechanical & Electrical: Riley Engineering Asbestos Removal & Lighting Consultants: Centrac Associates Design Collaborative - Interior Design Consultant - Christine Johnson, Principal Design International - Food Service Consultant - Les Jones, Consultant | |
| Rotunda D.H - Remodel Engineers’ Calculations. 9/1985. Architects & Engineers: Walker McGough Foltz Lyerla P.S. Mechanical & Electrical: Riley Engineering, Inc. Lighting Engineer. Centrac Associates, Inc. | |
| Rotunda D.H - Renovation - Building Program. 1/1985. | |
| Rotunda D.H - Life Cycle Cost Analysis. 4/1985. Prepared by Riley Engineering, Inc. & Walker McGough Foltz Lyerla | |
| Rotunda D.H - Project Manual. 9/1985. Walker, McGough Foltz Lyerla, P.S. | |
| Rotunda D.H - Project Manual. Selective Demolition & Asbestos Abatement. 5/1985. Walker McGough Foltz Lyerla, P.S. - Architects & Engineers. Centrac Associates - Asbestos Abatement Consultant Riley Engineering - Mechanical/Electrical | |
| Rotunda D.H. Remodel - Schematic Design Brochure. 4/1985. Walker McGough Goltz Lyerla. P.S. - Architects & Engineers | |
| Stimson Hall - Renovation - Project Manual. 10/1985. Warren Cummings Heylmnan & Partners - Architects | |
| Stimson Hall Renovation - Life Cycle Cost Analysis. 5/1984. Warren Cummings Heylman & Partners/Architects Stingle - Atwood & Associates/Engineers | |
| Stimson Hall Renovation- Design Development. 4/1984. Warren Cummings Heylman & Partners/Architects | |
| Stimson Hall Renovation- Hall Residents Proposal. 8/1983. Warren Cummings Heylman & Partners/Architects 3/ | |
| Stimson Hall Remodel Building Program. 8/1982. | |
| Stimson Hall Renovation Design Development. 3/1984. Warren Cummings Heylman & Partners/Architects | |
| Stimson Hall Renovation - Schematic Design Submittal. Design Analysis Tabulations; Construction Cost Estimate; Outline Specifications. 12/1982. Warren Cummings Heylman & Partners/Architects | |
| Stimson Hall Renovation - Project Manual Draft Copy. 9/1985. Warren Cummings Heylman & Partners/Architects | |
| Stimson Hall Landscaping - Project Manual. 2/1987. Warren Cummings Heylman & Partners/Architects | |
| Science Hall Remodel Phase 2. Volume 2 Sec 15/16. 1/1988. Architect & Planners: Decker/Fukui Davison Structural Engineers: Engineers Northwest, Inc. Mechanical Engineers: Halvorson, Beach & Bower. Inc. Electrical Engineers. Sparling & Associates, Inc. Interior Designers: Anne Fisher Associates Acoustical Engineers: Michail R. Yantis Associates Health Physicist. Ralph M. Baltzo Estimators: Constructioneering | |
| Science Hall Remodel Phase 1 - Project Manual, Volume 1. 6/1983. Architect & Planners: Decker/Fukui Davison Structural Engineers: Engineers Northwest, Inc. | |
| Science Hall Remodeling Phase 1 - Project Manual, Volume 2. Architect & Planners: Decker/Fukui Davison | |
| Science Hall Remodeling - Building Program. 10/1977. | |
| Science Hall Remodeling - Building Program Phase 1. 5/1982. Architect & Planners: Decker/Fukui Davison | |
| Science Hall Remodeling - Phase 1 Schematic Design Brochure. 11/1982. | |
| Science Hall Remodeling - Building Program Phase 2. 5/1982. | |
| Science Hall Remodeling - Building Program Phase 2. 12/1985. | |
| Science Hall Remodeling - Schematic Design Phase 2. | |
| 17 | Safety Building - Schematic Design Submittal (Placed alongside of box due to length). Doudna Williams Phipps Architects |
| Student Services Addition - Energy Conservation Report, Life Cycle Cost Analysis. 11/1993. Riley Engineering, Inc. Mahlum & Nordfors. McKinley, Gordon | |
| Student Services Addition - Value Engineering Study Mahlum & Nordfors, McKinley, Gordon. 10/1993. | |
| Student Services Addition - Scheme E McKinley Gordon. 10/1992. | |
| Student Services Addition - Schematic Design Submittal McKinley Gordon Architect. 11/1992. | |
| Student Health Service Remodeling & Addition Schematic Design Brochure. De Neff Deeble Barton Associates - Architects & Planners Rice & Luhn - Mechanical Engineers Wanless-Cook Associates - Electrical Engineers Peter A. Suden - Structural Engineers Robert L. Woerner Landscape Architect | |
| Students’ Bookstore - Schematic Design Submittal. Architect: Trogdon - Smith AIA Bookstore Planning: Henry Berry Associates, Inc. Structural Engineers Lyerla & Peden Mechanical Engineers: Rice & Strecker Electrical Engineers: Joseph M. Doyle & Associates | |
| Student Bookstore - Addition to. 9/1978. TSG Architects Structural: Peter A. Suden Mechanical: Rice & Luhn Electrical: Wanless-Cook | |
| Student Residential Community (Steptoe). Schematic Design Brochure 200 Apartments. 4/1969. Architect. Durham Anderson Freed AIA Landscape Architect: Richard Carothers Associates Structural: Harold K. Roe, CE, SE Mechanical: Benjamin S. Notkin & Associates Electrical: Beverly A. Travis & Associates Civil: Hammond, Collier & Wade and Associates Acoustical: Rovin M. Towne & Associates, Inc. | |
| Student Recreation Center - Project Update. 4/1998. Architect: Yost Grube Hall Architects | |
| Student Recreation Center - Schematic Design. 4/1998. Architect: Yost Grube Hall Architects | |
| Student Health - Student Health Service Clinic Building Preliminary Brochure (Placed alongside of box due to length). 1963. Prepared by McClure & Adkison Architect AIA | |
| Streit - Perham Remodel - Project Manual. 12/1985. Clayton R. Joyce Architects Interior Design: Design Collaborative Structural: H.K. Kim Engineers, Inc. Mechanical: D. W Thompson Consultant, Ltd. Electrical Engineers: Louis C. Warner & Co. | |
| Streit - Perham Remodel - Design Development. 4/1985. Clayton R. Joyce Architects Interior Design: Design Collaborative Structural: H.K. Kim Engineers, Inc. Mechanical: D. W. Thompson Consultant, Ltd. Electrical Engineers: Louis C. Warner & Co. | |
| Streit - Perham Remodel - Specifications - Asbestos Abatement & Demolition. 7/1985. Clayton & Joyce Architects Centrac Associates - Asbestos Abatement Consultant | |
| South Fairway Intramural Field - Schematic Design Report. 2/1992. Richard Carothers Associates - Landscape Architects. Planners, Civil Engineers, & Surveyors Subconsultants: Tam, Boyle Heyamoto - Architects Riley Engineers - Mechanical/Electrical | |
| South Fairway Intramural Field - Construction Document Submittal. 5/1993. Richard Carothers Associates - Landscape Architects, Planners, Civil Engineers, & Surveyors Subconsultants: Tan, Boyle Heyamoto - Architects Riley Engineers - Mechanical/Electrical Guifford Consultants - Geotechnical | |
| Swine Center - Design Development Phase II. Livestock Teaching & Research Facilities. 1975. Architects: ORB Architects Planners Engineers EISI Engineered Industrial Systems. Inc. | |
| Swine Center - Design Development Phase II. Livestock Teaching & Research Facilities (Booklet is titled the same as above, contains different supplemental material). 1975. Architects: ORB Architects Planners Engineers EISI Engineered Industrial Systems, Inc. | |
| Sloan - Technology Building - Engineering Addition Preliminary Design. 5/1959. Culler Gale Martell Norrie Architects & Engineers | |
| Stephenson Residence Center - Preliminary Design Submittal - Third Tower. 1967. Architects: Walker & McGough, AIA Mechanical Engineers Lyle Marque & Associates Electrical Engineers: Joseph M. Doyle Landscape Architect Keith L. Hellstrom | |
| Smith Agricultural Engineering Building - Alterations & Additions. 1966. Architects: Evanoff & Kabush, AIA Structural: Lyerla & Peden Mechanical & Electrical: James S Latenser | |
| Spokane Intercollegiate Research & Technology Institute (SIRTI) Design Development. 7/1990. WMFL, P.S. Architect & Engineers in Association with Arthur Erickson Architects Structural: WMFL, P.S. Architects, & Engineers Electrical: Riley Engineering Landscape Architecture: SKU | |
| SIRTI Geotechnical Information - Stone Column/Vibro - Replacement Foundation Improvement Work, SIRTI Site, Spokane WA. Gifford Consultants, Inc. - Geotechnical Consultants | |
| SIRTI - Project Manual. 4/1991. WMFL Architects & Engineers MW Consulting Engineers: Mechanical Riley Engineering: Electrical SKU: Civil Engineering/ Landscape Architecture | |
| SIRTI - Building Program. 4/1988. | |
| Spokane Riverpoint - Health Sciences Building - Schematic Design. Architect: Integrus Architecture Structural: Integrus Architecture Mechanical/Electrical: MW Consulting Engineers Cost Estimating: Roen Associates | |
| Spokane Riverpoint - Health Sciences Building - Predesign Study at the Riverpoint Higher Education Park For The Joint Center for Higher Education Integrus Architecture, P.S. 7/1996. | |
| Spokane Riverpoint - State Archives Facility Eastern Washington Region & Cooperative Academic Library Services (CALS) - Riverpoint Higher Education Park Management. 10/1998. Prepared for: the Office of the Secretary of State Archives & Records Division, Ralph Munro, Secretary of State. Prepared By: Integrus Architecture, P.S. | |
| Spokane - Joint Center for Higher Education. 6/1993. Trent & Riverside Avenue Properties Architectural & Structural: Integrus Architecture Mechanical & Electrical: MW Consulting Engineers Property Management: R.W. Robideaux & Company | |
| Spokane University District Development - Preplanning & Schematic Design. 9/1988. W.M.F.L., P.S. Associate Architects: Arthur Erickson Architects | |
| 18 | Todd Hall Addition - Building Program DCVRs To be Kept With as Built Drawings. 1963. C. D. Contractors, Inc. |
| Todd Hall Addition - Specifications Volume I of II. 4/1989. The Henry Klein Partnership Mechanical: Notkin Engineer, Inc. Electrical: Sparling & Associates Structural: ABKJ Landscape Consultant: Jongejan/Gerrard/McNeal Kitchen Consultant: Forma Civil Engineer: Munir Daud & Associates | |
| Todd Hall Addition - Specification Volume II of II, Mechanical & Electrical With Addendums Attached. 4/1989. The Henry Klein Partnership Mechanical: Notkin Engineer, Inc. Electrical: Sparling & Associates Structural: ABKJ Landscape Consultant. Jongejan/Gerrard/McNeal Kitchen Consultant: Forma Civil Engineer: Munir Daud & Associates | |
| Todd Hall Renewal - Specifications (three binders). 12/1993. The Henry Klein Partnership, Architects | |
| Thompson Hall Renewal - Building Program. 6/1992. Architect: Cardwell/Thomas & Associates/Architects | |
| Thompson Hall - Feasibility Study, Foley Institute for Public Policy and Public Service. 1/1995. Architect. Cardwell/Thomas & Associates/Architects | |
| Thompson Hall Renewal - Schematic Design. 6/1994. Architect: Cardwell/Thomas & Associates/Architects Structural: Ratti, Swenson, Perbix Mechanical: Path Engineers, Inc. Electrical: Elcon Associates, Inc. Cost Control: Ackroyd. Inc. | |
| Thompson Hall Renewal - Design Development Supplemental Information. Estimate of Construction Cost; Program Area Comparison; Architectural Details; Structural Notes; Mechanical Narrative; Light Fixture Schedule. 11/1994. Ackroyd, Inc. Cardwell/Thomas & Associates/Architects | |
| Thompson Hall Remodel Project. Results of Subsurface Explorations & Floor Slab Moisture Survey. 6/1995. Gifford Consultants, Inc. - Geotechnical Engineers | |
| Thompson Hall Remodeling - Former Administration Building Remodeling De Neff Deeble & Barton Architects. 1975. Rice, Strecker & Cook Professional Engineers | |
| Supplemental Appendix to the Energy Conservation Report & Life Cycle Cost Analysis. 12/1992. Mechanical: Path Engineers. Inc. Electrical Engineer: Elcon Associates, Inc. Architect: Cardwell/ Thomas & Associates | |
| 19 | Todd Hall Addition - Schematic Design Brochure. 1963. Architect: John W. Maloney, AIA University Architect: Philip E. Keene, AIA |
| Todd Hall Addition - Building Program Statement. 12/1983. | |
| Todd Hall Addition - Site Selection Study. 2/1984. Burke/Lee A Joint Venture | |
| Todd Hall Addition to - Schematic Design. 11/1987. Burke/Lee A Joint Venture | |
| Todd Hall Renovation - Remodeling Program. 5/1990. The Henry Klein Partnership Structural: KPFF Mechanical: Nolkin Engineering Electrical: Sparling & Associates | |
| Todd Hall Renewal - Preplanning Documents - Outline Specifications, Cost Estimate & Drawings. 7/1990. The Henry Klein Partnership, Architects | |
| Todd Hall Renewal - Schematic Design. 4/1992. Architects: The Henry Klein Partnership, Structural: Andersen Bjornstad, Kane, Jacobs Halvorson, Beach & Bower Sparling & Associates, Inc. Acoustical: Michael R. Yantis Associates | |
| Todd Hall Renewal - Design Development Submittal. 7/1992. Henry Klein Partnership, Architects | |
| Todd Hall Renewal - Schematic Design Submittal. 7/1992. Andersen Bjornstad Kane Jacobs, Inc. | |
| Todd Hall Renewal - Renovation Feasibility Study. 5/1992. Morrison Knudsen Corporation | |
| Todd Hall Renovation - Health & Safety Plan, Demolition of Lead Paint Containing Material. 3/1994. RZA AGRA, Inc. - Earth & Environmental Group | |
| Troy Hall Remodeling - Schematic Design Brochure. 1971. Duglas C. Durkoop, Architect Rice & Luhn, Mechanical Engineers Joseph M. Doyle & Associates, Electrical Engineers | |
| Tri-Cities University Center - Building Addition. 2/1988. | |
| Tri-Cities University Center - Master Planning Report. 6/1988. Architect: The McKinley Architects, PSC Associate Architect: Dillman - Luvaas Architects, P.S. Civil & Structural Engineers: KPFF: Consulting Civil Engineering Consultant to KPFF: Lin & Associates Landscape Architects: Murase | |
| Tri-Cities University Center - Schematic Design. Architect: The McKinley Architects, PSC Associate Architect: Dillman - Luvaas Architects, P.S. Civil & Structural Engineers: KPFF Consulting Engineers Civil Engineering Consultant to KPFF: Lin & Associates | |
| Tri-Cities University Center Addition Addendum No. 1. 2/1990. The McKinley Architects PSC | |
| Tri-Cities Campus - Consolidated Information Center (C.I.C.). 12/1993. Integrus Architecture, P.S. | |
| Tri-Cities C.I.C. - Schematic Design. 10/1994. Integrus Architecture, P.S. | |
| Tri-Cities Campus - Science & Education Center - Predesign Report. 6/1998. SRG Partnership, PC | |
| Tri-Cities C.I.C - Predesign Study. 5/1994. Prime Architect & Structural Engineers Integrus Architecture P.S. Mechanical & Communications Electronics Consultants: MW Consulting Engineers Electrical Consultants: Elcon Associates, Inc. Cost Estimating Consultants: C3 Management Group Civil Engineers: Rose Water Engineering, Inc. Food Service Consultants: George Bundy & Associates | |
| 20 | Thompson Hall Renewal - Project Manual - 99% Construction Documents Submittal, Division 1 - 14. 6/1995. Cardwell/Thomas & Associates Structural: Senson Say Faget Mechanical: Path Engineers Electrical: Elcon Associates Estimate: Ackroyd & Associates Fire Protection: Accurate Design Specifications: Eskilsson Architecture Survey: Munir Daud Associates Code Review: Robert Fossatti Associates |
| Thompson Hall Renewal - Project Manual - 99% Construction Documents Submittal, Division 15 - 16. 6/1995. Cardwell/Thomas & Associates Structural: Senson Say Faget Mechanical: Path Engineers Electrical: Elcon Associates Estimate: Ackroyd & Associates Fire Protection: Accurate Design Specifications: Eskilsson Architecture Survey: Munir Daud Associates Code Review: Robert Fossatti Associates | |
| Thompson Hall Renewal - Bid Package No. 2. Specification for Appendix A - Hazardous Materials Abatement Project. 3/1998. Prepared by Ed Delorme, OHST AHERA Project Designer # 940511-05 while employed by: SCM Consultants. Inc. | |
| Thompson Hall Renovation - Abatement Specifications & Contract Documents. 6/1995. Prepared by: Edward S. DeLorme, OHST AHERA Project Designer #940511-05 while employed by: SCM Consultants, Inc. | |
| Thompson Hall Renewal - Division 15 Mechanical. 4/1998. | |
| Thompson Hall Renewal - Bid Package II - Project Manual. Volume I Divisions 0-8 Project No. 94-1-024. | |
| Thompson Hall Renewal - Bid Package I: Demolition - Project Manual. 6/1997. Cardwell/Thomas & Associates/Architects | |
| Thompson Hall Renewal - Bid Package II Project Manual. Volume I Divisions 1-7 Project No. 94-1-024. 3/1998. Cardwell/Thomas & Associates | |
| Thompson Hall Renewal - Bid Package II Project Manual. Volume II Divisions 8-16. 3/1998. Cardwell Thomas & Associates | |
| 21 | Valley Road Multi - Use Recreation Fields - Phase 2 Developments. 3/1998. RCA/Huitt - Zollars, Inc., Prime Consultants Tan-Heyamoto, Architect Riley Engineering, Mechanical-Electrical Engineers Gifford Consultants, Geotechnical |
| Van Doren Hall - Facility Condition Survey. 7/1990. SCM Consultants, Inc. Architects & Engineers | |
| Visitor Center Site Study - Comprehensive Physical Planning Process. 11/1988. Burke/Lee A Joint Venture | |
| New Veterinary Teaching Hospital - Design Development. 3/1990. De Neff Deeble Barton Associates - Architects & Planners | |
| New Veterinary Teaching Hospital - Schematic Design. 3/1990. De Neff Deeble Barton Associates - Architects & Planners | |
| Veterinary Research - Diagnostic Center - Schematic Design Material, Western WA Research & Extension Center. 12/1988. Gtde Weisenbach Foil Wyatt Mckewen | |
| Veterinary Teaching Hospital Interim Report. 2/1988. De Neff Deeble Barton Associates - Architects & Planners | |
| Veterinary Teaching Hospital - A Report on Site Planning. 11/1988. Burke/Lee A Joint Venture, Campus Planners | |
| Veterinary Science Building - Design Development, Multipurpose Animal Holding Facility. 9/1981. Naramore Bain Brady & Johanson | |
| Veterinary Science Building - Site Evaluation & Recommendation, Multipurpose Animal Holding Facility. 9/1980. The NBBJ Group | |
| Veterinary Animal Holding Facilities - Schematic Design Brochure. 6/1978. Barnard & Holloway, Architects | |
| Veterinary Science Building (Bustad) - Design Development. 1/1975. Architects: Maloney, Herrington. Freesz & Lund Structural: Skilling, Helle, Christiansen & Robertson Mechanical & Electrical: Valentine, Fisher & Tomlinson | |
| Vancouver - Engineering/Life Science Building - Schematic Design. 6/1998. Architect: Zimmer Gunsul Grasca Partnership Electrical: PAE Consulting Engineers, Inc Landscape Architect: Zimmer Gunsul Frasca Partnership Civil Engineer: Kato & Warren, Inc. Soils: Geotechnical Resources, Inc. Planning & Environmental Services: the J.D. White Company Cost Estimator: Zimmer Gunsul Frasca Mechanical: PAE Consulting Engineers, Inc. Structural: Kramer Gehlen Associates Signage: Mayer/Reed Survey: Minister Glaeser Acoustical: the Greenbusch Group Telecommunication: Path Engineers Specifications: Eskilson Architecture Irrigation: SVR Design Company Laboratory Design: Earl Walls Associates | |
| Vancouver Campus Circulation - Preliminary Design. 6/1998. Architect: Zimmer Gunsul Frasca Partnership Electrical : PAE Consulting ,Inc. Landscape: Zimmer Gunsul Frasca Civil: Kato & Warren, Inc. Soils Engineer. Geotechnical Resources Planning & Environmental Services: The JD White Company Cost Estimator: Zimmer Gunsul Frasca | |
| Vancouver Physical Plant Maintenance Shops - Schematic Design. 6/1998. Architect: Zimmer Gunsul Frasca Structural Engineer: Kramer Gehlen Mechanical: PAE Consulting Engineers, Inc. Electrical: PAE Consulting Engineers, Inc. Landscape Architect: Zimmer Gunsul Frasca Civil: Kato & Warren, Inc. Soils Engineer: Geotechnical Resources, Inc. Planning & Environmental Services: The JD White Company Cost Estimator. Zimmer Gunsul Frasca | |
| Vancouver - Multimedia Classroom Building - Schematic Design. 6/1998. Architect: Zimmer Gunsul Frasca Partnership, Electrical: PAE Consulting Engineers, Inc. Landscape Architect: Zimmer Gunsul Frasca Partnership Civil Engineer: Kato & Warren, Inc. Soils: Geotechnical Resources, Inc. Planning & Environmental Services: the J.D. White Company Cost Estimator: Zimmer Gunsul Frasca Mechanical: PAE Consulting Engineers, Inc. Structural: Kramer Gehlen Associates Signage: Mayer/Reed Survey: Minister Glaeser Acoustical: the Greenbusch Group Telecommunication: Path Engineers Specifications: Eskilson Architecture Irrigation: SVR Design Company | |
| Vancouver - Phase 1 Campus Development - Schematic Design. Classroom Building Library Building; Student Services & Classroom Building 6504 or 6526; Physical Plant Building 1. 10/1993. Architect: Zimmer Gunsul Frasca Structural: Kramer Gehlen Mechanical: PAE Consulting Engineers. Inc. Electrical: PAE Consulting Engineers, Inc. Laboratory Designer: the Estime Group Food Service: Halliday Associates, Inc. Library: Philip D. Leighton Audio Visual: MRG Consulting Acoustical: Daly Standlee & Associates, Inc. Landscape Architect: Mayer/Reed Civil Engineer: Parametrix. Inc. Soils Engineer: Geotechnical Resources, cin. Planning & Environmental Services: the JD white Company Cost Estimator: Zimmer Gunsul Frasca Partnership | |
| Vancouver - Phase II Campus Development Schematic Design. Early Childhood/Education Facility. 12/1995. Architect: Zimmer Gunsul Frasca, Partnership Structural Engineer: Keramer Gehlen & Associates Mechanical: PAE Consulting Engineers Electrical Engineer: PAE Consulting Engineers Acoustical: Alternatt Associates Landscape Architect: Mayer/Reed Civil: Kato & Warren, Inc. Soils Engineer: Geotechnical Resources, Inc Planning & Environmental Services: The JD White Company Cost Estimator: Zimmer Gunsul Frasca Partnership | |
| Vancouver - Phase II Campus Development - Preliminary Design. Campus Infrastructure Work. 3/1996. Architect: Zimmer Gunsul Frasca Partnership Structural: Kramer Gehlen & Associates Civil: Kato & Warren Inc., Mechanical: PAE Consulting Engineers Electrical: PAE Consulting Engineers Landscape: Mayer/Reed Geotechnical Engineer: Geotechnical Resources, Inc. | |
| Vancouver - Cascades Volcano Observatory - United States Geological Survey. Conceptual Panning Submittal. 6/1996. By: General Services Administration, United States Geological Survey United States Department of the Interior Washington State University Vancouver Campus Dean WSU Office of Business Affairs Department of Facilities Development Zimmer Gunsul Frasca Partnership Architectural Consultant | |
| Vancouver - Phase II Academic Buildings - Predesign Study. Engineering Life Sciences Building; Multimedia/Electronic Communications Building. 5/1996. Prepared By Zimmer Gunsul Frasca Partnership | |
| Vancouver Campus Master Plan. 9/1992. Prepared by: Zimmer Gunsul Frasca Moyer/Reed Parametrix, inc. The JD White Company The Basmaciyan Group PAE Engineering Geotechnical Resources Incorporated | |
| Vancouver Campus Master Plan Appendix: Wetlands, Wildfire & Fisheries Report; Geotechnical Investigation; Master Plan Utility Report; Master Plan Electrical Report; Master Plan Mechanical Report; Transportation; Technical Report. Zimmer Gunsul Frasca | |
| Vancouver - A special Report to the Presidents & Regents from the ADVISORY COUNCIL VANCOUVER - Vancouver Long Range Planning Report. 3/1988. | |
| Vancouver & Clark College Bauer Hall - Second Phase Building Program - State Project # 88-030. 6/1988. | |
| Vancouver - Clark College Bauer Hall Phase II - State Project # 88-030. Project Manual for Construction Documents. 3/1989. Gary Rogowski - Architect AIA Structural: Kramer/Gehlen Associates Inc. Mechanical: Paraclete, PS Electrical: Dean J. Alhay & Associates, Inc. Landscape Architect: Walsh & Associates, Inc. | |
| 22 | Vancouver - Draft Supplemental Environmental Impact Statement. 12/1992. The JD White Company, Inc. |
| Vancouver - Summary Master Plan. 7/1992. Zimmer Gunsul Frasca Partnership | |
| Vancouver - An Addition for The Southwest Washington Joint Center for Education & WSU At the Evergreen State College Building in Vancouver 1986 - 1987. Andy Bremmeyer with Advisors Don Heil, Robert Patton, & Dave Scott Dr. George Condon, Director of WSU - Vancouver College of Engineering & Architecture School of Architecture - Fifth Year Program | |
| Vancouver - Campus Infrastructure Preliminary Design Specifications. 2/1996. Zimmer Gunsul Frasca Partnership | |
| Vancouver - Campus Infrastructure Work - Phase II Development Construction Documents, WSU Review, Not for Construction. 5/1996. Zimmer Gunsul Frasca Partnership | |
| Vancouver - Mechanical & Electrical Calculation for the Phase II Campus Infrastructure Project & The Early Childhood/Education Facility Project. 8/1996. PAE Consulting Engineers. Inc. | |
| Vancouver - Phase II Development Campus Infrastructure Work Construction Document Set. 1/1997. Zimmmer Gunsul Frasca Partnership | |
| Vancouver - Early Childhood Education Facility. 7/1996. Zimmer Gunsul Frasca Partnership Kramer Gehlen Associates Consulting Engineers/Structural/Civil | |
| Water System Plan Update. 12/1994. Thomas, Dean & Hoskins, Inc. | |
| Water Research Center - Schematic Design Brochure. Carlson & James Architects Stingle & Atwood & Associates Lyerla & Peden | |
| Waste Management Program Evaluation. Technical & Economic Feasibility Report - Appendix Section. 5/1990. Doucet & Mainka, P.C. | |
| Wegner Hall - Specification (TRA Architecture Engineering Planning Interiors). General Work Project Manual Volume 1 of 3. 9/1979. TRA Architecture Engineering Planning Interiors | |
| Wegner Hall - Specifications. Mechanical & Electrical Project Manual Volume 2 of 3. 9/1979. TRA Architecture Engineering Planning Interiors | |
| Wegner Hall - Schedules - Project Manual Volume 3 of 3. 9/1979. TRA Architecture Engineering Planning Interiors | |
| Wegner Hall - Library Addition - Schematic Design Brochure. J. Kimball Barnard, AIA Bovay Engineers, Inc., Structural Mechanical & Electrical | |
| Wegner Hall - Design Development Remodeling/Addition. 9/1978. | |
| Wegner Hall - Design Development Renovation/Addition. 10/1978. TRA Architecture Engineering Planning Interiors | |
| Wegner Hall - Remodeling & Addition Building Program. 9/1977. | |
| Wenatchee - Tree Fruit Research Center - Office & Laboratory Building. 1966. Fraley & Leighton Architects | |
| Wenatchee - Tree Fruit Research Center - USDA Addition. 1977. Fraley & Leighton Architects | |
| Wilson Hall Remodeling - Schematic Design Brochure. 1971. Architects: De Neff Deeble Barton Associates Mechanical: Rice & Luhn Electrical: Wanless-Cook | |
| Wilson Compton Union Building Addition. 1966. Architects: Maloney, Herrington, Greesz & Lund Structural: Worthington, Skilling, Helle & Jackson Mechanical & Electrical: Valentine, Fisher, & Tomlinson Food Service Consultants: John R. Carlson Associates Ltd. | |
| Wilmer Davis Hall - Food Services Facility - Design Development Documents. Proposed Alterations & Additions. 6/1970. Architects: James & Hicks Mechanical: Rice & Luhn Electrical: Wanless & Cook Structural: Paul Panagakis Food Service Consultants: James Lambert & Associates | |
| Women’s Residence Hall - Schematic Design Brochure (Streit Perham). 1959. Walker McGough & Trogdon Architects AIA | |
| 23 | Daggy Phase I Humanities Building. 4/1970. Architects: Fred Bassetti & Company Mechanical: Valentine, Fisher & Tomlinson Electrical: Beverly A. Travis & Associates Theatrical Consultants: George C. Izenour & Associates Acoustical Consultants. Robin M. Towne & Associates Landscape Architects: Richard Haag Associates |
| Daggy Phase I Humanities/Speech Building - Building Program. | |
| Dana Hall Remodeling. 6/1973. Architect: De Neff Deeble Barton Associates Mechanical: Rice & Luhn Electrical: Wanless-Cook | |
| Athletic Facilities Study - Analysis of Existing Facilities! Improvements & Additions: 812S Martin Stadium; 0009 Hollingbery Field House; 372 Bailey Field; 171 Mooberry Track; 319C Stadium Way Tennis Courts; 013 Lower Soccer Fields; 365E WSU Golf Course ;319C Intramural/Practice Fields. ALSC Architects, P.S. | |
| AMID/Landscape Architecture Building Predesign Study. 5/1998. Northwest Architectural Company | |
| Consolidated Information Center (C.I.C.) - Project Manual Volume 1. 9/1995. Integrus Architecture. P.S. | |
| Consolidated Information Center (C.I.C.) - Project Manual Volume 2. 9/1995. Integrus Architecture, P.S. | |
| Campus infrastructure & Road improvements - Phase I. Schematic Design Brochure. 1/1998. KPFF Consulting Engineers, Prime Civil Engineer Wood/Harbinger, Mechanical/Electrical C3 Management Group, Cost Estimator White Shield, Surveyor/Geologist | |
| Carpenter Hall Renewal Building Program. 7/1987, 1/1988. | |
| Chemical Storage Building Environmental Health Services Facility. 5/1994. Bovay Northwest, Inc. | |
| Cleveland Hall Renovation - Value Engineering Study. 6/1927. Roen Associates | |
| Elevator Planning - Independent Counsel for Elevators in New Construction or Modernization "old". Charles W. Lerch & Associates - Elevator Consulting & Engineers | |
| 24 | Hazardous Waste Facility - Dangerous Waste Permit WADO 0414853301. Chemical Storage Facility, Incinerator Basement, Hazardous Waste Treatment & Waste Water Discharge Facility. 9/1989. Bovay Northwest Inc. |
| Hazardous, Pathological, & Radiological Waste Handling Facilities. Building Program - Physical Plant Draft,. 11/1991. Parametrix, Inc. | |
| Hydrogeologic Investigation of the Proposed Coal Ash Disposal Facility. Physical Plant, Parametrix, Final Report. 12/1991. Parametrix, Inc. | |
| Intercollegiate Center for Nursing Education - Joint Eastern Washington State College. Capital Budget Requests. 1977-1979. Walker McGough Foltz Lyerla | |
| Records, Maintenance Materials Storage & Recycling - Project Manual. Phase I, Re - Bid Specifications, Archos Corporation. 10/1994. Archos Corporation | |
| Records Maintenance, Material, Storage - Schematic Design, Inactive Records, Maintenance Materials Storage & Recycle Building: Phase I. 12/1992. Archos Corporation | |
| Records, Maintenance Materials Storage, & Recycling Building - Phase I Building Program. 8/1991. | |
| Storm & Sanitary Sewer System Study - Physical Plant (Where is it located?). 8/1990. CH2M Hill Engineers Planners Economists Scientists | |
| Student Services Addition - Project Manual Volume I Divisions 0 - 7 (Lighty Student Services). 9/1993. Mahlum & Nordfors McKinley Gordon | |
| Student Services Addition - Project Manual Volume II Divisions 8 - 16 (Lighty Student Services). 9/1993. Mahlum & Nordfors McKinley Gordon | |
| Stadium Way Programming Analysis - Draft Report. KPFF Consulting Engineers | |
| 25 | Bohler Gymnasium Addition - Predesign Study. 10/1992. Sasaki Associates, Inc. Stewart Associates |
| Bohler Gymnasium Renovation - Predesign Study. 6/1994. Sasaki Associates, Inc. Stewart Associates - Predesign Consultant | |
| Bohler Gymnasium Renovation - Capital Project Review Submittal. Allotment Request for Construction. 6/1994. Prepared BY: WSU Department of Facilities Development | |
| Animal Science Building - Predesign Study. 7/1992. MBT Associates - Predesign Consultants | |
| Engineering/Life Sciences Building. Multimedia/Electronic Communications Building. Phase II Academic Buildings - Predesign Study - Vancouver. 5/1996. Zimmer Gunsul Frasca | |
| Chemical Storage Building. Environmental Health Services Facility - Predesign Study. 5/1994. Bovay Northwest - Predesign Consultant | |
| Phase II Science Hall Remodeling - Building Program (Murrow East). 12/1985. | |
| 26 | Veterinary Teaching Hospital - Building Program (Bldg. Communication, Value Engineering Report, Physical Plant, Schedule & Equipment) +Slides & Pictures. 1991. De Neff Deeble Barton Associates Architects & Planners |
| WSU Tri-Cities Early Building Specifications. 1964 -1981. | |
| TriCities University Center Addition - Project Manual. 2/1990. McKinley Architects - Volume 1 Divisions 0 - 7 | |
| TriCities University Center Addition - Project Manual. McKinley Architects - Volume 2 Divisions 8 - 16 | |
| TriCities University Center Addition - Addendum No. 3. 3/1990. McKinley Architects | |
| TriCities University Center Addition - Project Manual “As Built”. McKinley Architects - Volume 1 Divisions 0 - 14 | |
| 27 | Animal Disease Biotechnology Facility - Project Data Base - Second Submittal. 11/1993. Northwest Architectural Company Wyatt - Jaykim Engineers - Surveyors Gifford Consulting Northwest - Geotechnical Consultants to Wyatt - Jaykim C3 Management Group, Inc. - Cost Estimating & Economic Analysis Michael R. Yantis & Associates. Inc. - Acoustical |
| ADBF - Responses to Review Comments - (These annotated comments accompany the Bid Set, responding to review comments from earlier submittals.). 7/1994. Northwest Architectural Company | |
| ADBF - Area Comparison/Cost estimate/Mechanical Calculations/Fire Protection Calculations/Electrical Calculations - Final Review Submittal. 2/1994. Northwest Architectural Company | |
| ADBF - Schematic Design Slides - BD. Of Regents Presentation. | |
| ADBF - Energy Conservation Report & Life Cycle Cost Analysis. 3/1993. Northwest Architectural Company - Architects/Engineers | |
| ADBF - Fixed Equipment - Third Submittal. 12/1993. Northwest Architectural Company | |
| ADBF - A landmark facility dedicated to serving the state of Washington. the Western Region. and the Nation. College of Veterinary; Medicine Facility Program Goals/Financial Summary of ADBF; Grants, Licenses & Selected Refereed Publications in 93 & 94. 2/1995. | |
| ADBF Slide - College of Veterinary Medicine. | |
| ADBF NAC Aerial Drawing of CVM (photo & slide). 7/1994. | |
| ADBF - College of Veterinary Medicine - Design Development Manual Volume II. Structural/Mechanical/Electrical Calculations. 11/1992. Northwest Architectural Company | |
| ADBF College of Veterinary Medicine - Design Development Manual - Volume I. Project Description/Cost Estimate/Equipment Schedule/Code Analysis. 11/1992. Northwest Architectural Company Structural Design Northwest Gerard & Associates - Mechanical Creighton Consulting NW - Fire Protection Consultants NAC Engineers - Electrical Foil & Wyatt Architects - Laboratory & Animal Facility Consultants Gail Staeger & Associates - Landscape Architects Wyatt Jaykim w/ Gifford & Associates - Survey & Geotechnical Consultants | |
| ADBF - Cost Estimate - Third Submittal - Cost Estimate. 12/1993. Northwest Architectural Company | |
| ADBF - Krieger Steel Products - Brochure Material. 12/1990. | |
| ADBF - Water Saver Faucet Co. - Brochure Material: Laboratory & Hospital Faucet Fixtures; Emergency Eye Wash & Shower Equipment. 7/1990. | |
| Animal Sciences Laboratory - Construction Documents Estimate Prepared For MBT. 5/1995. Ackroyd - Cost Control Consultants | |
| Animal Sciences Laboratory - Won - Door Corporation (fire guard) Brochure Material. 8/1991. | |
| Animal Sciences Laboratory Building - Value Engineering Services. 8/1994. EFT - Architects/Planners/Project Managers | |
| Animal Sciences Laboratory Building - Value Engineering Study Proposal. 8/1994. Meng Associates, Analysis Group - Architecture Planning/Value Engineering/Construction Research | |
| Asbestos Removal Plans - Alpha Engineering Group, Inc. | |
| Beasley Performing Arts Coliseum - Asbestos Removal & Abatement Specifications. 4/1992. By the Board of Regents - Physical Plant Department | |
| Beasley Performing Arts Coliseum - Asbestos Survey Report for the Department of Physical Plant. Alpha Engineering Group, Inc. | |
| Bohler Addition - Summary of Field and Laboratory Test Results File: WASUMI - M9601 A/ Contract 12254. 8/1997. Strata Geotechnical Engineering & Materials Testing | |
| Bohler Gym Addition/Renewal - Statement of Qualifications. 10/1991. Sasaki Associates, Inc. | |
| Bohler Gym Addition - Revised OFM Predesign Submittal. Prepared for Sasaki Associates, Inc. By C3 Management Group | |
| Bohler Gymnasium Addition - 50% Design Development Value Engineering! Workbook & Preliminary Idea Listing Test & Screen Alternatives - Optimize Total Costs & Total Performance. Ehninger Fetzer Tholen - Architects/Planners/Project Managers | |
| Bohler Gymnasium Remodel - OFM Predesign Submittal. 5/1994. C3 Management Group, Inc. | |
| Bohler Gymnasium Addition - Life Cycle Cost Analysis (Report Some Plans Included). 2/1995. Notkin Engineering, inc. | |
| Chemistry Building Cost Estimate Analysis. 3/1986. Brooks Hensley Creager Architects, | |
| Chemistry Building - Program Statement. 3/1984. | |
| Chemistry Building - Design Development. Pedestrian Corridor Development of College Avenue From Library Road to Stadium Way. Brooks Hensley Creager Architects | |
| Child Care Playground - Project Manual. 4/1994. Architect: The Tsang Partnership. inc. Landscape Architect: Douglas H. Tuma, ASLA | |
| Child Care Center - Building Program. 6/1991. | |
| Child Care Facility Playground - Specifications. 4/1994. Architect: The Tsang Partnership, Inc. Landscape Architect: Douglas H. Tuma, ASIA | |
| 28 | Request for Proposal, Strategic Partner in Communications - WSU Systems & Computing. 4/1991. |
| University Center/Classroom Auditoria Building - Predesign Study. 5/1992. Predesign Consultant: The Callison Partnership. Ltd. | |
| University Center - Site Considerations. 5/1992. Burke/Lee A Joint Venture, Architects, Planners & Landscape Architects | |
| Communication Infrastructure Renewal Project - Submitted July 1, 1993 to the CIR Review Team for Approval of the Format, Approval Requested Zone 2 - Sloan MCF - Communications Closet Drawings. 7/1993. JWP information Systems Network Integration Services | |
| Composting Facility - Preliminary Design Report Draft - Project #0901-001.01. 3/1994. Prepared for WSU by EMCON Northwest | |
| Dairy Forage Facility - Phase II Cost Estimate & Area Comparison Charts - Schematic Design Phase. 4/1992. The BJSS Group - Architects & Planners AIA | |
| Dairy Forage Facility - Phase II Construction Documents - Cost Estimate. 2/1993. The BJSS Group - Architects & Planners, AIA | |
| Dairy Forage Facility - Phase II Addendum No. 2. 6/1993. The BJSS Group | |
| Dairy Forage Facility - Phase II Addendum No. 3. The BJSS Group | |
| Kruegel Hall McAllister Hall Neill Hall - Photo Album. 4/1957. | |
| Mechanical Engineering Laboratory - Hazardous Materials Survey AGRA E & E’s Job No. 12-1195-00. 8/1994. AGRA Earth & Environmental | |
| ETRL - Preliminary Environmental Assessment. 5/1994. Prepared by Hart Crowser for The Callison Partnership | |
| ETRL - Pre-Design Building Program Draft - College of Engineering & Architecture. 7/1992. | |
| ETRL - Value Engineering Study. 5/1994. Meng Analysis Group - Value Engineering/Construction Research | |
| ETRL - Value Engineering Study - (different from above). 5/1994. Meng Associates - Analysis Group/Architecture/Planning/Value Engineering/Construction Research | |
| McAllister/Kruegel Residence Halls Consultant Agreement No. 11063. 2/1993. SCM Consultants, Inc. Architects & Engineers | |
| McAllister/Kruegel Residence Halls Consultant Agreement No. 11063 - Part C Structural Analysis. 2/1993. SCM Consultants Inc. Architects & Engineers | |
| Fulmer Hall/Fulmer Annex Renewal - Budget Estimate. 6/1993. Mahlum & Nordfor McKinley Gordon | |
| Fulmer Hall - Mckinley Gordon Architects Statement of Qualifications. 3/1993. | |
| Fulmer Hall/Fulmer Annex - Operations & Maintenance Plan for Asbestos. 3/1994. RZA AGRA, Inc. | |
| Fulmer Hall/Fulmer Annex Renovation Project - Consultant Roster Registration Environmental Consulting Services & Proposal for the Renovation Project. 11/1993. Hart Crowser - Earth & Environmental Technologies | |
| Fulmer Hall/Fulmer Annex Renewal - Lab Layout Drawings for user Group Meetings. 11/1993. Mahlum & Nordfors McKinley Gordon | |
| Fulmer Annex Renewal - Energy Conservation Report. 4/1994. Prepared by Riley Engineering, Inc. Mahlum & Nordfors Mckinley Gordon | |
| Glenn Terrell Friendship Mall & Extended Areas - Technical Report. 5/1987. By Landscape Architecture Students in Landscape Architecture 361 Department of Horticulture & Landscape Architecture | |
| Glenn Terrell Friendship Mall - Schematic Design Brochure. Design Team Catherin Howett/George Trakas A Partnership Project of WSU & the WSU Arts Commission | |
| Greenhouse Replacements - Design Development/Puyallup WWREC with Slides Included. 2/1995. Stafford Harris, Inc. | |
| Hazardous Waste Sites Phase II - Preliminary Construction Budget Estimate. 1/1994. Bovay Northwest Inc. | |
| Chemical Waste Collection Sites - Schematic Design Brochure. | |
| Eastlick Hall/Wegner Hall/Engineering Complex/Silver Recovery Units. 11/1994. Bovay Northwest Inc. | |
| Chemical Storage Building/Environmental Health Services Facility - Predesign Study (DRAFT). 4/1994. Bovey Northwest, Inc. | |
| 29 | Hill Residence Halls - Condition Survey/Review - Stevens & McCroskey Halls. Duarte Bryant Architecture - Statement of Qualifications. 3/1995. |
| Stevens Hall Dormitory - Exterior Renovation - Design Submittal. Lateral Study/Outline Specifications/Cost Estimate. 12/1992. Duarte Bryant Architecture | |
| Stevens Hall Dormitory - Exterior Restoration - Building Survey. 8/1992. Duarte Bryant Architecture | |
| Heald Hall - Rebar Study (Reinforcing Investigation). 7/1993. Miller Hull Partnership | |
| Heald Hall - Expanded Options Study. 8/1995. The Miller/Hull Partnership | |
| Heald Hall Renewal - Predesign Phase Proposal. 3/1992. The Miller/Hull Partnership | |
| Heald Hall Renewal - Options Phase Document. 6/1992. The Miller/Hull Partnership | |
| Holland Library Addition - Design Development. ALSC Architects/ Zimmer Gunsul Frasca Partnership - Design Architect Structural: Structural Design Northwest Mechanical: Riley Engineering Electrical: Doyle Engineering Civil: Wyatt - Jaykim | |
| Libraries - A Guide to Spacesaver High - Density Compact Storage Systems for the Library Environment The Space Saver Group. | |
| Holland Library Renewal - Project Scope Development. 1/1994. ALSC Architects, P.S. | |
| Holland Library Addition - Design Development Cost Estimate. 2/1990. ALSC Architects/Zimmer Gunsul Frasca Partnership - Design Architect | |
| Holland Library Addition - Holland Library Addition - Package No. 2. 8/1993. Mortenson - The Construction Organization | |
| Holland Library Addition - Design Development/Cost Estimate. 1/1989. C3Management Group, Inc. | |
| Library - An Assessment of Current and Projected Library Space Needs @ WSU. 3/1988. P. Genie Trapp - Office of Institutional Research | |
| ICNE - Yakima Permanent Facility - Proposed Site Study. Location: Between Glenn, Palmer & Prior Halls & the Brown Dental Clinic. 2/1994. Integrus Architecture, P.S. | |
| ICNE Yakima Site Studies Log Project No. 93091. 1993. SCM Consultant, Inc. | |
| Wheat Research Center - New Plant Growth. Tan Boyle Heyamota Architects Architects Design Group, Design Consultants Peden Petersen Lee, Structural Consultants MW Consulting Engineers, Mechanical & Electrical Consultants Ricard Carothers Associates, Landscape Consultants | |
| Plant Growth Wheat Research Center - Schematic Design (Layouts). | |
| New Plant Growth - Wheat Research Center - Schematic Design Submittal. 11/1994. Tan Boyle Heyamota/Architects Design Group | |
| New plant Growth Facility - Submittal of Qualifications. 5/1994. Tan Boyle Heyamoto Architects/Architect Design Group | |
| Inactive Records, Maintenance Materials Storage, and Recycle Building: Phase 1 - Schematic Design. 12/1992. Archos Corporation | |
| Records, Maintenance Materials Storage, & Recycling Building - Construction Document Submittal. 9/1993. Archos Corporation | |
| Records, Maintenance Material Storage, & Recycling building - Phase I - First Design Submittal. 4/1992. Archos Corporation | |
| Records, Maintenance Material Storage, & Recycling Building - Phase I - Revised Schematic Design Submittal. 10/1992. | |
| Records Storage & Recycle Building - Schematic Design Cost Estimate. 11/1992. Archos Corporation/C3 Management Group, Inc. | |
| Records, Maintenance Materials Storage, & Recycling Building Phase I - Supplementary Building Program. 3/1992. Archos Corporation | |
| University Facilities Planning & Student Housing Research - Qualifications Submittal Document. 1/1995. MGT of America, Inc. | |
| The University of Connecticut Residential Life Facilities Study - Summary Report. 1/1991. Division of Student Affairs and Services Dober, Lidsky, Craig & Associates, Inc. | |
| Proposed Undergraduate Housing Facility Program - Babson College. Babson College 1991 New Housing Study Committee. 3/1991. Dober, Lidsky, Craig & Associates, Inc., Consultants | |
| Student Housing Proposal/Statement of Qualifications. 1/1995. IBI Group - Architects & Engineers | |
| Graduate Student Housing - Massachusetts Institute of Technology/ 143 Albany Street. 5/1988. Facility Program Dober & Associates, Incorporated Planning Consultants | |
| Plant Growth Wheat Research Facility - Summary of Field and laboratory Test Results. 8/1997. File: WASUNI - M9602A Contract: 12380 Strata Geotechnical Engineering & Materials Testing | |
| Incinerator - Replacement Medical Waste Incinerator - Environmental Impact Statement Volume I of II WSU. 10/1996. | |
| Incinerator - Replacement Medical Waste Incinerator - Environmental Impact Statement Volume II of II WSU. 10/1996. | |
| Incinerator - Design Development Submittal for Incinerator Project. Civil Design Analysis/Preliminary Structural Calculations/Mechanical/Electrical. 7/1997. Bovay Northwest | |
| 30 | Incinerator - Design Development Submittal for Incinerator Project. 7/1997. Bovay Northwest |
| Incinerator - New Incineration Facility/Wastewater Pre-Treatment Study. 2/1997. Bovay Northwest | |
| Incinerator - Engineering Report Chapter 6 Site Selection. 7/1993. Bovay Northwest | |
| Waste Management Evaluations - Proposal for Consulting Services. 2/1990. Doucet & Mainka, P.C. | |
| Incinerator - Multicare Medical Center Incineration Project. Final Environmental Impact Statement. Pursuant to the State Environmental Policy Act of 1984 Chapter 43.2 (RCW 2/1990). | |
| Waste Management Program Evaluation - Technical & Economic Feasibility Report. 2/1990. Doucet & Mainka, P.C. | |
| Final Waste Management Program Evaluation - Report (DM347). 5/1990. Doucet & Mainka, P.C. | |
| Yakama Village - One - Year Warranty Inspection Final Report Checklist. 1/1997. Design West | |
| Student Services Addition - Mechanical Fixture Information Booklet. 9/1993. Mahlum & Nordfors Mckinley Gordon | |
| Student Services Addition - Design Development Phase - Schematic Design Review Comments. 3/1993. McKinley Gordon - A Professional Service Corporation | |
| French Administration Building Addition - Proposal to provide Value Engineering Services. 6/1993. Presented to: Mahlum & Nordfors Mckinley Gordon Submitted by: KJM & Associates, LTD | |
| Student Services Addition Design Development Estimate - Draft. 10/1993. Turner Construction Company | |
| Student Services Addition - Electrical Fixture Information Booklet. 9/1993. Mahlum & Nordfors Mckinley Gordon | |
| Thompson Hall Renewal - Design Development Supplemental Information: Estimate of Construction Cost; Program Area Comparison; Architectural Details; Structural Notes; Mechanical Narrative; Light Fixture Schedule. 11/1994. Cardwell/Thomas & Associates/Architects | |
| Thompson Hall Renewal - Schematic Design. 6/1994. Cardwell/Thomas & Associates/Architects | |
| Thompson Hall Renewal - Selected Product Information. Division 8 Doors & Windows/Division 9 Finishes/Division 10 Specialties. 3/1995. Cardwell/Thomas & Associates/Architects | |
| Thompson Hall Renewal - Addenda 1 - 6 Bid Package II. 5/1998. Cardwell/Thomas & Associates | |
| Thompson Hall - Hazardous Material Survey - Addendum No. 1. 10/1997. SCM Consultants Inc. | |
| Thompson Hall Renewal - Value Engineering Study. 10/1994. Olympic Associates Company | |
| Thompson Hall Hazardous Materials Survey Project 3710.010. 2/1995. SCM Consultants, Inc. - Architects & Engineers | |
| Thompson Hall Renewal Project - Value Engineering Services. 7/1994. Cardwell/Thomas & Associates | |
| Todd Hall - Health & Safety Observations. 9/1994. AGRA Earth & Environment, Inc. | |
| Todd Hall Renewal - Copy Finish Hardware Schedule for your review and comment. 3/1994. The Henry Klein Partnership | |
| Todd Hall Renewal - Value Engineering Study. 10/1992. The Henry Klein Partnership | |
| Todd Hall Renovation - Schematic Drawings. 7/1990. The Henry Klein Partnership Structural: ABJK Mechanical: Halvorson, Beach & Bower Electrical: Sparling & Assoc., Inc. | |
| Todd Hall Renovation - Room Capacity Chart along with drawings. 10/1991. The Henry Klein Partnership | |
| Todd Hall Renovation - Health & Safety Plan - Demolition of Lead Paint Containing Material R14. 3/1994. AGRA - Engineering & Environmental Services | |
| Todd Hall Renewal - Allotment Request for Construction - Renovation - renovation will bring fire, safety, & handicapped compliance up to date. 12/1993. | |
| Todd Hall Addition - Construction Cost Estimate. 1/1989. Olympic Associates Company | |
| Todd Hall Addition - Foundation Investigation. 7/1984. c/o Henry Klein Partnership Shannon & Wilson, Inc. | |
| Todd Hall Addition - Fire Alarm & Clock Control System. 12/1989. Simplex | |
| Todd Hall Addition - C.D. Contractors, Inc. Certified Payroll Reports beginning with period ending 6/23/1989 to date. 11/1989. C & D General Contractors. | |
| 31 | Todd Hall Addition - Equipment Brochures Job # 3147. 12/1988. FORMA - Interior Design Planning & Purchasing |
| Consolidated Information Center (C.I.C.) - Design Development Outline Specifications. 12/1994. Integrus Architecture | |
| Consolidated Information Center - Drainage Report (Tri-Cities). 12/1994. Rose Water Engineering, Inc. | |
| Consolidated Information Center - Energy Conservation Report (Tri-Cities). 1/1995. MW Consulting Engineers | |
| Consolidated Information Center - Value Engineering Study - Tri-Cities Branch. 11/1994. Roen Associates | |
| Hazardous Communication - Hazardous Chemical Program Manual. 7/1989. Contractors Northwest; Inc. | |
| Consolidated Information Center - Design Development Cost Estimate (Tri-Cities). 1/1995. | |
| Consolidated Information Center Preliminary Program Information. 12/1993. Integrus Architecture, P.S. | |
| Tri-Cities WSU - Campus Expansion Traffic Impact Study - Level of Service Reports - Existing Condition Year Traffix System Version 6.7. 1994. Licensed To INCA Engineers, Inc. | |
| Tri-Cities Campus Expansion - Traffic Impact Study. 8/1994. Prepared by INCA Engineers, Inc. | |
| Consolidated Information Center - Phase I Geotechnical Studies. 12/1994. Shannon & Wilson, Inc. - Geotechnical & Environmental Consultants | |
| Center for Northwest Anthropology - A Cultural Resources Survey of the WSU Tri-Cities Branch Campus Properties Contributions in Cultural Resource Management No. 49. 2/1995. | |
| Veterinary Teaching Hospital - Phase 11 Building Construction - Quality Control Program. Morgen & Oswood Construction Co., Inc. | |
| Veterinary Teaching Hospital - Site Preparation Phase I - Information for Preparation of Bids on Excavation & Fill. | |
| Veterinary Teaching Hospital - Phase II: Building Construction Contract No. 11470. Environmental & Pollution Prevention Plan. Morgen & Oswood Construction Co., Inc, | |
| Veterinary Teaching Hospital - Project Information & Procedures. Owner’s Project # 11470. Morgen & Oswood Project Number 9304 | |
| Veterinary Teaching Hospital - Value Engineering & Constructability Study. 5/1992. Morrison Knudsen Corporation | |
| Veterinary Teaching Hospital - Project Manual for Phase I: Site Grading/ Job Number 5-88-328A. 6/1991. De Neff Deeble Barton Associates Architects & Planners | |
| Veterinary Teaching Hospital - Clinic Building - Environmental Analysis. Volume Five of Six Oregon State University Environmental Quality Study (Item 10.10). Submitted to Grants & Contracts Management Branch - Public Health Service. Submitted by Mr. Milosh Popovich Vice Pres. Of Administration/Oregon State University | |
| Environmental Quality Study for (Exhibit D). Veterinary Research Laboratory Addition, Moscow Idaho. Caldwell Veterinary Medical Center, Caldwell, Idaho. Caldwell Veterinary Medical Center Isolation Building. Caldwell, Idaho. Volume Six of Six - University of Idaho (Item 10.10). 6/1977. | |
| College of Veterinary Medicine Capital Budget Request - Construction of New Veterinary Teaching Hospital. 1989 -1999. | |
| McCoy /Bustad Complex - Veterinary Teaching Hospital - Site Study. 4/1988. De Neff Deeble Barton Associates - Architects & Planners | |
| New Veterinary Teaching Hospital - College of Veterinary Medicine - Schematic Design. De Neff Deeble Barton Associates - Architects & Planners Thomas J. Gerard & Associates, Inc. - Mechanical Suden, Golden & Guest, Inc. - Structural Foil - Wyatt - Mckewen - Veterinary Consultant TresWest Engineers, Inc. - Electrical Thorson Partnership - Landscape Architect | |
| Veterinary Teaching Hospital - A Report on Site Planning. 11/1988. Burke/Lee A Joint Venture - Campus Planners | |
| Veterinary Teaching Hospital - Interview. 10/1987. Project Design Team: De Neff Deeble Barton Associates Architects & Planners Foil - Wyatt - McKewen - Veterinary Planning Consultant Suden, Golden & Guest, Inc. - Structural Engineers Thorson Partnership - Landscape Architects TresWest Engineers, Inc. - Mechanical/Electrical | |
| Veterinary Hospital - Benefit & Life Cycle Cost Analysis Summary. | |
| 32 | Veterinary Teaching Hospital Complex - Review Copy of Program. 7/1988. De Neff Deeble Barton Associates - Architects & Planners Program Consultant: Foil - Wyatt - Mckewen |
| New Veterinary Teaching Hospital - College of Veterinary Medicine. 12/1990. De Neff Deeble Barton Associates Program consultant - Foil - Wyatt - Mckewen | |
| New Veterinary Teaching Hospital Complex Program (Needs Not Meet In New Construction). 12/1990. De Neff Deeble Barton Associates Foil - Wyatt - Mckewen | |
| Health Professions Educational Facilities Construction Grant - Volume One of Six. 7/1977. Submitted by: Washington State University, Oregon State University, University of Idaho, |